Route CR-NA Project Description OVERLOOK AND SILVER HILLS NEIGHBORHOOD SIDEWALK CONNECTIONS ALONG SUMMER LANE, PLANTERS RIDGE, SILVER HILLS DRIVE, SWEET RIDGE ROAD, WEAVER STREET, JAY STREET, SHEILA BOULEVARD, AND AMANDA LANE IN THE CITY OF PRATTVILLE
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069431 TAPMN TA18 (937) CONSTRUCTION SIDEWALK 2019 $193 $0 $48 $241
TOTAL COST: $193 $0 $48 $241
Route CR-NA Project Description RESURFACING ON UPPER KINGSTON ROAD FROM 7TH STREET TO PRATTVILLE CITY LIMITS (SITE 1); WIDENING AND RESURFACING ON MARTIN LUTHER KING, JR. DRIVE FROM 7TH STREET TO POWELL ROAD (SITE 2)
Project Length in Miles 3.916 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057564 PE 2018
100057524 STPMN-STPAA 0118 (252)
CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2020 $885 $221 $0 $1,106TOTAL COST: $885 $221 $0 $1,106
Route CR-NA Project Description ADDITIONAL TURN LANES AT INTERSECTIONS ON FAIRVIEW AVENUE BETWEEN SR-3 (US-31) AND JASMINE TRAIL
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063688 SP 2018
100068602 STPMN 0115 (252) PRELIMINARY ENGINEERING TURN LANES 2020 $512 $0 $128 $640100063689 STPMN 0115 () CONSTRUCTION TURN LANES 2023 $3,200 $0 $800 $4,000
TOTAL COST: $3,712 $0 $928 $4,640
Route SR-3 Project Description ADDING TURN LANES AT INTERSECTIONS ON SR-3 (US-31) BETWEEN 6TH STREET (PRATTVILLE) NORTH TO I-65
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF PRATTVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063686 STPMN 0115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $4 $0 $1 $5100063687 STPMN 0115 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $2,000 $0 $500 $2,500
TOTAL COST: $2,004 $0 $501 $2,505
Route SR-3 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-3 (US-31) FROM I-65 TO THE CHILTON COUNTY LINE
Project Length in Miles 11.667 Urban Area MONTGOMERY Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069866 STPAA 0003 (626) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $3,965 $991 $0 $4,956
TOTAL COST: $3,965 $991 $0 $4,956
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
1 of 206
HIGHWAY PROJECTS - AUTAUGASTIP PLAN: 2020 - Original
Route SR-6 Project Description ADDITIONAL LANES ON SR-6 (US-82) FROM SR-14 TO SR-3 (US-31) IN PRATTVILLE
Project Length in Miles 2.740 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004438 PE 2001 / 100062112 PE 2015 / 100004451 RW 2012 / 100071577 CN 2020
100004425 RACR-001-006-001-CN ()
CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2020 $0 $16,200 $0 $16,200TOTAL COST: $0 $16,200 $0 $16,200
Route SR-6 Project Description ADDING TURN LANES ON SR-6 (US-82) AT CR-47 (GOLSON ROAD)
Project Length in Miles 0.300 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070705 PE 2020
100071064 ATRP2-01-2020-001-CN ()
CONSTRUCTION TURN LANES 2020 $0 $464 $0 $464TOTAL COST: $0 $464 $0 $464
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
2 of 206
HIGHWAY PROJECTS - AUTAUGASTIP PLAN: 2020 - Amendment # 3
Route CR-13 Project Description CONSTRUCTION OF ROUNDABOUT AT THE INTERSECTION OF CR-13 AND CR-44
Project Length in Miles 0.750 Urban Area EASTERN SHORE Sponsor BALDWIN COUNTY COMMISSION LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069294 PE 2019 / 100069296 RW 2021 / 100069295 UT 2021 / 100069297 CN 2021
100069296 HSIP 0219 (251) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $92 $0 $10 $102100069295 HSIP 0219 (251) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $202 $0 $22 $224100069297 HSIP 0219 () CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $1,435 $0 $159 $1,594
TOTAL COST: $1,728 $0 $192 $1,920
Route CR-30 Project Description TURN LANE CONSTRUCTION AND TRAFFIC SIGNAL UPGRADE ON CR-30 (GAYFER AVENUE) AT SR-42 (US-98) IN THE CITY OF FAIRHOPE
Project Length in Miles 0.000 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070857 STPOA 0220 () PRELIMINARY ENGINEERING TURN LANES 2020 $74 $0 $18 $92100070858 STPOA 0220 () CONSTRUCTION TURN LANES 2020 $522 $0 $130 $652
TOTAL COST: $595 $0 $149 $744
Route CR-31 Project Description INTERSECTION REALIGNMENT AND INSTALLATION OF TURN LANES AT CR-31 (OLD HIGHWAY 31) AND SR-3 (US-31)
Project Length in Miles 0.300 Urban Area EASTERN SHORE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070639 RW 2021 / 100070638 UT 2021 / 100070641 CN 2021
100070637 HSIP 0220 (250) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $36 $4 $0 $41100070639 HSIP 0220 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $32 $4 $0 $35100070638 HSIP 0220 (250) UTILITIES SAFETY IMPROVEMENTS 2021 $45 $5 $0 $51100070641 HSIP 0220 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $303 $34 $0 $337
TOTAL COST: $417 $46 $0 $463
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
3 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original
Route CR-64 Project Description RESURFACING ON CR-64 FROM SR-42 (US-98) TO CR-13 AND INTERSECTION IMPROVEMENTS ON CR-64 AT POLLARD ROAD
Project Length in Miles 1.500 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070861 STPOA 0220 () PRELIMINARY ENGINEERING RESURFACING 2020 $48 $0 $12 $60100070862 STPOA 0220 () CONSTRUCTION RESURFACING 2020 $992 $0 $248 $1,240
TOTAL COST: $1,040 $0 $260 $1,300
Route CR-64 Project Description WIDENING AND ADDING CENTER TURN LANE ON CR-64 FROM SR-181 TO CR-54, AND INSTALLATION OF ROUNDABOUT AT AUSTIN ROAD-RIGSBY ROAD
Project Length in Miles 3.020 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069347 PE 2019
100070859 STPOA 0219 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)
2020 $240 $0 $60 $300100070860 STPOA 0219 () UTILITIES WIDENING AND RESURFACING
(RDWY)2021 $1,212 $0 $303 $1,515
TOTAL COST: $1,452 $0 $363 $1,815
Route CR-65 Project Description BRIDGE DECK REPLACEMENT AT 2 SITES, CR-65 OVER TURKEY BRANCH (BIN 16349) AND DOC MCDUFFIE ROAD OVER WOLF CREEK (BIN 19657)
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071605 TIDP 0220 () CONSTRUCTION BRIDGE REHABILITATION 2021 $1,000 $0 $250 $1,250
TOTAL COST: $1,000 $0 $250 $1,250
Route CR-68 Project Description RESURFACING AND WIDENING ALONG CR-68 FROM THE LOXLEY TOWN LIMITS TO THE BALDWIN BEACH EXPRESS
Project Length in Miles 0.000 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070867 STPOA 0220 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING
(RDWY)2022 $41 $0 $10 $51
100070868 STPOA 0220 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2022 $600 $0 $150 $750TOTAL COST: $641 $0 $160 $801
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
4 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Amendment # 7
Route CR-99 Project Description ADD PAVED SHOULDERS ON CR-99 FROM CARRIER DRIVE TO SPANISH COVE DRIVE
Project Length in Miles 3.280 Urban Area LILLIAN(PENSACOLA) Sponsor BALDWIN COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063403 STPLL 0219 (254) PRELIMINARY ENGINEERING SHOULDER WIDENING 2020 $40 $0 $10 $50100063404 STPLL 0219 () CONSTRUCTION SHOULDER WIDENING 2020 $408 $0 $102 $510
TOTAL COST: $448 $0 $112 $560
Route CR-99 Project Description ADD PAVED SHOULDERS ON CR-99 FROM CR-91 TO CARRIER DRIVE
Project Length in Miles 0.000 Urban Area LILLIAN(PENSACOLA) Sponsor BALDWIN COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063640 CN 2023
100063634 STPLL 0215 () PRELIMINARY ENGINEERING SHOULDER PAVING 2021 $75 $0 $19 $94TOTAL COST: $75 $0 $19 $94
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
5 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original
