5g for europe smart city expo world...
TRANSCRIPT
5G FOR EUROPE
Smart City Expo World CongressDigital Transformation Session
Barcelona, 13 November 2018
Bernard Barani
Deputy Head of Unit
European Commission
DG CONNECT E1- Future Connectivity Systems
5G EU vision: industry transformation
Coordinated launch throughout single market
Comprehensive roll-out with geographical and sectorial focus
Early 5G launch in selected
areas
Commercial launch of 5G services
in at least one major city
in all MS
5G in all urban areas
and along main transport
paths
2018
2020
2025
5G Action Plan: European strategy for 5G introduction
Urban mobile data speeds
Hot Spot data speeds
700 MHz
3.6 GHzUrban coverage with dense small cells (1-3 Gb/s) e.g. mobile Gb/s society, smart cities, option for connected highways
Hot spots coverage (up to 10 Gb/s) e.g. fixed wireless access, railway stations, sport events, smart factories,
26 GHz
Universal coverage (10’s of Mb/s) of reliable connectivity
Reliable coverage
Source: 5G-PPP
EU 5G 'Pioneer' Frequency Bands
Phase 3 a) Verification Demo/Trial Platform- Integration radio+ network
Y2015 2016 2017 2018 2019 2020 2021 2022
Phase 2 - Demos PoC*- Core Techs Components
Phase 3 b) Integrated Verification Trial
- radio+network+applications -
Early 5G introductionLower frequency bands
Later 5G introductionHigher frequency bands
Phase I Core Techologies
5G PPP Phase 3, > € 200 millions for trials
Supporting Cross Industries European Partnerships towards deployment
5G Connected Cars in EU cross-border corridors
5G R&I for "Long Term Evolution"
*Proof of Concept
We are HERE
Note
: Lis
t of
corr
idors
is n
on e
xhaustive a
nd s
ubje
ct
to e
xte
nsio
ns
3 Supporting Projects, to be expanded:
• 5G CARMEN, Brenner corridor
• 5G CROCO, Metz Merzig Corridor
• 5G MOBIX, PT-ES and EL-TK corridors
Next MFF: proposal towards operational deployment
Connected & automated Mobility over cross border corridors as
flagship initiative, the “Rome process”
Verticals and Trial Roadmap
https://5g-ppp.eu/5g-trials-roadmap/
Supporting Vertical Pilots:
5G PPP E2E Infrastructure
Vertical use cases and standards
Source: 3GPP TSG RAN
Live on 27.9, Monitoring 5G AP Deployment targets
Main Findings Q1:
• Pre-commercial 5G trials:• >140 trials and pilots reported in the EU28;
• About 20 Trial Cities identified in 11 EU MS; (Definition)
• 10 digital cross-border corridors identified for CAM*
• National strategies and plans:• Acceleration with additional national 5G roadmaps in 2018 (now 8)
• 5G spectrum assignments:• A number of auctions (CZ, DE, ES, FI, FR, HU, IE, IT, LV, UK) have been held
in some of the '5G pioneer bands', but a lot of work still ahead
5G Observatory: http://5gobservatory.eu/
13
Over 140 5G trials registered in Europe (including Norway, Switzerland, Turkey and Russia)
Spain, France, Italy, Germany and the UK
combined account for over 50% of the
European trials
Designed in partnership with GSMA
Submission date: 21 November
Award at next MWC, Barcelona
3 Categories:
• European 5G Pioneer award (8.d)• Outstanding initiative in the EU fostering commercial 5G introduction
• In line with 5G Action Plan objectives
• 5G Leadership award (10.a)• Outstanding R&D or innovation initiative (global)
• 5G Industry Partnership Award (10.b)• Outstanding industry partnership towards digital transformation
https://www.mwcbarcelona.com/conference-programmes/global-mobile-awards/categories/
5G Awards
7th G5GE and EuCNC 2019 – Kick Off ICT-19 Projects
https://5g-ppp.eu/ and https://www.eucnc.eu/announcement-eucnc-2019/
More info:
https://ec.europa.eu/digital-single-market/en/policies/5G/