5s guidelines
TRANSCRIPT
-
7/28/2019 5s Guidelines
1/14
6/7/2013
XX CELLGUIDELINES FOR STANARDIZING AND SUSTAINING 5S
SORT(Do we need this?)
SET(Do we have a good place for this?)
SHINE(Is it in the designated place, labeled and clean?)
STANDARIZE(Is there a written procedure for this?)
SUSTAIN(Are we auditing and maintaining the written standard?)
Page 1 of 14
-
7/28/2019 5s Guidelines
2/14
6/7/2013
TABLE OF CONTENTS
GENERAL Pages 3-4
General Guidelines
Area Division
Daily Activities
Weekly Activities
Audits
Floor Taping
Floors, Wall, Aisles, Ceilings
MAIN CELL Pages 5 - 6
Cell Operation Areas
Kanban and Queue Locations
Supermarket
SFGI and SFGI Overflow
Communication Areas
TECHNICIAN AREA Page 7
Troubleshooting and Repair
Troubleshooting Test Fixture Storage
Tool and Misc. Equipment Storage
ADMIN AND MATERIAL SUPPORT Pages 8-10
Desk Areas
Quarantine
Staging area
Reject Area
SECTIONS TO BE DEVELOPED N/A
Annex
NPI cell
Appendix: Page 11 Floor Taping Guidelines
5S Operator Daily Check Sheet
5S Audit Sheet - General
Page 2 of 14
-
7/28/2019 5s Guidelines
3/14
6/7/2013
XX CELL - GENERAL
The guidelines for 5S in each area of the Signal Sources cell will be maintained
in a clearly labeled binder at the cell leader bench.
Any employee may suggest updates to the documentation.
Cell leaders and managers are responsible for maintaining updates. Only the
current approved version will be stored in the binder and this will be the onlyauthorized copy for setting the 5S expectations within the area.
The Signal Sources area of responsibility is divided into separate locations for thepurposes of conducting 5S activities. These areas are:
1. The Cell Operation area (cell proper). It includes the Supermarket as well asoperations on the main route from board test though shipping. Also includedare the communication (stand-up) areas, shift report and SQDC/QDIL boardcontent.
2. Troubleshooting and Repairarea. This includes technician benches and thestorage locations within this area. Also included is test fixture storage, andboard repair benches.
3. Administration Areas: This includes manager, cell lead and material handlerdesks as well as the staging, quarantine and rejects storage areas controlledand managed by these individuals.
4. Annex and NPI lab:
DAILY ACTIVITIES:Each operator, technician, material handler and manager will conduct a 5S audit oftheir individual work area at the end of each shift. All tools will be verified and leftin the appropriate positions. Work surfaces will be clean. Floors will be free ofdebris. Any unnecessary items will be removed. Trashcans will be emptied.Calibration dates will be verified.
WEEKLY ACTIVITIES:All employees will participate in weekly audits and corrections to findings duringthe audits.
Page 3 of 14
-
7/28/2019 5s Guidelines
4/14
6/7/2013
AUDITS:Audits will be conducted by each shift on a weekly basis at the end of the shift.Results will be posted on the SQDC/QDIL board. Outside audits will beconducted at least once per quarter by an individual who has been trained to do sofrom any other group or support function.
FLOOR TAPING:Refer to the reference sheet titled Level 3: Visual Controls Floor Taping at theend of this document.
FLOORS:Floors are to be kept free of debris. Normal scuff marks are the responsibility ofthe weekly cleaning service but any lack of service should be called to theattention of the cell manager and the site manager for Washington Group.
WALLS and VERTICAL SURFACES:Building walls and cubicle may be used as approved by managers to display
information, posters and pictures relevant to our business, events or currentinformation.
AISLES:Aisle ways will be kept clear at all times even if a manager has authorizedtemporary overflow. Trip hazards and obstacles to safe exit from the area are tobe avoided at all times.
CEILNGS:Ceiling tiles should be free of obvious stains, breaks or holes. Burned out bulbsshould be brought to the attention of Washington Group for maintenance. Notethat some areas have bulbs removed with management approval
Page 4 of 14
-
7/28/2019 5s Guidelines
5/14
6/7/2013
XX MAIN CELL
CELL OPERATION AREAS
Each work bench will use shadow boards for tools or have taped out space for
items that belong on horizontal surfaces.
Benches and PCs should be regularly cleaned. Cords and cables should be neatly dressed or stored and off the floor.
Work Instructions are posted on the company web site and will be open and
used for each build sequence.
Clipboards will be hanging at each station for displaying current waivers and
bench inventory sheets)
Kanban disciplines are TBD.
Only necessary items are to be present. Necessary items are to be clearly
labeled. All necessary items present and in their proper location at end of shift.
All equipment has current calibration dates.
No trip hazards At no time should food items be found within the ESD protected cell area.
The stand up area should be free of chairs, instruments and material other than
what is needed for show-and-tell.
KANBAN AND QUEUE LOCATIONS
TBD
Page 5 of 14
-
7/28/2019 5s Guidelines
6/14
6/7/2013
SUPERMARKET:
Flow Racks should be clean, labeled and orderly.
All part locations for storage are to be marked on both the front and back of
flow racks.
All individual boxes and totes are to be labeled with the current part numbers
(no use of xx suffix). Water skipper carts are to be left in taped out locations except when in use.
Personal notes, etc. are allowed on the work surface of the cart or pc location
during the shift but must be removed at the end of each shift.
SFGI and SFGI OVERFLOW: Instruments will be placed on the approved storage racks/locations in an orderly
fashion.
