5th me business & it resilience summit 2016 - project management in bcm why projects fail
TRANSCRIPT
1
Continuity and Resilience (CORE)
ISO 22301 BCM Consulting Firm Presentations by speakers at the
5th Middle East Business & IT Resilience Summit 20 – 21 April 2016 – Palace Hotel DownTown Dubai
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033 Fax: ++91 11 41055535
Email: [email protected]
Continuity and Resilience
P. O. Box 127557 Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530 Tel: +971 2 8152831 Fax: +971 2 8152888
Email: [email protected]
Please write to us if you would like to get in touch with the Speaker
Why Projects Fail
All rights reserved to Pillar Total Solutions s.a.l.
Material extracted from PMBOK® Guide, is PMI copyright and used with their permission .
Conducted by:
Imad Jomaa
3
Your Host
• Imad Jomaa.
• Education:
o Telecommunications & Electronics Engineer – 1980 – Cairo
University
• Employers:
o Pillar Total Solutions s.a.l. (PTS) Beirut (since 2010), The National
Commercial Bank (NCB) – Jeddah (24 years), CHUBB Alarms – Jeddah,
Schlumberger – Shetland Islands – Oil Rigs.
• Professional Certifications:
o PMP , ITIL, COBIT , TOGAF9.1, Management Consulting Essentials.
4
Your Host – 2
• Professional Memberships:
o Syndicate of Lebanese Engineers (OEA), IEEE, PMI , PMO CoP,
ISACA – Lebanon Chapter – Vice President, KOUDOURAT (NGO)
Anti Unemployment Association – Member of Executive Committee,
Chartered Management Institute , Association of Enterprise
Architects (AEA), Lebanese Management Association (LMA).
5
What is Work?
• Work involves either operations (routines) or
projects.
6
What are Operations?
• Operations are an organizational
function performing the ongoing
execution of activities that
produce the same product or
provide a repetitive service.
7
What is a Project?
• As per the definition of PMI
(Project Management
Institute), a project is a
temporary endeavor
undertaken to create a
unique product, service, or
result.
8
The Project Challenge – Your Plan
9
The Project Challenge – Reality
10
• Lack of a senior management support.
• Weak Change or transition
Management.
• Poor project management.
• Business politics & Power Struggle.
Reason for Projects’ Failure – 1
11
• Ignoring Risk Management.
• Unrealistic:
o timelines or schedules.
o Budget.
o Scope or requirements.
Reason for Projects’ Failure – 2
12
• Lack of Team members commitment.
• Unclear roles and responsibilities.
• Poor communication.
• Scope creep.
Reason for Projects’ Failure – 3
13
• Under estimating the complexity of the project.
• Lack of end-user involvement.
• Stakeholders conflict.
• Lack of prioritisation.
Reason for Projects’ Failure – 4
14
• Inadequate testing processes.
• Not meeting expectations.
• Insufficient resources.
• Bad decisions.
Reason for Projects’ Failure – 5
Q & A Thank You
16
Continuity and Resilience (CORE) ISO 22301 BCM Consulting Firm Presentations by speakers at the
5th Middle East Business & IT Resilience Summit 20 – 21 April 2016 – Palace Hotel DownTown Dubai
Our Contact Details:
INDIA UAE
Continuity and Resilience
Level 15,Eros Corporate Tower Nehru Place ,New Delhi-110019
Tel: +91 11 41055534/ +91 11 41613033 Fax: ++91 11 41055535
Email: [email protected]
Continuity and Resilience
P. O. Box 127557 Abu Dhabi, United Arab Emirates
Mobile:+971 50 8460530 Tel: +971 2 8152831 Fax: +971 2 8152888
Email: [email protected]
Please write to us if you would like to get in touch with the Speaker