5S Event SummaryKalkaska, MI
July 8 – 11, 2014
5S By the Numbers!
• 3.5 days (7/8 – 7/11)• Eleven participants trained on 5S principles • Focus on four areas in Kalkaska (parts
warehouse, training area, material storage, welding shop)
• One common goal: to reduce waste and organize the Kalkaska work area thereby increasing efficiency for warehouse and field personnel
Before the 5S
Spend time looking for things
Find the waste…
Before the 5S
Lots of inventory on hand
Find the waste…
Before the 5S
Need to move things around to access supplies, while customer waits
Find the waste…
Day 1 – Sort and Shine
Move everything out, trash what is not needed
Day 1 – Sort and Shine
Clean top to bottom, and inspect through cleaning
Day 2 – Set in Order
Finish repairs and put items near their point of use
Day 3 – Standardize and Sustain
Footprint and label everything. If something is missing or out of place, it should be immediately obvious
Day 3 – Standardize and Sustain
Footprint and label everything. If something is missing or out of place, it should be immediately obvious
Before and After – Parts Room
Before After
What did we do?• Removed storage room , opening up the area for easy identification of missing items,
trash, clutter, etc.• Removed balcony which only served to collect junk• Added shelves and bins• Painted walls and floors• Repaired lights
Before and After – Parts Room
Before After
What did we do?• Removed storage room/office area, opening up the area for easy identification of missing
items, trash, clutter, etc. Added shelves and bins• Painted walls and floors• Repaired lights• Replaced toilet/vanity in restroom
Before and After – Training Area
Before After
What did we do?• Removed clutter• Repaired lights• Painted walls and floors• Created space for designated training area
Before and After – Training Area
Before After
What did we do?• Removed clutter• Repaired lights• Painted walls and floors• Created space for pipe rack storage
Before and After –Material Storage
Before After
What did we do?• Removed clutter• Footprinted eye wash and fire extinguisher locations• Added shelves• Painted walls • Repaired lights
Before and After –Material Storage
Before After
What did we do?• Removed clutter• Footprinted eye wash and fire extinguisher locations• Added shelves• Painted walls • Repaired lights
Kalkaska, MI – 5S Event
Working together to succeed!
One Team
Continuous Improvement: Work smarter.
Team Members Included:
Name Job TitleAdam Steuer LaborerAndrew Windle Compliance SpecialistAndy Cleeter Safety DirectorBrian Davis ForemanChad Davis Manager South RegionJames Sylvester LaborerJim Harley General ForemanJorge Vasquez ForemanMatt Thomas OperatorMike Whaley Manager Great LakesRoy Lind Warehouse Coordinator
Facilitators:Brent BernekingChad LoweMegan MillerScott Miller