Route CR-NA Project Description COASTAL CONNECTION SCENIC BYWAY WAYSHOWING PROGRAM AND SIGNAGE PLAN
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057820 SB SP12 () SPECIAL UNCLASSIFIED 2020 $17 $4 $0 $21
TOTAL COST: $17 $4 $0 $21
Route CR-NA Project Description STREETSCAPES ALONG SR-42 (US-98) FROM ALABAMA STREET TO CHICAGO STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068388 TAPAA TA18 (925) CONSTRUCTION STREETSCAPE 2019 $311 $0 $78 $389
TOTAL COST: $311 $0 $78 $389
Route CR-NA Project Description SIDEWALKS ALONG NORTH DOBSON AVENUE FROM PHILLIPS STREET TO BOYKIN STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068390 TAPAA TA18 (926) CONSTRUCTION SIDEWALK 2020 $374 $0 $93 $467
TOTAL COST: $374 $0 $93 $467
Route CR-NA Project Description SDW ON E 2ND AVE FROM GULF SHORES PKWY TO E 2ND ST, E 2ND ST FROM E 2ND AVE TO E BEACH BLVD, E 1ST AVE FROM GULF SHORES PKWY TO E 2ND ST, E 1ST ST FROM E 2ND AVE TO E. BEACH BLVD, W 1ST AVE FROM GULF SHORES PKWY TO W 2ND ST, AND W 1ST ST TO W 1ST
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069030 TAPAA TA19 (924) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $799
TOTAL COST: $640 $0 $160 $799
Route CR-NA Project Description ROUNDABOUT AT NORTH SECTION STREET/CITY 104/VETERANS DRIVE/SCENIC 98
Project Length in Miles 0.000 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070869 STPOA 0220 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2023 $111 $0 $28 $139100070870 STPOA 0220 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $960 $0 $240 $1,200
TOTAL COST: $1,072 $0 $268 $1,339
Route CR-NA Project Description CONSTRUCT OFFSET LEFT TURN LANES ON FOLEY BEACH EXPRESS AT CR-12
Project Length in Miles 0.250 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069229 PE 2019 / 100068989 CN 2020
100068989 HRRR 0219 (250) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $381 $0 $42 $423TOTAL COST: $381 $0 $42 $423
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
6 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original
Route I-10 Project Description BRIDGE PAINTING ON BRIDGES ALONG I-10. ON SR-16 (US-98) OVER I-10 (BIN 10002,10003) ON I-10 OVER FISH RIVER (BIN 10170,10171) ON I-10 OVER 3-MILE CRK (BIN 10172,10173) ON I-10 OVER COWPEN CRK (BIN 8527,8528) ON I-10 OVER STYX RIVER (BIN 8530, 8531)
Project Length in Miles 0.300 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069462 BR I010 (347) PRELIMINARY ENGINEERING BRIDGE PAINTING 2020 $91 $10 $0 $101100069479 BR I010 () CONSTRUCTION BRIDGE PAINTING 2021 $1,376 $344 $0 $1,719
TOTAL COST: $1,466 $354 $0 $1,820
Route I-10 Project Description I-10 INTERCHANGE AT CR-68 WITH CONNECTOR TO (983) BALDWIN BEACH EXPRESS
Project Length in Miles 2.000 Urban Area EASTERN SHORE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055053 PE 2019 / 100055054 CN 2021
100055054 IM I010 () CONSTRUCTION LIGHTING 2021 $931 $103 $0 $1,034TOTAL COST: $931 $103 $0 $1,034
Route SR-16 Project Description INTERSECTION IMPROVEMENTS ON SR-16(US-90)/SR-42(US-98) AT SR-3(US-31) AND REALIGNMENT OF SPANISH MAIN STREET
Project Length in Miles 0.960 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069813 RP MR19 (904) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $332 $83 $0 $415100069814 STPAA MR19 (904) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $1,224 $306 $0 $1,530100069815 STPAA MR19 (904) UTILITIES INTERSECTION IMPROVEMENTS 2022 $330 $82 $0 $412100069816 STPAA MR19 (904) CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $1,236 $309 $0 $1,545
TOTAL COST: $3,122 $781 $0 $3,903
Route SR-16 Project Description INTERSECTION RELOCATION AND TRAFFIC SIGNAL INSTALLATION ON SR-16 (US-90) AT SR-59 IN LOXLEY
Project Length in Miles 0.529 Urban Area EASTERN SHORE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067778 PE 2018 / 100067785 RW 2019 / 100067786 UT 2020
100067786 HSIP-STPOA 0016 (524) UTILITIES GRADE, DRAIN, BASE AND PAVE 2020 $713 $79 $0 $792100067784 HSIP-STPOA 0016 (524) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2020 $1,732 $399 $0 $2,132
TOTAL COST: $2,445 $479 $0 $2,924
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
7 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original
Route SR-161 Project Description SR-161 CONNECTOR FROM SR-180 TO NORTH OF CR-4 (COTTON CREEK DR)
Project Length in Miles 0.670 Urban Area LILLIAN(PENSACOLA) Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063605 ST-002-000-015 () CONSTRUCTION BRIDGE 2020 $0 $42,768 $0 $42,768
TOTAL COST: $0 $42,768 $0 $42,768
Route SR-161 Project Description SR-161 CONNECTOR FROM NORTH OF CR-4 (COTTON CREEK DR) TO FOLEY BEACH EXPRESS
Project Length in Miles 5.460 Urban Area LILLIAN(PENSACOLA) Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065621 PE 2016 / 100066949 RW 2018 / 100063604 UT 2020
100066950 ST-002-999-005 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2021 $0 $20,185 $0 $20,185TOTAL COST: $0 $20,185 $0 $20,185
Route SR-180 Project Description SR-180 NEW LOCATION AND WIDENING FROM SR-59 IN GULF SHORES TO FOLEY BEACH EXPRESS
Project Length in Miles 9.480 Urban Area LILLIAN(PENSACOLA) Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040566 STPAA 0180 () RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2022 $3,391 $848 $0 $4,239100040567 STPAA 0180 () UTILITIES GRADE, DRAIN, BASE AND PAVE 2023 $1,118 $279 $0 $1,397
TOTAL COST: $4,509 $1,127 $0 $5,636
Route SR-181 Project Description SR-181, ADDITIONAL LANES FROM SR-42 (US-98) TO CR-32
Project Length in Miles 7.260 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100044780 PE 2007 / 100044783 CN 2024
100044781 STPAA 0181 () RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2022 $4,133 $1,033 $0 $5,166100044782 STPAA 0181 () UTILITIES GRADE, DRAIN, BASE AND PAVE 2023 $2,722 $680 $0 $3,402
TOTAL COST: $6,855 $1,714 $0 $8,568
Route SR-181 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-181 FROM SR-42 (US-98) TO JUST SOUTH OF QUAIL CREEK DRIVE
Project Length in Miles 6.950 Urban Area EASTERN SHORE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066642 STPAA-HSIP 0181 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,548 $351 $0 $1,899
TOTAL COST: $1,548 $351 $0 $1,899
Route SR-3 Project Description RESURFACING ON SR-3 (US-31) FROM CROSBY ROAD TO THE ESCAMBIA COUNTY LINE
Project Length in Miles 11.330 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069728 STPAA 0003 (623) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,834 $459 $0 $2,293
TOTAL COST: $1,834 $459 $0 $2,293
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
8 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original
Route SR-42 Project Description ACCESS MANAGEMENT ON SR-42 (US-98) FROM CR-64 TO VAN AVENUE IN THE CITY OF DAPHNE
Project Length in Miles 0.800 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071523 STPOA 0042 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $120 $0 $30 $150100071524 STPOA 0042 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,762 $0 $441 $2,203
TOTAL COST: $1,882 $0 $471 $2,353
Route SR-42 Project Description ADD PAVED SHOULDERS ON SR-42 (US-98) FROM BARCLAY AVENUE TO ALABAMA STATE LINE
Project Length in Miles 1.348 Urban Area LILLIAN(PENSACOLA) Sponsor BALDWIN COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060029 CN 2024
100060027 STPLL 0042 () PRELIMINARY ENGINEERING SHOULDER WIDENING 2023 $20 $0 $5 $25TOTAL COST: $20 $0 $5 $25
Route SR-42 Project Description TRAFFIC SIGNAL INSTALLATION AT THE INTERSECTION OF SR-42 (US-98) AND CR-34
