5marla
DESCRIPTION
1TRANSCRIPT
SUMMARY-1
RESIDENCE MR. ABDUL BASEERVELANCIA LAHORE
PRICED BILL OF QUANTITIES
SUMMARY OF COST
Description
A. STRUCTURAL WORKS 10,113,919
B. ARCHITECTURAL FINISHESi BRICK WORKS 2,755
i PLASTERING 15,848
ii MARBLE FLOOR Err:522
ii MARBLE SKIRTING 276
ii IFO WHITE (GLAZED TILE) 172
iii LAMINATED DOORS 232
iii SOLID WOOD DOORS 232
iii ALUMINUM WINDOWS 167
iv ICI VINYLE EMULSION PAINT 15,848
v GRAFIATO FINISHING 806
viI MISCELLANEOUS
viiii ROOF INSULATION 850
Err:522
C PLUMBING WORKS 3%
D ELECTRICAL WORKS 3%
G.TOTAL:
Item No.
SUMMARY-2
RESIDENCE MR. ABDUL BASEERVELANCIA LAHORE
PRICED BILL OF QUANTITIES
SUMMARY OF COST
Amount (Rs)
60%
595,600
Err:522
CIVIL -3 MAIN REDSIDENCE BUILDING
RESIDENCE MR. ABDUL BASEERVELANCIA LAHORE
PRICED BILL OF QUANTITIES
STRUCTURAL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
GENERAL
EARTH WORK1 Cft 19960 8 159,678
2 Cft 6912 10 69,118
ANTI TERMITE3 Sft 17773 6.50 115,521
4 Cft 7026 85 597,231
All items of Civil works of building described here of under the title description unless specifically indicated otherwise, shall be deemed to be read in terms of supplying, making, assembling, installing, providing, laying, fixing and testing, etc, inclu
Excavation for foundations trenches and drains, in all kinds of soil including ramming, watering, dressing and disposal of surplus material.
Supplying stacking and filling local sand of best quality from outside source including dressing, watering and consolidation by ramming in layers not exceeding 9 inches in depth to full compaction.
Providing and applying anti-termite treatment by using Biflix or Termidor termite proffer mixed with water in ratio as manufacturer specified, at bottom and sides of foundation trenches and under floors before laying of sub-base.
CEMENT CONCRETE IN FOUNDATION
Providing and laying 1:4:8 (1 cement, 4 Chenab sand and 8 Marglla crush 1.5" and down gauge) cement concrete in foundation including leveling, compacting and curing etc. complete.
CIVIL -4 MAIN REDSIDENCE BUILDING
STRUCTURAL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
5
i) Footing. Cft 1500 120 180,051
ii) Roof Slab. Cft 5354 150 803,037
iii) Roof Beams/Lintels. Cft 1642 160 262,651
iv) Stairs/Steps. Cft 307.63 160 49,220
STEEL REINFORCEMENT6
M.Ton 54 72,000 3,871,263
REINFORCED CEMENT CONCRETE WORK
Providing and laying reinforced cement concrete by using of Marglla crush ¾” and down gauge, 50% Lewrancepur sand and 50% Chenab sand for following minimum works cube crushing strength in at 28 days, including form work and its removal, vibrating, levelin
a) 3000 lbs/inch2 (Ratio 1:2:4)
Providing and laying deformed steel reinforcement bars AFCO, or approved equivalent with guaranteed following minimum yield stress including the cost of straightening, cutting, bending, binding, wastage, complete in all kinds of RCC work. Testing of at r
a) ASTM A-615 G-60 (60000 psi)
CIVIL -5 MAIN REDSIDENCE BUILDING
STRUCTURAL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
BRICK MASONRY7
Cft 12868 90 1,158,152
b) 9" thick walls in super structure. Cft 11000 90 990,000
Sft 7720 135 1,042,172
8 Sft 289 75 21,694
8 Sft 1733 40 69,306
Providing and laying 1st class solid burnt brick masonry set in cement and Chenab sand mortar 1:5 in walls including scaffolding raking out joints and curing etc.
a) Basement, foundation and up to Plinth level.
c) Cavity walls (9" internal side and 4-1/2" outer side) with 1/4" dia iron wire ties at every 6th course and 3' apart.
Providing and laying 1st class solid burnt brick masonry set in cement and Chenab sand mortar 1:4 in walls 4-1/2” thick including scaffolding raking out joints and curing etc.
Providing and laying damp proof course of cement concrete 1:2:4 1½" thick including bitumen coating, with two coats of bitumen and one coat polythene sheet 500 gauge.
CIVIL -6 MAIN REDSIDENCE BUILDING
STRUCTURAL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
ROOF INSULATION34 Sft 8245 85 700,825
35 Each 16 1,500 24,000
Total: 10,113,919
Providing and applying water proofing treatment on roof in following layers,
2" thick high density thermopore sheet over covered with two layers of polythen sheet one over and other under of 500 gauge laying over two coats of hot bitumen @ 20 lb / 100 Sft over R.C.C roof slab.
Brick tiles floor jointed and grouted with 1:3 cement sand mortar over 4" thick mud including curing, making slope towards the drains, complete in all respects as per drawings, specification and all as directed by the Engineer.
Making of Roof Khurras 2'x2' in cement concrete 1:2:4 finished with steel trowel including C.I grating, curing etc, complete in all respects as per drawings, specifications and all as directed by the Engineer.
Structural Works-7
RESIDENCE MR. ABDUL BASEERVELANCIA LAHORE
PRICED BILL OF QUANTITIES
CIVIL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
A. FINISHING WORKSGENERAL
PLASTERING
Ceiling11 Sft #REF! 10 #REF!
Walls12 Sft #VALUE! 10 #VALUE!
13 Sft #VALUE! 12 #VALUE!
Sub-Total of plastring: #REF!
B. FLOORS & DADO/SKIRTING
1
Bed Rooms Sft #REF! 90 #REF!
2
All items of Civil works of building described here of under the title description unless specifically indicated otherwise, shall be deemed to be read in terms of supplying, making, assembling, installing, providing, laying, fixing and testing, etc, including all lead and lift upto any elevation/level complete in all respects, and as directed by the Engineer.
1/2" thick cement, Chenab sand plaster in 1:3 on ceiling etc including making edges, corners and curing etc.
1/2" thick cement, Chenab sand plaster in 1:4 on internal walls, columns etc. including making edges, corners and curing etc.
3/4" thick cement, Chenab sand plaster in 1:4 on external walls, columns etc. including making edges, corners and curing etc.
Providing and laying floor of approved quality and shade Laminated wood laid as per manufacturer's specifications, complete in all respects. (Bed Rooms)
Providing and laying A-1 quality porcelain tiles of Master or approved make, size and quality on floor laid over 3/4" thick cement mortar base 1:3 including jointing and washing the tiles with white cement slurry of matching color (by using pigment in white cement) and curing, etc.
Structural Works-8
CIVIL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
Sft 806 125 100,719
3 Sft 130 120 15,634
4
Bath Room, Dress, Powder Sft 5977 130 777,010
5 Rft 500 110 55,000
6
Drawing, Dinidng, Patio, Passages Sft 190 75 14,268
7 Sft 25 350 8,750
a) on stairs/entrance steps Sft 723 650 470,158b) on bath vanity counter. Sft 48 650 470,158
8 Sft 208 40 8,320
9
Swimming Pool, Water Body Sft 2150 475 1,021,250
Kitchen, Pantry, open Setting, open area
Providing and fixing 1" thick hard wood skirting of approved design fixed to wall with sunken head nails including polishing, complete.
Providing and laying approved quality Ceramic tiles of "Spain" on walls and floor laid over 3/4" thick cement base mortar 1:3 including jointing and washing the tiles with white cement slurry of matching color (by using pigment in white cement) and curing, etc.
Providing and laying Ceramic tiles bordar of approved size, shade and quality on walls and floor laid over 3/4" thick cement mortar base 1:3 including jointing and washing the tiles with white cement slurry of matching color (by using pigment in white cement) and curing, etc.
