49
Route CR-85 Project Description RESURFACING ON CR-85 FROM CR-40 TO THE SOUTH END OF THE BRIDGE OVER MORTAR CREEK Project Length in Miles 2.179 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071548 STPMN 0120 (250) CONSTRUCTION RESURFACING 2020 $231 $58 $0 $289 TOTAL COST: $231 $58 $0 $289 Route CR-NA Project Description OVERLOOK AND SILVER HILLS NEIGHBORHOOD SIDEWALK CONNECTIONS ALONG SUMMER LANE, PLANTERS RIDGE, SILVER HILLS DRIVE, SWEET RIDGE ROAD, WEAVER STREET, JAY STREET, SHEILA BOULEVARD, AND AMANDA LANE IN THE CITY OF PRATTVILLE Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE LVOE TAP COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100069431 TAPMN TA18 (937) CONSTRUCTION SIDEWALK 2019 $193 $0 $48 $241 TOTAL COST: $193 $0 $48 $241 Route CR-NA Project Description RESURFACING ON UPPER KINGSTON ROAD FROM 7TH STREET TO PRATTVILLE CITY LIMITS (SITE 1); WIDENING AND RESURFACING ON MARTIN LUTHER KING, JR. DRIVE FROM 7TH STREET TO POWELL ROAD (SITE 2) Project Length in Miles 3.916 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100057524 STPMN-STPAA 0118 CONSTRUCTION WIDENING AND RESURFACING 2020 $885 $14 $207 $1,106 TOTAL COST: $885 $14 $207 $1,106 Route CR-NA Project Description ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100068602 STPMN 0115 (252) PRELIMINARY ENGINEERING TURN LANES 2020 $512 $0 $128 $640 100063689 STPMN 0115 () CONSTRUCTION TURN LANES 2023 $3,200 $0 $800 $4,000 TOTAL COST: $3,712 $0 $928 $4,640 Route NA Project Description 5-YEAR REGIONAL TRAFFIC OPERATIONS PROGRAM (RTOP) TSMO FOR 118 SIGNALIZED INTERSECTIONS ALONG SR6, SR8, SR9, SR14, SR110, SR271, US31, US231 AND COBBS FORD RD IN THE CITIES OF MONTGOMERY, PRATTVILLE, MILLBROOK, AND WETUMPKA Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL 100071910 STPAA NR20 () PRELIMINARY ENGINEERING INFORMATION TECHNOLOGY SYSTEMS 2020 $1,911 $478 $0 $2,388 TOTAL COST: $1,911 $478 $0 $2,388 7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM 10/1/2019-9/30/2023 1 of 49 REGION HIGHWAY PROJECTS - AUTAUGA STIP PLAN: 2020 - Amendment # 8

Upload: others

Post on 27-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-85 Project Description RESURFACING ON CR-85 FROM CR-40 TO THE SOUTH END OF THE BRIDGE OVER MORTAR CREEK

Project Length in Miles 2.179  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071548 STPMN 0120 (250) CONSTRUCTION RESURFACING 2020 $231 $58 $0 $289

TOTAL COST: $231 $58 $0 $289

Route CR-NA Project Description OVERLOOK AND SILVER HILLS NEIGHBORHOOD SIDEWALK CONNECTIONS ALONG SUMMER LANE, PLANTERS RIDGE, SILVER HILLS DRIVE, SWEET RIDGE ROAD, WEAVER STREET, JAY STREET, SHEILA BOULEVARD, AND AMANDA LANE IN THE CITY OF PRATTVILLE

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069431 TAPMN TA18 (937) CONSTRUCTION SIDEWALK 2019 $193 $0 $48 $241

TOTAL COST: $193 $0 $48 $241

Route CR-NA Project Description RESURFACING ON UPPER KINGSTON ROAD FROM 7TH STREET TO PRATTVILLE CITY LIMITS (SITE 1); WIDENING AND RESURFACING ON MARTIN LUTHER KING, JR. DRIVE FROM 7TH STREET TO POWELL ROAD (SITE 2)

Project Length in Miles 3.916  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057524 STPMN-STPAA 0118

(252)CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $885 $14 $207 $1,106

TOTAL COST: $885 $14 $207 $1,106

Route CR-NA Project Description ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068602 STPMN 0115 (252) PRELIMINARY ENGINEERING TURN LANES 2020 $512 $0 $128 $640100063689 STPMN 0115 () CONSTRUCTION TURN LANES 2023 $3,200 $0 $800 $4,000

TOTAL COST: $3,712 $0 $928 $4,640

Route NA Project Description 5-YEAR REGIONAL TRAFFIC OPERATIONS PROGRAM (RTOP) TSMO FOR 118 SIGNALIZED INTERSECTIONS ALONG SR6, SR8, SR9, SR14, SR110, SR271, US31, US231 AND COBBS FORD RD IN THE CITIES OF MONTGOMERY, PRATTVILLE, MILLBROOK, AND WETUMPKA

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071910 STPAA NR20 () PRELIMINARY ENGINEERING INFORMATION TECHNOLOGY

SYSTEMS2020 $1,911 $478 $0 $2,388

TOTAL COST: $1,911 $478 $0 $2,388

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

1 of 49

REGION HIGHWAY PROJECTS - AUTAUGASTIP PLAN: 2020 - Amendment # 8

Page 2: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-3 Project Description ADDING TURN LANES AT INTERSECTIONS ON SR-3 (US-31) BETWEEN 6TH STREET (PRATTVILLE) NORTH TO I-65

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF PRATTVILLE COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063686 STPMN 0115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $4 $0 $1 $5100063687 STPMN 0115 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $2,000 $0 $500 $2,500

TOTAL COST: $2,004 $0 $501 $2,505

Route SR-3 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-3 (US-31) FROM I-65 TO THE CHILTON COUNTY LINE

Project Length in Miles 11.667  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069866 STPAA 0003 (626) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,965 $991 $0 $4,956

TOTAL COST: $3,965 $991 $0 $4,956

Route SR-6 Project Description ADDITIONAL LANES ON SR-6 (US-82) FROM SR-14 TO SR-3 (US-31) IN PRATTVILLE

Project Length in Miles 2.740  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100004425 RACR-001-006-001-CN

()CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND

BRG2020 $0 $16,200 $0 $16,200

TOTAL COST: $0 $16,200 $0 $16,200

Route SR-6 Project Description ADDING TURN LANES ON SR-6 (US-82) AT CR-47 (GOLSON ROAD)

Project Length in Miles 0.300  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071064 ATRP2-01-2020-001-CN

()CONSTRUCTION TURN LANES 2020 $0 $464 $0 $464

TOTAL COST: $0 $464 $0 $464

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

2 of 49

REGION HIGHWAY PROJECTS - AUTAUGASTIP PLAN: 2020 - Amendment # 3

Page 3: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-20 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007678) ON CR-20 OVER JACKSON CREEK; SITE 2 - (BIN 007679) ON CR-20 OVER PAULS CREEK; SITE 3 - (BIN 005189) ON CR-20 OVER LINDSEY CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071450 HRRR 0320 (250) CONSTRUCTION GUARDRAIL 2020 $162 $0 $18 $180

TOTAL COST: $162 $0 $18 $180

Route SR-1 Project Description REMOVE (BIN 007606), (BIN 007607) AND PEDESTRIAN (BIN 011380) ON SR-1 (US-431) OVER ABANDONED GEORGIA SOUTHWESTERN RAILROAD. REMOVE AND REPLACE (BIN 007604) AND (BIN 007605) AND REMOVE PEDESTRIAN (BIN 011379) ON SR-1 (US-431) OVER CHEWALLA CREEK

Project Length in Miles 0.304  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040558 BR 0001 (609) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $88 $22 $0 $109100040559 BR 0001 (609) UTILITIES BRIDGE REPLACEMENT 2022 $118 $29 $0 $147100040561 BR 0001 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $6,482 $1,621 $0 $8,103

TOTAL COST: $6,688 $1,672 $0 $8,360

Route SR-10 Project Description MILLING AND RESURFACING ON SR-10 FROM .48 MILE EAST OF SR-51 TO EAST INTERSECTION OF CR-41 AND SR-10.

Project Length in Miles 18.620  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068709 STPNU 0010 (550) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,016 $254 $0 $1,270

TOTAL COST: $1,016 $254 $0 $1,270

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

3 of 49

REGION HIGHWAY PROJECTS - BARBOURSTIP PLAN: 2020 - Original

Page 4: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-165 Project Description BRIDGE SCOUR COUNTERMEASURES AND GUARDRAIL INSTALLATION ON CR-165 AT BIN 005642 OVER WILLIAMS CREEK (SITE 1) AND AT BIN 005643 OVER OLD TOWN CREEK (SITE 2) - BCP 06-02-18

Project Length in Miles 0.200  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069346 BR 0618 (251) CONSTRUCTION BRIDGE REHABILITATION 2020 $337 $0 $84 $422

TOTAL COST: $337 $0 $84 $422

Route CR-165 Project Description RESURFACING ON CR-165 FROM SR-110 TO CR-130 - BCP 06-02-19

Project Length in Miles 0.700  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070536 RASTPNU 0619 () CONSTRUCTION RESURFACING 2021 $91 $23 $0 $114

TOTAL COST: $91 $23 $0 $114

Route CR-177 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-177 FROM CR-87 TO 500 FT NORTH OF PENN ROAD - BCP 06-01-19

Project Length in Miles 3.000  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069755 RASTPNU 0619 () CONSTRUCTION RESURFACING 2021 $392 $98 $0 $490

TOTAL COST: $392 $98 $0 $490

Route NA Project Description VEGETATION MANAGEMENT ALONG BULLOCK COUNTY ROADS

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067221 TAPOA TA17 (931) CONSTRUCTION UNCLASSIFIED 2020 $119 $0 $30 $148

TOTAL COST: $119 $0 $30 $148

Route SR-223 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-223 FROM THE PIKE COUNTY LINE TO 0.57 MILE SOUTH OF CR-28

Project Length in Miles 3.820  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070171 STPAA-HSIP 0223 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,346 $278 $0 $1,624

TOTAL COST: $1,346 $278 $0 $1,624

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

4 of 49

REGION HIGHWAY PROJECTS - BULLOCKSTIP PLAN: 2020 - Original

Page 5: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-11 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 009989) ON CR-11 OVER CEDAR CREEK RELIEF BRANCH

Project Length in Miles 0.039  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071453 HRRR 0720 (251) CONSTRUCTION GUARDRAIL 2020 $71 $0 $8 $79

TOTAL COST: $71 $0 $8 $79

Route CR-16 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN004836) ON CR-16 ON ROCKY CREEK; SITE 2 - (BIN 004839) ON CR-16 OVER PERSIMMON CREEK RELIEF - BCP 07-189-18

Project Length in Miles 0.142  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069562 HRRR 0719 (250) CONSTRUCTION GUARDRAIL 2019 $90 $0 $23 $113

TOTAL COST: $90 $0 $23 $113

Route CR-16 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 004838) ON CR-16 OVER PERSIMMON CREEK

Project Length in Miles 0.063  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071452 HRRR 0720 (250) CONSTRUCTION GUARDRAIL 2020 $54 $0 $6 $60

TOTAL COST: $54 $0 $6 $60

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

5 of 49

REGION HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original

Page 6: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM CR-41 TO .7 MILE SOUTH OF THE LOWNDES COUNTY LINE

Project Length in Miles 14.328  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071093 IM I065 (516) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $45 $5 $0 $50

100069001 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $4,034 $448 $0 $4,483TOTAL COST: $4,079 $453 $0 $4,533

Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM .7 MILE SOUTH OF BUTLER COUNTY LINE TO .63 MILE SOUTH OF SR-97

Project Length in Miles 22.380  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070853 IM I065 (511) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $45 $5 $0 $50

100068999 IM I065 (511) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $4,681 $520 $0 $5,202TOTAL COST: $4,726 $525 $0 $5,252

Route I-65 Project Description REST AREA REPLACEMENT NB AND SB I-65 NEAR GREENVILLE BLDG AND PK

Project Length in Miles 0.041  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100001665 IM I065 (423) CONSTRUCTION REST AREA REHABILITATION 2022 $9,273 $1,030 $0 $10,303

TOTAL COST: $9,273 $1,030 $0 $10,303

Route I-65 Project Description SIGN REHABILITATION ALONG I-65 FROM CONECUH CL THROUGH BUTLER, LOWNDES, MONTGOMERY, ELMORE, AND AUTAUGA TO CHILTON CL.