Project Length in Miles 0.010 Urban Area EASTERN SHORE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069345 STPOA 0042 (537) CONSTRUCTION SIGNALIZATION 2020 $280 $0 $70 $350
TOTAL COST: $280 $0 $70 $350
Route SR-42 Project Description RESURFACING SR-42 (US-98) FROM D'OLIVE CREEK TO JUST NORTH OF SR-104
Project Length in Miles 7.550 Urban Area EASTERN SHORE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066184 NH 0042 (534) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $2,661 $665 $0 $3,326
TOTAL COST: $2,661 $665 $0 $3,326
Route SR-59 Project Description RESURFACING ON SR-59 FROM MCMILLIAN ROAD TO CR-80
Project Length in Miles 12.451 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068301 STPAA-HSIP 0059 (518) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $4,180 $1,037 $0 $5,217
TOTAL COST: $4,180 $1,037 $0 $5,217
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
9 of 206
HIGHWAY PROJECTS - BALDWINSTIP PLAN: 2020 - Original
Route CR-20 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007678) ON CR-20 OVER JACKSON CREEK; SITE 2 - (BIN 007679) ON CR-20 OVER PAULS CREEK; SITE 3 - (BIN 005189) ON CR-20 OVER LINDSEY CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071450 HRRR 0320 (250) CONSTRUCTION GUARDRAIL 2020 $162 $0 $18 $180
TOTAL COST: $162 $0 $18 $180
Route SR-1 Project Description REMOVE (BIN 007606), (BIN 007607) AND PEDESTRIAN (BIN 011380) ON SR-1 (US-431) OVER ABANDONED GEORGIA SOUTHWESTERN RAILROAD. REMOVE AND REPLACE (BIN 007604) AND (BIN 007605) AND REMOVE PEDESTRIAN (BIN 011379) ON SR-1 (US-431) OVER CHEWALLA CREEK
Project Length in Miles 0.304 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068900 PE 2019
100040558 BR 0001 (609) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $88 $22 $0 $109100040559 BR 0001 (609) UTILITIES BRIDGE REPLACEMENT 2022 $118 $29 $0 $147100040561 BR 0001 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $6,482 $1,621 $0 $8,103
TOTAL COST: $6,688 $1,672 $0 $8,360
Route SR-10 Project Description MILLING AND RESURFACING ON SR-10 FROM .48 MILE EAST OF SR-51 TO EAST INTERSECTION OF CR-41 AND SR-10.
Project Length in Miles 18.620 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068709 STPNU 0010 (550) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12020 $1,016 $254 $0 $1,270
TOTAL COST: $1,016 $254 $0 $1,270
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
10 of 206
HIGHWAY PROJECTS - BARBOURSTIP PLAN: 2020 - Original
Route CR-2 Project Description RESURFACING ON CR-2 (WEST ASHBY ROAD) FROM SR-25 TO SR-139 - BCP 04-01-19
Project Length in Miles 5.313 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071683 STPNU 0420 (250) CONSTRUCTION RESURFACING 2021 $1,225 $0 $306 $1,531
TOTAL COST: $1,225 $0 $306 $1,531
Route CR-51 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND STRIPING ON CR-51 FROM PERRY COUNTY LINE NORTH TO SR-219
Project Length in Miles 6.450 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069407 FLAP-STPNU FLAP (027) CONSTRUCTION RESURFACING 2018 $570 $143 $0 $713
TOTAL COST: $570 $143 $0 $713
Route CR-51 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND STRIPING ON CR-51 FROM PERRY COUNTY LINE NORTH TO SR-219
Project Length in Miles 6.450 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071694 FLAP-STPNU FLAP (027) CONSTRUCTION RESURFACING 2020 $322 $80 $0 $402
TOTAL COST: $322 $80 $0 $402
Route SR-5 Project Description REPLACE BRIDGE ON SR-5 OVER BLUE GIRTH CREEK (BIN# 002651) AND RELIEF (BIN# 002650)
Project Length in Miles 1.665 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049166 PE 2018
100070849 BR 0005 (556) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $100 $25 $0 $125100071634 BR 0005 (556) UTILITIES BRIDGE REPLACEMENT 2020 $80 $20 $0 $100100049167 BR 0005 (556) CONSTRUCTION BRIDGE REPLACEMENT 2021 $8,863 $2,216 $0 $11,079
TOTAL COST: $9,043 $2,261 $0 $11,304
Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-82) OVER SANDY CREEK (BIN 1189)
Project Length in Miles 1.652 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066952 PE 2017 / 100066953 RW 2019
100066954 BR 0006 (573) UTILITIES BRIDGE REPLACEMENT 2020 $259 $65 $0 $324100066955 BR 0006 (573) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,671 $1,168 $0 $5,838
TOTAL COST: $4,930 $1,233 $0 $6,163
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
11 of 206
HIGHWAY PROJECTS - BIBBSTIP PLAN: 2020 - Amendment # 1
Route CR-22 Project Description BRIDGE REPLACEMENT ON CR-22 (DEANS FERRY ROAD) OVER CSX RAILROAD BIN 012072 - BCP 05-163-17
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068195 BRZ 0518 (251) CONSTRUCTION BRIDGE REPLACEMENT 2020 $1,857 $33 $554 $2,444
TOTAL COST: $1,857 $33 $554 $2,444
Route CR-51 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 006221) ON CR-51 OVER BLACK WARRIOR RIVER; SITE 2 - (BIN 004976) ON CR-29 OVER HIGHLAND LAKE; SITE 3 - (BIN 007159) ON CR-33 OVER CALVERT PRONG
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071451 HRRR 0520 (251) CONSTRUCTION GUARDRAIL 2020 $141 $0 $16 $156
TOTAL COST: $141 $0 $16 $156
Route CR-9 Project Description RESURFACING ON CR-9 FROM SR-160 TO SR-3 (US-31) - BCP 05-170-19
Project Length in Miles 5.800 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071529 STPNU 0520 (250) CONSTRUCTION RESURFACING 2022 $490 $0 $122 $612
TOTAL COST: $490 $0 $122 $612
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 3, 4, 7, 23, 25, 34, 53, 67, 74, 75, 79, 132, 144, 160 AND 174 IN BLOUNT AND ST CLAIR COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061455 PE 2014
100061456 STPAA NR13 (934) CONSTRUCTION SIDEWALK 2022 $106 $27 $0 $133TOTAL COST: $106 $27 $0 $133
Route SR-160 Project Description INTERSECTION IMPROVEMENTS ON SR-160 AT THE I-65 INTERCHANGE RAMP AND AT SR-3 (US-31)
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066786 PE 2017 / 100066787 RW 2021 / 100066788 UT 2021 / 100066789 CN 2022
100066787 HSIP 0160 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $468 $52 $0 $520100066788 HSIP 0160 () UTILITIES INTERSECTION IMPROVEMENTS 2021 $937 $104 $0 $1,041100066789 HSIP 0160 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $4,730 $526 $0 $5,255
TOTAL COST: $6,134 $682 $0 $6,816
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
12 of 206
HIGHWAY PROJECTS - BLOUNTSTIP PLAN: 2020 - Original
Route SR-53 Project Description REPLACE BRIDGE AND APPROACHES ON SR-53 (US-231) OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER BIN 002844 STR #53-5-3.3
Project Length in Miles 0.200 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064121 PE 2018
100038326 BR 0053 (559) RIGHT OF WAY BRIDGES AND APPROACHES 2021 $204 $51 $0 $255100003356 BR 0053 () CONSTRUCTION BRIDGES AND APPROACHES 2022 $2,885 $721 $0 $3,606
TOTAL COST: $3,089 $772 $0 $3,861
Route SR-74 Project Description BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL
Project Length in Miles 2.272 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064177 PE 2016 / 100067595 RW 2019
100069045 BR 0074 (537) UTILITIES BRIDGES AND APPROACHES 2020 $440 $110 $0 $550100003565 BR 0074 (537) CONSTRUCTION BRIDGES AND APPROACHES 2020 $3,801 $950 $0 $4,751
TOTAL COST: $4,241 $1,060 $0 $5,301
Route SR-75 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-75 FROM 2100 FEET NORTH OF CR-39 TO SR-74 (US-278)
Project Length in Miles 10.665 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068645 STPAA 0075 (538) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $3,510 $878 $0 $4,388
TOTAL COST: $3,510 $878 $0 $4,388
