6060-109 glow worm with susp unit - wicksteed...steel bar to bs en 10025 welding to en iso...

12
SPECIFICATION INSTALLATION INSTRUCTIONS Note Note PROD. CODE SIZE AGE RANGE F/ FALL HEIGHT HEAVIEST PART TOTAL WEIGHT Rockerplay 6060-109 2260x1030x385 2 - 6 Years 1000mm Approx 69Kg Approx 109Kg 6060-109 Page 1 of 8 1. Read instructions thoroughly before commencing installation of unit. 2. Excavate foundations as shown on the foundation plan (see page 2). 3. Position and assemble the below ground fixing with spragging irons (see page 2) centrally in the excavated hole ensuring that it is at the correct height and the top plate is flush with the finished surface level. 4. Backfill with 0.28 m³ concrete (4 parts gravel, 2 parts sand & 1 part cement). 5. Allow concrete to set for a period of 48 hours. 6. Fit the Main Body Assembly to the below ground fixing as shown on page 5. 7. Ensure that all fastenings are fully tightened. Steel plate to BS EN 10025 Steel CHS to BS EN 10255 Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS 4190:2001 Non-standard fixings are anti-vandal and corrosion resistant Ensure all installation aids are removed before first use. Glow Worm with Suspsension Unit

Upload: others

Post on 18-Aug-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

SPECIFICATION

INSTALLATION INSTRUCTIONS

Note

Note

PROD. CODE

SIZE

AGE RANGE

F/ FALL HEIGHT

HEAVIEST PART

TOTAL WEIGHT

Rockerplay

6060-109

2260x1030x385

2 - 6 Years

1000mm

Approx 69Kg

Approx 109Kg

6060-109Page 1 of 8

1. Read instructions thoroughly before commencing installation of unit.

2. Excavate foundations as shown on the foundation plan (see page 2).

3. Position and assemble the below ground fixing with spragging irons (see page 2) centrally in theexcavated hole ensuring that it is at the correct height and the top plate is flush with the finishedsurface level.

4. Backfill with 0.28 m³ concrete (4 parts gravel, 2 parts sand & 1 part cement).

5. Allow concrete to set for a period of 48 hours.

6. Fit the Main Body Assembly to the below ground fixing as shown on page 5.

7. Ensure that all fastenings are fully tightened.

Steel plate to BS EN 10025Steel CHS to BS EN 10255Steel Bar to BS EN 10025Welding to EN ISO 14341:2011Polyester powder paint to EN 13438:2005

Standard fixings to BS 3692:2001 andBS 4190:2001Non-standard fixings are anti-vandal andcorrosion resistant

Ensure all installation aids are removed before first use.

Glow Wormwith Suspsension Unit

Page 2: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

6060-109

Page 2 of 8

Foundation Detail(Care must be taken in abnormal conditions)

FSL = Finished Surface Level

FSL

35

0

Foundation Detail(Care must be taken in abnormal conditions)

Bark Fix

700

700

350

60

0

Concrete

SpraggingIrons

5

3

4

5

70

0

40

0

10

00

700

350

35

0

Bark

Concrete

SpraggingIron

FSL

Page 3: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

6060-109

Page 3 of 8

Minimum Space

2259

1141

86

3

54

8

5260

16

92.5

338

5

R1500

R1500

2630

Minimum Space

Page 4: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

6060-109

Page 4 of 8

Safety Surfacing

Wetpour

15.5 Sq. Metres 40mm Wetpour15.0 Linear Metres Wetpour Edging

Grass Mats(1500 x 1000mm)

16 off Total

Safety Tiles(1000 x 1000mm)

19.0 Sq. Metres40mm Thickness18.0 Linear Metres of Tile Edging

6000

3000

40

00

350

05500

5350

33

50

R1500

2750

16

75

2675

17

50

20

00

Page 5: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

6060-109

Page 5 of 8

Fixing Details for MaintenanceFrame to Below Ground Fixing

Below Ground Fixing

687

Page 6: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

6060-109

Page 6 of 8

Fixing Details for MaintenanceEnd Cap

Fixing Details for MaintenanceAttaching Seats

1.3

1.51.5

1.4

1.6

1.7

1.8

1.9

1.1

Page 7: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

6060-109

Page 7 of 8

Fixing Details for MaintenanceSuspension Unit Assembly to Main Body

1.2.7

1.2.15

1.10

1.11

1.2.2

1.2.7

1.2.10

1.2.10

1.2.12

1.2.13

1.2.41.2.111.2.8

1.2.8

1.2.4

1.2.13

1.2.12

1.2.1

1.2.16

1.2.14

1.2.6

1.2.9

1.2.3

1.2.5

Loctite

1.13

1.12

Page 8: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

REV

ECN

SIG.