Providing and laying Stone Finish Tiles of of approved make, size and quality on floor laid over 3/4" thick cement mortar base 1:3 including jointing and washing the tiles with white cement slurry of matching color (by using pigment in white cement) and curing, etc.
1/2" thick perpolished imported Granite (Italy) skirting of approved quality, shade and size as shown on drawings over cement sand mortar 1:3 including grouting, finishing, etc, complete in all respects.
Providing and laying 1/2" thick terrazzo in gray cement on walls and floor laid over 3/4" thick cement sand mortar base 1:3 including grouting, grinding, polishing, finishing, etc, complete in all respects.
Providing and laying Glass Mosaic Tiles of MEC, complete in all respects.
Structural Works-9
CIVIL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
10
Sft 1750 80 140,000
Sub-Total of Flooring/Dado & skirting: #REF!
WOOD WORK
WOODEN DOORS11
Type-D1 No. 1 36,000 36,000Type-D2 No. 2 32,000 64,000Type-D3 No. 5 30,000 150,000Type-D4 No. 11 24,000 264,000Type-D5 No. 4 22,000 88,000Type-D6 No. 2 188,000 376,000
12 Sft 1325 1,200 1,590,000
13 Sft 732 500 366,000
14
a) Main doors Nos. 1 3,200 3,200b) Internal doors Nos. 24 1,000 24,000
CABINETS & WARDROBESa) Kitchen Job L.s 225,000 225,000b) Full height wardrobes. Sft 350 375 131,250
Sub-Total of Wood Wook: 3,067,450
PAINTING15 Sft 7873 8 62,983
Providing and laying 2" thick precast concrete Tuff Paver of approved design and shade on floor laid over 2" thick sand cushion including grouted with sand, leveling, mechanically compacting and curing etc. complete.
Providing and fixing 1-1/2" thick solid approved quality wood door shutter hinged with same wood main frame (Choket) including best quality fitting, brass hinges, anti-termite, polishing, etc, complete in all respects
Providing and fixing Wooden Pergolas and wooden beams of approved wood, as per drawings, complete in all respects.
Providing and fixing Wooden Jeffrey of approved design, as per drawings, complete in all respects.
Providing and fixing best quality imported Door Locks of approved make for doors with approved handle .
Providing and applying Plastic emulsion paint of approved make and shade in two coats over and including the cost of one priming coat including sand, preparing, dusting and filling the holes, cracks and inequalities if any on ceiling and walls.
Structural Works-10
CIVIL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
16 Sft 250 15 3,750
Sub-Total of Painting: 66,733
FAÇADE FINISHING
17 Sft #VALUE! 175 #VALUE!
Sub-Total of Façade Finishing: #VALUE!
ALUMINUM WINDOWS16
2513 Sft 325 816,603
Sub-Total of Aluminum windows: 816,603
MISCELLANEOUS18 Sft 143 350 50,050
19 Stainless Steel Fire Places 5 No. 20,000 100,000
Sub-Total of Miscellaneous: 150,050
ROOF INSULATION20 Sft 9237 75 692,812
Providing and applying weather sheild painting of approved shade, quality on walls as per manufacturer's specifications.
Providing and laying Stone tiles on façade laid over 3/4" thick cement sand mortar base 1:3, complete in all respects.
Providing and fixing aluminum windows of 1.6 mm thick with 6mm thick imported plain / colored glass.
a) fully glazed partly sliding/openable and partly fixed windows with ply proof shutter on openable panels. (Type-1,2,3,4,5,6,7,8,10,11,12,13,14)
Providing and fixing Stair/ Ent podium railing of approved design of wrought iron of including spay painting, etc, complete as per drawings.
Providing and applying water proofing treatment on roof in following layers,
2" thick high density thermopore sheet (25Kg/m3) over 1 layer of polythen sheet of 500 gauge laying over two coats of hot bitumen @ 25 Kg / m2 over R.C.C roof slab.
Brick tiles floor jointed and grouted with 1:3 cement sand mortar over 4" thick mud including curing, making slope towards the drains, complete in all respects as per drawings, specification and all as directed by the Engineer.
Structural Works-11
CIVIL WORKSSr. DESCRIPTION UNIT QTY. RATE AMOUNTNo. (Rs.) (Rs.)
21 Each 8 1,500 12,000
Sub-Total of Roof insulation: 704,812
Making of Roof Khurras 2'x2' in cement concrete 1:2:4 finished with steel trowel including C.I grating, curing etc, complete in all respects as per drawings, specifications and all as directed by the Engineer.
PLUMBING-12MAIN REDSIDENCE BUILDING
RESIDENCE MR. ABDUL BASEERVELANCIA LAHORE
PRICED BILL OF QUANTITIES
PLUMBING
Description Unit Quantity
Part-1: PLUMBING FIXTURES
1.1 Nos. 6 10,500 63,000
1.2 Nos. 7 5,000 35,000
1.3 Nos. 4 45,000 180,000
1.4 Nos. 4 12,000 48,000
1.5 Nos. 1 4,500 4,500
1.5 Nos. 1 40,000 40,000
1.6 Nos. 4 65,000 260,000
Sr. No.
Rate (Rs.)
Amount (Rs.)
Providing and installing water closet english type, PORTA-China make coupled cistern , Grohe make 15 mm dia. T.stop cock ,15 mm dia. supply and 32 mm dia. waste water connections, complete including testing, colour as specified by the architect.
Providing and installing PORTA-China make wash hand basin, Grohe make 15 mm dia.T.stop cock,15 mm dia. supply and 32 mm dia. waste water connections, waste coupling, P-trap complete including testing, colour as specified.
Providing and installing approved make equivalent make shower cabinet, complete including testing, colour as specified.
Providing and installing approved make bath tub, Grohe make 15 mm dia.T.stop cock, waste coupling, P-trap complete including testing, colour as specified.
Providing and installing water closet indian type, ICL or equivalent make coupled cistern , Grohe make 15 mm dia. T.stop cock ,15 mm dia. supply and 32 mm dia. waste water connections, complete including testing, colour as specified by the architect.
Providing and installing Jaccuyci Chinese make, Grohe make 15 mm dia.T.stop cock, waste coupling, P-trap complete including testing, colour as specified.
Providing and installing Shower Cabinet Chinese make, complete including testing, colour as specified.
PLUMBING-13MAIN REDSIDENCE BUILDING
PLUMBING
Description Unit QuantitySr. No.
Rate (Rs.)
Amount (Rs.)
1.6
a) Wash basin mixer Nos. 7 1,200 8,400
b) Muslim shower with double bib cock Nos. 6 1,200 7,200
c) Shower wall mounted with double bib cock Nos. 4 850 3,400
d) Kitchen sink mixer Nos. 1 650 650
1.7
Set 5 2,500 12,500
1.8
a) single bowl with double drain board Nos. 1 8,500 8,500
Part-2: INTERNAL WATER SUPPLY
2.1
1/2" i.d (20 mm) Rft. 150 45 6,750
3/4" i.d (25 mm) Rft. 290 55 15,950
1" i.d (32 mm) Rft. 335 65 21,775
1-1/4" i.d (40 mm) Rft. 200 75 15,000
1-1/2" i.d (50 mm) Rft. 365 110 40,150
2" i.d (63 mm) Rft. 300 125 37,500
2.2
1" i.d (32 mm) Nos. 5 125 625
1-1/4" i.d (40 mm) Nos. 7 150 1,050
Providing and fixing 15 mm dia bibcock/mixer of Grohe or equivalent make with C.P pipe 15 mm dia. complete including pipe connections, all fittings, testing etc.
Providing and fixing bath room accessories set consisting of 7 pieces (soap dish, toilet paper holder, towel rail, Grohe or equivalent make.
Providing and installing Kitchen Sink Grohe or equivalent make, Grohe make 15 mm dia.T.stop cock,15 mm dia supply and 32 mm dia. waste water connections, waste coupling, P-trap complete including testing, colour as specified.