Page 6 of 14
-
7/28/2019 5s Guidelines
7/14
6/7/2013
XX Cell TECHNICIAN AREA
TROUBLESHOOTING AND REPAIRTechnician bench tops and shelves are for tools, equipment and referencematerial to be shared by bench partners. Items on the bench top and shelves willbe neatly organized and clearly labeled. The only items to be stored at the benchare those items which are used frequently throughout the week.
Items used less frequently than on a weekly basis but are still needed for currentwork activities will be stored in the storage cabinet. All items in this cabinet willhave a designated and neatly labeled location for storage.
The top bench drawer should contain shadow boards for tools. The bottom drawer
will contain neatly stored and organized reference material such as personalcopies of schematics or personal notes and other reference materials.
TROUBLESHOOTING TEST FIXTURE STORAGE:
Each fixture is to be labeled with name or part number.
Fixtures are to be stored in designated locations or taped out floor locations
when not in use.
As fixtures are needed they are moved to a work bench. They are to be
returned to storage at the end of the shift or when finished working with them.
TOOL and MISC EQUIPMENT STORAGE:Items infrequently used and shared by technicians will be kept in a storage cabinetadjacent to the test fixture storage. Items in the cabinet will be neatly labeled andstored.
Page 7 of 14
-
7/28/2019 5s Guidelines
8/14
6/7/2013
XX CellADMINISTRATIVE AND MATERIAL SUPPORT AREAS
The purpose for these standards is two-fold:1. Desk areas should be kept visually appropriate for tours, important customers
and other visitors.2. In the event of an unplanned absence, the desk area should be organized andlabeled well enough to allow a person with general knowledge of the role totake over with a minimum of difficulty in understanding what stage varioustasks were left in and where necessary records are stored.
ADMINISTRATIVE DESK AREAS:
Administrative desk areas should be neat, well-organized and free of clutter at
the end of each work shift.
Nothing shall extend above the height of higher cube walls.
Work surfaces shall be clean of stains and debris.
Drink and food items and containers should be properly stored away in the
break area, personal lockers or designated drawer space at the end of eachshift.
No appliances (coffee pots, microwaves, refrigerators, etc.)
Desks which are not shared with others are allowed personal items so long as
they do not impede on required workspace if others need to use the desk.
Personal items should be appropriate to a business environment.
Floors should be clear of items other than trash can, one recycle box and
personal heaters or fans approved by managers.
Miscellaneous supplies should be neatly stored in pencil and desk drawers. Only currently active work should exist on the desktop.
Cabinet surfaces should not be used for desktop overflow but may be labeled
and used for appropriate holding space for work.
Drawers, cabinets and work in progress should be labeled well enough for
others to step in during an absence.
Reference material posted on interior walls should be current and necessary.
All parts and assemblies temporarily at a desk will be properly protected. They
will be re-located to their proper storage locations before the end of the shift.Exceptions are allowed only for overnight attention and communication to the
next days shift.
Page 8 of 14
-
7/28/2019 5s Guidelines
9/14
6/7/2013
QUARANTINE:The quarantine area is used to temporarily store material or instruments beingevaluated or with some kind of problem causing it need to be kept apart fromsupermarket inventory. Items kept in this area must be labeled with the followinginformation:
What it is
Why it is in quarantine
Who is responsible or owns the items/problem
Date the item went into quarantine and if known, how long it is expected to be
stored there.
Items in the area should be reviewed at least on a monthly basis to be sure theydo not linger for long periods of time without action.
STAGING AREA:Items in the staging area are instruments staged for work activities that are not
part of the cell daily rate or are waiting for some support activity. Examples are: Code 5 warehouse returns
Waiting for rework
Production Hold.
As items move into the staging area the white board will be updated with thefollowing information:
Date in
Who is responsible
Reason for the item being in the staging area What needs to happen for it to move out and/or expected date for it to move
out
As items leave the staging area they should be erased from the white board sothat the white board is always up-to-date with the current content of the stagingarea. This area should be audited as part of the end of shift clean up activitieseach work day.
This is not a location for storing parts or collecting unnecessary items.
Page 9 of 14
-
7/28/2019 5s Guidelines
10/14
6/7/2013
REJECT AREA:
Reject parts must be clearly labeled and should be found in only one of three
areas:
1. Cell lead desk tops have clearly marked bins for parts coming off the line asmaterial needing to be rejected. Cell leaders print the appropriate tags and doall necessary quality record entries. This work should generally be completedbefore leaving for the day.
2. Once rejects have been appropriately labeled and transacted by the cell lead,they are moved to the black bins on the reject carts adjacent to the stagingarea. Material Handlers process these items on a daily basis by transactingthem in Oracle. As they do so, the material is moved to the orange bins for anengineering review prior to having the parts scrapped. Engineers will make the
final determinations as to whether these parts can be used as is, returned tovendors or discarded as scrap.3. Cell lead benches also have separate bins for returning reject parts to each
shift cell leader when the reject tags have not been properly filled out. Thisensures the correct individual gets the appropriate feedback for correctiveaction in the future. These bins are not to be used to deposit reject parts forany other reason.
No part should linger in any one location for more than two business days.Exceptions should be brought to the shift managers attention so that additionalhelp can be called for as needed. Rejecting parts in a timely manner ensures wecan keep appropriate inventory levels and have knowledge about leading edgequality problems.
Page 10 of 14
-
7/28/2019 5s Guidelines
11/14
6/7/2013
APPENDIX
Floor Taping Guidelines.Page 12
5S Operator Daily CheckList.Page 13
5S Audit Sheet GeneralPage 14
Page 11 of 14
-
7/28/2019 5s Guidelines
12/14
6/7/2013
Page 12 of 14
-
7/28/2019 5s Guidelines
13/14
6/7/2013
Page 13 of 14
-
7/28/2019 5s Guidelines
14/14
6/7/2013
Page 14 of 14