Route SR-79 Project Description SIDEWALKS AND PEDESTRIAN IMPROVEMENTS ALONG SR-79 FROM PARK ROAD TO CR-13, AND ALONG CR-13 FROM SR-79 TO SCHOOL ROAD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069327 TAPBH TA19 (931) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route SR-79 Project Description REPL BIN#004658 ON SR-79 OVER BLACKBURN FORK OF LITTLE WARRIOR RIVER
Project Length in Miles 0.500 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003399 PE 1999 / 100038330 RW 2011
100044645 BR 0079 (500) UTILITIES BRIDGE REPLACEMENT 2023 $296 $74 $0 $370100003396 BR 0079 (500) CONSTRUCTION BRIDGE REPLACEMENT 2023 $8,335 $2,084 $0 $10,419
TOTAL COST: $8,631 $2,158 $0 $10,789
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
13 of 206
HIGHWAY PROJECTS - BLOUNTSTIP PLAN: 2020 - Original
Route CR-165 Project Description BRIDGE SCOUR COUNTERMEASURES AND GUARDRAIL INSTALLATION ON CR-165 AT BIN 005642 OVER WILLIAMS CREEK (SITE 1) AND AT BIN 005643 OVER OLD TOWN CREEK (SITE 2) - BCP 06-02-18
Project Length in Miles 0.200 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069346 BR 0618 (251) CONSTRUCTION BRIDGE REHABILITATION 2020 $337 $0 $84 $422
TOTAL COST: $337 $0 $84 $422
Route CR-165 Project Description RESURFACING ON CR-165 FROM SR-110 TO CR-130 - BCP 06-02-19
Project Length in Miles 0.700 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070536 RASTPNU 0619 () CONSTRUCTION RESURFACING 2020 $90 $23 $0 $113
TOTAL COST: $90 $23 $0 $113
Route CR-177 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-177 FROM CR-87 TO 500 FT NORTH OF PENN ROAD - BCP 06-01-19
Project Length in Miles 3.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069755 RASTPNU 0619 () CONSTRUCTION RESURFACING 2021 $392 $98 $0 $490
TOTAL COST: $392 $98 $0 $490
Route NA Project Description VEGETATION MANAGEMENT ALONG BULLOCK COUNTY ROADS
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067221 TAPOA TA17 (931) CONSTRUCTION UNCLASSIFIED 2020 $119 $0 $30 $148
TOTAL COST: $119 $0 $30 $148
Route SR-223 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-223 FROM THE PIKE COUNTY LINE TO 0.57 MILE SOUTH OF CR-28
Project Length in Miles 3.820 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070171 STPAA-HSIP 0223 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,346 $278 $0 $1,624
TOTAL COST: $1,346 $278 $0 $1,624
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
14 of 206
HIGHWAY PROJECTS - BULLOCKSTIP PLAN: 2020 - Original
Route CR-11 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 009989) ON CR-11 OVER CEDAR CREEK RELIEF BRANCH
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071453 HRRR 0720 () CONSTRUCTION GUARDRAIL 2020 $71 $0 $8 $79
TOTAL COST: $71 $0 $8 $79
Route CR-16 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN004836) ON CR-16 ON ROCKY CREEK; SITE 2 - (BIN 004839) ON CR-16 OVER PERSIMMON CREEK RELIEF - BCP 07-189-18
Project Length in Miles 0.142 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069562 HRRR 0719 (250) CONSTRUCTION GUARDRAIL 2019 $90 $20 $0 $110
TOTAL COST: $90 $20 $0 $110
Route CR-16 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 004838) ON CR-16 OVER PERSIMMON CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071452 HRRR 0720 () CONSTRUCTION GUARDRAIL 2020 $54 $0 $6 $60
TOTAL COST: $54 $0 $6 $60
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
15 of 206
HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original
Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM CR-41 TO .7 MILE SOUTH OF THE LOWNDES COUNTY LINE
Project Length in Miles 14.328 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069001 CN 2021
100071093 IM I065 (516) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $45 $5 $0 $50100069001 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $4,034 $448 $0 $4,483
TOTAL COST: $4,079 $453 $0 $4,533
Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM .7 MILE SOUTH OF BUTLER COUNTY LINE TO .63 MILE SOUTH OF SR-97
Project Length in Miles 22.380 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068999 CN 2021
100070853 IM I065 (511) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $45 $5 $0 $50100068999 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $4,681 $520 $0 $5,202
TOTAL COST: $4,726 $525 $0 $5,252
Route I-65 Project Description REST AREA REPLACEMENT NB AND SB I-65 NEAR GREENVILLE BLDG AND PK
Project Length in Miles 0.041 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100001702 PE 1995 / 100001681 RW 2000
100001665 IM I065 (423) CONSTRUCTION REST AREA REHABILITATION 2022 $9,273 $1,030 $0 $10,303TOTAL COST: $9,273 $1,030 $0 $10,303
Route I-65 Project Description SIGN REHABILITATION ALONG I-65 FROM CONECUH CL THROUGH BUTLER, LOWNDES, MONTGOMERY, ELMORE, AND AUTAUGA TO CHILTON CL.
Project Length in Miles 92.467 Urban Area MONTGOMERY Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054299 PE 2010 / 100054300 CN 2021
100054300 IM I065 (407) CONSTRUCTION SIGN REHABILITATION 2021 $3,608 $401 $0 $4,009TOTAL COST: $3,608 $401 $0 $4,009
Route I-65 Project Description RESURFACING ON I-65 FROM 0.87 MILE NORTH OF PETTIBONE ROAD TO CR-41
Project Length in Miles 7.716 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069861 CN 2022
100069861 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2
2022 $4,322 $480 $0 $4,802TOTAL COST: $4,322 $480 $0 $4,802
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
16 of 206
HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original
Route SR-185 Project Description ROADWAY IMPROVEMENTS SR-185, INCLUDING ROADWAY WIDENING, SIGNALS AND TURN LANE FROM CR-42 (MANNINGHAM ROAD) TO 0.2 MILE NORTH CR-73 (CAHABA RD)
Project Length in Miles 0.670 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056464 PE 2012
100056506 STPAA 0185 (501) CONSTRUCTION ROADWAY WIDENING 2021 $1,415 $354 $0 $1,769TOTAL COST: $1,415 $354 $0 $1,769
Route SR-185 Project Description RESURFACING ON SR-185 FROM THE NORTH END OF THE RAILROAD BRIDGE TO WILLOW LANE
Project Length in Miles 2.181 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067902 STPAA 0185 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22019 $1,553 $388 $0 $1,942
TOTAL COST: $1,553 $388 $0 $1,942
Route SR-263 Project Description CAPE SEALING ON SR-263 FROM SR-185 TO SR-21
Project Length in Miles 15.132 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070058 STPAA 0263 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12020 $1,918 $480 $0 $2,398
TOTAL COST: $1,918 $480 $0 $2,398
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
17 of 206
HIGHWAY PROJECTS - BUTLERSTIP PLAN: 2020 - Original
Route CR-19 Project Description BRIDGE REPLACEMENT AND APPROACHES (BIN 010008) ON BALLPLAY ROAD OVER MILL CREEK - CCP 08-96-17
Project Length in Miles 0.106 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071499 BR 0818 (251) CONSTRUCTION BRIDGES AND APPROACHES 2020 $760 $0 $190 $950
TOTAL COST: $760 $0 $190 $950
Route CR-440 Project Description CR-440 (64TH STREET) BRIDGE REPLACEMENT BIN # 6204 NEAR WEAVER
Project Length in Miles 0.020 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054937 STPOA 7448 () RIGHT OF WAY BRIDGE REPLACEMENT 2024 $30 $0 $8 $38100054938 STPOA 7448 () UTILITIES BRIDGE REPLACEMENT 2025 $20 $0 $5 $25
TOTAL COST: $50 $0 $13 $63
Route CR-NA Project Description REHABILITATE BOWL ROAD (RT 420), MOUNTAIN LONGLEAF WILDLIFE REFUGE (APPORTIONMENT FY 2017)
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065122 PFH 0816 () CONSTRUCTION RESURFACING 2020 $237 $0 $0 $237
TOTAL COST: $237 $0 $0 $237