Providing, fixing, jointing and testing Polypropylene Random (PPR) pipes Dadex make "Polydex" or approved equivalent pressure pipe for cold water as per DIN 8077-8078 for pipes and DIN 16962,PN25 for fittings (polyfusion welded joints) inside building including fittings and specials (sockets, tees, elbows, bends, crosses, reducers, adaptor, plugs and union etc.) supported on walls or suspended from roof slab or run in chases including pipe hangers, supports, cutting and making good the chases and holes, complete in all respects.
Providing and installing ball valves of following nominal dia., kitz make ,including jointing ,fitting, painting, testing, complete in all respects to match with following G.I pipe diameters.
PLUMBING-14MAIN REDSIDENCE BUILDING
PLUMBING
Description Unit QuantitySr. No.
Rate (Rs.)
Amount (Rs.)
1-1/2" i.d (50 mm) Nos. 4 200 800
2" i.d (63 mm) Nos. 2 265 530
3.1
2" dia Rft. 225 90 20,250
3" dia Rft. 430 140 60,200
4" dia Rft. 745 180 134,100
3.2 Nos. 10 500 5,000
3.3 Nos. 7 600 4,200
3.4 Nos. 10 5,000 50,000
3.5 Rft 610 90 54,900
Part-3: INTERNAL SEWERAGE , VENTS & ROOF DRAINAGE
Providing, fixing , cutting, jointing and testing uPVC piping conforming to ISO 3633:1991 ( wall thickness=3.2 mm) including uPVC fittings with solvent cement jointing Dadex make "Nikasi Type B" or approved equal , rates include cost of clamping to walls and ceiling , hangers, supports, cutting through walls and providing sleeves through concrete slabs for pipelines and pipe fittings of the following diameter:
Providing and fixing 4" dia uPVC Floor Trap of make Nikassi or approved equivalent including Stainless Steel grating ,and cover.
Providing and constructing gully trap of size 6" x 6" at locations shown on drawings with cover, complete in all respects.
Providing and making 9" thick brick masonry Manhole of 2'x2' size including, plastering, 18" dia C.I manhole cover, complete in all respects.
Reinforced cement concrete sewer pipes 6" dia conforming to ASTM C-14 Class 3 including fittings, excavation bedding, backfilling, etc, complete.
PLUMBING-15MAIN REDSIDENCE BUILDING
PLUMBING
Description Unit QuantitySr. No.
Rate (Rs.)
Amount (Rs.)
Part-4: GAS SUPPLY
4.1
3/4" dia Rft. 295 40 11,800
1" dia Rft. 210 55 11,550
4.2
3/4" dia Nos. 6 120 720
Part-5: MISCELLANEOUS
5.1 Nos. 2 35,000 70,000
5.2 Nos. 4 13,500 54,000
Total: 1,288,000
Providing and fixing G.I. Pipe and fittings make IIL medium quality for gas supply from meter to kitchens of each floor including cutting trenches, burring in floors and walls. All buried pipes shall be provided with 3" wide bituminous tape winded around the pipe.
Providing and installing ball valves of following nominal dia, Kitz make, including jointing, fitting, painting, testing, complete in all respects to match with following G.I pipe dia meters.
Provide, install, test and commission clean water centrifugal submersible pumps of make KSB or approved equivalent of 25 gpm each capable of pumping against a total pumping head of 50 ft. coupled with water cooled electric motor of requiset HP, 250 volts, 1 - phase, 50 Hz. . The pump shall be provided with auto / manual switches, dry running protection, low / high level water controls with alternative standby duty operation system, complete in all repects.
Providing, installing, testing and commissioning stainless steel body gas geyser of 35 gallons capacity of Ambassadors or equivalent make including all necessary fittings, valves, complete in all respects.
Page 16
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.
1 EXCAVATION
4-4 1 124.5 4 3 1494
5-5 1 124.25 2.5 3 932
basement plan 1 4203 1 5.25 22066
Say 25716 Cft
2 ANTI TERMITE
In foundation
EXT WALLS 1 269.58 2.75 3 2224
1-1 1 139.125 2.75 3 1148
2-2 1 161.663 3.125 3 1516
3-3 1 18.75 2.5 3 141
4-4 1 41.25 2.75 3 340
F-1 11 4.5 4.5 3 668
base for swimming pool 1 15.25 23.625 5.25 1891
PILLER 4 4 4 3 168
under floor
Ground Floor Area
Ent.Pavers 1 310 310
Porc 1 20 18 356
Drawing 1 24 16 384
Passage +Stair all 1 591 591
Litcen 1 15.75 13.25 209
S.Q 1 8.50 8.5 72
Bat 1 13.00 10.5 137
Bed 1 15.00 20 300
1 8.63 6.83 59
swimming pool Podi. 1 20.75 1.67 35
Ext.Passage 1 49.50 5 248
1 49.25 5 246
First Floor Area
Sitting 1 6.25 5.5 34
Terrace 1 20.5 5.25 108
Living 1 18 15.75 284
Passege+Stair all 1 223.55 224
.Bed 1 16 14.5 232
D/Bat 1 21.125 8.67 183
Bed 1 15.75 13.25 209
1 14.5 14.5 210
Dress Bed 1 15 8.5 128
Landry 1 9 6.25 56
aid 1 10 10.5 105
Bat 1 6.25 4 25
Say 13480 Cft
Item No.
Page 17
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
3 LEAN CONC.
In foundation
EXT WALLS 1 269.58 2.75 0.33 245
1-1 1 139.125 2.75 0.33 126
2-2 1 161.663 3.125 0.33 167
3-3 1 18.75 2.5 0.33 15
4-4 1 41.25 2.75 0.33 37
F-1 11 4.5 4.5 0.33 74
base for swimming pool 1 15.25 23.625 0.33 119
PILLER 4 4 4 3 168
Say 998
4 R.C.C.
4 ROOF SLAB
GROUND FLOOR SLAB 1 2448.33 0.500 1224
FIRST FLOOR SLAB 1 2075.51 0.500 1038
Say 2375 Cft
e SLAB BEAMS
Ground Floor
B3 1 57.75 0.75 0.75 32
B4 1 18.75 0.75 1 14
LB2 1 9.83 0.75 0.75 6
LB3 1 20 0.75 0.75 11
LB4 1 15 0.75 1.5 17
CB1 1 112.125 1.5 0.33 56
CB2 1 12.125 1.25 0.33 5
CB3 1 42.67 1.75 0.33 25
CB6 1 46 1.75 0.33 27
PB1 1 21.25 1.25 1 27
PB2 1 5.83 0.75 0.5 2
First Floor
LB1 1 13.875 0.75 1 10
LB2 1 72.045 0.75 0.75 41
LB3 1 5.5 0.75 0.75 3
CB1 1 24.25 1.25 0.75 23
RB1 1 12.125 0.75 0.5 5
RB2 1 18.5 0.75 0.92 13
Sec. x - x 2 13.08 7.92 0.33 68
2 1.67 7.92 0.33 9
Side beam 2 7.92 0.75 1.75 21
Say 413 Cft
4 PARGOLAS
20 1.50 0.5 0.750 11
Say 11 Cft
4 FOOTINGS
Page 18
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
F1 1 4.00 4 0.750 12
Swimming Pool base 1 23.75 3.5 0.750 62
1 23.75 5.5 0.750 98
1 23.75 6.42 0.750 114
1 12.75 3.5 1.000 45
1 12.75 5.5 1.000 70
1 10.00 6.42 0.330 21
Say 444 Cft
R.C.C Stairs
GF, FF
Waste Slab 2 21.25 0.5 4.000 85
Steps 36 4.50 1 0.670 109
Say 194 Cft
R.C.C walls
Swimming Pool walls 2 23.75 0.5 4.580 109
2 12.75 0.5 4.580 58
Say 167 Cft
4 COLUMNS
Up to N.G.L
C1 13 1.50 1.5 5.000 146
Say 146 Cft
Ground Floor
C1 11 1.50 1.5 1.500 37
11 0.44 11.000 53
2 0.75 0.75 7.000 8
Say 98 Cft
First Floor
C1
7 0.44 11.000 34
Say 34 Cft
5 REINFORCMENT
Footings 1 444 4 1775
Columns 1 279 10 2787
Beams 1 413 10 4126
Slabs, Perapet, Pergola 1 2386 5 11931
R.C.C Walls 1 167 8 1337
21957 lbs
9959 Kg
Say 14 Tons
6 BRICK MASONRY > 9" and above IN FOUNDATION AND UP TO PL
Ext. Walls 1 252 1.68 1 422
1 252 0.75 5.5 1040
Internal walls
Kitchen+SQ 1 15.75 1.87 1.25 37
1 15.75 0.75 5.5 65
Page 19
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
1 8.5 1.87 1.25 20
1 8.5 0.75 5.5 35
Bath 1 15.75 1.87 1.25 37
1 15.75 0.75 5.5 65
1 14 1.87 1.25 33
1 14 0.75 5.5 58
Swimming 1 11.67 1.87 1.25 27
1 11.67 0.75 5.5 48
1 20.75 1.87 1.25 48
1 20.75 0.75 5.5 86
Boundry wall 1 270 1.87 1 504
1 270 0.75 5.5 1114
Description No. L (ft) W (ft) H (ft) Qty.