Project Length in Miles 92.467  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054300 IM I065 (407) CONSTRUCTION SIGN REHABILITATION 2021 $3,608 $401 $0 $4,009

TOTAL COST: $3,608 $401 $0 $4,009

Route I-65 Project Description RESURFACING ON I-65 FROM 0.87 MILE NORTH OF PETTIBONE ROAD TO CR-41

Project Length in Miles 7.716  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069861 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 22022 $4,322 $480 $0 $4,802

TOTAL COST: $4,322 $480 $0 $4,802

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

6 of 49

REGION HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original

Page 7: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-185 Project Description ROADWAY IMPROVEMENTS SR-185, INCLUDING ROADWAY WIDENING, SIGNALS AND TURN LANE FROM CR-42 (MANNINGHAM ROAD) TO 0.2 MILE NORTH CR-73 (CAHABA RD)

Project Length in Miles 0.670  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100056506 STPAA 0185 (501) CONSTRUCTION ROADWAY WIDENING 2021 $1,415 $354 $0 $1,769

TOTAL COST: $1,415 $354 $0 $1,769

Route SR-185 Project Description RESURFACING ON SR-185 FROM THE NORTH END OF THE RAILROAD BRIDGE TO WILLOW LANE

Project Length in Miles 2.181  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067902 STPAA 0185 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22019 $1,553 $388 $0 $1,942

TOTAL COST: $1,553 $388 $0 $1,942

Route SR-263 Project Description CAPE SEALING ON SR-263 FROM SR-185 TO SR-21

Project Length in Miles 15.132  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070058 STPAA 0263 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,918 $480 $0 $2,398

TOTAL COST: $1,918 $480 $0 $2,398

Route SR-55 Project Description RESURFACING ON SR-55 FROM SR-3 TO SR-106

Project Length in Miles 3.759  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070527 STPAA 0055 (515) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $1,711 $428 $0 $2,138

TOTAL COST: $1,711 $428 $0 $2,138

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

7 of 49

REGION HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original

Page 8: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-420 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 009670) ON CR-420 OVER HAYS CREEK; SITE 2 - (BIN 009937) ON CR-719 OVER WILSON CREEK; SITE 3 - (BIN 014257) ON CR-148 OVER KISER MILL CREEK; SITE 4 - (BIN 013670) ON CR-148 OVER TURNER CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071457 HRRR 1620 (250) CONSTRUCTION GUARDRAIL 2020 $110 $0 $12 $122

TOTAL COST: $110 $0 $12 $122

Route SR-12 Project Description RESURFACING AND PLANING ON SR-12 (US-84) FROM SR-203 TO SR-87

Project Length in Miles 2.797  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068700 NH 0012 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $939 $235 $0 $1,173

TOTAL COST: $939 $235 $0 $1,173

Route SR-125 Project Description RESURFACING ON SR-125 FROM SR-167 TO THE PIKE COUNTY LINE

Project Length in Miles 5.825  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071048 STPAA 0125 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,128 $282 $0 $1,410

TOTAL COST: $1,128 $282 $0 $1,410

Route SR-134 Project Description PLANING, RESURFACING AND 2' SAFETY WIDENING OF SR-134 FROM SR-87 TO SR-88

Project Length in Miles 10.800  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068699 STPAA-HSIP 0134 (508) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $3,754 $807 $0 $4,562

TOTAL COST: $3,754 $807 $0 $4,562

Route SR-167 Project Description ADDITIONAL LANES ON SR-167 FROM SR-12 (US-84) TO 0.28 MILE NORTH OF CR-48 (SALEM RD)

Project Length in Miles 2.140  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100047417 STPAA A115 (900) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $7,345 $1,836 $0 $9,181

TOTAL COST: $7,345 $1,836 $0 $9,181

Route SR-167 Project Description PLANING AND RESURFACING ON SR-167 FROM SR-12 (US-84) (BOLL WEEVIL CIRCLE) TO CR-154

Project Length in Miles 8.230  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068716 STPAA 0167 () FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $1,224 $306 $0 $1,530

TOTAL COST: $1,224 $306 $0 $1,530

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

8 of 49

REGION HIGHWAY PROJECTS - COFFEESTIP PLAN: 2020 - Original

Page 9: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-189 Project Description PLANING AND RESURFACING ON SR-189 FROM SR-203 SOUTH OF ELBA TO SR-203 NORTH OF ELBA

Project Length in Miles 2.105  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068702 STPAA 0189 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $428 $107 $0 $534

TOTAL COST: $428 $107 $0 $534

Route SR-27 Project Description RESURFACING AND PLANING ON SR-27 FROM SR-12 IN ENTERPRISE TO THE DALE COUNTY LINE

Project Length in Miles 7.535  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068712 RP-STPAA 0027 (516) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $2,804 $701 $0 $3,505

TOTAL COST: $2,804 $701 $0 $3,505

Route SR-51 Project Description PREVENTATIVE MAINTENANCE ON SR-51 FROM SR-12 (US-84) TO SR-167

Project Length in Miles 5.600  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068698 STPAA 0051 (517) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $915 $229 $0 $1,143

TOTAL COST: $915 $229 $0 $1,143

Route SR-87 Project Description PLANING AND RESURFACING ON SR-87 FROM SR-12 (US-84) TO SR-203

Project Length in Miles 0.792  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068701 STPAA 0087 (516) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $290 $73 $0 $363

TOTAL COST: $290 $73 $0 $363

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

9 of 49

REGION HIGHWAY PROJECTS - COFFEESTIP PLAN: 2020 - Original

Page 10: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-32 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS ON CR-32 OVER AN UNNAMED TRIBUTARY TO FIVE RUNS CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071460 HRRR 2020 (251) CONSTRUCTION GUARDRAIL 2020 $31 $0 $3 $34

TOTAL COST: $31 $0 $3 $34

Route CR-85 Project Description WIDENING AND RESURFACING ON CR-85 FROM CR-38 (POTTER ROAD) TO SR-9(US-331) - CCP 20-378-19

Project Length in Miles 2.263  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071692 STPNU 2020 (253) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $584 $0 $146 $729

TOTAL COST: $584 $0 $146 $729

Route CR-89 Project Description WIDENING AND RESURFACING ON CR-89 FROM FOREST ROAD TO THE GENEVA COUNTY LINE - CCP 20-379-19

Project Length in Miles 1.860  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071691 STPNU 2020 (252) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $270 $0 $68 $338

TOTAL COST: $270 $0 $68 $338

Route CR-93 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007111) ON CR-93 OVER AN UNNAMED TRIBUTARY TO POND CREEK; SITE 2 - (BIN 007466) ON CR-93 OVER POND CREEK; SITE 3 - (BIN 011305) ON CR-93 OVER POND CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071459 HRRR 2020 (250) CONSTRUCTION GUARDRAIL 2020 $115 $0 $13 $128

TOTAL COST: $115 $0 $13 $128

Route CR-NA Project Description FIVE BRIDGE REPLACEMENTS IN CONECUH NF: CR-11 OVER BLACK WATER CREEK (BIN 017111); GILES RD OVER HURRICANE CREEK (BIN 013826); GILES RD OVER PANTHER CREEK (BIN 013722); SANDERS RD OVER RUM CREEK (BIN 015884); CR-11 OVER BLACK WATER CREEK (BIN 014361)

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067952 N-FLAP FLAP (020) CONSTRUCTION BRIDGE REPLACEMENT 2020 $638 $0 $160 $798

TOTAL COST: $638 $0 $160 $798

Route SR-12 Project Description PLANING AND RESURFACING ON SR-12 (US-84) FROM CR-77 TO SR-9 (US-331)

Project Length in Miles 3.554  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068715 NH 0012 (570) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,883 $471 $0 $2,354

TOTAL COST: $1,883 $471 $0 $2,354

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

10 of 49

REGION HIGHWAY PROJECTS - COVINGTONSTIP PLAN: 2020 - Original

Page 11: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-52 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-52 FROM SR-9 (US-331) IN OPP TO HARVEST TIME ROAD

Project Length in Miles 14.560  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068697 STPAA-HSIP 0052 (517) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $4,571 $1,017 $0 $5,588

TOTAL COST: $4,571 $1,017 $0 $5,588

Route SR-55 Project Description ROUNDABOUT INSTALLATION AT THE INTERSECTION OF SR-55 AND SR-12 (US-84)

Project Length in Miles 0.248  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068779 HSIP 0055 (514) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $32 $4 $0 $35100071676 HSIP 0055 () UTILITIES UTILITY ADJUSTMENT 2022 $92 $10 $0 $102100068780 HSIP 0055 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $2,352 $261 $0 $2,613

TOTAL COST: $2,475 $275 $0 $2,750

Route SR-9 Project Description BRIDGE REPLACEMENT (BIN 002285) ON SR-9 (US-331) OVER LIGHTWOOD KNOT CREEK

Project Length in Miles 1.140  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100033503 BR 0009 (573) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $23 $6 $0 $28100038583 BR 0009 (573) UTILITIES BRIDGE REPLACEMENT 2021 $292 $73 $0 $365100033501 BR 0009 (573) CONSTRUCTION BRIDGE REPLACEMENT 2021 $6,287 $1,572 $0 $7,859

TOTAL COST: $6,601 $1,650 $0 $8,252

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

11 of 49

REGION HIGHWAY PROJECTS - COVINGTONSTIP PLAN: 2020 - Original

Page 12: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-10 Project Description PLANE AND RESURFACE SR-10 (US-29) FROM THE PIKE CRENSHAW COUNTY LINE TO SR-53 (231)

Project Length in Miles 11.352  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068708 STPNU 0010 (549) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $2,742 $685 $0 $3,427

TOTAL COST: $2,742 $685 $0 $3,427

Route SR-9 Project Description INTERSECTION IMPROVEMENTS ON SR-9 (US-331) AT SR-10 (US-29)

Project Length in Miles 0.480  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069729 NH 0009 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2021 $122 $31 $0 $153100069741 NH 0009 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $245 $61 $0 $306100069742 NH 0009 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $250 $62 $0 $312

TOTAL COST: $617 $154 $0 $771

Route SR-9 Project Description REPLACE BRIDGE, BIN 003021, SR-9 (US-331) OVER PATSALIGA CREEK (SUFF=57.9, STATUS=FO)

Project Length in Miles 1.059  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100049232 BR 0009 (541) CONSTRUCTION BRIDGE REPLACEMENT 2020 $11,287 $2,822 $0 $14,109

TOTAL COST: $11,287 $2,822 $0 $14,109

Route SR-97 Project Description RESURFACING, 2FT SAFETY WIDENING,CULVERT EXTENSIONS AND GUARDRAIL ON SR-97 FROM SR-9 (US-331) TO THE MONTGOMERY COUNTY LINE

Project Length in Miles 7.780  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068684 STPAA-HSIP 0097 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,530 $482 $0 $3,012

TOTAL COST: $2,530 $482 $0 $3,012

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

12 of 49

REGION HIGHWAY PROJECTS - CRENSHAWSTIP PLAN: 2020 - Original

Page 13: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-21 Project Description RESURFACING ON CR-21 FROM SR-123 TO THE OZARK CITY LIMITS (SITE 1); RESURFACING ON CR-82 FROM THE COFFEE COUNTY LINE TO SR-53(US-231) (SITE 2); WIDENING AND RESURFACING ON CR-33 FROM CR-20 TO CR-54 (SITE 3)

Project Length in Miles 3.241  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070303 RASTPAA 2319 (252) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $525 $131 $0 $656

TOTAL COST: $525 $131 $0 $656

Route CR-47 Project Description RESURFACING ON CR-47 FROM THE HOUSTON COUNTY LINE TO SR-134

Project Length in Miles 5.180  Urban Area DOTHAN  Sponsor DALE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065700 STPOA 2319 (250) CONSTRUCTION RESURFACING 2020 $729 $0 $303 $1,032

TOTAL COST: $729 $0 $303 $1,032

Route CR-9 Project Description WIDENING AND RESURFACING ON CR-9 FROM THE HOUSTON COUNTY LINE TO SR-134

Project Length in Miles 4.031  Urban Area DOTHAN  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070304 RASTPNU 2319 (251) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $692 $0 $173 $865