Route CR-NA Project Description RESURFACING ON HENRY ROAD AND COUNTRY CLUB DRIVE SOUTHWEST TO THE JACKSONVILLE CITY LIMITS
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF JACKSONVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070197 STPOA 0819 () PRELIMINARY ENGINEERING RESURFACING 2020 $70 $0 $17 $87100070198 STPOA 0819 () CONSTRUCTION RESURFACING 2021 $376 $0 $94 $470
TOTAL COST: $446 $0 $112 $558
Route CR-NA Project Description RESURFACING ON GEORGE DOUTHIT DRIVE SOUTHWEST FROM SR-21 TO BRIERWOOD PLACE
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF JACKSONVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070203 STPOA 0819 () PRELIMINARY ENGINEERING RESURFACING 2022 $170 $0 $43 $213100070208 STPOA 0819 () CONSTRUCTION RESURFACING 2023 $917 $0 $229 $1,146
TOTAL COST: $1,087 $0 $272 $1,359
Route CR-NA Project Description BICYCLE AND PEDESTRIAN MULTI-USE PATH CONSTRUCTION AND RIDE SHARE ON BALTZELL GATE ROAD FROM SR-21 TO WEST OF FEDERAL WAY
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF ANNISTON COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070238 STPOA 0819 () PRELIMINARY ENGINEERING SIDEWALK 2022 $15 $0 $4 $18100070239 STPOA 0819 () CONSTRUCTION SIDEWALK 2023 $147 $0 $37 $183
TOTAL COST: $161 $0 $40 $201
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
18 of 206
HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original
Route CR-NA Project Description BICYCLE AND PEDESTRIAN MULTI-USE PATH CONSTRUCTION, SR-202 COLDWATER MOUNTAIN/MULBERRY STREET TO LEGARDE AVENUE FOR 1,075 FT
Project Length in Miles 0.300 Urban Area ANNISTON Sponsor CITY OF ANNISTON COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070241 STPOA 0202 () PRELIMINARY ENGINEERING SIDEWALK 2021 $26 $0 $7 $33100070242 STPOA 0202 () CONSTRUCTION SIDEWALK 2022 $132 $0 $33 $165
TOTAL COST: $158 $0 $39 $197
Route CR-NA Project Description WIDENING ON FRIENDSHIP ROAD FROM CHEAHA DRIVE TO CIRCLE DRIVE (PHASE I); PHASE I WILL INCLUDE DESIGN AND FUNCTIONAL DRAINAGE TO CORRECT EXISTING WATER FLOW ISSUES
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF OXFORD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070247 STPOA 0819 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING
(RDWY)2020 $252 $0 $63 $314
100070248 STPOA 0819 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)
2021 $261 $0 $65 $326100070249 STPOA 0819 () UTILITIES WIDENING AND RESURFACING
(RDWY)2022 $259 $0 $65 $323
100070250 STPOA 0819 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2023 $1,212 $0 $303 $1,515TOTAL COST: $1,983 $0 $496 $2,479
Route CR-NA Project Description BRIDGE REPLACEMENT ON FRIENDSHIP ROAD OVER CHOCCOLOCCO CREEK (BIN 004773) AND CHOCCOLOCCO CREEK RELIEF (BIN 004774)
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF OXFORD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070257 CN 2025
100070253 STPOA 0819 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $282 $0 $71 $353100070254 STPOA 0819 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $155 $0 $39 $193100070255 STPOA 0819 () UTILITIES BRIDGE REPLACEMENT 2022 $153 $0 $38 $192
TOTAL COST: $590 $0 $148 $738
Route CR-NA Project Description RESURFACING, WIDENING AND UPGRADING EXISTING TURN SIGNALS AND ADDING TURN LANES ON FRIENDSHIP ROAD AT CHEAHA DRIVE
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF OXFORD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070271 CN 2025
100070259 STPOA 0819 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING (RDWY)
2020 $122 $0 $30 $152100070262 STPOA 0819 () RIGHT OF WAY WIDENING AND RESURFACING
(RDWY)2021 $87 $0 $22 $108
100070269 STPOA 0819 () UTILITIES WIDENING AND RESURFACING (RDWY)
2022 $86 $0 $22 $108TOTAL COST: $295 $0 $74 $368
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
19 of 206
HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original
Route CR-NA Project Description RESURFACING ON ALEXANDRIA-JACKSONVILLE HIGHWAY FROM CEDAR SPRINGS ROAD TO THE JACKSONVILLE CITY LIMITS - CCP 08-107-19
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070224 STPOA 0819 (250) CONSTRUCTION RESURFACING 2020 $587 $0 $147 $734
TOTAL COST: $587 $0 $147 $734
Route CR-NA Project Description RESURFACING ON WHITES GAP ROAD SOUTHEAST FROM SR-21 TO THE JACKSONVILLE CITY LIMITS AND ON WHITES GAP ROAD FROM WHITES GAP ROAD SOUTHEAST TO SR-9
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070226 STPOA 0819 () CONSTRUCTION RESURFACING 2021 $1,028 $0 $257 $1,285
TOTAL COST: $1,028 $0 $257 $1,285
Route CR-NA Project Description RESURFACING ON ROY WEBB ROAD FROM SR-21 TO FOSTER WEST ROAD
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070230 STPOA 0819 () CONSTRUCTION RESURFACING 2022 $783 $0 $196 $979
TOTAL COST: $783 $0 $196 $979
Route CR-NA Project Description RESURFACING ON EULATON GATE ROAD FROM BYNUM LEATHERWOOD ROAD TO THE ANNISTON ARMY DEPOT GATE
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070232 STPOA 0819 () CONSTRUCTION RESURFACING 2023 $312 $0 $78 $390
TOTAL COST: $312 $0 $78 $390
Route CR-NA Project Description RESURFACING CHURCH AVENUE FROM SR-21 TO 11TH STREET NORTHEAST CITY OF JACKSONVILLE
Project Length in Miles 3.350 Urban Area ANNISTON Sponsor CITY OF JACKSONVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064885 PE 2018
100064886 STPOA 0815 (261) CONSTRUCTION RESURFACING 2020 $1,528 $0 $382 $1,910TOTAL COST: $1,528 $0 $382 $1,910
Route CR-NA Project Description BRIDGE REPLACEMENT ON AIRPORT ROAD AT COLDWATER CREEK BIN # 11215 CITY OF OXFORD
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CITY OF OXFORD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064887 PE 2018
100064888 STPOA 0815 (260) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $8 $0 $2 $10100064889 STPOA 0815 (260) UTILITIES BRIDGE REPLACEMENT 2021 $62 $0 $16 $78100064890 STPOA 0815 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,715 $0 $429 $2,144
TOTAL COST: $1,786 $0 $446 $2,232
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
20 of 206
HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original
Route CR-NA Project Description INSTALLATION OF A ROUNDABOUT AT THE BYNUM LEATHERWOOD ROAD (CR-109) AND OLD GADSDEN HIGHWAY INTERSECTION
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064896 PE 2018
100064897 STPOA 0815 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $727 $0 $182 $909TOTAL COST: $727 $0 $182 $909
Route CR-NA Project Description RESURFACE RUSSELL DRIVE FROM ALEXANDRIA ROAD TO PEACEBURG ROAD CITY OF WEAVER
Project Length in Miles 0.660 Urban Area ANNISTON Sponsor CITY OF WEAVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064898 PE 2018
100064899 STPOA 0818 () CONSTRUCTION RESURFACING 2021 $330 $0 $83 $413TOTAL COST: $330 $0 $83 $413
Route I-20 Project Description RESURFACING I-20 (OPEN GRADE FRICTION COURSE) FROM EXIT 185 (SR-21) MP 185.830 TO CLEBURNE COUNTY LINE MP 193.823
Project Length in Miles 15.983 Urban Area ANNISTON Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071440 CN 2021
100071441 IM I020 (360) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $81 $9 $0 $90100071440 IM I020 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $6,181 $687 $0 $6,868
TOTAL COST: $6,262 $696 $0 $6,958
Route NA Project Description BICYCLE LANE, STRIPING AND POSSIBLE 2 FT SHOULDER WIDENING ALONG SOUTH NOBLE STREET FROM CHESTNUT STREET TO FOURTH STREET
Project Length in Miles 1.500 Urban Area ANNISTON Sponsor CITY OF ANNISTON COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070244 STPOA 0819 () PRELIMINARY ENGINEERING SIDEWALK 2020 $4 $0 $1 $6100070245 STPOA 0819 () CONSTRUCTION SIDEWALK 2021 $36 $0 $9 $45