Say 3819 Cft
6 BRICK MASONRY ABOVE PL
GROUND FLOOR
DRAWING ROOM 2 14.75 0.75 10 221
DRAWING ROOM 2 12.75 0.75 10 191
BED FRONT 2 19.124 0.75 10 287
BED FRONT 2 17.75 0.75 10 266
BACK WALL 1 36.5 0.75 10 274
BED SIDE WALL 3 15.5 0.75 10 349
BED WALL 1 28 0.75 10 210
LOUNGE WALL 1 14.75 0.75 10 111
STORE 1 24.75 0.75 10 186
STORE 1 12.25 0.38 10 47
BED FRONT BATH 1 24.125 0.38 10 92
STAIR 1 21.66 0.75 10 162
STAIR BATH 2 6.41 0.38 10 49
STAIR BATH 1 4 0.38 10 15
LOBBY 2 6.5 0.75 10 98
KITCHNE LAUNDARY 2 16 0.75 10 240
KITCHNE LAUNDARY 1 9 0.75 10 68
KITCHNE LAUNDARY 1 5.75 0.38 10 22
LESS DOOR 1 -4 0.75 7 -21
LESS DOOR 6 -3.5 0.75 7 -110
LESS DOOR 3 -2.5 0.38 7 -20
LESS DOOR 1 -3 0.75 7 -16
2755 Cft
8 FLOOR
GROUND FLOOR
LAWN 1 12 5 1 34
PORCH 1 11 15.75 1 53
DRAWING 1 12 10 1 44
LOUNGE 1 24 10 1 67
FRONT AREA OF KITCHEN 1 9.00 5 1 28
BED 1 13.75 11 1 50
Item No.
Page 20
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
KITCHEN 1 9.00 6.75 1 32
BACK YARD 1 25.00 10 1 70
FIRST FLOOR
BED 1 14 11 1 50
STORE 1 9 6.75 1 32
LOUNGE 1 24 10 1 67
FRONT OF STR 1 9 5 1 28
BED 1 12.00 10 1 44
FRONT OF TERRACE 1 5.00 5 1 20
TERRACE 1 5.00 13 1 36
MUMTY 1 7.00 10 1 34
Err:522
SKIRTING
GROUND FLOOR
LAWN 2 12 5 1 68
PORCH 2 11 15.75 1 106
DRAWING 2 12 10 1 88
LOUNGE 2 24 10 1 134
FRONT AREA OF KITCHEN 2 9.00 5 1 56
BED 2 13.75 11 1 99
KITCHEN 2 9.00 6.75 1 63
BATH 2 8.00 6 1 56
BACK YARD 2 25.00 10 1 140
FIRST FLOOR 2
BED 2 14 11 1 99
STORE 2 9 6.75 1 63
LOUNGE 2 24 10 1 134
FRONT OF STR 2 9 5 1 56
BED 2 12.00 10 1 88
BATH 2 5.00 5 1 40
FRONT OF TERRACE 2 5.00 5 1 40
TERRACE 2 5.00 13 1 72
MUMTY 2 7.00 10 1 68
212.25 155.25 2769 PLASTER ON WALLS
LAWN 2 12 5 10 680
PORCH 2 11 15.75 10 1060
DRAWING 2 12 10 10 880
LOUNGE 2 24 10 10 1340
FRONT AREA OF KITCHEN 2 9.00 5 10 560
BED 2 13.75 11 10 990
KITCHEN 2 9.00 6.75 10 630
BATH 2 8.00 6 10 560
BACK YARD 2 25.00 10 10 1400
FIRST FLOOR 2
BED 2 14 11 10 990
STORE 2 9 6.75 10 630
Page 21
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
LOUNGE 2 24 10 10 1340
FRONT OF STR 2 9 5 10 560
BED 2 12.00 10 10 880
BATH 2 5.00 5 10 400
FRONT OF TERRACE 2 5.00 5 10 400
TERRACE 2 5.00 13 10 720
MUMTY 2 7.00 10 10 680
BOUNDRY WALL 1 59 7.00 1 41315113
9 PLASTER ON CEILING
LAWN 1 12 5 1 34
PORCH 1 11 15.75 1 53
DRAWING 1 12 10 1 44
LOUNGE 1 24 10 1 67
FRONT AREA OF KITCHEN 1 9.00 5 1 28
BED 1 13.75 11 1 50
KITCHEN 1 9.00 6.75 1 32
BATH 1 8.00 6 1 28
BACK YARD 1 25.00 10 1 70
FIRST FLOOR 1
BED 1 14 11 1 50
STORE 1 9 6.75 1 32
LOUNGE 1 24 10 1 67
FRONT OF STR 1 9 5 1 28
BED 1 12.00 10 1 44
BATH 1 5.00 5 1 20
FRONT OF TERRACE 1 5.00 5 1 20
TERRACE 1 5.00 13 1 36
MUMTY 1 7.00 10 1 3415848
GLAZED TILE
GROUND FLOOR
BATH 1 8.00 6 1 28
BATH 1 5.00 5 1 20
BATH 1 28.00 7 1 70
BATH 1 20.00 7 1 54
17210 LAMINATED WOOD
D1 2 4 7 8
D2 6 4 7 147
D3 2 3 7 42
D4 2 3 7 35
23210 ALUMINUM WINDOWS
W1 2 8 5 16
W2 2 5 5 50
W3 1 4 3.5 14
Page 22
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
W4 2 4 5 40
DW 1 5 7 35
V1 2 3 2 12
16711 EXTERNAL FINISH
DRAWING EXTERNAL WALL 1 14 25 338
PORCH WALL 1 11.50 18 207
TERRACE 1 6.50 12.5 81
MUMTY 1 18.00 10 180806 Sft
9 ROOF INSULATION
FIRST FLOOR 1 25 34 850
9 CERAMIC TILES FLOOR (Master ) 8"x12"
GROUND FLOOR
BATH-1 1 10.00 12 120
DRESS 1 10.00 7.25 73
BATH-2 1 10.00 10 100
DRESS 1 10.00 9.75 98
BATH-3 1 11.00 13 143
DRESS 1 18.00 13.25 239
POW 1 8.00 8 64
PANT 1 10.00 8 80
KIT 1 17.00 14 238
LAND 1 8.00 5 40
SH/BTH 2 4.00 6 48
FIRST FLOOR 0
BATH-4 1 12 10 120
DRESS 1 10 7.25 73
BATH-5 1 10 10 100
DRESS 1 10 9.25 93
Say 1627 Sft9 Terrazo Finish
GROUND FLOOR
SER. 1 12.00 12 1441 8 8 64
Say 208 Sft
9 STONE FINISH TILE
GROUND FLOOR
SITTING 1 22 13.25 292
COVERED PATIO 1 30 20 30
OUTER KIT 1 16.00 21.75 348
DINING 1 20.00 20 400
DRAWING 1 23.00 20 460
VER 1 20.00 20 400
PASSAGE 1 48.00 8 384
1 62.00 8 496
STAIR CASE 1 14.00 12 168
Page 23
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
POW 1 8.00 8 64
CROC 1 7.00 8 56
PANT 1 10.00 8 80
OPEN SITTING 1 43.50 14.6 635
1 30.00 20 600
1 16.00 16 256
OPEN BAR 1 20.00 20 400
FIRST FLOOR 0
PASSAGE 1 48 8 384
Say 5453 Sft10 TUFF PAVERS
GROUND FLOOR
PORCH 1 1750 1750
Say 1750 Sft10 BRICK TILE ON ROOF
1 7958.49 1 7958
1 22 22 484
1 39.75 20 795
923710 WOOD SKIRTING
GROUND FLOOR
BED 2 20 18 0.33 50
M.BED 1 18 18 0.33 24
FIRST FLOOR 0.33 0
BED 2 20 18 0.33 50Say 130 Sft
11 PORCLINE TILE SK
GROUND FLOOR
SITTING 1 22 13.25 0.33 23
PASSAGE 1 48.00 8 0.33 37
1 62.00 8 0.33 46
STAIR CASE 1 14.00 12 0.33 17