TOTAL COST: $692 $0 $173 $865

Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS AT (BIN 012976) CR-113 OVER JUDY CREEK, (BIN 010981) CR-60 OVER LITTLE JUDY CREEK, (BIN 003095) CR-54 OVER COTTON CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069567 HRRR 2319 (253) CONSTRUCTION GUARDRAIL 2020 $74 $0 $8 $82

TOTAL COST: $74 $0 $8 $82

Route SR-134 Project Description RESURFACING AND 2' SAFETY WIDENING ON SR-134 FROM SR-123 TO CR-67

Project Length in Miles 6.480  Urban Area DOTHAN  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068717 STPAA-HSIP 0134 (509) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2021 $1,171 $257 $0 $1,428

TOTAL COST: $1,171 $257 $0 $1,428

Route SR-53 Project Description RESURFACING ON SR-53 (US-231) NORTH OF OZARK FROM SOUTH OF SR-27 TO NORTH OF CR-2

Project Length in Miles 6.040  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068686 NH 0053 (585) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $4,973 $1,243 $0 $6,217

TOTAL COST: $4,973 $1,243 $0 $6,217

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

13 of 49

REGION HIGHWAY PROJECTS - DALESTIP PLAN: 2020 - Original

Page 14: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-85 Project Description REALIGNING OF SR-85, SIGNING UPGRADE, AND REMOVING OVERHEAD FLASHER AT SR-85 AND SR-167

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071549 HSIP 0085 (504) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $32 $4 $0 $35

TOTAL COST: $32 $4 $0 $35

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

14 of 49

REGION HIGHWAY PROJECTS - DALESTIP PLAN: 2020 - Original

Page 15: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-140 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 004660) ON HARRISON AVENUE OVER BEECH CREEK; SITE 2 - (BIN 007960) ON CR-21 OVER CAINE CREEK; SITE 3 - (BIN 007961) ON CR-21 OVER BEAR CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071461 HRRR 2420 (250) CONSTRUCTION GUARDRAIL 2020 $233 $0 $26 $258

TOTAL COST: $233 $0 $26 $258

Route CR-NA Project Description RIVERFRONT BOARDWALK-PHASE II CITY OF SELMA

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067164 TAPAA TA17 (924) CONSTRUCTION SIDEWALK 2020 $371 $0 $93 $464

TOTAL COST: $371 $0 $93 $464

Route NA Project Description RIVERFRONT BOARDWALK-PHASE I LOCATED ALONG THE ALABAMA RIVER ON AN ELEVATED BANK RUNNING PARALLEL TO WATER AVENUE IN THE CITY OF SELMA.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065546 TAPAA TA16 (922) CONSTRUCTION SIDEWALK 2020 $393 $0 $98 $491

TOTAL COST: $393 $0 $98 $491

Route NA Project Description ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT ON STATE ROUTES 8, 14 AND 22 FOR DALLAS COUNTY (DISTRICT 5) PHASE 3

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060243 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $187 $47 $0 $233

TOTAL COST: $187 $47 $0 $233

Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 AT BLUE GIRTH SWAMP (BIN 1556 AND 1557)

Project Length in Miles 0.783  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068988 BR 0014 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $63 $16 $0 $79100068984 BR 0014 () UTILITIES BRIDGE REPLACEMENT 2021 $122 $31 $0 $153100061670 BR 0014 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $6,178 $1,545 $0 $7,723

TOTAL COST: $6,364 $1,591 $0 $7,954

Route SR-140 Project Description RESURFACING ON SR-140 FROM SR-41 (US-80) TO SR-14

Project Length in Miles 12.480  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070535 STPAA 0140 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $2,840 $710 $0 $3,550

TOTAL COST: $2,840 $710 $0 $3,550

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

15 of 49

REGION HIGHWAY PROJECTS - DALLASSTIP PLAN: 2020 - Original

Page 16: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-219 Project Description RESURFACING ON SR-219 FROM SR-22 TO THE PERRY COUNTY LINE

Project Length in Miles 10.728  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070531 STPAA 0219 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $1,831 $458 $0 $2,288

TOTAL COST: $1,831 $458 $0 $2,288

Route SR-22 Project Description SR-22 FR END OF EXISTING 4-LN TO CR-63

Project Length in Miles 5.436  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100008928 STPAA 0022 (504) UTILITIES GRADE, DRAIN, BASE, PAVE AND

BRG2022 $2,170 $543 $0 $2,713

TOTAL COST: $2,170 $543 $0 $2,713

Route SR-41 Project Description PLANING AND RESURFACING ON SR-41 (US-80 TRUCK ROUTE) FROM 50' NORTH OF THE MERIDIAN AND BIGBEE RAILROAD (MP 122.813) TO SOUTH OF SR-14 (MP127.446)

Project Length in Miles 4.633  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067822 NH 0041 (519) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,043 $761 $0 $3,804

TOTAL COST: $3,043 $761 $0 $3,804

Route SR-8 Project Description PLANING AND RESURFACING ON SR-8 (US-80) (EASTBOUND ONLY) FROM THE PERRY COUNTY LINE (MP 59.941) TO .4 MILE WEST OF THE CAHABA RIVER BRIDGE (MP 73.765)

Project Length in Miles 13.824  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069865 NH 0008 (595) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,432 $858 $0 $4,290

TOTAL COST: $3,432 $858 $0 $4,290

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

16 of 49

REGION HIGHWAY PROJECTS - DALLASSTIP PLAN: 2020 - Original

Page 17: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-154 Project Description SAFETY WIDENING, GUARDRAIL IMPROVEMENTS, AND TRAFFIC STRIPING ON BURT MILL ROAD FROM FLAT ROCK ROAD TO SR-14

Project Length in Miles 4.100  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071463 HRRR 2620 (251) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $239 $79 $0 $318

TOTAL COST: $239 $79 $0 $318

Route CR-23 Project Description MICROSURFACING ON COOSADA ROAD (CR-23) FROM SR-143 TO BLACKWELL DRIVE

Project Length in Miles 4.400  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070657 STPMN 2619 (256) CONSTRUCTION RESURFACING 2020 $309 $77 $0 $386

TOTAL COST: $309 $77 $0 $386

Route CR-23 Project Description MICROSURFACING ON S EDGEWOOD AND EDGEWOOD ROADS (CR-23) FROM COBBS FORD ROAD (CR-2) TO SR-143 - ECP 26-57-19

Project Length in Miles 2.100  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070658 STPMN 2619 (261) CONSTRUCTION RESURFACING 2020 $168 $42 $0 $210

TOTAL COST: $168 $42 $0 $210

Route CR-8 Project Description WIDENING ON CR-8 (REDLAND ROAD) FROM SR-9 (US-231) TO CR-4 (RIFLE RANGE ROAD) AND BRIDGE REPLACEMENT AT HARWELL MILL CREEK (BIN #10936) AND INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)

Project Length in Miles 2.960  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063232 STPMN 2615 (250) UTILITIES WIDENING AND RESURFACING

(RDWY)2020 $700 $0 $175 $875

100063233 STPMN 2615 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2021 $1,200 $0 $300 $1,500TOTAL COST: $1,900 $0 $475 $2,375

Route CR-8 Project Description INSTALLATION OF A ROUNDABOUT AT THE INTERSECTION OF REDLAND ROAD (CR-8) AND FIRETOWER/DOZIER ROAD (CR-59).

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065211 HSIP 2616 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,123 $0 $125 $1,248

TOTAL COST: $1,123 $0 $125 $1,248

Route CR-8 Project Description WIDENING AND RESURFACING WITH INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)

Project Length in Miles 0.550  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067261 STPMN 2615 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $1,520 $0 $380 $1,900

TOTAL COST: $1,520 $0 $380 $1,900

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

17 of 49

REGION HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original

Page 18: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description INTERSECTION IMPROVEMENTS WITH ROUNDABOUT AT ORLINE ST AND COMPANY ST; SIDEWALKS, PEDESTRIAN LIGHTING AND LANDSCAPING ON COMPANY ST FROM E BRIDGE ST TO ORLINE ST, ORLINE ST FROM COMPANY ST TO HILL ST AND HILL ST FROM ORLINE ST TO E BRIDGE ST

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071163 STPMN 2620 (252) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $186 $0 $47 $233100071164 STPMN 2620 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,243 $0 $311 $1,553

TOTAL COST: $1,429 $0 $357 $1,786

Route CR-NA Project Description RESURFACING, WIDENING, LEVELING, BIKE LANES, DRAINAGE IMPROVEMENTS AND TRAFFIC STRIPING ON CAMP GRANDVIEW ROAD FROM SR-14 TO OLD PRATTVILLE ROAD

Project Length in Miles 2.400  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071610 STPMN 2620 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING

(RDWY)2020 $8 $0 $2 $10

100071611 STPMN 2620 () UTILITIES WIDENING AND RESURFACING (RDWY)

2021 $80 $0 $20 $100100071613 STPMN 2620 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $464 $0 $116 $580

TOTAL COST: $552 $0 $138 $690

Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON FOXWOOD ROAD FROM THE AUTAUGA COUNTY LINE TO DEATSVILLE HIGHWAY - ECP 26-11-19

Project Length in Miles 0.300  Urban Area MONTGOMERY  Sponsor ELMORE COUNTY COMMISSION  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069844 STPAA 2619 (254) CONSTRUCTION RESURFACING 2020 $81 $0 $21 $102

TOTAL COST: $81 $0 $21 $102

Route CR-NA Project Description MICRO-SURFACE AND TRAFFIC STRIPE ON FLATWOOD ROAD FROM CEASERVILLE ROAD TO THE FLATWOOD ROAD DEAD END - ECP 26-53-19

Project Length in Miles 4.650  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070682 STPMN 2619 (257) CONSTRUCTION RESURFACING 2020 $176 $0 $54 $230

TOTAL COST: $176 $0 $54 $230

Route CR-NA Project Description MICRO-SURFACE ON FLATWOOD CURVE FROM MEHEARG ROAD TO FLATWOOD ROAD

Project Length in Miles 0.480  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070683 STPMN 2619 (258) CONSTRUCTION RESURFACING 2020 $28 $0 $8 $37

TOTAL COST: $28 $0 $8 $37

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

18 of 49

REGION HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Amendment # 3

Page 19: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description MICRO-SURFACE ON MEHEARG ROAD FROM SR-14 TO FLATWOOD ROAD

Project Length in Miles 1.620  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070684 STPMN 2619 (259) CONSTRUCTION RESURFACING 2020 $98 $0 $29 $127

TOTAL COST: $98 $0 $29 $127

Route CR-NA Project Description MICRO-SURFACING ON FORT TOULOUSE ROAD FROM FORT TOULOUSE PARK ENTRANCE TO THE WETUMPKA CITY LIMITS

Project Length in Miles 2.430  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070685 STPMN 2619 (260) CONSTRUCTION RESURFACING 2020 $145 $0 $43 $187

TOTAL COST: $145 $0 $43 $187

Route CR-NA Project Description RESURFACING ON LAUREL CREEK ROAD AND REA ROAD FROM SR-21 (US-231) TO WEOKA ROAD

Project Length in Miles 3.550  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070686 STPMN 2620 (250) CONSTRUCTION RESURFACING 2020 $323 $8 $72 $403

TOTAL COST: $323 $8 $72 $403

Route CR-NA Project Description RESURFACE DEATSVILLE HIGHWAY FROM THE MILLBROOK CITY LIMITS TO ALPHA LANE - ECP 26-10-19

Project Length in Miles 5.500  Urban Area MONTGOMERY  Sponsor ELMORE COUNTY COMMISSION  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069845 RASTPAA 2619 (255) CONSTRUCTION RESURFACING 2020 $712 $0 $178 $890

TOTAL COST: $712 $0 $178 $890

Route CR-NA Project Description UTILITY RELOCATION AND STREET IMPROVEMENTS ON COMPANY STREET FROM LOGAN STREET TO EAST BRIDGE STREET AND SOUTH MAIN STREET FROM EAST BRIDGE STREET TO SR-9 (US-231)

Project Length in Miles 2.520  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057512 STPMN 2619 () UTILITIES RESURFACING 2020 $95 $0 $24 $118100056090 STPMN 2619 () CONSTRUCTION RESURFACING 2022 $640 $0 $160 $800

TOTAL COST: $735 $0 $184 $918

Route I-65 Project Description INTERCHANGE LIGHTING ON I-65 AT SR-14 (EXIT 181) - PRATTVILLE / MILLBROOK