TOTAL COST: $40 $0 $10 $50
Route SR-1 Project Description ACCESS MANAGEMENT, RESURFACING, TRAFFIC STRIPE, GUARDRAIL, AND BRIDGE RAIL RETROFIT ON SR-1 (US-431) FROM THE END OF SR-1 (US-431) BYPASS (MP 233.238) TO 0.116 MILE NORTH OF SR-144 (MP 240.491)
Project Length in Miles 7.253 Urban Area ANNISTON Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068386 NH-FMGR 0001 (613) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $7,374 $1,843 $0 $9,217
TOTAL COST: $7,374 $1,843 $0 $9,217
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
21 of 206
HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original
Route SR-144 Project Description RESURFACING, TRAFFIC STRIPING, 2 FT SAFETY WIDENING, AND BRIDGE GUARDRAIL RETROFITTING ON SR-144 FROM THE ST CLAIR COUNTY LINE (MP 17.173) TO .15 MILE WEST OF SR-1 (US-431) (MP 26.537)
Project Length in Miles 9.364 Urban Area ANNISTON Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069004 STPAA-HSIP 0144 (502) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR
REHAB W/ SAFETY WIDENING2020 $3,206 $718 $0 $3,924
TOTAL COST: $3,206 $718 $0 $3,924
Route SR-202 Project Description SIGNAL UPGRADES AT SR-202 AND NORTH HUNTER STREET
Project Length in Miles 0.000 Urban Area ANNISTON Sponsor CALHOUN COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070695 STPOA 0202 () PRELIMINARY ENGINEERING SIGNALIZATION 2020 $24 $0 $6 $30100070228 STPOA 0202 () CONSTRUCTION SIGNALIZATION 2021 $82 $0 $20 $102
TOTAL COST: $106 $0 $26 $132
Route SR-204 Project Description BRIDGE REPLACEMENT OVER ABANDONED RAILROAD AND TALLAHATCHEE CREEK ON SR-204 (BIN 4684)
Project Length in Miles 0.250 Urban Area ANNISTON Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049971 CN 2026
100049969 BR 0204 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $288 $72 $0 $360TOTAL COST: $288 $72 $0 $360
Route SR-21 Project Description SIGNAL UPGRADE SR-21 AT BALTZELL GATE ROAD
Project Length in Miles 0.015 Urban Area ANNISTON Sponsor CITY OF ANNISTON COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100047013 PE 2007
100047014 STPOA 0021 (516) CONSTRUCTION SIGNALIZATION 2020 $363 $91 $0 $454TOTAL COST: $363 $91 $0 $454
Route SR-4 Project Description RE-CONFIGURE INTERSECTION SR-4 (US-78)ATCR-186 (BARRY STREET)
Project Length in Miles 0.100 Urban Area ANNISTON Sponsor CITY OF OXFORD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057404 PE 2012 / 100057405 RW 2019
100057406 STPOA 0004 (536) UTILITIES INTERSECTION IMPROVEMENTS 2020 $94 $0 $23 $117100057407 STPOA 0004 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $534 $0 $134 $668
TOTAL COST: $628 $0 $157 $785
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
22 of 206
HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Original
Route SR-9 Project Description REPLACE BRIDGE BIN 005152, SR-9 OVER SOUTHERN RR, 1.8 MILES N OF SR-4(US-78) NEAR IRON CITY (SUFF=43.1,STAT=FO, 2001 HBRRP LIST)
Project Length in Miles 0.250 Urban Area ANNISTON Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100041404 CN 2026
100061463 BR 0009 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $135 $34 $0 $169TOTAL COST: $135 $34 $0 $169
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
23 of 206
HIGHWAY PROJECTS - CALHOUNSTIP PLAN: 2020 - Amendment # 3
Route CR-208 Project Description INTERSECTION IMPROVEMENTS AT CR-208 (PHILLIPS ROAD) AND CR-299 (CUSSETA ROAD) - CCP 09-15-03
Project Length in Miles 1.077 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071174 RASTPNU 0916 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $1,760 $440 $0 $2,200
TOTAL COST: $1,760 $440 $0 $2,200
Route CR-289 Project Description WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-289 FROM 3750 FEET NORTH OF CR-216 NORTHWEST FOR 770 FEET
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071454 HRRR 0920 (250) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $134 $0 $15 $149
TOTAL COST: $134 $0 $15 $149
Route CR-83 Project Description WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-83 FROM 3.6 MILES SOUTH OF SR-50 NORTHWEST FOR .68 MILE - CCP 09-10-18
Project Length in Miles 0.700 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069588 HRRR-HSIP 0919 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $300 $1 $33 $334
TOTAL COST: $300 $1 $33 $334
Route I-85 Project Description REMOVE AND REPLACE LIGHTING ON I-85 AT SR-15 (US-29)
Project Length in Miles 0.620 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071044 CN 2021
100071044 IM I085 () CONSTRUCTION LIGHTING 2021 $909 $101 $0 $1,010TOTAL COST: $909 $101 $0 $1,010
Route SR-147 Project Description RESURFACING AND TRAFFIC STRIPE ON SR-147 FROM THE LEE COUNTY LINE (MP 12.826) TO THE INTERSECTION OF SR-1 (US-431) (MP 17.001)
Project Length in Miles 4.175 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069809 STPAA 0147 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,152 $288 $0 $1,440
TOTAL COST: $1,152 $288 $0 $1,440
Route SR-77 Project Description BRIDGE REPLACEMENT ON SR-77 AT HOOTALOOCO CREEK 4.8 MILES NORTH WEST OF US-431 BIN 2600
Project Length in Miles 0.050 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067064 PE 2018
100003702 BR 0077 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,204 $551 $0 $2,755TOTAL COST: $2,204 $551 $0 $2,755
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
24 of 206
HIGHWAY PROJECTS - CHAMBERSSTIP PLAN: 2020 - Original
Route SR-25 Project Description INTERSECTION SAFETY IMPROVEMENTS ON SR-25 (US-411) AT WALMART (MP 238.800), SIGNAL INSTALLATION BY STATE FORCES
Project Length in Miles 1.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068145 PE 2019 / 100068146 CN 2021 / 100068147 CN 2021
100068146 HSIP 0025 (560) CONSTRUCTION SIGNALIZATION 2021 $32 $4 $0 $36100068147 HSIP 0025 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $139 $15 $0 $155
TOTAL COST: $171 $19 $0 $190
Route SR-68 Project Description BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO)
Project Length in Miles 0.625 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049708 PE 2010 / 100049709 RW 2013
100049710 BR 0068 (505) UTILITIES BRIDGE REMOVAL 2020 $378 $95 $0 $473100049707 BR 0068 (505) CONSTRUCTION BRIDGE REMOVAL 2020 $3,171 $793 $0 $3,963
TOTAL COST: $3,549 $887 $0 $4,436
Route SR-9 Project Description RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)
Project Length in Miles 5.020 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068417 STPAA-HSIP 0009 (575) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,966 $457 $0 $2,423
TOTAL COST: $1,966 $457 $0 $2,423
Route SR-9 Project Description RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)
Project Length in Miles 5.020 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071445 STPAA 0009 (575) UTILITIES PREVENTATIVE MAINTENANCE
LEVEL 22020 $505 $126 $0 $631
TOTAL COST: $505 $126 $0 $631
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
25 of 206
HIGHWAY PROJECTS - CHEROKEESTIP PLAN: 2020 - Original
Route CR-51 Project Description PATCHING AND TRAFFIC STRIPING ON CR-51 FROM CR-44 TO CR-42 - CCP 11-587-19
Project Length in Miles 4.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070592 STPNU 1119 (250) CONSTRUCTION PAVEMENT REHABILITATION 2020 $302 $0 $178 $480
TOTAL COST: $302 $0 $178 $480