CROC 1 7.00 8 0.33 10
PANT 1 10.00 8 0.33 12
KIT 1 17.00 14 0.33 20
SER. 1 12.00 12 0.33 16
LAND 1 8.00 5 0.33 9
Say 190 Sft
9 CERAMIC TILES FLOOR (Master ) 8"x12"
GROUND FLOOR
BATH-1 1 10.00 12 7 308
DRESS 1 10.00 7.25 7 242
BATH-2 1 10.00 10 7 280
DRESS 1 10.00 9.75 7 277
BATH-3 1 11.00 13 7 336
DRESS 1 18.00 13.25 7 438
POW 1 8.00 8 7 224
Page 24
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
PANT 1 10.00 8 7 252
KIT 1 17.00 14 7 434
LAND 1 8.00 5 7 182
SH/BTH 2 4.00 6 7 280
FIRST FLOOR 7 0
BATH-4 1 12 10 7 308
DRESS 1 10 7.25 7 242
BATH-5 1 10 10 7 280
DRESS 1 10 9.25 7 270
Say 4351 Sft
11 SOID WOODEN DOORS
D3 3 4 8 96
D4 0
D5 3 3.75 8 90
D6 2 3 8 48
D7 3 3 8 72
D8 4 2.75 8 88
D9 1 2.5 8 20
414 Sft
11 GLAZED WOODEN DOORS
D1 1 5 8 40
D2 3 4 8 96
136 Sft
11 Sliding Door
SD1 1 4 8 96
96 Sft
13 STAIRS FINISH (GR)
GROUND FLOOR
PODIUM 1 22 22 484
RISER 3 22 1.58 104
MAIN STAIR TR 21 4 1 84
RISER 22 4 0.58 51Say 723 Sft
14 MARBLE VENITY/KIT TOP
BATH 2 9 1.6 29
1ST FLOOR
BATH 1 7.5 1.5 11
BATH 1 5 1.5 8
Say 48 Sft
14 Cabnit Wall mounted
KIT 1 32.375 2 65
Say 65 Sft
Page 25
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
14 Cabnit Floor mounted
KIT 1 32.375 2.75 89
Say 89 Sft
25 WINDOWS GLAZEDW1 1 16 16 256W2 1 15 16 240W3 1 13 8 104W4 1 13 12 156W5 4 12 7.5 360W6 2 21 16 672W7 2 10 16 320W8 4 8 7 224W9 1 8 5 40W10 2 6 5 60W11 1 4.75 7.5 36W12 1 4 5 20W13 1 3 5 15W14 2 2 2.5 10
2513 Sft28 STAIR RAILNG
GF 1 28 2.75 77FF 2 12 2.75 66
Say 143 Sft
29 STEEL STAIR 1 1 Sft
30 WARD ROBESGROUND FLOORBed 1 14.455 10 145F.F 2 7 10 140
1 8.625 10 861 10.625 10 106
477 SFT
11 Graphiiotoo
Around Building 1 245 12 2940
Around Building 1 241 12 2892
Less Doors -136
Less Windows -25133343 SFT
11 Vynile Emultion on ceiling
GROUND FLOORPorc 1 20 18 356Drawing 1 24 16 384Passage +Stair all 1 591 591Litcen 1 15.75 13.25 209S.Q 1 8.50 8.5 72Bat 1 13.00 10.5 137Bed 1 15.00 20 300
1 8.63 6.83 59swimming pool Podi. 1 20.75 1.67 35Ext.Passage 1 49.50 5 248
1 49.25 5 246FIRST FLOOR
Page 26
Calculation of QuantitiesDescription No. L (ft) W (ft) H (ft) Qty.Item
No.
Sitting 1 6.25 5.5 34Terrace 1 20.5 5.25 108Living 1 18 15.75 284Passege+Stair all 1 223.55 224.Bed 1 16 14.5 232D/Bat 1 21.125 8.67 183Bed 1 15.75 13.25 209
1 14.5 14.5 210Dress Bed 1 15 8.5 128Landry 1 9 6.25 56aid 1 10 10.5 105Bat 1 6.25 4 25
11 Vynile Emultion on walls
GROUND FLOORPorc 1 20 18 10 755Litcen 1 15.75 13.25 5 290S.Q 1 8.50 8.5 10 340Bath 1 13.00 10.5 5 235FIRST FLOORSitting 1 6.25 5.5 10 235D/Bat 1 21.125 8.67 5 298Dress Bed 1 15 8.5 10 470Landry 1 9 6.25 10 305maid 1 10 10.5 10 410Bath 1 6.25 4 5 103
7873 SFT11 Texture Coating
GROUND FLOORDrawing 1 24 16 10 800Passage +Stair all 1 591 1 591Bed 1 15.00 20 10 700
1 8.63 6.83 10 309FIRST FLOORSitting 1 6.25 5.5 10 235Living 1 18 15.75 10 675Passege+Stair all 1 223.55 10 224.Bed 1 16 14.5 10 610Bed 1 15.75 13.25 10 580
1 14.5 14.5 10 580Dress Bed 1 15 8.5 10 470
5774 SFT
27
SALMAN TASEER FARM HOUSE
MEASUREMENT SHEETS
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
1 Excavation
F1 18 5.50 5.50 2.25 1225.13
F2 5 4.00 4.00 2.25 180.00
F3 4 4.50 4.50 2.25 182.25
F4 1 4.00 4.00 2.25 36.00
F4A 1 4.00 4.00 2.25 36.00
Cavity Wall 1 162.00 3.50 2.25 1275.75
1 6.75 3.50 2.25 53.16
1 22.00 3.50 2.25 173.25
1 45.00 3.50 2.25 354.38
1 5.00 3.50 2.25 39.38
1 26.50 3.50 2.25 208.69
1 18.50 3.50 2.25 145.69
2 13.00 3.50 2.25 204.75
1 13.75 3.50 2.25 108.28
1 6.75 3.50 2.25 53.16
1 14.83 3.50 2.25 116.79
2 6.50 3.50 2.25 102.38
1 14.50 3.50 2.25 114.19
1 4.00 3.50 2.25 31.50
1 32.00 3.50 2.25 252.00
1 8.00 3.50 2.25 63.00
1 48.00 3.50 2.25 378.00
2 18.50 3.50 2.25 291.38
1 47.00 3.50 2.25 370.13
1 10.00 3.50 2.25 78.75
1 32.00 3.50 2.25 252.00
3 25.75 3.50 2.25 608.34
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
28
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
Sec 2-2 5 20.00 3.00 2.25 675.00
1 13.00 3.00 2.25 87.75
1 10.00 3.00 2.25 67.50
1 60.25 3.00 2.25 406.69
1 6.00 3.00 2.25 40.50
2 17.00 3.00 2.25 229.50
1 20.00 3.00 2.25 135.00
1 22.00 3.00 2.25 148.50
Sec 2a-2a 1 6.75 3.00 2.25 45.56
2 7.75 3.00 2.25 104.63
Sec 3-3 1 12.00 2.00 1.75 42.00
2 5.00 2.00 1.75 35.00
2 17.08 2.00 1.75 119.58
1 27.17 2.00 1.75 95.10
Sec 4-4 1 6.75 2.75 2.25 41.77
" 1 10.00 2.75 2.25 61.88
" 1 10.75 2.75 2.25 66.52
Swimming pool 1 1450.00 6.00 8700.00
Water pound 1 620.00 3.00 1860.00
Fire Place Raft 1 7.00 3.00 3.00 63.00
Total: 19959.74 Cft
Sand filling
Total Qty of excavation 1 19959.74