Project Length in Miles 1.200  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055339 IM I065 (418) CONSTRUCTION LIGHTING 2022 $1,928 $214 $0 $2,142

TOTAL COST: $1,928 $214 $0 $2,142

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

19 of 49

REGION HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original

Page 20: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route NA Project Description STREETSCAPE IMPROVEMENTS ALONG SR-14, SISTRUNK STREET, JAMES STREET AND SOUTH ANN AVENUE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069023 TAPNU TA19 (917) CONSTRUCTION STREETSCAPE 2020 $580 $0 $145 $725

TOTAL COST: $580 $0 $145 $725

Route NA Project Description CITY OF WETUMPKA RIVERWALK - PHASE 2

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069432 TAPMN TA18 () CONSTRUCTION UNCLASSIFIED 2020 $48 $0 $12 $60

TOTAL COST: $48 $0 $12 $60

Route NA Project Description ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT ON STATE ROUTES 63, 111 AND 143 IN ELMORE AND MONTGOMERY COUNTIES (DISTRICTS 1 AND 3)

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060170 STPAA NR13 (925) CONSTRUCTION SIDEWALK 2022 $171 $43 $0 $214

TOTAL COST: $171 $43 $0 $214

Route SR-14 Project Description ADD LANE SR-14 FROM 0.5 MILE WEST CR-3 (INGRAM RD) TO CR-153 (COOSADA PKWY)

Project Length in Miles 8.610  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064189 STPAA 0014 (541) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $3,863 $966 $0 $4,829100064194 STPAA 0014 (541) UTILITIES ADDITIONAL ROADWAY LANES 2023 $780 $195 $0 $975100054496 STPAA 0014 (541) CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $7,775 $1,944 $0 $9,719

TOTAL COST: $12,418 $3,105 $0 $15,523

Route SR-14 Project Description ADDING TURN LANES WHERE COOSADA PARKWAY AND INGRAM ROAD INTERSECT WITH SR-14; ADDING OR RECONFIGURING LANES AT SR-143 AND COBBS FORD ROAD; STUDY INTERSECTION OF SR-14 AND OAK TREE ROAD

Project Length in Miles 0.072  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071072 ATRP2-26-2020-026-CN

()CONSTRUCTION TURN LANES 2021 $0 $1,202 $0 $1,202

TOTAL COST: $0 $1,202 $0 $1,202

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

20 of 49

REGION HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Amendment # 3

Page 21: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-229 Project Description PAVEMENT PRESERVATION ON SR-229 FROM SR-14 (MP 11.566) TO SR-63 (MP 22.751)

Project Length in Miles 11.233  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070057 STPAA 0229 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,359 $340 $0 $1,699

TOTAL COST: $1,359 $340 $0 $1,699

Route SR-229 Project Description RESURFACING ON SR-229 FROM THE INTERSECTION OF I-85 TO SR-14.

Project Length in Miles 7.950  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070525 STPAA 0229 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12021 $1,047 $262 $0 $1,309

TOTAL COST: $1,047 $262 $0 $1,309

Route SR-9 Project Description UPGRADE TRAFFIC SIGNALS ON SR-9 (US-231) FROM TODD ROAD TO SR-9 (CENTRAL PLANK ROAD)

Project Length in Miles 11.271  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070139 HSIP 0009 (576) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $167 $19 $0 $185

TOTAL COST: $167 $19 $0 $185

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

21 of 49

REGION HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original

Page 22: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-17 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 (BIN 003970) ON CR-17 OVER SAMSON BRANCH: SITE 2 (BIN 013483) ON CR-16 OVER JUSTICE MILL CREEK.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071466 HRRR 3120 (252) CONSTRUCTION GUARDRAIL 2020 $118 $0 $13 $131

TOTAL COST: $118 $0 $13 $131

Route CR-4 Project Description RESURFACING ON CR-4 FROM CR-53 TO CR-61 - GCP 31-04-19

Project Length in Miles 2.900  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070267 RASTPNU 3119 (253) CONSTRUCTION RESURFACING 2020 $392 $0 $96 $488

TOTAL COST: $392 $0 $96 $488

Route CR-49 Project Description RESURFACE AND TRAFFIC STRIPE ON CR-49 FROM CR-68 TO THE HOUSTON COUNTY LINE

Project Length in Miles 0.910  Urban Area DOTHAN  Sponsor GENEVA COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069707 STPOA 3119 (251) CONSTRUCTION RESURFACING 2020 $257 $0 $64 $321

TOTAL COST: $257 $0 $64 $321

Route CR-53 Project Description RESURFACING ON CR-53 FROM THE FLORIDA LINE TO CR-4 - GCP 31-05-19

Project Length in Miles 1.600  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070270 RASTPNU 3119 (252) CONSTRUCTION RESURFACING 2020 $251 $0 $59 $310

TOTAL COST: $251 $0 $59 $310

Route CR-85 Project Description STOP LINES AND RUMBLE STRIPS INSTALLATION FOR THE FOLLOWING SITES: SITE 1 - INTERSECTION OF CR-85 AND CR-44; SITE 2 - INTERSECTION OF CR-49 AND CR-28

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071465 HRRR 3120 (251) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $4 $0 $0 $4

TOTAL COST: $4 $0 $0 $4

Route CR-85 Project Description SAFETY SIGNING INSTALLATION FOR THE FOLLOWING SITES: SITE 1-INTERSECTION OF CR-85 AND CR-44 SITE 2-INTERSECTION OF CR-49 AND CR-28

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071487 HRRR 3120 (250) CONSTRUCTION SIGNING 2020 $4 $0 $14 $17

TOTAL COST: $4 $0 $14 $17

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

22 of 49

REGION HIGHWAY PROJECTS - GENEVASTIP PLAN: 2020 - Original

Page 23: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description SIDEWALKS ALONG SR-52 FROM 6TH AVENUE TO 4TH AVENUE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068373 TAPNU TA18 (917) CONSTRUCTION SIDEWALK 2020 $352 $0 $88 $440

TOTAL COST: $352 $0 $88 $440

Route NA Project Description CURB RAMP INSTALLATIONS AND MODIFICATIONS ON STATE ROUTES 1, 12, 27, 52, 53, 87, 95, 103, 123, 196 AND 210 IN GENEVA AND HOUSTON COUNTIES

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060276 STPAA NR13 () CONSTRUCTION SIDEWALK 2022 $600 $150 $0 $750

TOTAL COST: $600 $150 $0 $750

Route SR-153 Project Description INSTALLING RUMBLE STRIPS, UPGRADING SIGNING, AND REMOVAL OF OVERHEAD FLASHER ON SR-153 AT SR-52

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071550 HSIP 0153 (501) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $13 $1 $0 $14

TOTAL COST: $13 $1 $0 $14

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

23 of 49

REGION HIGHWAY PROJECTS - GENEVASTIP PLAN: 2020 - Original

Page 24: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-46 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 010222) ON CR-46 OVER ABBIE CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069572 HRRR 3419 (250) CONSTRUCTION GUARDRAIL 2019 $34 $0 $4 $38

TOTAL COST: $34 $0 $4 $38

Route CR-55 Project Description RESURFACING ON CR-55 FROM SR-134 TO CR-26

Project Length in Miles 4.896  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071176 RASTPNU 3419 (251) CONSTRUCTION RESURFACING 2020 $481 $24 $667 $1,172

TOTAL COST: $481 $24 $667 $1,172

Route SR-1 Project Description RESURFACING SR-1(US-431) FROM JUST NORTH OF INTERSECTION OF SR-173 IN HEADLAND TO JUST NORTH OF CR-18

Project Length in Miles 6.670  Urban Area DOTHAN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068682 NH 0001 (606) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $3,243 $811 $0 $4,054

TOTAL COST: $3,243 $811 $0 $4,054

Route SR-10 Project Description BRIDGE REPLACEMENT ON SR-10 OVER MCRAE MILL CREEK (BIN #002543) (SUFF=55.2, STATUS=FO)

Project Length in Miles 0.657  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069448 BR 0010 (545) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $41 $10 $0 $51100049234 BR 0010 (545) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,242 $811 $0 $4,053

TOTAL COST: $3,284 $821 $0 $4,105

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

24 of 49

REGION HIGHWAY PROJECTS - HENRYSTIP PLAN: 2020 - Original

Page 25: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-203 Project Description RESURFACING ON CR-203/CAMPBELLTON HIGHWAY FROM HADDEN ROAD TO SR-1 (US-231) SOUTH OATES STREET

Project Length in Miles 6.050  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069713 STPOA 3519 () CONSTRUCTION RESURFACING 2023 $1,145 $0 $286 $1,431

TOTAL COST: $1,145 $0 $286 $1,431

Route CR-203 Project Description INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CAMPBELLTON HIGHWAY (CR-203) AND TAYLOR ROAD (CR-64)

Project Length in Miles 0.020  Urban Area DOTHAN  Sponsor HOUSTON COUNTY  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067032 HSIP NR17 (929) UTILITIES INTERSECTION IMPROVEMENTS 2019 $144 $16 $0 $160100066849 HSIP NR17 (929) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $526 $0 $58 $585

TOTAL COST: $671 $16 $58 $745

Route CR-25 Project Description CR-25 (DENTON RD) ADD LANES FROM SR-210 (ROSS CLARK CIRCLE) TO WESTGATE PARKWAY

Project Length in Miles 1.203  Urban Area DOTHAN  Sponsor CITY OF DOTHAN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100008618 STPOA 9450 (602) CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $4,988 $653 $2,560 $8,201

TOTAL COST: $4,988 $653 $2,560 $8,201

Route CR-33 Project Description RESURFACING ON S CR-33 (FIRST AVENUE) FROM SR-12 (US-84) TO OLD HIGHWAY 84 - HCP 35-406-19

Project Length in Miles 1.290  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065701 STPOA 3519 (255) CONSTRUCTION RESURFACING 2020 $80 $20 $0 $100

TOTAL COST: $80 $20 $0 $100

Route CR-41 Project Description RESURFACING ON CR-41 (WALDEN DRIVE) FROM KINSEY ROAD TO BROAD STREET - HCP 35-408-19

Project Length in Miles 1.770  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065702 STPOA 3516 () CONSTRUCTION RESURFACING 2021 $424 $0 $106 $530

TOTAL COST: $424 $0 $106 $530

Route CR-51 Project Description RESURFACE CR-51 (BETHEL ROAD) FROM CR-41 (BROAD STREET) TO SR-1 (US-431)

Project Length in Miles 0.890  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065705 STPOA 3516 () CONSTRUCTION RESURFACING 2022 $197 $0 $49 $246

TOTAL COST: $197 $0 $49 $246

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

25 of 49

REGION HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 26: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-65 Project Description RESURFACE CR-65 (COWARTS CREEK RD/SOUTH BROAD STREET) FROM CR-24 (LUCY GRADE ROAD) TO SR-12 (US-84)

Project Length in Miles 2.767  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065697 STPOA 3516 () CONSTRUCTION RESURFACING 2023 $498 $0 $124 $622

TOTAL COST: $498 $0 $124 $622

Route CR-65 Project Description RESURFACE N BROAD STREET AND OMUSSEE ROAD FROM SR-12 (US-84) TO SR-52 (COLUMBIA HIGHWAY)

Project Length in Miles 3.320  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065698 STPOA 3519 (253) CONSTRUCTION RESURFACING 2020 $607 $152 $0 $758

TOTAL COST: $607 $152 $0 $758

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG BROAD STREET FROM JORDAN AVENUE TO WICKER ROAD AND ON WICKER ROAD FROM BROAD STREET TO THE DEAD END.