Route I-65 Project Description I-65 BRIDGE RAISING AT BIN 006787 (CR-59), BIN 006788 (CR-24), BIN 006093 (CR-32), BIN 006793 (CR-51), BIN 007152 (SR-145), BIN 006794 (CR-43), BIN 006795 (CR-48) FROM THE AUTAUGA COUNTY LINE TO THE SHELBY COUNTY LINE
Project Length in Miles 0.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066599 UT 2020 / 100066598 CN 2020
100066597 IM I065 (514) PRELIMINARY ENGINEERING BRIDGE RAISING 2020 $360 $40 $0 $400100066599 IM I065 (514) UTILITIES BRIDGE RAISING 2020 $180 $20 $0 $200100066598 IM I065 () CONSTRUCTION BRIDGE RAISING 2020 $2,520 $280 $0 $2,800
TOTAL COST: $3,060 $340 $0 $3,400
Route I-65 Project Description ROUNDABOUTS, SIGNING AND STRIPING ON I-65 ON-RAMPS AND OFF-RAMPS AT EXIT 208 (CR-28 INTERSECTION)
Project Length in Miles 0.753 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068100 PE 2020 / 100068101 RW 2021 / 100068102 UT 2021 / 100068103 CN 2021
100068103 HSIP I065 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,893 $210 $0 $2,104100068100 HSIP I065 (502) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $230 $26 $0 $255100068101 HSIP I065 (502) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068102 HSIP I065 (502) UTILITIES SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103
TOTAL COST: $2,308 $256 $0 $2,565
Route SR-3 Project Description BRIDGE WIDENING BIN# 006916 ON SR-3 (US-31) AT I-65 IN CLANTON (EXIT 205)
Project Length in Miles 0.380 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065814 PE 2017
100068720 BR 0003 (607) UTILITIES BRIDGE WIDENING 2020 $373 $93 $0 $467100065815 BR 0003 (607) CONSTRUCTION BRIDGE WIDENING 2021 $2,438 $609 $0 $3,047
TOTAL COST: $2,811 $703 $0 $3,514
Route SR-3 Project Description RESURFACING, 2 FT SAFETY WIDENING, AND SHOULDER SCORING ON SR-3 (US-31) PARALLEL TO THE CSX RAILROAD FROM THE THORSBY NORTH CITY LIMITS TO THE JEMISON NORTH CITY LIMITS
Project Length in Miles 3.766 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070199 STPAA-HSIP 0003 (627) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,661 $390 $0 $2,050
TOTAL COST: $1,661 $390 $0 $2,050
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
26 of 206
HIGHWAY PROJECTS - CHILTONSTIP PLAN: 2020 - Original
Route CR-14 Project Description BRIDGE REPLACEMENT CR-14 EAST RELIEF FOR PUSS CUSS CREEK BIN # 3125
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062180 PE 2014 / 100062385 CN 2021
100062385 BR 1214 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $357 $0 $89 $447TOTAL COST: $357 $0 $89 $447
Route CR-14 Project Description BRIDGE REPLACEMENT CR-14 WEST RELIEF FOR PUSS CUSS CREEK BIN # 3126
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062181 PE 2014 / 100062386 CN 2021
100062386 BR 1214 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $357 $0 $89 $446TOTAL COST: $357 $0 $89 $446
Route CR-18 Project Description RESURFACING ON CR-18 FROM MELVIN CUTOFF ROAD TO CR-11 - CCP 12-03-19
Project Length in Miles 3.281 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070366 STPNU 1219 () CONSTRUCTION RESURFACING 2021 $596 $0 $149 $745
TOTAL COST: $596 $0 $149 $745
Route CR-32 Project Description BRIDGE REPLACEMENT OVER NEALS CREEK ON CR-32 BIN #442
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062156 PE 2014 / 100061343 CN 2021
100061343 BR 1214 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $166 $0 $42 $208TOTAL COST: $166 $0 $42 $208
Route CR-9 Project Description RESURFACING ON CR-9 FROM BONNER TOWN ROAD TO MELVIN CUTOFF ROAD - CCP 12-02-19
Project Length in Miles 3.193 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070365 STPNU 1219 (251) CONSTRUCTION RESURFACING 2020 $642 $0 $160 $802
TOTAL COST: $642 $0 $160 $802
Route SR-10 Project Description RESURFACING ON SR-10 FROM CR-45 TO 0.47 MILE WEST OF THE BUTLER TOWN LIMITS
Project Length in Miles 7.945 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070063 STPAA 0010 (548) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,524 $381 $0 $1,906
TOTAL COST: $1,524 $381 $0 $1,906
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
27 of 206
HIGHWAY PROJECTS - CHOCTAWSTIP PLAN: 2020 - Original
Route SR-12 Project Description BRIDGE REPLACEMENT ON SR-12 (US-84) OVER TOMBIGBEE RIVER (BIN # 006201)
Project Length in Miles 5.075 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040182 BRF 0012 (572) UTILITIES BRIDGE REPLACEMENT 2022 $479 $120 $0 $599100038706 BRF 0012 (572) CONSTRUCTION BRIDGE REPLACEMENT 2023 $22,162 $5,541 $0 $27,703
TOTAL COST: $22,641 $5,660 $0 $28,302
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
28 of 206
HIGHWAY PROJECTS - CHOCTAWSTIP PLAN: 2020 - Original
Route CR-1 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 009583) ON CR-1 OVER CANE CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071455 HRRR 1320 () CONSTRUCTION GUARDRAIL 2020 $34 $0 $4 $38
TOTAL COST: $34 $0 $4 $38
Route CR-21 Project Description BRIDGE REPLACEMENT (BIN # 007957) AND APPROACHES ON CR-21 OVER SATILPA CREEK RELIEF - CCP 13-37-16
Project Length in Miles 0.037 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070595 RABRZ 1317 (250) CONSTRUCTION BRIDGE REPLACEMENT 2020 $1,020 $0 $255 $1,275
TOTAL COST: $1,020 $0 $255 $1,275
Route CR-27 Project Description RESURFACING ON CR-27 (OLD HIGHWAY 5 NORTH) FROM THE THOMASVILLE CITY LIMITS TO THE WILCOX COUNTY LINE - CCP 13-46-19
Project Length in Miles 5.509 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070302 RASTPNU 1319 () CONSTRUCTION RESURFACING 2021 $1,200 $300 $0 $1,500
TOTAL COST: $1,200 $300 $0 $1,500
Route CR-NA Project Description STREETSCAPES ALONG PECAN CIRCLE, SOUTH PORTIS AVENUE, MAGNOLIA DRIVE, COMMERCE STREET, BROAD STREET, AND SOUTH KIMBALL AVENUE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069032 TAPNU TA19 (926) CONSTRUCTION STREETSCAPE 2019 $446 $0 $112 $558
TOTAL COST: $446 $0 $112 $558
Route SR-13 Project Description RELOCATE INTERSECTION SR-13 (US-43) ATCR-3 (MCVAY RD) FROM 0.1 MILE NORTH OF CR-484 (TELLIE TRAIL) TO 0.4 MILE NORTH OF CR-3 (MCVAY RD)
Project Length in Miles 0.670 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054555 PE 2010 / 100054556 RW 2011 / 100054557 UT 2012
100054558 NH 0013 (564) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $425 $106 $0 $531TOTAL COST: $425 $106 $0 $531
Route SR-177 Project Description RESURFACING ON SR-177 FROM WEST OF MILLER STREET TO SOUTH OF SR -13 (US-43)
Project Length in Miles 2.958 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071690 STPAA 0177 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $843 $211 $0 $1,054
TOTAL COST: $843 $211 $0 $1,054
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
29 of 206
HIGHWAY PROJECTS - CLARKESTIP PLAN: 2020 - Original
Route SR-5 Project Description RESURFACING ON SR-5 FROM SR-13 (US-43) TO THE WILCOX COUNTY LINE
Project Length in Miles 4.725 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070069 NH 0005 (558) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $967 $242 $0 $1,209
TOTAL COST: $967 $242 $0 $1,209
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
30 of 206
HIGHWAY PROJECTS - CLARKESTIP PLAN: 2020 - Original
Route SR-49 Project Description RESURFACING ON SR-49 FROM SR-9 (MP 68.517) TO 0.22 MILE NORTH OF CARVER STREET (MP 69.620)
Project Length in Miles 1.183 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068369 STPAA 0049 (512) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $637 $159 $0 $796
TOTAL COST: $637 $159 $0 $796
Route SR-49 Project Description RESURFACING AND STRIPING ON SR-49 FROM 0.25 MILES NORTH OF CARVER STREET (MP 69.700) TO INTERSECTION OF SR-281 (MP 82.684).
