© 2019 Nokia 1 Future X Research Lab. (FXR Lab.) 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 The success of the project based on the smart and flexible FXR Lab – test network The forthcoming FXR Lab is an evolution from the NetLeap network used in LTE so usable also for 4G evolution The FXR Lab offers an environment to test all kind of Future generation use cases The Architecture options 3x (Non Standalone) will be supported in the first phase and 2 (Standalone) a bit later Used Radio Network will use the bands allocated by LVM (Ministry of Transport and Communications) for Test, Development and Education purposes in Finland. In addition the radio room makes possible to use other frequencies The rules to use the FXR Lab in rough level included to doc. “5G-FORCE Testbed User AgreementsAalto University Nokia´s Busines groups Nokia Bell Labs Espoo Campus FXR Lab Nokia Tampere Nokia Oulu Helsinki University Tampere Tech.Univ. VTT Other test Networks Internet Others (SMEs,LE´ s) Oulu University Features (for example): Radio access for: 4G/5G/ mm and cm waves. WiFi and Fixed access Cellular and fixed IoT Cloud RAN, ORAN Network Slicing DevOps mechanism with SAFe Data Collection and Analytic (ML/AI – DCAP & AVA) for Internal and External data URLLC/MEC for Games, Healt Care, Robotic…etc…. Cloud Core (Voice & Data) Smart City *1 (LuxTurrim) Nokia Externals Other Universitie s Nokia confidential

Upload: others

Post on 04-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

© 2019 Nokia1

Future X Research Lab. (FXR Lab.)5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020

• The success of the project based on the smart and flexible FXR Lab – test network

• The forthcoming FXR Lab is an evolution from the NetLeap network used in LTE so usable also for 4G evolution

• The FXR Lab offers an environment to test all kind of Future generation use cases

• The Architecture options 3x (Non Standalone) will be supported in the first phase and 2 (Standalone) a bit later

• Used Radio Network will use the bands allocated by LVM (Ministry of Transport and Communications) for Test, Development and Education purposes in Finland. In addition the radio

room makes possible to use other frequencies

• The rules to use the FXR Lab in rough level included to doc. “5G-FORCE Testbed User Agreements”

AaltoUniversity

Nokia´sBusinesgroups

NokiaBell Labs

EspooCampus

FXR Lab

NokiaTampere

Nokia Oulu

HelsinkiUniversity

TampereTech.Univ.

VTT

Other

test Networks

Internet

Others(SMEs,LE´

s)

OuluUniversity

Features (for example):• Radio access for: 4G/5G/ mm and cm

waves.• WiFi and Fixed access• Cellular and fixed IoT• Cloud RAN, ORAN• Network Slicing• DevOps mechanism with SAFe• Data Collection and Analytic

(ML/AI – DCAP & AVA)for Internal and External data

• URLLC/MEC for Games, Healt Care,Robotic…etc….

• Cloud Core (Voice & Data)

Smart City *1

(LuxTurrim)

Nokia

Externals

OtherUniversitie

s

Nokia confidential

Page 2: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

Nokia Test Networks in Finland – general view

Common Functions(e.g. Core Functions, SDM, ML/AI, Network and

Service Mgmt…)

FieldExperience

Center(FEC)

FieldVerification

(FiVe)

Future XResearch

Lab(FXR Lab)

Future X E2Enetwork Lab

(FX Lab)(ex. FITE)

Network forresearch like3GPP, ETSI,etc. Open

forAcademicalInstitutes,VTT andIndustry

Network forRadio

products(BTS)

verification(Gate for

P7)

Network for5G Use casePoCs withCSPs andlive showcases inEspoo

Campus

Network forFuture X

Show room/

environment for

customerdemos

(locatednear to EEC)

Different Interest groups for test networks:• Product Verification (FiVe)• Show cases (FEC)• Customer Demos (Future X )• Open Research ecosystem (FXR Lab.)

• Separate physical 5G RAN + CGW for remote sites(Otaniemi, Karaportti 5G indoor cases EEC, Garageetc.).

• Netleap 4G evolution towards 5G, 6G… over time• Gross BG joint use case development for end2end use

cases and experiments

• Goal: Common Outdoor 5G (4G) RAN shared by FiVe,FEC, FX LAB and FXR Lab (Campus 4G/5G use cases)

• Gross BG team to manage and develop test networkcommon functions and user support

Common Outdoor 5G (4G) RAN in Karaportti

Commonpart

Note: Finnish Ministry of Transport and Communications allocates Radio Frequencies (indoor/outdoor) for test use giving excellent possible to

build test networks in Finland

Nokia confidential

Page 3: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

20/05/20193 © Nokia 2015

Confidential

Research Verticalproject

ResearchInstitutes

IndustryPartners

PublicPartners

5G FORCE 7 11 0Lux Turrim5G 3 11+ 1Neutral Host Pilot 3 11 25G VIIMA 2 22 0Sat 5G 3 2 0Mega Sense 2 9 7CRANE 4 11 3Otaniemi Smart Energy 3 tbd tbdMARACAS 2 8 1

Co-operation with

University co-operation projects: 5GTNF Phase 3 (2019-2020) – FXR LabusersResearch verticals and co-operation Universities and Industry-/Public Partners

Future X Research Lab.

(FXR Lab.)