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor TOWN OF COWARTS  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067202 TAPOA TA17 (927) CONSTRUCTION STREETSCAPE 2020 $337 $84 $0 $421

TOTAL COST: $337 $84 $0 $421

Route CR-NA Project Description BIKE AND PEDESTRIAN FACILITIES ALONG HOUSTON STREET FROM GROVE STREET TO CR-55

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069026 TAPNU TA19 (920) CONSTRUCTION SIDEWALK 2020 $140 $0 $35 $175

TOTAL COST: $140 $0 $35 $175

Route CR-NA Project Description RESURFACE SUGGS ROAD FROM HEADLAND AVENUE TO THE HOUSTON/HENRY COUNTY LINE

Project Length in Miles 0.970  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065703 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $258 $0 $65 $323

TOTAL COST: $258 $0 $65 $323

Route CR-NA Project Description RESURFACING ON HOSEA ROAD FROM THE GENEVA COUNTY LINE TO SR-605 - HCP 35-407-19

Project Length in Miles 0.970  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065704 STPOA 3516 () CONSTRUCTION RESURFACING 2022 $194 $0 $49 $243

TOTAL COST: $194 $0 $49 $243

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

26 of 49

REGION HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 27: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description RESURFACING ON ASHFORD ROAD FROM ENON ROAD TO BEN IVEY ROAD

Project Length in Miles 1.170  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069704 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $248 $0 $62 $310

TOTAL COST: $248 $0 $62 $310

Route CR-NA Project Description RESURFACING ON HODGESVILLE ROAD FROM E SAUNDERS ROAD TO ROSS CLARK CIRCLE

Project Length in Miles 1.870  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069705 STPOA 3519 (254) CONSTRUCTION RESURFACING 2020 $529 $132 $0 $661

TOTAL COST: $529 $132 $0 $661

Route CR-NA Project Description RESURFACING ON JORDAN AVENUE FROM RUTH CIRCLE TO ENON ROAD.

Project Length in Miles 1.300  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069708 STPOA 3520 () CONSTRUCTION RESURFACING 2021 $243 $0 $61 $303

TOTAL COST: $243 $0 $61 $303

Route CR-NA Project Description RESURFACING ON RONEY ROAD FROM SR-1 (US-431) TO WALDEN DRIVE

Project Length in Miles 3.040  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069710 STPOA 3519 () CONSTRUCTION RESURFACING 2022 $626 $0 $156 $782

TOTAL COST: $626 $0 $156 $782

Route CR-NA Project Description RESURFACING ON TAYLOR ROAD FROM SR-605 TO CAMPBELLTON HIGHWAY

Project Length in Miles 3.930  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069711 STPOA 3519 () CONSTRUCTION RESURFACING 2022 $845 $0 $211 $1,057

TOTAL COST: $845 $0 $211 $1,057

Route CR-NA Project Description RESURFACE SOUTH PARK AVENUE FROM TAYLOR ROAD TO ROSS CLARK CIRCLE

Project Length in Miles 1.088  Urban Area DOTHAN  Sponsor HOUSTON COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069706 STPOA 3519 (252) CONSTRUCTION RESURFACING 2020 $284 $71 $0 $354

TOTAL COST: $284 $71 $0 $354

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

27 of 49

REGION HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 28: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-12 Project Description INSTALL RAILROAD CROSSING DEVICES ON SR-12 (US-84) AND MUSEUM AVENUE IN DOTHAN, DOT NO. 733686N, REF #1325 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS MARKINGS AND LEGENDS

Project Length in Miles 0.000  Urban Area DOTHAN  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066498 RHCH RR17 (903) CONSTRUCTION RR CROSSING IMPROVEMENTS 2021 $270 $30 $0 $300

TOTAL COST: $270 $30 $0 $300

Route SR-12 Project Description INTERSECTION IMPROVEMENTS AND ACCESS MANAGEMENT WEST OF COWARTS ON SR-12 (US-84) FROM 150' WEST OF HEALTH SCIENCES BLVD TO 1470' EAST OF EDDINS RD INCLUDING WIDENING OF TURN LANE, ADDITION OF ACCELERATION LANE AND MEDIAN CROSSOVER PROTECTION

Project Length in Miles 2.000  Urban Area DOTHAN  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070066 HSIP 0012 (568) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $6 $1 $0 $7100070256 HSIP 0012 (568) CONSTRUCTION SAFETY IMPROVEMENTS 2023 $1,452 $161 $0 $1,613

TOTAL COST: $1,458 $162 $0 $1,620

Route SR-210 Project Description ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM US-231 SOUTH TO BAUMAN DRIVE

Project Length in Miles 2.682  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062175 NHF 0210 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2022 $4,046 $1,012 $0 $5,058

TOTAL COST: $4,046 $1,012 $0 $5,058

Route SR-210 Project Description ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM SOUTH OF MEADOWBROOK DRIVE SOUTH TO NORTH CHEROKEE AVENUE AND ON SR-53 (US-231) FROM GIRARD AVENUE TO BUYERS DRIVE

Project Length in Miles 1.434  Urban Area DOTHAN  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069318 NHF 0210 (509) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $14,963 $3,741 $0 $18,704

TOTAL COST: $14,963 $3,741 $0 $18,704

Route SR-52 Project Description RESURFACING ON SR-52 FROM SR-605 TO SR-210 (US-231/ROSS CLARK CIRCLE)

Project Length in Miles 3.023  Urban Area DOTHAN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068718 RP-NH 0052 (518) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22021 $2,335 $584 $0 $2,919

TOTAL COST: $2,335 $584 $0 $2,919

Route SR-53 Project Description PAVEMENT PRESERVATION SR-53 (US-231) FROM SR-210 (US-431/ROSS CLARK CIRCLE) TO THE DALE COUNTY LINE

Project Length in Miles 3.690  Urban Area DOTHAN  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068704 NH 0053 (587) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 12020 $2,189 $547 $0 $2,736

TOTAL COST: $2,189 $547 $0 $2,736

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

28 of 49

REGION HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original

Page 29: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-137 Project Description RESURFACING AND WIDENING ON CR-137 FROM THE MACON COUNTY LINE TO CHADWICK LANE

Project Length in Miles 3.562  Urban Area AUBURN-OPELIKA  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070043 STPOA 4119 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2023 $837 $0 $209 $1,046

TOTAL COST: $837 $0 $209 $1,046

Route CR-188 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-188 FROM SR-14 TO SOUGAHATCHEE CREEK

Project Length in Miles 2.694  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069408 RASTPNU 4119 (252) CONSTRUCTION RESURFACING 2020 $604 $0 $295 $899

TOTAL COST: $604 $0 $295 $899

Route CR-197 Project Description FULL DEPTH RECLAMATION, PAVE, AND TRAFFIC STRIPE CR-197 FROM CR-208 TO CR-240 - LCP 41-147-17

Project Length in Miles 2.400  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062982 STPPC 4118 (252) CONSTRUCTION RESURFACING 2020 $788 $0 $197 $985

TOTAL COST: $788 $0 $197 $985

Route CR-243 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-243 FROM THE RUSSELL COUNTY LINE TO CR-248

Project Length in Miles 3.200  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067543 STPPC 4119 (253) CONSTRUCTION RESURFACING 2020 $586 $147 $0 $733

TOTAL COST: $586 $147 $0 $733

Route CR-249 Project Description RESURFACING ON CR-249 FROM CR-379 TO CR-318 IN SMITHS STATION

Project Length in Miles 1.700  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067545 STPPC 4117 () CONSTRUCTION RESURFACING 2021 $442 $0 $111 $553

TOTAL COST: $442 $0 $111 $553

Route CR-318 Project Description RESURFACING ON CR-318 FROM CR-248 (SUMMERVILLE ROAD) TO CR-249 IN SMITHS STATION

Project Length in Miles 4.800  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067544 STPPC 4117 () CONSTRUCTION RESURFACING 2021 $1,056 $0 $264 $1,320

TOTAL COST: $1,056 $0 $264 $1,320

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

29 of 49

REGION HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 30: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-379 Project Description RESURFACING ON CR-379 FROM SR-1 (US-280) TO THE BRIDGE OVER HARDING LAKE IN SMITHS STATION

Project Length in Miles 9.700  Urban Area PHENIX CITY  Sponsor LEE COUNTY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067546 STPPC 4117 () CONSTRUCTION RESURFACING 2021 $1,300 $0 $325 $1,625

TOTAL COST: $1,300 $0 $325 $1,625

Route CR-379 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (4430) CR-379 MILL CR; (4750) CR-148 PHELPS CR; (10292) CR-188 LOBLOCKEE CR; (3310) CR-175 TRIB TO LITTLE UCHEE CR; (4416) CR-183 WACOOCHEE CR; (3645) CR-126 BRUSH CR; (5051) CR-29 COSSEY BR

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071469 HRRR 4120 (250) CONSTRUCTION GUARDRAIL 2020 $180 $0 $20 $200

TOTAL COST: $180 $0 $20 $200

Route CR-40 Project Description RESURFACING,WIDENING,TRAFFIC SIGNALS AND DRAINAGE IMPROVEMENTS ON SOUTH COLLEGE STREET,SAMFORD AVENUE, GAY STREET, AND REESE AVENUE

Project Length in Miles 0.968  Urban Area AUBURN-OPELIKA  Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065892 STPOA 4116 (250) UTILITIES WIDENING AND RESURFACING

(RDWY)2021 $109 $0 $27 $136

100061106 STPOA 4116 (250) CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2021 $3,627 $0 $907 $4,533TOTAL COST: $3,736 $0 $934 $4,670

Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG CARVER AVE FROM THE COVINGTON RECREATION CENTER PARKING LOT TO CLANTON ST, ON CLANTON ST FROM CARVER AVE TO MCCOY ST, ON MCCOY ST FROM CLANTON ST TO GENEVA ST AND ON GENEVA ST FROM MCCOY ST TO VAUGHN AVE

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor OPELIKA  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067220 TAPAA TA17 (922) CONSTRUCTION UNCLASSIFIED 2019 $391 $0 $98 $489

TOTAL COST: $391 $0 $98 $489

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON N 8TH STREET FROM N RAILROAD AVENUE TO 1ST AVENUE, AND ON 1ST AVENUE FROM N 8TH STREET TO N 7TH STREET

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor OPELIKA  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069022 TAPAA TA19 (916) CONSTRUCTION STREETSCAPE 2020 $331 $0 $83 $414

TOTAL COST: $331 $0 $83 $414

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

30 of 49

REGION HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 31: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description ROUNDABOUT AT THE INTERSECTION OF WIRE ROAD AND COX ROAD IN THE CITY OF AUBURN

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor AUBURN  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069291 HSIP 4119 (251) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $86 $0 $10 $96100069293 HSIP 4119 (251) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $191 $0 $21 $213100069292 HSIP 4119 (251) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,267 $0 $141 $1,408

TOTAL COST: $1,545 $0 $172 $1,716

Route CR-NA Project Description RESURFACING, SIDEWALKS AND SIGNALS ALONG PEPPERELL PARKWAY FROM LOWNDES STREET TO AUBURN CITY LIMITS

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor OPELIKA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070013 STPOA 4119 () PRELIMINARY ENGINEERING RESURFACING 2022 $55 $0 $14 $69100070014 STPOA 4119 () RIGHT OF WAY RESURFACING 2022 $52 $0 $13 $65100070015 STPOA 4119 () UTILITIES RESURFACING 2023 $140 $0 $35 $175100070016 STPOA 4119 () CONSTRUCTION RESURFACING 2023 $1,357 $0 $339 $1,696

TOTAL COST: $1,604 $0 $401 $2,005

Route CR-NA Project Description ADD TURN LANE ON DONAHUE DRIVE FROM NORTH OF BRAGG AVENUE TO CARY DRIVE

Project Length in Miles 1.410  Urban Area AUBURN-OPELIKA  Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100008577 STPOA 4116 () RIGHT OF WAY TURN LANES 2021 $408 $0 $102 $510100033351 STPOA 4116 () UTILITIES TURN LANES 2021 $522 $0 $131 $653100008575 STPOA 4116 () CONSTRUCTION TURN LANES 2022 $1,947 $0 $487 $2,434

TOTAL COST: $2,878 $0 $719 $3,597

Route CR-NA Project Description RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM LOWNDES STREET TO GATEWAY DRIVE (SR-38/US-280)

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor OPELIKA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068460 STPOA 4118 (250) RIGHT OF WAY RESURFACING 2021 $21 $0 $5 $26100068461 STPOA 4118 (250) UTILITIES RESURFACING 2021 $52 $0 $13 $64100068462 STPOA 4118 () CONSTRUCTION RESURFACING 2021 $1,385 $0 $346 $1,731

TOTAL COST: $1,457 $0 $364 $1,821

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

31 of 49

REGION HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 32: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM WESTEND COURT (FIVE POINTS) TO GATEWAY DRIVE (SR-38/US-280)

