6.0 SUPPORT FACILITIES ELEMENT Significant growth in projected enrollment will increase the need for additional support facilities. The majority of this projected need will be for academic and administrative office space, much of which occurs within academic facilities. Funding mechanisms instituted at the SUS level will continue to play an integral role in the fulfillment of FIU’s goals, objectives and policies as related to the continued adequate provision of on-campus support facilities (see Element 6.1: Modesto A. Maidique Campus, Element 6.2: Engineering Center and Element 6.3: Biscayne Bay Campus for the location of support facilities). GOAL 1: Provide support facilities necessary to correct present deficits
and meet the needs of projected student enrollment through the planning period.
Objective 1.1 Identify Critical Facility Needs and Required Locations: Develop future support facilities including offices,
administrative, maintenance and related support services. Phase and locate facilities to correct prioritized deficiencies and meet projected needs.
Policy 1.1.1 Provide faculty offices, lounges, and administrative space distributed
proportionate to and included within the programs for all new academic buildings.
Policy 1.1.2 MODESTO A. MAIDIQUE
Concentrate maintenance and facility operations functions on the western edge of campus. Locate additional physical plant support spaces in all new parking garages.
Policy 1.1.3 Locate general use/campus support space adjacent to Graham
Center.
Policy 1.1.4 Concentrate administrative offices adjacent to Primera Casa and the Graham Center within the loop road on the eastern edge of the campus. Integrate academic offices within college hubs and academic neighborhoods.
Policy 1.1.5 Integrate support services within student housing and all new
academic facility development by designating the first floor of each building as multi-purpose space.
Policy 1.1.6 Incorporate retail dining hubs with study space hubs at new and
existing academic buildings in accordance with the FIU auxiliary services plan to create profitable and consistent nodes of service.
Florida International University 6-2 March 27, 2014 Campus Master Plan BT 857
Policy 1.1.7 ENGINEERING CENTER
Maintain campus support and maintenance functions in the existing facility.
Policy 1.1.8 Provide student and general use support spaces on the first floor of
the proposed academic building. Enclose and repurpose the first floor of the building to improve student outreach, auxiliary retail, study and meeting spaces.
Policy 1.1.9 BISCAYNE BAY CAMPUS Maintain campus support and maintenance functions in the northwest
quadrant of the campus. Policy 1.1.10 Expand existing physical plant facilities to serve projected campus
growth and provide adequate chilled water for FIU facilities.
Policy 1.1.11 Provide multi-purpose support spaces within all new facilities, reserving the first floor for flexible office, study and meeting space as well as student oriented retail.
Objective 1.2 Integrate Phasing and Funding: Develop support facilities to reflect prioritized needs. Take
advantage of partnerships and non-traditional opportunities to secure funding necessary to address projected needs.
Policy 1.2.1 By 2020, FIU will develop support facilities in the following planning
periods. MMC & EC BBC Existing: 1,641,152 GSF 291,702 GSF
Currently Underway: 146,029 GSF 32,250 GSF 2015: 342,332 GSF 30,675 GSF 2020: 399,859 GSF 10,794 GSF
Total: 2,529,372 GSF 365,421 GSF
Policy 1.2.2 Accommodate support facility development opportunities which are
determined to be consistent with the academic mission and current/planned programs in:
- Planned but unassigned future support buildings
Florida International University 6-3 March 27, 2014 Campus Master Plan BT 857
- Designate building sites depicted in the Future Land Use Plan. Amend the Campus Master Plan as necessary to incorporate any new and unforeseen support facilities.
Policy 1.2.3 Supplement normal CIP funding requests with resources which
may be available from joint use facility operations (facility leasing), user fees, and joint development agreements with Miami-Dade County Parks and Recreation Department, and the Miami-Dade County Fair and Exposition.