DATE:

COMPILED

DATE:

6060-109

Page 8 of 8

MC

23/03/17

Parts List

DESCRIPTIONPART NUMBERQTYITEM

Glow Worm Assembly5112-12011

Glow Worm Main Body W.A.4202-75511.1

Suspension Unit Assembly5114-11011.2

Suspension Unit Plate3201-34311.2.1

U - Plate3201-34411.2.2

Rubber Suspension Unit - Machined2911-00611.2.3

End Cap3292-21421.2.4

Torsion Bar3069-04211.2.5

Plate3293-12611.2.6

Spacer2570-00421.2.7

Spacer2570-00521.2.8

Fixing Locator3756-17821.2.9

DIA 6 x 12 LG SELLOK PIN2223-02121.2.10

M8 x 8 LG CUP POINT GRUB SCREW2171-11131.2.11

M10 x 30 Pent Button Head2176-13221.2.12

M10 Spring Washer2212-20321.2.13

M12 x 40 SKT HD CAP SCREW c/w PIN2171-22861.2.14

M12 EXTRA LARGE PLAIN WASHER2215-51561.2.15

M12 Spring Washer2212-00261.2.16

Aluminium End Cap3711-00221.3

T-SHAPED SEAT3726-10521.4

M8 x 8 LG CUP POINT GRUB SCREW2171-11141.5

M8 x 30 LG PENT C'SK SCREW2176-22861.6

M8 Washer2215-50761.7

M8 Nyloc Nut2192-00161.8

M8 Protective Cap2613-01561.9

M12 x 30 Skt Hd Cap Screw c/w Pin2171-22641.10

M12 Spring Washer2212-00241.11

Spacer Panel3756-20411.12

M8 x 25 C'SK SKT HD SCREW with PIN2171-17941.13

BGF for Spring Mechanism5071-05613

BGF for Spring Mechanism - Bark5071-05714

460mm Spragging Iron3030-31035

M20 x 55 HT HEX HD SCREW2175-18146

M20 WASHER 2mm THK2215-51247

20mm SPRING WASHER2212-20648

1761

MC

0

23/03/17

Minor

MC

1

12/04/17

Minor

MC

2

07/06/17 12/07/17

3

MC

Minor Minor

MC

4

28/11/17

Page 9: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

Product: Date of Issue: 23/03/17

Issue: A

Item Unit Qty Part No. Checked

1 1 Glow Worm Assembly 5112-120

2 1 BGF upright 5071-056

3 1 Fixing pack

4

5

6

7 Pre-assembled Panels

8 2 T-Shaped Seats * 3726-105

9 2 Fixing Locator * 3756-178

10 1 Spacer Panel * 3756-204

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Picked By: Checked By:

COMPILED REV 0 1

BY: MC ECN No. 1761 Minor

DATE 23/03/17 28/11/2017

DATE: 23/03/17 SIGN MC MC

Sheet 1 of 1DESPATCH LIST

6060-109 Glow Worm (with Suspension Unit)

Total No. of Items

Items marked * to be fitted before despatch

Order No:

Description

Page 10: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

Product: Date of Issue: 23/03/17

Issue: A

Item Unit Qty Part No. Checked

1 2 3030-310

2 4 2175-181

3 4 2215-512

4 4 2212-206

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Picked By: Checked By:

COMPILED REV 0 1 2BY: MC ECN No. 1761 Minor Minor

DATE 23/03/17 07/06/2017 12/07/2017

DATE: 23/03/17 SIGN MC MC MC

Total No. of Items

M20 Washer

FIXINGS LIST

M20 Spring Washer

Sheet 1 of 1

6060-109 Glow Worm (with Suspension Unit)

Order No:

Description

460mm Spragging Iron

M20 x 55 HT Hex Head Bolt

Page 11: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

Product: Date of Issue: 23/03/17

Issue: A

Item Unit Qty Part No. Checked

1 1 Glow Worm Assembly 5112-120

2 1 BGF upright - Bark 5071-057

3 1 Fixing pack

4

5

6

7 Pre-assembled Panels

8 2 T-Shaped Seats * 3726-105

9 2 Fixing Locator * 3756-178

10 1 Spacer Panel * 3756-204

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Picked By: Checked By:

COMPILED REV 0 1

BY: MC ECN No. 1761 Minor

DATE 23/03/17 28/11/2017

DATE: 23/03/17 SIGN MC MC

Order No:

Description

6060-909 Glow Worm (with Suspension Unit) - BARK

Total No. of Items

Items marked * to be fitted before despatch

Sheet 1 of 1DESPATCH LIST

Page 12: 6060-109 Glow Worm with Susp Unit - Wicksteed...Steel Bar to BS EN 10025 Welding to EN ISO 14341:2011 Polyester powder paint to EN 13438:2005 Standard fixings to BS 3692:2001 and BS

Product: Date of Issue: 23/03/17

Issue: A

Item Unit Qty Part No. Checked

1 1 3030-310

2 4 2175-181

3 4 2215-512

4 4 2212-206

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Picked By: Checked By:

COMPILED REV 0 1 2BY: MC ECN No. 1761 Minor Minor

DATE 23/03/17 07/06/2017 12/07/2017

DATE: 23/03/17 SIGN MC MC MC

Sheet 1 of 1

6060-909 Glow Worm (with Suspension Unit) - BARK

Order No:

Description

460mm Spragging Iron

M20 x 55 HT Hex Head Bolt

Total No. of Items

M20 Washer

FIXINGS LIST

M20 Spring Washer