Project Length in Miles 1.776  Urban Area AUBURN-OPELIKA  Sponsor OPELIKA COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068464 STPOA 4118 (251) RIGHT OF WAY RESURFACING 2021 $21 $0 $5 $26100068465 STPOA 4118 (251) UTILITIES RESURFACING 2021 $52 $0 $13 $64100068466 STPOA 4118 () CONSTRUCTION RESURFACING 2021 $1,072 $0 $268 $1,339

TOTAL COST: $1,144 $0 $286 $1,430

Route CR-NA Project Description INTERSECTION IMPROVEMENTS ON COLUMBUS PARKWAY AT 4TH, 6TH AND 7TH STREETS

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor OPELIKA  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069306 HSIP 4119 (250) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $262 $0 $29 $291100069307 HSIP 4119 (250) UTILITIES INTERSECTION IMPROVEMENTS 2021 $294 $0 $33 $326100069301 HSIP 4119 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $1,122 $0 $125 $1,247

TOTAL COST: $1,677 $0 $186 $1,864

Route I-85 Project Description RESURFACING ON I-85 FROM .4 MILE SOUTH OF SR-147(EXIT 51) TO .38 MILE SOUTH OF BENT CREEK ROAD

Project Length in Miles 5.525  Urban Area AUBURN-OPELIKA  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071653 IM I085 () PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 22021 $164 $18 $0 $182

100069862 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2022 $3,095 $344 $0 $3,439TOTAL COST: $3,258 $362 $0 $3,621

Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO .42 MILE WEST OF SR-15

Project Length in Miles 7.412  Urban Area AUBURN-OPELIKA  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069065 IM I085 (369) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 22020 $205 $23 $0 $227

100068991 IM I085 (369) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2

2021 $2,525 $281 $0 $2,805TOTAL COST: $2,729 $303 $0 $3,033

Route I-85 Project Description INTERCHANGE LIGHTING AND LANDSCAPING ON I-85 AT EXIT 50 (COX ROAD)

Project Length in Miles 2.000  Urban Area AUBURN-OPELIKA  Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070019 STPOA I085 (371) PRELIMINARY ENGINEERING LIGHTING 2020 $80 $0 $20 $100100070020 STPOA I085 (371) CONSTRUCTION LIGHTING 2021 $889 $0 $222 $1,111

TOTAL COST: $969 $0 $242 $1,211

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

32 of 49

REGION HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 33: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route I-85 Project Description INTERCHANGE LIGHTING AND LANDSCAPING ON I-85 AT EXIT 57 (BENT CREEK ROAD)

Project Length in Miles 2.000  Urban Area AUBURN-OPELIKA  Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070044 STPOA I085 (370) PRELIMINARY ENGINEERING LIGHTING 2020 $80 $0 $20 $100100070021 STPOA I085 () CONSTRUCTION LIGHTING 2021 $889 $0 $222 $1,111

TOTAL COST: $969 $0 $242 $1,211

Route I-85 Project Description BRIDGE WIDENING ON I-85 (BIN# 008593) AND (BIN# 008594) OVER CHOCTAFAULA CREEK(SITE 1) ; BRIDGE WIDENING ON I-85 (BIN# 007262) AND (BIN# 007263) OVER HALAWAKEE CREEK(SITE 2)

Project Length in Miles 0.300  Urban Area AUBURN-OPELIKA  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100051084 IM I085 (366) CONSTRUCTION BRIDGE WIDENING 2022 $3,254 $362 $0 $3,615

TOTAL COST: $3,254 $362 $0 $3,615

Route I-85 Project Description I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL EXTENSIONS NB OFF RAMP AND SB ON RAMP

Project Length in Miles 4.300  Urban Area AUBURN-OPELIKA  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067237 IMF I085 (362) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $544 $60 $0 $605100067238 IMF-CHBP I085 (362) CONSTRUCTION BRIDGE REPLACEMENT 2021 $25,213 $1,595 $0 $26,808100070677 IMF I085 (362) UTILITIES BRIDGE REPLACEMENT 2020 $346 $38 $0 $385

TOTAL COST: $26,103 $1,694 $0 $27,798

Route NA Project Description MULTI-USE PATH ALONG MARTIN LUTHER KING DRIVE/SR-14 FROM WEBSTER ROAD TO SHUG JORDAN PARKWAY OVERPASS IN AUBURN

Project Length in Miles 0.000  Urban Area AUBURN-OPELIKA  Sponsor AUBURN  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067301 TAPAAF TA17 (923) CONSTRUCTION UNCLASSIFIED 2020 $400 $0 $100 $500

TOTAL COST: $400 $0 $100 $500

Route SR-147 Project Description ROUNDABOUT AT THE INTERSECTION OF SR-147 (NORTH COLLEGE STREET) AND CR-72 (FARMVILLE ROAD)

Project Length in Miles 0.206  Urban Area AUBURN-OPELIKA  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068032 HSIP 0147 (503) UTILITIES SAFETY IMPROVEMENTS 2020 $259 $29 $0 $288100068030 HSIP 0147 (503) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $2,661 $296 $0 $2,957

TOTAL COST: $2,920 $324 $0 $3,244

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

33 of 49

REGION HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 34: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-147R Project Description FEASIBILITY STUDY RELOCATE SR-147 BY CONSTRUCTING A NEW ROAD FROM I-85ATCR-26 (BEEHIVE RD) TO SR-38 (US-280)ATMP-101.37, AND WIDENING PREVIOUS ROADWAY

Project Length in Miles 13.000  Urban Area AUBURN-OPELIKA  Sponsor AUBURN COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100043913 STPOA 0147 (910) SPECIAL UNCLASSIFIED 2020 $230 $0 $58 $288

TOTAL COST: $230 $0 $58 $288

Route SR-38 Project Description MODIFYING VERTICAL CURVE, ADDING ACCELERATION LANES, AND IMPROVING MEDIAN ON SR-38 (US-280) AT SR-147

Project Length in Miles 3.000  Urban Area AUBURN-OPELIKA  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070664 HSIP 0038 (546) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $167 $19 $0 $185100070665 HSIP 0038 (546) UTILITIES SAFETY IMPROVEMENTS 2020 $90 $10 $0 $100100070666 HSIP 0038 () CONSTRUCTION SAFETY IMPROVEMENTS 2020 $2,340 $260 $0 $2,600

TOTAL COST: $2,597 $289 $0 $2,885

Route SR-51 Project Description BRIDGE REPLACEMENT ON SR-51 OVER WATULA CREEK BIN 002012

Project Length in Miles 0.200  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066232 BR 0051 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $42 $11 $0 $53

TOTAL COST: $42 $11 $0 $53

Route SR-51 Project Description BRIDGE REPLACEMENT ON SR-51 OVER CHEWACLA CREEK (BIN #004213)

Project Length in Miles 0.069  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070387 BR 0051 (516) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $156 $39 $0 $195100070377 BR 0051 (516) UTILITIES BRIDGE REPLACEMENT 2021 $73 $18 $0 $92100069445 BR 0051 (516) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,672 $918 $0 $4,590

TOTAL COST: $3,902 $976 $0 $4,878

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

34 of 49

REGION HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original

Page 35: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-37 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-37 FROM SR-97 TO SR-8 (US-80) - LCP 43-06-18

Project Length in Miles 9.919  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068276 RASTPNU 4318 (250) CONSTRUCTION RESURFACING 2020 $529 $0 $1,084 $1,614

TOTAL COST: $529 $0 $1,084 $1,614

Route SR-21 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-21 FROM THE WILCOX COUNTY LINE (MP 97.521) TO 0.5 MILES SOUTH OF CR-45 (MP 108.462)

Project Length in Miles 10.941  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069869 STPAA-FMGR 0021 (570) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $2,769 $692 $0 $3,461

TOTAL COST: $2,769 $692 $0 $3,461

Route SR-97 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-97 FROM SR-3 (US-31) TO I-65

Project Length in Miles 4.174  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070532 STPAA-HSIP 0097 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 1 W/ SAFETY WIDEN2020 $1,059 $233 $0 $1,292

TOTAL COST: $1,059 $233 $0 $1,292

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

35 of 49

REGION HIGHWAY PROJECTS - LOWNDESSTIP PLAN: 2020 - Original

Page 36: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description PEDESTRIAN IMPROVEMENTS ALONG BIBB STREET FROM SR-8 (US-80)TO WEST MONTGOMERY ROAD IN THE CITY OF TUSKEGEE.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065542 TAPAA TA16 (918) CONSTRUCTION SIDEWALK 2020 $314 $0 $78 $392

TOTAL COST: $314 $0 $78 $392

Route CR-NA Project Description NEW SANITARY SEWER LIFT STATION AND FORCE MAIN AT REST AREA, I-85 MACON COUNTY

Project Length in Miles 0.000  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068445 IM I085 () CONSTRUCTION REST AREA REHABILITATION 2022 $139 $15 $0 $155

TOTAL COST: $139 $15 $0 $155

Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO SR-138

Project Length in Miles 7.092  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070852 IM I085 (368) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $45 $5 $0 $50

100069000 IM I085 (368) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $1,997 $222 $0 $2,219TOTAL COST: $2,042 $227 $0 $2,269

Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM 1.15 MILE NORTH OF CR-36 TO THE LEE COUNTY LINE

Project Length in Miles 23.000  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071492 IM I085 (372) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE

LEVEL 12020 $135 $15 $0 $150

100069002 IM I085 (372) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1

2021 $6,454 $717 $0 $7,171TOTAL COST: $6,589 $732 $0 $7,321

Route NA Project Description MAIN STREET PEDESTRIAN IMPROVEMENTS BETWEEN THE NEW LOVES TRAVEL STOP AND THE POST OFFICE IN THE TOWN OF SHORTER.

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065547 TAPNU TA16 (924) CONSTRUCTION STREETSCAPE 2020 $133 $0 $33 $166

TOTAL COST: $133 $0 $33 $166

Route SR-14 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-14 FROM THE TALLAPOOSA COUNTY LINE TO THE LEE COUNTY LINE

Project Length in Miles 9.306  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067908 STPAA-HSIP 0014 (546) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $2,195 $498 $0 $2,694

TOTAL COST: $2,195 $498 $0 $2,694

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

36 of 49

REGION HIGHWAY PROJECTS - MACONSTIP PLAN: 2020 - Original

Page 37: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-49 Project Description RESURFACING ON SR-49 FROM I-85 TO THE TALLAPOOSA COUNTY LINE

Project Length in Miles 4.060  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067906 STPAA 0049 (511) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $2,350 $588 $0 $2,938

TOTAL COST: $2,350 $588 $0 $2,938

Route SR-81 Project Description BRIDGE REPLACEMENT ON SR-81 OVER UPHAPEE CREEK BIN # 2853

Project Length in Miles 0.480  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070391 BR 0081 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $41 $10 $0 $51100070379 BR 0081 () UTILITIES BRIDGE REPLACEMENT 2022 $124 $31 $0 $155100061664 BR 0081 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $6,631 $1,658 $0 $8,288

TOTAL COST: $6,795 $1,699 $0 $8,494

Route SR-81 Project Description BRIDGE REPLACEMENT (BIN 001489) ON SR-81 OVER CSXT RAILROAD

Project Length in Miles 0.270  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070390 BR 0081 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $41 $10 $0 $51100070378 BR 0081 () UTILITIES BRIDGE REPLACEMENT 2022 $124 $31 $0 $155100068673 BR 0081 () CONSTRUCTION BRIDGE REPLACEMENT 2024 $5,612 $1,403 $0 $7,015

TOTAL COST: $5,777 $1,444 $0 $7,221

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

37 of 49

REGION HIGHWAY PROJECTS - MACONSTIP PLAN: 2020 - Original

Page 38: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-234 Project Description RESURFACING AND WIDENING RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY

Project Length in Miles 2.460  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064673 STPMN 5115 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING

(RDWY)2020 $286 $0 $71 $357

100064674 STPMN 5115 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)

2021 $170 $0 $42 $212100064675 STPMN 5115 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2023 $2,400 $0 $600 $3,000

TOTAL COST: $2,855 $0 $714 $3,569

Route CR-236 Project Description RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.