LEGENDOFFICES (FICM 300)
CAMPUS FACILITY SUPPORT (FICM 700)
STUDENT HEALTHCARE FACILITIES (FICM 800)
GENERAL USE / AUXILIARY (FICM 600)
1 FLOOR MULTI PURPOSE SPACE
PROPOSED / EXISTING BUILDING
RETAIL DINING HUB
HATCHED BUILDINGS REPRESENT SUPPORTFUNCTIONS THAT OCCUPY LESS THAN HALF OFTHE BUILDING
S5
S6
S3
S4S7
S1
S2
P1
PG 8
F1
F2
H1
H3
A5A6
A7
A8
A9
A10
A14A4
A19
H4
SW 8TH STREET
SW 10
7TH A
VENU
E
SW 11
7TH A
VENU
E
PROPOSEDPROPERTY
ACQUISITION
MIAMI-DADEYOUTH FAIR AND EXPOSITION
H2
P7
A2A11
A13
PG6
A1
A3
A12
A20
NORTH
0 1000500250125
Scale: 1:500
P E R K I N SW I L L+
ELEMENT 6.1: SUPPORT FACILITIESMODESTO A. MAIDIQUE CAMPUS
A1. ACADEMIC 1A2. ACADEMIC 2A3. ACADEMIC 3A4. ACADEMIC 4A5. ACADEMIC 5A6. ACADEMIC 6A7. ACADEMIC 7A8. ACADEMIC 8A9. ACADEMIC 9A10. ACADEMIC 10A11. ACADEMIC 11A12. SOCIAL STUDIES / HUMANITIESA13. SIPA IIA14: MANGOA19. HONORS COLLEGEA20. ACADEMIC HEALTH CENTER LIBRARY ADDITIONH1. PARKVIEW HOUSING IIH2. GREEK HOUSINGH3. MAIN STREET HOUSINGH4. HONORS COLLEGE HOUSINGFI. FACILITIES 1F2: CENTRAL UTILITIESP1. HOTELP7. PARTNERSHIPPG6. FACILITY SUPPORTPG8. FACILITY SUPPORTS1. SUPPORT 1S2. SUPPORT 2S3. PRESIDENT'S PARK PAVILIONS4. ALUMNI CENTERS5. STUDENT ACADEMIC SUPPORT CENTERS6. GRAHAM CENTER ADDITIONS7. FROST MUSEUM ADDITION
KEY
A1
WEST FLAGLER STREET
107T
H AV
ENUE
LEGENDOFFICES (FICM 300)
CAMPUS FACILITY SUPPORT (FICM 700)
STUDENT HEALTHCARE FACILITIES (FICM 800)
GENERAL USE / AUXILIARY (FICM 600)
1 FLOOR MULTI PURPOSE SPACE
PROPOSED / EXISTING BUILDING
RETAIL DINING HUB
HATCHED BUILDINGS REPRESENT SUPPORTFUNCTIONS THAT OCCUPY LESS THAN HALF OFTHE BUILDING
NORTH0 1000500250125
Scale: 1:500
P E R K I N S
W I L L+
ELEMENT 6.2: SUPPORT FACILITIESENGINEERING CENTER
A1. ENGINEERING BUILDINGKEY
H1
F1
A2
A4
BAY VISTA BOULEVARD
P6
P7
P8
P4LEGEND
OFFICES (FICM 300)
CAMPUS FACILITY SUPPORT (FICM 700)
STUDENT HEALTHCARE FACILITIES (FICM 800)
GENERAL USE / AUXILIARY (FICM 600)
1 FLOOR MULTI PURPOSE SPACE
PROPOSED / EXISTING BUILDING
RETAIL DINING HUB
HATCHED BUILDINGS REPRESENT SUPPORTFUNCTIONS THAT OCCUPY LESS THAN HALF OFTHE BUILDING
NORTH0 1000500250125
Scale: 1:500
P E R K I N S
W I L L+
ELEMENT 6.3: SUPPORT FACILITIESBISCAYNE BAY CAMPUS
A2. MEDIA INNOVATION CENTERA4. ENVIRONMENTAL COMMUNICATIONSF1. FACILITY SUPPORTH1. STUDENT HOUSINGP4. ACADEMIC HEALTH CENTERP6. MULTI-PURPOSE ACADEMIC BUILDINGP7. HOTELP8. ACADEMIC HEALTH CENTER HOUSING
KEY