5G-FORCE(5G Platform Project – Many Radio- and Core

related Research items)

LuxTurrim5G+(Smart City – Smart light poles with intelligent

sensors)

5G VIIMA(Industrial vertical: Smart Grids, Industry

Campus, Digital Factory)

CRANE(Fast deployable Cellular BTS)

Smart Otaniemi(Smart Energy Ecosystem)

Neutral Host Pilot(Smart City)

MegaSense(Air Quality Sensing in Mega cities – AI based

sensor calibration)

PRIORITY(MARACAS)

(Maritime-Area Connectivity and Autonomous

Ships)

Sat 5G(5G NR over satellite link)

Note: In addition of these ones we have lot of other co-opration

projects / events with universities

SANSASASA

SA

SA

NSA NSA

SASA

NSA

SA= Stand alone Arch Option 2NSA =Non Stand alone Arch Option

3x

Page 4: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

WP6 Nokia contribution

▪ Make/document transport plan so that Nokia centralized part of test network will be connected to remotesites (M5)

▪ Update LTE based NetLeap (EPC) to Cloud (Datacenter in Karaportti 8) (Ready)

▪ Update Registers to support 5G NSA profiles (Registers in DC Tampere) (Ready)

▪ Update old routers and switches in Karaportti campus (old ones are not capable to handle all neededconnections) (M5)

▪ Update EPC to support 5G Non Standalone architecture option 3x (Ready)

▪ Update Karaportti eNB´s to support 5G IW functionality (M5)

▪ Make a solid plan for SIM management (M6)

▪ Create Nokia internal information sharing portal about the test network (documentation, contact information,network status etc.). Public information of that will be loaded to 5GTNF/5GFORCE information portal. (M6)

▪ Install gNBs to Karaportti (Discussion needed with Nokia Field Verification people) (M6)

20.5.2019 VTT – beyond the obvious 4

Page 5: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

WP6 Nokia contribution

▪ Update NB-IoT functionality to Karaportti eNB´s (M8)

▪ Update IoT device management (“IMPACT”) (M8)

▪ Install DCAP to collect element data (M9)

▪ Update ML/AI platform to system (Nokia AVA Cognitive Service Platform) (M9)

▪ Make possible to install remote Packet WG to remote sites to support local brake out (URLLC connections)(M10)

▪ Make possible to install Multi Access Edge Computing (MEC) to remote sites (M10)

▪ Update registers to support Standalone 5G subscriber profiles (M10)

▪ Install 5G capable new Standalone Core (Note: NSA will stay parallel with this SA model) (M10)

▪ Update or install new 5G SA capable gNB´s to Karaportti / Otaniemi (M10)

▪ Make plan to prepare Network Slicing (M10-M11)

▪ Probably to update SA architecture to support slicing (5G Core + registers) (M12)

20.5.2019 VTT – beyond the obvious 5

Page 6: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

© 2019 Nokia6

Future X Research Lab. - Rough Technical View

EPC

(LTE + 5G Opt. NSA

3x)

5G Core (NC)

(5G Opt. SA 2)

Registers

Voice Core (IMS)

Common Functions in Karaportti 8

and Tampere Data Centers

UE

UE

UERemote

sites (1…N)

.

:

IoT IMPACT Provisioning

ML/AI Apps.Service &

Research mgmt.

Nokia and External Research Network Users

MEC

SGW/

PGW

Edge

Cloud and

bare metal

option

Future X Research Lab. (NetLeap

evo) LTE/5G

- BellLabs experiments

- Campus Apps

LuxTurrim/Neutral

host gNBNs

(26GHz SCs)

UE

UE

UEBackhaul /transport

- Routers

- Optical

Nokia Espoo Campus Research Network Users

…and

OthersDCAP / AVA

1N

IoT

IoT

Page 7: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

7

LuxTurrim5G smart light pole (2nd generation)

Building key enablers for a Digital Smart City

Page 8: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

8

5G networkHigh capacity, low latencySmall cells -> many sites5G network: Nokia Bell LabsLight pole: Exel Composites

OperatorsBusiness models for:- Existing ones- New ones?

Smart city services ontop of a commonplatformExamples:- Video surveillance, public safety,

infotainment screens: Teleste- Air quality, weather: Vaisala- Location, navigation: Indagon- Lighting/charging: Ensto- Drones: Rumble Tools

City InfrastructureLight pole infra, power,data transportInfra planning: SitowiseInfra owner: Espoo,…

Indoor/OutdoorconnectionsSignal propagation throughconstruction materials- RF permeable windows: LamminWindows

Public partnerscontributing in eachresearch area:VTT, Aalto

LuxTurrim5G - SolutionLuxTurrim5G develops and pilots concrete technology enablers and service concepts for open Smart City DigitalEcosystem

Page 9: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

9

Real time application – Latency between Vaasa – Espoo

Edge CloudL1/

L2Low

UE gNB

L2/HighL3….

MEC

Page 10: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

10

Helsinki

Distributed Core Network Needed for Low Latency Services

Server

Gateway

UE

Oulu

Server

Gateway

UE

Helsinki

Oulu

Server

Gateway

UE

Helsinki

+9 ms = +9 ms =

(4,5+4,5)ms = 9ms 2 x (4,5+4,5)ms = 18ms

Page 11: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

11

• 5G target is 1 ms round trip time• 100 km two-way propagation delay

in optical fiber is to 1 ms• 10 km propagation delay to 0.1 ms

Page 12: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

12

Open questions to discussion:What are your requirement for Vaasa 5G test network?

What frequency's are you planning to use?

Test terminal expectations?

Plans to join to 5GTNF consortium?

Do you have any 4G test network already available?

Page 13: 5G Platform project – 5G-FORCE of 5GTNF Phase 3 2019-2020 … · 2019-05-27 · WP6 Nokia contribution Make/document transport plan so that Nokia centralized part of test network

13

Open questions to discussion:

Reflections of the day

Next steps…