Less Brick work in foundation -1 -4521.32
Less lean conc. in foundation -1 -7026.25
Less foundation -1 -1500.43
Total: 6911.75 Cft
Termite proofing
F1 18 5.50 5.50 544.50
F2 5 4.00 4.00 80.00
F3 4 4.50 4.50 81.00
29
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
F4 1 4.00 4.00 16.00
F4A 1 4.00 4.00 16.00
Cavity Wall 1 162.00 3.50 567.00
1 6.75 3.50 23.63
1 22.00 3.50 77.00
1 45.00 3.50 157.50
1 5.00 3.50 17.50
1 26.50 3.50 92.75
1 18.50 3.50 64.75
2 13.00 3.50 91.00
1 13.75 3.50 48.13
1 6.75 3.50 23.63
1 14.83 3.50 51.91
2 6.50 3.50 45.50
1 14.50 3.50 50.75
1 4.00 3.50 14.00
1 32.00 3.50 112.00
1 8.00 3.50 28.00
1 48.00 3.50 168.00
2 18.50 3.50 129.50
1 47.00 3.50 164.50
1 10.00 3.50 35.00
1 32.00 3.50 112.00
3 25.75 3.50 270.38
Sec 2-2 5 20.00 3.00 300.00
1 13.00 3.00 39.00
1 10.00 3.00 30.00
1 60.25 3.00 180.75
1 6.00 3.00 18.00
2 17.00 3.00 102.00
1 20.00 3.00 60.00
30
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
1 22.00 3.00 66.00
Sec 2a-2a 1 6.75 3.00 20.25
2 7.75 3.00 46.50
Sec 3-3 1 12.00 2.00 24.00
2 5.00 2.00 20.00
2 17.08 2.00 68.33
1 27.17 2.00 54.34
2 Sec 4-4 1 6.75 2.75 18.56
" 1 10.00 2.75 27.50
" 1 10.75 2.75 29.56
Swimming pool 1 1450.00 1450.00
Water pound 1 620.00 0.54 334.80
Fire Place Raft 1 7.00 3.00 1.00 21.00
under floor 1 11780.00 11780.00 Cft
4 Total: 17772.50
Reinforcement bars
Qty as per Footings 3.50 1500 Cft 5251.49 Kg
Qty of slab & stair concrete 4.00 6123 Cft 24490.35 Kg
Qty of beams & lintle concrete 5.00 1642 Cft 8207.86 Kg
Qty of column & walls concrete 6.00 2636 Cft 15817.85 Kg
5 Total: 53767.54
F1 18 5.50 5.50 0.50 272.25
F2 5 4.00 4.00 0.50 40.00
F3 4 4.50 4.50 0.50 40.50
F4 1 4.00 4.00 0.50 8.00
F4A 1 4.00 4.00 0.50 8.00
Cavity Wall 1 162.00 3.50 0.50 283.50
P.C.C. 1:4:8 using crushed stone under foundation
31
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
1 6.75 3.50 0.50 11.81
1 22.00 3.50 0.50 38.50
1 45.00 3.50 0.50 78.75
1 5.00 3.50 0.50 8.75 Cft
1 26.50 3.50 0.50 46.38
1 18.50 3.50 0.50 32.38
2 13.00 3.50 0.50 45.50
1 13.75 3.50 0.50 24.06
1 6.75 3.50 0.50 11.81
1 14.83 3.50 0.50 25.95
2 6.50 3.50 0.50 22.75
1 14.50 3.50 0.50 25.38
1 4.00 3.50 0.50 7.00
1 32.00 3.50 0.50 56.00
1 8.00 3.50 0.50 14.00 Cft
1 48.00 3.50 0.50 84.00
6 2 18.50 3.50 0.50 64.75
1 47.00 3.50 0.50 82.25
1 10.00 3.50 0.50 17.50
1 32.00 3.50 0.50 56.00
3 25.75 3.50 0.50 135.19
Sec 2-2 5 20.00 3.00 0.50 150.00
1 13.00 3.00 0.50 19.50
1 10.00 3.00 0.50 15.00
1 60.25 3.00 0.50 90.38
1 6.00 3.00 0.50 9.00
2 17.00 3.00 0.50 51.00
1 20.00 3.00 0.50 30.00
1 22.00 3.00 0.50 33.00
Sec 2a-2a 1 6.75 3.00 0.50 10.13
2 7.75 3.00 0.50 23.25
32
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
Sec 3-3 1 12.00 2.00 0.50 12.00
2 5.00 2.00 0.50 10.00
2 17.08 2.00 0.50 34.17
1 27.17 2.00 0.50 27.17
Sec 4-4 1 6.75 2.75 0.50 9.28
" 1 10.00 2.75 0.50 13.75
" 1 10.75 2.75 0.50 14.78
Swimming pool 1 1450.00 0.50 725.00
Water pound 1 620.00 0.50 310.00
Fire Place Raft 1 7.00 3.00 0.50 10.50
under floor 1 11780.00 0.33 3887.40
Total: 7026.25 Cft
R.C.C. 1:1/2:3 in foundations
F1 18 5.00 5.00 0.75 337.50
F2 5 3.50 3.50 0.50 30.63
F3 4 4.00 4.00 0.50 32.00
F4 1 3.50 3.50 0.50 6.13
F4A 1 3.50 3.50 0.50 6.13
Swimming pool Raft 1 1450.00 0.50 725.00
Water pound 1 620.00 0.54 334.80
Fire Place Raft 1 7.00 3.00 0.50 10.50
FB1 1 17.75 1.00 1.00 17.75
Total: 1500.43 Cft
R.C.C. 1:1/2:3 in Slab, Beams & Lintels
Ground floor
Slab (Ground floor) 1 6960.00 Sft 0.50 3480.00
1 500.00 Sft 0.50 250.00
1 785.00 Sft 0.58 455.30
33
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
Slab (1st floor) 1 1338.00 Sft 0.50 669.00
1 632.00 Sft 0.79 499.28
Total: 5353.58 Cft
Beams
Ground floor
B1 2 39.25 1.25 1.42 139.34
B2 2 18.50 0.75 1.58 43.85
B3 1 37.08 0.75 1.58 43.94
B4 1 20.33 1.25 0.33 8.39
1 11.50 1.25 0.33 4.74
1 22.00 1.25 0.33 9.08
B5 1 24.25 0.75 1.50 27.28
B6 1 22.17 0.75 1.00 16.63
1 43.00 0.75 1.00 32.25
B7 1 8.00 1.00 0.33 2.64
B8 1 18.00 2.00 0.33 11.88
B9 1 14.00 1.25 0.75 13.13
B10 1 13.75 1.50 0.75 15.47
B11 2 67.00 1.25 2.00 335.00
B12 2 19.25 1.00 1.00 38.50
B13 1 59.00 1.50 0.75 66.38
P1 12 18.00 0.67 1.00 144.72
P2 2 41.00 0.67 2.00 109.88
P3 9 13.00 0.50 1.00 58.50
PB1 1 33.00 1.00 1.00 33.00
SB1 1 18.75 4.00 0.83 62.25
SB2 1 6.00 0.83 0.83 4.13
1st floor
P1 27 8.00 0.67 1.00 144.72
P2 1 60.75 0.67 2.00 81.41
LB1 1 22.00 0.75 2.00 33.00
34
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
Lintels doors
L1 3.00 0.75 0.50 0.00
L2 3.25 0.75 0.50 0.00
L3 2 3.50 1.25 0.50 4.38
