6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 1
Team Software Project (TSP)
June 19, 2007
High Level Designs,
Code Inspections &
Measurement
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 2
Outline
High Level Design Phase Review
Inspection Questions
Power
Code Inspection
Measurement
System Test Plan Review
Next Phases (Implementation & Test)
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 3
Due Today
Completed & Inspected High Level Design (SDS) & Integration Test Plan
Completed & Inspected Configuration Management Plan
SRS Inspection Quality Records (LOGD, INS, Baseline Sheets)
Completed & Inspected Integration Test Plans (incl. LOGD, INS, Baseline forms)
Completed and Inspected Coding, naming & design standards (incl. LOGD, INS, Baseline forms)
System Test Plans (draft for inspection)
Updated project schedule & measurement data collected
Time, defect & size data collected
Updated project notebook
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 4
Software Design Specification (SDS)
InputConceptual Design
Requirements (SRS)
Design ObjectivesPrincipal parts
How the parts interact
How they are put together
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 5
Design Standards
Naming conventionsFunction, File, Variable, Parameter NamesDefines, Globals, Public, Statics, etc.
Interface formatsVariable handlingError codes
System & Error messagesDefect standards
SeveritiesDefect typesRoot cause bucketing
LOC counting
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 6
Design for Reuse
Reusable functions should be:Self contained
Cleanly isolated
Clearly & concisely documented (usage, interfaces, returns, errors)
Examples of successful reusable components?
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 7
Design for Testability
Unit test harnesses
Simulation testing
Black box testingVerify program’s external interfaces
White box testingAlso considers program’s logical paths & structure
Typically requires special tools (e.g. code coverage)
Typically requires supporting code
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 8
Integration Test Plan
ObjectiveVerify all system component interfaces
ActivityReview all interfaces (as defined in SDS)
Specify how to test them
Recommend: inspecting SDS & Integration Test Plan simultaneouslyCould also combine into a single document
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 9
System Test Plan
Areas to cover:InstallationStart-upAll required functions available & working as specifiedDiabolical (e.g. power failures, corner cases, incorrect handling)PerformanceUsability
Includes:Test cases you plan to run (numbered / named)Expected resultsOrdering of testing & dependenciesSupporting materials neededTraceability to requirements
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 10
Power!
What is it?“probability that one actor within a social relationship will be in a
position to carry out his own will despite resistance” – Max Weber
“interpersonal relationship in which one individual (or group) has the ability to cause another individual (or group) to take an action that would not be taken otherwise” – Steers & Black
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 11
Types of Power
Referent/CharismaticBased on personal qualities, characteristics, reputation
ExpertKnowledge or expertise relevant to person
Power only in domain of expertise
LegitimatePerson has the right to exert power in a specified domain
RewardControls rewards a person wants
CoerciveBased on fear, person can administer punishment
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 12
Effectiveness
Which types of power are most effective?
Power within the class teams?
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 13
Inspections
Inspection ObjectivesFind defects at earliest possible pointVerify to specification (e.g. design to requirements)Verify to standardsCollect element and process dataSet baseline point
Exit CriteriaAll detected defects resolvedOutstanding, non-blocking issues tracked
Techniques & MethodsGeneric checklists & standardsInspectors prepared in advanceFocus on problems, not on resolutionPeers only“Mandatory” data collection
Roles: Moderator, reader, recorder, inspector, author
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 14
Inspection Logistics
Identify moderator (for TSPi, use process manager)Inspection briefing (identify inspection roles, set date/time for inspection)Review product
– Individual reviews– Record time spent reviewing– Identify defects, but do not log on LOGD form
(defects recorded during inspection on INS & LOGD forms)
– Typically want 3-5 days for an adequate review period
Inspection meeting– Obtain & record preparation data– Step through product one line or section at a time– Raise defects or questions– Defects recorded by moderator on INS form– Defects recorded by producer on LOGD form (no need to use Change Requests)– Peripheral issues & action items should be recorded in ITL log*
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 15
Inspection Logistics (continued)
Estimate remaining defectsTBD (but, for each defect, record all members who identified it)
Conclude meeting– Agree on verification method for defects
– Agree on disposition (e.g. approved, approved with modification, re-inspect)
Rework product & verify fixes (e.g. moderator)
Obtain signatures of all inspectors on baseline sheet(file as quality record)
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 17
Measurement Data & Metrics
Base Metrics# & Type of Defects found (major, minor)For each defect, who found# of pages inspected, preparation time (per inspector), inspection time
MeasuresPreparation rate = # pages / average preparation timeInspection rate = # pages / inspection timeInspection defect rate = # major defects / inspection timeDefect density = # estimated defects / # of pagesInspection yield = # defects / # estimated defects (individual & team)
SRS Phase Defect Containment (%) =100% * # Defects removed @ step / ( Incoming defects + Injected defects)
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 18
InspectionsEstimating Defects
Capture-ReCapture ExampleCatch 20 fish in lake, tag & release them
Catch 25 more, 5 are tagged
How many fish are in the lake?
5 out of 25 = 20 out of Total Population
Total = ?
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 19
Capture-ReCapture Formula
Fishing example:5 out of 25 = 20 out of Total
C = # from both fishing tries (e.g. 5)
A = # from first fishing try (e.g. 20)
B = # from second fishing try (e.g. 25)
So,C out of B = A out of Total
C/B = A/Total
Total = A*B/C
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 20
Estimating Defects2 Developer Case
C = # from both tries = # found by both developersA = # from first try = # found by developer AB = # from second try = # found by developer B
Total # defects = # A * # B / # both foundYield = # found / Total # defects expressed as percentage
= 100 * (A*B-C) / (A*B/C)= 100 * (A*B-C)*C / A*B
Humphrey 2 Developer Example:Two developers, A found 7, B found 5, common defects 3Total estimated # defects = (7*5)/3 = 12Yield = 9 / 12 = 75%
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 21
Estimating Defects3 Developer Example
Three developers in an inspection identified 10 unique defects (# from 1 to 10).Harry found defects 1, 2, 3, 4 & 5
Chapin found defects 1, 2, 4, 6 & 7
Sue found defects 4, 6, 7, 8, 9 & 10
Estimate total # of defects in product prior to inspection.
Estimate total inspection yield.
Sue identified the most unique defects (3) = 6 identified
Combine Harry’s & Chapin’s defects = 7 identified, 3 in common w/ Sue
Total Product Defects = 6 * 7 / 3 = 14
Yield % = 100 * 10/14 = 71%
6/19/2007 SE 652- 2007_06_19_Overview_Inspections.ppt 22
Capture-ReCapture Assumptions & Cautions
• Population is homogeneous
• Population is randomly distributed
• Sample #s are reasonably large