Project Length in Miles 2.130  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059831 STPMN 5116 () CONSTRUCTION RESURFACING 2021 $2,400 $0 $600 $3,000

TOTAL COST: $2,400 $0 $600 $3,000

Route CR-28 Project Description RESURFACING ON CR-28 (MERIWETHER TRAIL) FROM SR-94 TO THE PIKE COUNTY LINE - MCP 51-04-18

Project Length in Miles 7.047  Sponsor COUNTY  LVOE County COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068888 STPNU 5118 (256) CONSTRUCTION RESURFACING 2020 $908 $103 $223 $1,233

TOTAL COST: $908 $103 $223 $1,233

Route CR-33 Project Description BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060092 STPMN 7702 (601) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $60 $0 $15 $75100060091 STPMN 7702 (601) UTILITIES BRIDGE REPLACEMENT 2023 $160 $0 $40 $200

TOTAL COST: $220 $0 $55 $275

Route CR-39 Project Description BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060096 STPMN 7701 (602) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $93 $0 $23 $116100060095 STPMN 7701 (602) UTILITIES BRIDGE REPLACEMENT 2021 $160 $0 $40 $200100055809 STPMN 7701 (602) CONSTRUCTION BRIDGE REPLACEMENT 2023 $2,340 $0 $585 $2,925

TOTAL COST: $2,592 $0 $648 $3,240

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

38 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 39: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-42 Project Description RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION

Project Length in Miles 2.700  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064378 STPMN 5118 (251) CONSTRUCTION RESURFACING 2020 $740 $185 $0 $925

TOTAL COST: $740 $185 $0 $925

Route CR-54 Project Description WIDENING, RESURFACING, AND TRAFFIC SIGNAL IMPROVEMENTS ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3(US-31)

Project Length in Miles 3.700  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067639 STPMN 5118 (255) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $2,800 $0 $700 $3,500

TOTAL COST: $2,800 $0 $700 $3,500

Route CR-626 Project Description FEASIBILITY STUDY FOR SIDEWALKS/MULTI-USE PATH ON (CR-626) VAUGHN ROAD FROM TAYLOR ROAD TO CHANTILLY PARKWAY

Project Length in Miles 4.400  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062338 STPMN 5115 () SPECIAL SIDEWALK 2021 $240 $0 $60 $300

TOTAL COST: $240 $0 $60 $300

Route CR-70 Project Description RESURFACING ON CR-70 (PAULK ROAD) FROM CR-70 (HILLABEE ROAD) TO CR-39 (MT ZION ROAD) - MCP 51-01-19

Project Length in Miles 2.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070372 STPMN 5119 (251) CONSTRUCTION RESURFACING 2020 $286 $12 $59 $358

TOTAL COST: $286 $12 $59 $358

Route CR-NA Project Description RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.

Project Length in Miles 4.200  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063731 STPMN 5115 () PRELIMINARY ENGINEERING RESURFACING 2020 $342 $0 $86 $428100063732 STPMN 5115 () CONSTRUCTION RESURFACING 2021 $3,939 $0 $985 $4,923

TOTAL COST: $4,281 $0 $1,070 $5,351

Route CR-NA Project Description LIGHTING IMPROVEMENTS ON MONROE STREET FROM S DECATUR STREET TO N UNION STREET, AND ON WASHINGTON AVENUE FROM S BAINBRIDGE STREET TO S UNION STREET - PHASE II

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069024 TAPAA TA19 (918) CONSTRUCTION LIGHTING 2019 $445 $0 $111 $556

TOTAL COST: $445 $0 $111 $556

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

39 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 40: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description PIKE ROAD NATURE TRAIL: MERIWEATHER ROAD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor TOWN OF PIKE ROAD  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069433 TAPMN TA18 (938) CONSTRUCTION UNCLASSIFIED 2020 $200 $0 $50 $250

TOTAL COST: $200 $0 $50 $250

Route CR-NA Project Description WIDENING AND RESURFACING ON DOZIER ROAD FROM CR-64(WARES FERRY ROAD) TO THE EMERALD MOUNTAIN TOLL BRIDGE

Project Length in Miles 1.700  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070368 STPMN 5119 (252) CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2020 $392 $98 $0 $489

TOTAL COST: $392 $98 $0 $489

Route CR-NA Project Description WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)

Project Length in Miles 1.710  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100044273 STPMN 7724 () RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $2,368 $0 $592 $2,960

TOTAL COST: $2,368 $0 $592 $2,960

Route CR-NA Project Description WIDENING AND RESURFACING ON PERRY HILL RD FROM SOUTH OF CARDINAL LN TO NORTH OF ATLANTA HWY AND ALONG ATLANTA HWY FROM W OF PERRY HILL RD TO BELLHURST DR

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067740 STPMN 5115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $444 $0 $111 $555

TOTAL COST: $444 $0 $111 $555

Route CR-NA Project Description WIDEN AND RESURFACE ANN STREET FROM BREWTON ST. AND REALIGN TO FEDERAL DRIVE (PHASE 1)

Project Length in Miles 0.220  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100053059 STPAA 7733 (601) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $1,917 $479 $0 $2,396

TOTAL COST: $1,917 $479 $0 $2,396

Route CR-NA Project Description WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Project Length in Miles 1.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040817 STPMN 5116 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2023 $1,248 $0 $312 $1,560

TOTAL COST: $1,248 $0 $312 $1,560

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

40 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 41: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Project Length in Miles 2.000  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064606 STPMN 5116 (250) RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $200 $0 $50 $250

100064607 STPMN 5116 (250) UTILITIES WIDENING AND RESURFACING (RDWY)

2023 $40 $0 $10 $50TOTAL COST: $240 $0 $60 $300

Route CR-NA Project Description RESURFACING, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD

Project Length in Miles 2.500  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059726 STPMN 5115 (251) UTILITIES RESURFACING 2020 $80 $0 $20 $100100063695 STPMN 5115 () CONSTRUCTION RESURFACING 2022 $3,200 $0 $800 $4,000

TOTAL COST: $3,280 $0 $820 $4,100

Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067613 STPMN 5117 (254) UTILITIES INTERSECTION IMPROVEMENTS 2021 $80 $0 $20 $100100067614 STPMN 5117 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $400 $0 $100 $500

TOTAL COST: $480 $0 $120 $600

Route CR-NA Project Description RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO THE WEST SIDE OF THE FOGGY BOTTOM BRIDGE (PHASE II)

Project Length in Miles 9.750  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068972 STPMN 5118 (254) RIGHT OF WAY RESURFACING 2021 $160 $0 $40 $200100068973 STPMN 5118 (254) UTILITIES RESURFACING 2022 $80 $0 $20 $100100068974 STPMN 5118 () CONSTRUCTION RESURFACING 2023 $2,600 $0 $650 $3,250

TOTAL COST: $2,840 $0 $710 $3,550

Route CR-NA Project Description WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)

Project Length in Miles 0.900  Urban Area MONTGOMERY  Sponsor CITY OF MONTGOMERY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100053061 STPMN 7733 (602) RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $983 $0 $246 $1,229

100045392 STPMN 7733 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)

2023 $1,474 $0 $368 $1,842TOTAL COST: $2,457 $0 $614 $3,071

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

41 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 42: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route I-65 Project Description INSTALL WRONG-WAY ENTRY COUNTERMEASURES, SIGNS AND CONCRETE CURBS AT I-65 AND EDGEMONT AVENUE

Project Length in Miles 0.200  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070138 HSIP I065 (509) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $20 $2 $0 $22

TOTAL COST: $20 $2 $0 $22

Route I-65 Project Description RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE

Project Length in Miles 2.030  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066459 IM I065 (493) CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12020 $3,381 $376 $0 $3,757

TOTAL COST: $3,381 $376 $0 $3,757

Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM THE NORTH END OF THE ALABAMA RIVER BRIDGE TO THE ELMORE COUNTY LINE

Project Length in Miles 4.650  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068992 IM I065 (507) CONSTRUCTION PREVENTATIVE MAINTENANCE

LEVEL 12020 $1,689 $188 $0 $1,877

TOTAL COST: $1,689 $188 $0 $1,877

Route I-85 Project Description ADDITIONAL SB LANE UTILIZING EXISTING OUTSIDE PAVED SHOULDER ON I-85 FROM 0.5 MILE NORTH OF TAYLOR TOAD TO 0.4 MILE SOUTH OF CHANTILLY PARKWAY

Project Length in Miles 2.480  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070512 IM I085 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $90 $10 $0 $100100070511 IM I085 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $909 $101 $0 $1,010

TOTAL COST: $999 $111 $0 $1,110

Route I-85 Project Description SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY, MACON AND LEE COUNTY TO THE CHAMBERS COUNTY LINE

Project Length in Miles 47.460  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Interstate Resurfacing COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054302 IM I085 (333) CONSTRUCTION SIGN REHABILITATION 2021 $2,561 $285 $0 $2,845

TOTAL COST: $2,561 $285 $0 $2,845

Route I-85 Project Description BRIDGE WIDENING ON I-85 NB AND SB OVER LINE CREEK (BIN # 007554 AND 007555) AND RELIEF BRIDGES (BIN # 007556, 007557, 007566 AND 007567)

Project Length in Miles 0.480  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059253 IM I085 (365) CONSTRUCTION BRIDGE WIDENING 2022 $12,843 $1,427 $0 $14,270

TOTAL COST: $12,843 $1,427 $0 $14,270

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

42 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 43: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route NA Project Description MULTI-PURPOSE NATURE TRAIL,WALLAHATCHIE ROAD - PHASE 3, LOCATED ALONG MARLER ROAD NORTH WAUGH TOWN CENTER CONNECTOR

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066530 TAPMN TA16 (949) CONSTRUCTION UNCLASSIFIED 2020 $188 $0 $47 $235

TOTAL COST: $188 $0 $47 $235

Route NA Project Description PIKE ROAD NATURE TRAIL: WALLAHATCHIE ROAD-PHASE 4

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066847 TAPMN TA17 (900) CONSTRUCTION UNCLASSIFIED 2020 $200 $0 $50 $250

TOTAL COST: $200 $0 $50 $250

Route NA Project Description PROTECTIVE PURCHASE FOR PROPERTIES ON THE EAST SIDE OF ANN STREET BETWEEN MCQUEEN ST AND THRASHER ST

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071638 STPMN 5120 () RIGHT OF WAY WIDENING AND RESURFACING

(RDWY)2021 $240 $0 $60 $300

TOTAL COST: $240 $0 $60 $300

Route NA Project Description RESURFACING AND BRIDGE REPLACEMENT (BIN 005831) ON WARES FERRY RD FROM WEST SIDE OF FROGGY BOTTOM BRIDGE TO MCLEMORE RD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071639 STPMN 5120 () PRELIMINARY ENGINEERING RESURFACING 2020 $180 $0 $45 $225

TOTAL COST: $180 $0 $45 $225

Route SR-3 Project Description ADDITION OF TURNLANE ON SR-3 (US-31) AT HYUNDAI BOULEVARD (MP 174.663)

Project Length in Miles 0.530  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071496 STPAA 0003 (629) PRELIMINARY ENGINEERING TURN LANES 2020 $40 $10 $0 $50100071436 STPAA 0003 (629) CONSTRUCTION TURN LANES 2020 $258 $64 $0 $322

TOTAL COST: $298 $74 $0 $372

Route SR-53 Project Description RESURFACING ON SR-53(US-231) FROM CR-89 TO ATHEY ROAD

Project Length in Miles 4.657  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069868 NH 0053 (589) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2021 $4,746 $1,187 $0 $5,933

TOTAL COST: $4,746 $1,187 $0 $5,933

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

43 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 44: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN # 000735

Project Length in Miles 1.200  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100004312 BR 0006 (563) CONSTRUCTION BRIDGES AND APPROACHES 2020 $5,853 $1,463 $0 $7,316

TOTAL COST: $5,853 $1,463 $0 $7,316

Route SR-6 Project Description INTERSECTION IMPROVEMENTS TO SR-6 (US-231) AT MERIWETHER ROAD AND TROTMAN ROAD; INCLUDING TURN LANES, AND RAISED MEDIANS

Project Length in Miles 1.147  Urban Area MONTGOMERY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071082 ATRP2-51-2020-402-CN

()CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $0 $520 $0 $520

TOTAL COST: $0 $520 $0 $520

Route SR-8 Project Description INSTALLING INTERSECTION CONFLICT WARNING SYSTEM AT THE INTERSECTION OF SR-8 (US-80) AND WARES FERRY ROAD

Project Length in Miles 0.300  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071948 TDAI 0008 (596) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $15 $4 $0 $19

TOTAL COST: $15 $4 $0 $19

Route SR-8 Project Description TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD

Project Length in Miles 0.269  Urban Area MONTGOMERY  Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064157 STPMN 5115 () SPECIAL CORRIDOR STUDY 2023 $96 $0 $24 $120

TOTAL COST: $96 $0 $24 $120

Route SR-NA Project Description INSTALLATION OF ROUNDABOUTS ON SR-126 AT BOTH I-85 EXIT 16 RAMPS, AND AT SR-126/SR-8 (US-80) INTERSECTION, AND ON SR-8 (US-80) AT MARLER ROAD

Project Length in Miles 0.000  Urban Area MONTGOMERY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068821 HSIP 5119 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $227 $25 $0 $253100068820 HSIP 5119 (250) UTILITIES SAFETY IMPROVEMENTS 2021 $161 $18 $0 $179100068810 HSIP 5119 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $1,733 $193 $0 $1,925

TOTAL COST: $2,121 $236 $0 $2,356

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

44 of 49

REGION HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original

Page 45: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-2209 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 010958) ON CR-2209 OVER DOUBLE BRANCH CREEK; SITE 2 - (BIN 009776) ON CR-2253 OVER WARRICK CREEK; SITE - 3 (BIN 008382) ON CR-3319 OVER MIMS CREEK

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071472 HRRR 5520 (250) CONSTRUCTION GUARDRAIL 2020 $154 $0 $17 $171

TOTAL COST: $154 $0 $17 $171

Route CR-2238 Project Description INSTALLING TRAFFIC CONTROL DEVICES AND GUARDRAIL ON CR-2238 FROM CR-2243 TO CR-2290 (SITE 1); INSTALLING TRAFFIC CONTROL DEVICES ON CR-6600 FROM SR-223 TO CR-6602 (SITE 2)

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071479 HRRR 5520 (251) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $128 $0 $14 $143

TOTAL COST: $128 $0 $14 $143

Route CR-NA Project Description SIDEWALK IMPROVEMENTS ON SOUTH 3 NOTCH STREET, WEST CHURCH STREET AND MARKET STREET IN TROY

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067200 TAPOA TA17 (925) CONSTRUCTION SIDEWALK 2019 $399 $0 $100 $499

TOTAL COST: $399 $0 $100 $499

Route CR-NA Project Description A MULTI-USE PATH ALONG ELM STREET FROM COLLEGE DRIVE TO SOUTH GEORGE WALLACE DRIVE

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068376 TAPAA TA18 (919) CONSTRUCTION SIDEWALK 2020 $478 $0 $119 $597

TOTAL COST: $478 $0 $119 $597

Route CR-NA Project Description SIDEWALKS ALONG WINDMILL DRIVE FROM VETERANS BOULEVARD TO GALLOWAY ROAD, AND ALONG GALLOWAY ROAD FROM 6TH AVENUE TRAVELLING ALONG GALLOWAY ROAD TURNING SOUTH ON HENDERSON STREET AND EAST ON VETERANS BOULEVARD BEFORE ENDING SHORT OF MAIN STREET

Project Length in Miles 0.000  Sponsor ALDOT  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069025 TAPNU TA19 (919) CONSTRUCTION SIDEWALK 2020 $385 $0 $96 $481

TOTAL COST: $385 $0 $96 $481

Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS AT (BIN 6602) ON CR-1165 OVER YOUNGBLOOD CR; (BIN 7705) ON CR-3339 OVER WHITEWATER CR; (BIN 9748) ON CR-5534 OVER UNNAMED CR; (BIN 8721) ON CR-1111 OVER BEEMAN CR

Project Length in Miles 0.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069579 HRRR 5519 (250) CONSTRUCTION GUARDRAIL 2019 $201 $0 $22 $224

TOTAL COST: $201 $0 $22 $224

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

45 of 49

REGION HIGHWAY PROJECTS - PIKESTIP PLAN: 2020 - Original

Page 46: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route SR-15 Project Description RESURFACING AND 2' SAFETY WIDENING ON SR-15 (US-29) FROM SR-93 IN BANKS TO THE BULLOCK COUNTY LINE

Project Length in Miles 9.977  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068714 STPAA-HSIP 0015 (537) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR

REHAB W/ SAFETY WIDENING2020 $3,601 $780 $0 $4,381

TOTAL COST: $3,601 $780 $0 $4,381

Route SR-167 Project Description CONSTRUCTING A ROUNDABOUT AT SR-167 AND SR-87

Project Length in Miles 4.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100072140 HSIP 0167 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $218 $24 $0 $242100072141 HSIP 0167 () RIGHT OF WAY SAFETY IMPROVEMENTS 2022 $83 $9 $0 $92100072142 HSIP 0167 () UTILITIES SAFETY IMPROVEMENTS 2022 $157 $17 $0 $174100072143 HSIP 0167 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $1,703 $189 $0 $1,892

TOTAL COST: $2,160 $240 $0 $2,401

Route SR-167 Project Description FEASIBILITY STUDY FOR ROUNDABOUT AT INTERSECTION OF SR-167 AND SR-87 IN SPRINGHILL

Project Length in Miles 1.000  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069502 HSIP 0167 (513) SPECIAL PRELIMINARY DESIGN PE 2020 $52 $6 $0 $58

TOTAL COST: $52 $6 $0 $58

Route SR-167 Project Description RESURFACING AND PLANING ON SR-167 FROM THE COFFEE COUNTY LINE TO SR-87 IN SPRINGHILL

Project Length in Miles 4.084  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068710 STPNU 0167 (512) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $1,312 $328 $0 $1,640

TOTAL COST: $1,312 $328 $0 $1,640

Route SR-87 Project Description RESURFACING ON SR-87 FROM SR-167 IN SPRINGHILL TO CR-3304/CR-59

Project Length in Miles 5.444  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068711 STPAA 0087 (514) FEDERAL MAINT CN PAVEMENT MINOR

REHABILITATION2020 $2,599 $650 $0 $3,249

TOTAL COST: $2,599 $650 $0 $3,249

Route SR-87 Project Description RESURFACING ON SR-87 FROM CR-3304(CURTIS ROAD) TO SR-10 ( US-231)

Project Length in Miles 2.140  Sponsor ALDOT  LVOE Non-Interstate Resurface COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068696 STPAA 0087 (515) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 22020 $1,258 $314 $0 $1,572

TOTAL COST: $1,258 $314 $0 $1,572

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

46 of 49

REGION HIGHWAY PROJECTS - PIKESTIP PLAN: 2020 - Original

Page 47: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON 14TH STREET IN DOWNTOWN PHENIX CITY

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY  LVOE TAP COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067217 TAPPC TA17 (919) CONSTRUCTION STREETSCAPE 2020 $339 $0 $85 $423

TOTAL COST: $339 $0 $85 $423

Route CR-NA Project Description BRIDGE REPLACEMENT ON SEALE ROAD OVER COCHGALECHEE CREEK BIN # 004291 IN PHENIX CITY

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067447 STPPC 5717 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $32 $0 $8 $40100067448 STPPC 5717 () UTILITIES BRIDGE REPLACEMENT 2020 $32 $0 $8 $40100067449 STPPC 5717 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $352 $0 $88 $440

TOTAL COST: $416 $0 $104 $520

Route CR-NA Project Description RESURFACING AND WIDENING ON FREEMAN ROAD FROM SANDFORT ROAD TO SR-1 (US-431) IN PHENIX CITY

Project Length in Miles 2.300  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067563 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $322 $0 $81 $403

TOTAL COST: $322 $0 $81 $403

Route CR-NA Project Description WIDEN AND RESURFACE BRADLEY ROAD FROM NUCKOLS ROAD TO SR-165

Project Length in Miles 2.940  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063092 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $412 $0 $103 $515

TOTAL COST: $412 $0 $103 $515

Route CR-NA Project Description WIDEN AND RESURFACE LATO ROAD FROM UCHEE HILL HIGHWAY

Project Length in Miles 2.880  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063093 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $403 $0 $101 $504

TOTAL COST: $403 $0 $101 $504

Route CR-NA Project Description WIDEN AND RESURFACE TARVER ROAD FROM LATO ROAD TO NUCKOLS ROAD

Project Length in Miles 2.240  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063094 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING

(RDWY)2021 $314 $0 $78 $392

TOTAL COST: $314 $0 $78 $392

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

47 of 49

REGION HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original

Page 48: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description RESURFACING AND WIDENING ON OWENS ROAD FROM MCCLENDON ROAD TO PATTERSON ROAD IN FORT MITCHELL

Project Length in Miles 0.496  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067564 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $69 $0 $17 $87

TOTAL COST: $69 $0 $17 $87

Route CR-NA Project Description RESURFACING AND WIDENING ON OWENS ROAD FROM SR-165 TO MCCLENDON ROAD IN FORT MITCHELL

Project Length in Miles 1.200  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067565 STPPC 5717 () CONSTRUCTION RESURFACING 2022 $168 $0 $42 $210

TOTAL COST: $168 $0 $42 $210

Route CR-NA Project Description RESURFACING AND WIDENING ON MCCLENDON ROAD FROM OWENS ROAD TO OWENS ROAD IN FORT MITCHELL

Project Length in Miles 1.884  Urban Area PHENIX CITY  Sponsor ALDOT COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067566 STPPC 5717 () CONSTRUCTION RESURFACING 2022 $264 $0 $66 $330

TOTAL COST: $264 $0 $66 $330

Route CR-NA Project Description RESURFACING ON BRICKYARD ROAD FROM DILLINGHAM STREET TO STATE DOCKS ROAD

Project Length in Miles 2.100  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063082 STPPC 5716 (253) CONSTRUCTION RESURFACING 2020 $1,038 $0 $260 $1,298

TOTAL COST: $1,038 $0 $260 $1,298

Route CR-NA Project Description RESURFACING ON BRICKYARD ROAD FROM STATE DOCKS ROAD TO THE CITY LIMITS

Project Length in Miles 2.100  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063086 STPPC 5716 (252) CONSTRUCTION RESURFACING 2020 $366 $0 $92 $458

TOTAL COST: $366 $0 $92 $458

Route CR-NA Project Description RESURFACING ON SOUTH RAILROAD STREET FROM SR-38 (US-280) TO STADIUM DRIVE

Project Length in Miles 1.360  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063088 STPPC 5716 (255) CONSTRUCTION RESURFACING 2020 $791 $0 $198 $989

TOTAL COST: $791 $0 $198 $989

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

48 of 49

REGION HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original

Page 49: 6/18/2020 ALABAMA STATEWIDE TRANSPORTATION … › OfficeEngineer › Project... · 2020-06-18 · silver hills drive, sweet ridge road, weaver street, jay street, sheila ... (609)

Route CR-NA Project Description RESURFACING ON SOUTH RAILROAD STREET FROM STADIUM DRIVE TO SUMMERVILLE DRIVE

Project Length in Miles 0.000  Urban Area PHENIX CITY  Sponsor CITY OF PHENIX CITY COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063090 STPPC 5716 (250) CONSTRUCTION RESURFACING 2020 $633 $0 $158 $791

TOTAL COST: $633 $0 $158 $791

Route SR-165 Project Description ADDING LEFT TURN LANE ON SR-165 AT CR-24

Project Length in Miles 0.300  Urban Area PHENIX CITY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070661 HSIP 0165 (506) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $41 $5 $0 $45100070660 HSIP 0165 (506) UTILITIES SAFETY IMPROVEMENTS 2021 $91 $10 $0 $101100070663 HSIP 0165 (506) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $469 $52 $0 $521

TOTAL COST: $600 $67 $0 $667

Route SR-165 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM THE BARBOUR COUNTY LINE TO .29 MILE SOUTH OF SR-208

Project Length in Miles 6.006  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069870 STPAA-HSIP 0165 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2020 $1,847 $417 $0 $2,264

TOTAL COST: $1,847 $417 $0 $2,264

Route SR-165 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM .36 MILE SOUTH OF NEW HOPE CHURCH ROAD TO .1 MILE SOUTH OF NUCKOLS ROAD

Project Length in Miles 12.389  Urban Area PHENIX CITY  Sponsor ALDOT  LVOE Safety COST IN THOUSANDS

Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069871 STPAA-HSIP 0165 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE

LEVEL 2 W/ SAFETY WIDEN2021 $4,596 $1,009 $0 $5,605

TOTAL COST: $4,596 $1,009 $0 $5,605

7/13/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023

49 of 49

REGION HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original