Results from HSS Assessments in 20 Townships
(Infrastructure)
Dr. Thida KyuDeputy Director(Planning)
DOH
![Page 2: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/2.jpg)
Conditions of RHCs in 20 TownshipsSr No
Name of Townships
No; of RHCs
RHC Building Need Renovation
Need NewConstruction
Labour room
+
Electri-city(EPC)Good Bad
1 Lewe 8 4 4 2 1 2 42 Yedashe 8 7 1 0 1 5 33 Shwe Gu 5 2 3 3 0 3 14 Bamaw 6 2 3 3 1 3 05 Pyinmana 5 4 0 0 1 0 1
6Nyaung Shwe 7 4 3 3 0 3 0
7Tharyarwaddy 6 4 2 2 0 1 2
8 Tha Htone 5 4 1 1 0 3 09 Mudon 6 5 1 1 3 3
10 Hsipaw 5 3 2 2 0 5 0Total 61 39 20 16 5 28 14
![Page 3: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/3.jpg)
Conditions of RHCs in 20 TownshipsSr No
Name of Townships
No; of RHCs
RHC Building Need Renovation
Need NewConstruction
Labour room
+
Electri-city(EPC)
Good Bad
1 Myeik 5 4 1 1 0 5 2
2 Kyaing Tone 5 4 1 1 0 3 2
3 Kaw Hmu 5 2 2 2 0 5 3
4 Nga Putaw 5 2 2 2 0 4 0
5 Hakha 4 3 1 0 1 1 0
6 Hlaing Bwe 8 5 3 3 0 7 0
7 Hti Lin 5 4 1 1 0 0 0
8 Demawsoe 7 1 6 5 1 0 1
9 MaungDaw 9 7 2 2 0 1 1
10 Ye Oo 6 4 2 0 0 6 0
Total 59 36 21 17 2 32 9
![Page 4: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/4.jpg)
RHCs which need renovation /new construction in HSS 20 TS
![Page 5: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/5.jpg)
Total No: of RHCs which need renovation / new construction in HSS 20 TS
Total No; of RHCs- 120 in 20TSNeed Renovation -33Need New Construction -7
![Page 6: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/6.jpg)
Sub-centres with No Building in HSS 20 TS
Township No SC building
Bamaw 1
Shwegu 1
Demawsoe 13
Hlaingbwe 10
Hakha 0
Thaton 6
Mudon 8
Maungdaw 8
Nyaung-Shwe 0
Kengtong 10
Township No SC building
Hsipaw 1
Ye-U 6
Pyinmana 4
Lewe 8
Htilin 1
Yedeshay 18
Thayawady 3
Kawhmu 2
Ngaputaw 6
Myeik 11
Total 117
![Page 7: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/7.jpg)
Appointed MWs who have no SC building in 20 TS
Township MW Assigned
No SC building
Bamaw 27 1
Shwegu 23 1
Demawsoe 41 13
Hlaingbwe 47 10
Hakha 24 0
Thaton 43 6
Mudon 35 8
Maungdaw 32 8Nyaung-Shwe 35 0
Kengtong 34 10
Township MW Assigned No SC building
Hsipaw 19 1
Ye-U 32 6
Pyinmana 17 4
Lewe 38 8
Htilin 28 1
Yedeshay 31 18
Thayawady 33 3
Kawhmu 24 2
Ngaputaw 29 6
Myeik 32 11
Total 624 117
![Page 8: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/8.jpg)
Name of Townships No; of RHCs Labour Room + Electricity(EPC) Myeik 5 5 2Kyaing Tone 5 3 2Kaw Hmu 5 5 3Nga Putaw 5 4 0Hakha 4 1 0Hlaing Bwe 8 7 0Hti Lin 5 0 0Demawsoe 7 0 1MaungDaw 9 1 1Ye Oo 6 6 0Lewe 8 2 4Yedashe 8 5 3Shwe Gu 5 3 1Bamaw 6 3 0Pyinmana 5 0 1Nyaung Shwe 7 3 0Tharyarwaddy 6 1 2Tha Htone 5 3 0Mudon 6 3 3Hsipaw 5 5 0
Total 120 60 23
Labour Room attached RHCs & Electricity from EPC in HSS 20 TS
![Page 9: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/9.jpg)
RHCs with attached Labour Room and Electricity from EPC
![Page 10: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/10.jpg)
![Page 11: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/11.jpg)
![Page 12: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/12.jpg)
Nyaung Shwe
![Page 13: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/13.jpg)
MUDON
Kamaroat S/C
In Mudon township -Totally 6 RHCs & 24 sub centers - 3 RHCs have labour room attached- 8 sub centers do not have sub-centre building, even no demarkated land space for S/C.
![Page 14: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/14.jpg)
Kawt Kha Pon RHC attached at Village Authority’s building
Kawtkhapon RHC in Mudon has no building and it has to be opened at the local authority’s office in the morning.
![Page 15: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/15.jpg)
PyinmanaAmong 5 RHCs in Pyinmana township, 1 RHC (Boe-ma) and 4 sub centres have no building, 1 sub centre is being constructed.
Temporary building for We’ Gyi S/C
Midwives who do not have sub centre building, have to stay in village administration offices or stay attached to village head’shome.
![Page 16: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/16.jpg)
Shwegu
2 out of 5 RHC have good building. 3 RHCs need renovation. Only 3 RHCs have labour room ; Need to build one sub center
2 out of 5 RHC have good building. 3 RHCs need renovation. Only 3 RHCs have labour room ; Need to build one sub center
![Page 17: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/17.jpg)
Yaydarshae
Aye Gye S/C does not have sub centre building and has to open at local authority officeOne local person from the village willing to give his own land to construct S/C
Kyun Pin Su S/C
Hle Pwe lay RHC has no RHC Building 18 sub centres have no sub-center buildings.
![Page 18: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/18.jpg)
Bamaw township
Naung Lite SC under Ma au pin RHC
Naung Lite SC under Ma au pin RHC
3RHCs have labour room attached.
![Page 19: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/19.jpg)
Thaton
2 sub centers Kyarpun RHC (Duyin Seik and Gaw ), 1 sub cencre (Thein Seik -2) under the Thein Seik RHC, 2 sub centres (Kadaik Lay and Tawgyi ) under Kadaikgyi RHC and Naungbo subcenter under Painetaw RHC have no building.
![Page 20: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/20.jpg)
Hsipaw
One out of 14 sub-centers and 3 special region clinics ( Pan Hone, Nar Nyu and Ohn mu) had building that need major renovation and need to construct1 SC . 5 RHCs have labor rooms.
![Page 21: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/21.jpg)
Conclusion • Infrastructures are needed for motivation of midwives
to work in the community especially in HTR areas
• Infrastructures for working and living have to be fulfilled
• Prioritization have to be done for those in real need than those that can wait for the construction of sub center
• Similarly for renovation, HSS program could take care of a few: but in the CTHP, gaps for refurbishment were mentioned for donors and other interesting parties concern and contribution.
![Page 22: 5.total infrastructure (dr thida kyu)](https://reader033.vdocuments.us/reader033/viewer/2022061217/54b513654a7959202e8b4609/html5/thumbnails/22.jpg)
Magyi Seik RHC,Nyaung Shwe
Gamone Taung RHC, Pyinmana