L4 3.75 0.75 0.50 0.00
L5 2 4.00 1.25 0.50 5.00
L6 5 4.25 0.75 0.50 7.97
L7 13 4.50 0.75 0.75 32.91
L7a 4.75 0.75 0.75 0.00
L8 5.00 0.75 0.75 0.00
L9 5 5.25 0.75 0.75 14.77
L10 3 5.50 0.75 0.75 9.28
L11 5.75 0.75 0.75 0.00
L12 1 6.00 0.75 0.75 3.38
L13 6.25 0.75 0.75 0.00
L14 6.50 0.75 0.75 0.00
L15 6.75 0.75 0.75 0.00
L16 7.00 0.75 0.75 0.00
L17 7.25 0.75 0.75 0.00
L18 2 7.50 0.75 0.75 8.44
L19 8.00 0.75 0.75 0.00
L20 8.50 0.75 0.75 0.00
L21 9.00 0.75 0.75 0.00
L21a 9.25 0.75 0.75 0.00
L22 5 11.00 0.75 0.75 30.94
L23 11.50 0.75 0.75 0.00
L24 12.00 0.75 1.50 0.00
L25 12.50 0.75 1.50 0.00
L26 2 13.00 0.75 1.50 29.25
L27 1 13.50 0.75 1.50 15.19
35
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
Total: 1641.57 Cft
R.C.C. 1:1:2 in Stairs
Main staircase (waste slab) 1 36.25 4.00 0.58 84.10
Steps 4.0 4.00 1.00 0.58 9.28
4.0 4.00 1.13 0.58 10.44
Main enterance steps (waste slab) 1 24.00 5.00 0.50 60.00
Steps 1.5 24.00 1.50 0.58 31.32
3 8.75 4.60 0.50 60.38
Steps 10.5 4.50 1.00 0.58 27.41
Lhort waste Steps (waste slab) 1 9.00 3.75 0.50 16.88
Steps 1.5 9.00 1.00 0.58 7.83
Total: 307.63 Cft
Cft
Walls (Swimming pool) 1 174.00 0.75 6.25 815.63
1 185.00 0.75 1.50 208.13
Walls (water pound) 1 102.00 0.50 6.25 318.75
1 57.50 0.50 6.25 179.69
12 5.00 0.33 6.25 123.75
6 5.00 1.25 0.75 28.13
Ground floor
C1 4 1.50 1.50 23.33 209.97 Cft
C2 5 0.79 23.33 91.57
C3 10 1.00 1.00 23.33 233.30
C4 7 1.00 1.25 23.33 204.14
C5 2 0.79 23.33 36.63
C6 4 1.00 2.00 23.33 186.64
First floor Total: 2636.31 Cft
C4 2 1.00 1.25 11.00 27.50
3 No,s short waste Steps (waste slab)
R.C.C. 1:1:2 in Columns, Retaining walls, Lift well and Parapet
36
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
C6 4 1.00 2.00 11.00 88.00
parapet 1 127.75 0.33 2.50 105.39
1 125.00 0.33 2.50 103.13
1 82.50 0.33 2.50 68.06
1 84.00 0.33 2.50 69.30
Total: 461.38 Cft
Brick Masonry in foundation
Ground Floor
Cavity Wall 1 162.00 2.25 0.50 182.25
1 162.00 1.88 0.50 151.88
1 162.00 1.50 0.50 121.50
1 162.00 1.13 9.25 1685.81
1 6.75 2.25 0.50 7.59
1 6.75 1.88 0.50 6.33
1 6.75 1.50 0.50 5.06
1 6.75 1.13 9.25 70.24
1 22.00 2.25 0.50 24.75
1 22.00 1.88 0.50 20.63
1 22.00 1.50 0.50 16.50
1 22.00 1.13 9.25 228.94
1 45.00 2.25 0.50 50.63
1 45.00 1.88 0.50 42.19
1 45.00 1.50 0.50 33.75
1 45.00 1.13 9.25 468.28
1 5.00 2.25 0.50 5.63
1 5.00 1.88 0.50 4.69
1 5.00 1.50 0.50 3.75
1 5.00 1.13 9.25 52.03
1 26.50 2.25 0.50 29.81
1 26.50 1.88 0.50 24.84
37
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
1 26.50 1.50 0.50 19.88
1 26.50 1.13 9.25 275.77
1 18.50 2.25 0.50 20.81
1 18.50 1.88 0.50 17.34
1 18.50 1.50 0.50 13.88
1 18.50 1.13 9.25 192.52
2 13.00 2.25 0.50 29.25
2 13.00 1.88 0.50 24.38
2 13.00 1.50 0.50 19.50
2 13.00 1.13 9.25 270.56
1 13.75 2.25 0.50 15.47
1 13.75 1.88 0.50 12.89
1 13.75 1.50 0.50 10.31
1 13.75 1.13 9.25 143.09
1 6.75 2.25 0.50 7.59
1 6.75 1.88 0.50 6.33
1 6.75 1.50 0.50 5.06
1 6.75 1.13 9.25 70.24
1 14.83 2.25 0.50 16.68
1 14.83 1.88 0.50 13.90
1 14.83 1.50 0.50 11.12
1 14.83 1.13 9.25 154.32
2 6.50 2.25 0.50 14.63
2 6.50 1.88 0.50 12.19
2 6.50 1.50 0.50 9.75
2 6.50 1.13 9.25 135.28
1 14.50 2.25 0.50 16.31
1 14.50 1.88 0.50 13.59
1 14.50 1.50 0.50 10.88
1 14.50 1.13 9.25 150.89
1 4.00 2.25 0.50 4.50
38
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
1 4.00 1.88 0.50 3.75
1 4.00 1.50 0.50 3.00
1 4.00 1.13 9.25 41.63
1 32.00 2.25 0.50 36.00
1 32.00 1.88 0.50 30.00
1 32.00 1.50 0.50 24.00
1 32.00 1.13 9.25 333.00
1 8.00 2.25 0.50 9.00
1 8.00 1.88 0.50 7.50
1 8.00 1.50 0.50 6.00
1 8.00 1.13 9.25 83.25
1 48.00 2.25 0.50 54.00
1 48.00 1.88 0.50 45.00
1 48.00 1.50 0.50 36.00
1 48.00 1.13 9.25 499.50
2 18.50 2.25 0.50 41.63
2 18.50 1.88 0.50 34.69
2 18.50 1.50 0.50 27.75
2 18.50 1.13 9.25 385.03
1 47.00 2.25 0.50 52.88
1 47.00 1.88 0.50 44.06
1 47.00 1.50 0.50 35.25
1 47.00 1.13 9.25 489.09
1 10.00 2.25 0.50 11.25
1 10.00 1.88 0.50 9.38
1 10.00 1.50 0.50 7.50
1 10.00 1.13 9.25 104.06
1 32.00 2.25 0.50 36.00
1 32.00 1.88 0.50 30.00
1 32.00 1.50 0.50 24.00
1 32.00 1.13 9.25 333.00
39
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
3 25.75 2.25 0.50 86.91
3 25.75 1.88 0.50 72.42
3 25.75 1.50 0.50 57.94
3 25.75 1.13 9.25 803.88
Sec 2-2 5 20.00 2.25 0.50 112.50
5 20.00 1.88 0.50 93.75
5 20.00 1.50 0.50 75.00
5 20.00 1.13 0.50 56.25
5 20.00 0.75 9.25 693.75
1 13.00 2.25 0.50 14.63
1 13.00 1.88 0.50 12.19
1 13.00 1.50 0.50 9.75
1 13.00 1.13 0.50 7.31
1 13.00 0.75 9.25 90.19
1 10.00 2.25 0.50 11.25
1 10.00 1.88 0.50 9.38
1 10.00 1.50 0.50 7.50
1 10.00 1.13 0.50 5.63
1 10.00 0.75 9.25 69.38
1 60.25 2.25 0.50 67.78
1 60.25 1.88 0.50 56.48
1 60.25 1.50 0.50 45.19
1 60.25 1.13 0.50 33.89
1 60.25 0.75 9.25 417.98
1 6.00 2.25 0.50 6.75
1 6.00 1.88 0.50 5.63
1 6.00 1.50 0.50 4.50
1 6.00 1.13 0.50 3.38
1 6.00 0.75 9.25 41.63
2 17.00 2.25 0.50 38.25
40
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
2 17.00 1.88 0.50 31.88
2 17.00 1.50 0.50 25.50
2 17.00 1.13 0.50 19.13
2 17.00 0.75 9.25 235.88
1 20.00 2.25 0.50 22.50
1 20.00 1.88 0.50 18.75
1 20.00 1.50 0.50 15.00
1 20.00 1.13 0.50 11.25
1 20.00 0.75 9.25 138.75
1 22.00 2.25 0.50 24.75
1 22.00 1.88 0.50 20.63
1 22.00 1.50 0.50 16.50
1 22.00 1.13 0.50 12.38
1 22.00 0.75 9.25 152.63
Sec 2a-2a 1 6.75 2.25 0.50 7.59
1 6.75 1.88 0.50 6.33
1 6.75 1.50 0.50 5.06
1 6.75 1.13 0.50 3.80
1 6.75 0.75 9.25 46.83
2 7.75 2.25 0.50 17.44
2 7.75 1.88 0.50 14.53
2 7.75 1.50 0.50 11.63
2 7.75 1.13 0.50 8.72
2 7.75 0.75 9.25 107.53
Sec 3-3 1 12.00 1.88 0.50 11.25
1 12.00 1.50 0.50 9.00
1 12.00 1.13 0.50 6.75
1 12.00 0.75 9.25 83.25
2 5.00 1.88 0.50 9.38
2 5.00 1.50 0.50 7.50
2 5.00 1.13 0.50 5.63
41
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
2 5.00 0.75 9.25 69.38
2 17.08 1.88 0.50 32.03
2 17.08 1.50 0.50 25.62
2 17.08 1.13 0.50 19.22
2 17.08 0.75 9.25 236.99
1 27.17 1.88 0.50 25.47
1 27.17 1.50 0.50 20.38
1 27.17 1.13 0.50 15.28
1 27.17 0.75 9.25 188.49
Sec 4-4 1 6.75 2.25 0.50 7.59
1 6.75 1.88 0.50 6.33
1 6.75 1.50 0.50 5.06
1 6.75 1.13 0.50 3.80
1 6.75 0.75 9.25 46.83
" 1 10.00 2.25 0.50 11.25
1 10.00 1.88 0.50 9.38
1 10.00 1.50 0.50 7.50
1 10.00 1.13 0.50 5.63
1 10.00 0.75 9.25 69.38
" 1 10.75 2.25 0.50 12.09
1 10.75 1.88 0.50 10.08
1 10.75 1.50 0.50 8.06
1 10.75 1.13 0.50 6.05
1 10.75 0.75 9.25 74.58
Total: 12868.36 Cft
Brick Masonry
Ground floor
Cavity Wall 1 162.00 13.00 2106.00
1 6.75 13.00 87.75
1 22.00 13.00 286.00
1 45.00 13.00 585.00
42
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
1 5.00 13.00 65.00
1 26.50 13.00 344.50
1 18.50 13.00 240.50
2 13.00 13.00 338.00
1 13.75 13.00 178.75
1 6.75 13.00 87.75
1 14.83 13.00 192.79
2 6.50 13.00 169.00
1 14.50 13.00 188.50
1 4.00 13.00 52.00
1 32.00 13.00 416.00
1 8.00 13.00 104.00
1 48.00 13.00 624.00
2 18.50 13.00 481.00
1 47.00 13.00 611.00
1 10.00 13.00 130.00
11 1 32.00 13.00 416.00
3 25.75 13.00 1004.25
-1 76.00 13.00 -988.00
Total: 7719.79 Sft
Sec 2-2 5 20.00 0.75 13.00 975.00
1 13.00 0.75 13.00 126.75
1 10.00 0.75 13.00 97.50
1 60.25 0.75 13.00 587.44
1 6.00 0.75 13.00 58.50
2 17.00 0.75 13.00 331.50
1 20.00 0.75 13.00 195.00
1 22.00 0.75 13.00 214.50
Sec 2a-2a 1 6.75 0.38 13.00 32.91
2 7.75 0.38 13.00 75.56
Sec 3-3 1 12.00 0.75 13.00 117.00
43
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
2 5.00 0.75 13.00 97.50
2 17.08 0.75 13.00 333.06
1 27.17 0.75 13.00 264.91
Sec 4-4 1 6.75 0.75 13.00 65.81
1 10.00 0.75 13.00 97.50
1 10.75 0.75 13.00 104.81
1st floor
1 22.00 1.13 11.00 272.25
1 60.75 1.13 11.00 751.78
1 13.17 1.13 11.00 162.98
1 30.25 1.13 11.00 374.34
Sec 2-2 4 20.00 0.75 13.00 780.00
2 10.00 0.75 13.00 195.00
Deductions
D1 -1 4.50 0.75 8.00 -27.00
D2 -2 4.00 0.75 8.00 -48.00
D3 -5 3.75 0.75 8.00 -112.50
D4 -11 3.00 0.75 8.00 -198.00
D5 -4 2.75 0.75 8.00 -66.00
D6 -2 2.50 0.75 13.00 -48.75
-2 10.00 0.75 13.00 -195.00
-2 10.00 0.75 13.00 -195.00
Total: 5421.35 Cft
Sec 2a-2a 1 6.75 13.00 87.75
2 7.75 13.00 201.50
Total: 289.25 Sft
Horizontal D.P.C
Cavity Wall 2 162.00 1.13 364.50
2 6.75 1.13 15.19
44
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
2 22.00 1.13 49.50
2 45.00 1.13 101.25
2 5.00 1.13 11.25
2 26.50 1.13 59.63
2 18.50 1.13 41.63
22 4 13.00 1.13 58.50
2 13.75 1.13 30.94
2 6.75 1.13 15.19
2 14.83 1.13 33.37
4 6.50 1.13 29.25
2 14.50 1.13 32.63
2 4.00 1.13 9.00
2 32.00 1.13 72.00
2 8.00 1.13 18.00
2 48.00 1.13 108.00
4 18.50 1.13 83.25
2 47.00 1.13 105.75
2 10.00 1.13 22.50
2 32.00 1.13 72.00
6 25.75 1.13 173.81
-1 76.00 1.13 -85.50
Sec 2-2 5 20.00 0.75 75.00
1 13.00 0.75 9.75
1 10.00 0.75 7.50
1 60.25 0.75 45.19
1 6.00 0.75 4.50
2 17.00 0.75 25.50
1 20.00 0.75 15.00
1 22.00 0.75 16.50
Sec 2a-2a 1 6.75 0.38 2.53
2 7.75 0.38 5.81
45
STRUCTURAL WORKS
SI. No. DESCRIPTION NO.MEASUREMENT
ContentsLength Breadth Height
Note: All measurements are calculated for estimate only. These measurements cannot be used for payments.
Sec 3-3 1 12.00 0.75 9.00
2 5.00 0.75 7.50
2 17.08 0.75 25.62
1 27.17 0.75 20.38
Sec 4-4 2 6.75 0.75 10.13
2 10.00 0.75 15.00
2 10.75 0.75 16.13
Total: 1732.65 Sft