Project Length in Miles 12.984 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069812 STPAA 0049 (513) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12020 $1,300 $325 $0 $1,625
TOTAL COST: $1,300 $325 $0 $1,625
Route SR-77 Project Description RESURFACING, TRAFFIC STRIPING, AND 2 FT SAFETY WIDENING ON SR-77 FROM THE RANDOLPH COUNTY LINE (MP 25.208) TO SR-49 (MP 32.099)
Project Length in Miles 6.953 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069811 STPAA-HSIP 0077 (525) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2021 $2,243 $492 $0 $2,736
TOTAL COST: $2,243 $492 $0 $2,736
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
31 of 206
HIGHWAY PROJECTS - CLAYSTIP PLAN: 2020 - Original
Route CR-10 Project Description WIDENING AND RESURFACING ON CR-10 FROM CR-25 TO CR-51 - CCP 15-55-18
Project Length in Miles 4.295 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069650 RASTPNU 1519 (251) CONSTRUCTION RESURFACING 2020 $964 $241 $0 $1,205
TOTAL COST: $964 $241 $0 $1,205
Route CR-35 Project Description RESURFACING ON CR-35 FROM SR-4 (US-78) TO CR-49 - CCP 15-56-18
Project Length in Miles 3.321 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069371 RASTPNU 1518 () CONSTRUCTION RESURFACING 2021 $298 $75 $0 $373
TOTAL COST: $298 $75 $0 $373
Route CR-50 Project Description BRIDGE REPLACEMENT (BIN # 9400) AND APPROACHES ON CR-50 OVER MUSCADINE CREEK - CCP 15-30-12
Project Length in Miles 0.390 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060379 RABRZ 1514 (251) CONSTRUCTION BRIDGE REPLACEMENT 2020 $619 $0 $155 $774
TOTAL COST: $619 $0 $155 $774
Route CR-55 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE - 1 (BIN 011919) ON CR-55 OVER SOUTH FORK TERRAPIN CREEK; SITE 2 - (BIN 004932) ON CR-49 OVER TERRAPIN CREEK NORTH; SITE - 3 (BIN 004931) ON CR-49 OVER TERRAPIN CREEK SOUTH
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071456 HRRR 1520 () CONSTRUCTION GUARDRAIL 2020 $139 $0 $15 $154
TOTAL COST: $139 $0 $15 $154
Route CR-94 Project Description BRIDGE REPLACEMENT ON CR-94 OVER TERRAPIN CREEK BIN # 832
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061540 PE 2014 / 100060395 CN 2021
100060395 RABRZ 1513 () CONSTRUCTION BRIDGE 2021 $495 $124 $0 $618TOTAL COST: $495 $124 $0 $618
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
32 of 206
HIGHWAY PROJECTS - CLEBURNESTIP PLAN: 2020 - Original
Route I-20 Project Description WELCOME CENTER REPLACEMENT AND PARKING UPGRADES ON I-20 NEAR HEFLIN.
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071547 CN 2023
100071546 IM I020 () PRELIMINARY ENGINEERING REST AREA COMPLETE 2021 $909 $101 $0 $1,010TOTAL COST: $909 $101 $0 $1,010
Route I-20 Project Description RESURFACING ON I-20 FROM SR-9 (EXIT 199) (MP 199.835) TO SR-46 (EXIT 205) (MP 205.054)
Project Length in Miles 10.439 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070886 CN 2020
100070887 IM I020 (359) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $63 $7 $0 $70100070886 IM I020 (359) CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22020 $5,804 $645 $0 $6,449
TOTAL COST: $5,867 $652 $0 $6,519
Route I-20 Project Description RESURFACING (OGFC) ON I-20 FROM SR-46 (MP 205.054) TO CR-49 (MP 210.383)
Project Length in Miles 10.659 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071647 CN 2021
100071659 IM I020 (361) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $94 $10 $0 $104100071647 IM I020 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $4,727 $525 $0 $5,252
TOTAL COST: $4,820 $536 $0 $5,356
Route I-20 Project Description RESURFACING (OGFC) ON I-20 FROM THE CALHOUN COUNTY LINE (MP 193.823) TO SR-9 (EXIT 199) (MP 199.850)
Project Length in Miles 6.012 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067282 PE 2019 / 100067283 CN 2020
100067283 IM I020 (358) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $2,761 $307 $0 $3,067TOTAL COST: $2,761 $307 $0 $3,067
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
33 of 206
HIGHWAY PROJECTS - CLEBURNESTIP PLAN: 2020 - Original
Route CR-420 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 009670) ON CR-420 OVER HAYS CREEK; SITE 2 - (BIN 009937) ON CR-719 OVER WILSON MILL CREEK; SITE 3 - (BIN 014257) ON CR-148 OVER KISER MILL CREEK; SITE 4 - (BIN 013670) ON CR-148 OVER BRANCH
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071457 HRRR 1620 (250) CONSTRUCTION GUARDRAIL 2020 $116 $0 $13 $129
TOTAL COST: $116 $0 $13 $129
Route SR-12 Project Description RESURFACING AND PLANING ON SR-12 (US-84) FROM SR-203 TO SR-87
Project Length in Miles 2.797 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068700 NH 0012 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $939 $235 $0 $1,173
TOTAL COST: $939 $235 $0 $1,173
Route SR-125 Project Description RESURFACING ON SR-125 FROM SR-167 TO THE PIKE COUNTY LINE
Project Length in Miles 5.825 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071048 STPAA 0125 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,128 $282 $0 $1,410
TOTAL COST: $1,128 $282 $0 $1,410
Route SR-134 Project Description PLANING, RESURFACING AND 2' SAFETY WIDENING OF SR-134 FROM SR-87 TO SR-88
Project Length in Miles 10.800 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068699 STPAA-HSIP 0134 (508) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR
REHAB W/ SAFETY WIDENING2020 $3,754 $807 $0 $4,562
TOTAL COST: $3,754 $807 $0 $4,562
Route SR-167 Project Description ADDITIONAL LANES ON SR-167 FROM SR-12 (US-84) TO 0.28 MILE NORTH OF CR-48 (SALEM RD)
Project Length in Miles 2.140 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100047415 PE 2006 / 100047416 RW 2009 / 100052587 UT 2012
100047417 STPAA A115 (900) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $7,345 $1,836 $0 $9,181TOTAL COST: $7,345 $1,836 $0 $9,181
Route SR-167 Project Description PLANING AND RESURFACING ON SR-167 FROM SR-12 (US-84) (BOLL WEEVIL CIRCLE) TO CR-154
Project Length in Miles 8.230 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068716 STPAA 0167 () FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2021 $1,224 $306 $0 $1,530
TOTAL COST: $1,224 $306 $0 $1,530
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
34 of 206
HIGHWAY PROJECTS - COFFEESTIP PLAN: 2020 - Original
Route SR-189 Project Description PLANING AND RESURFACING ON SR-189 FROM SR-203 SOUTH OF ELBA TO SR-203 NORTH OF ELBA
Project Length in Miles 2.105 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068702 STPAA 0189 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $428 $107 $0 $534
TOTAL COST: $428 $107 $0 $534
Route SR-27 Project Description RESURFACING AND PLANING ON SR-27 FROM SR-12 IN ENTERPRISE TO THE DALE COUNTY LINE
Project Length in Miles 7.535 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068712 STPAA 0027 (516) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2021 $2,804 $701 $0 $3,505
TOTAL COST: $2,804 $701 $0 $3,505
Route SR-51 Project Description PREVENTATIVE MAINTENANCE ON SR-51 FROM SR-12 (US-84) TO SR-167
Project Length in Miles 5.600 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068698 STPAA 0051 (517) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12021 $866 $217 $0 $1,083
TOTAL COST: $866 $217 $0 $1,083
Route SR-87 Project Description PLANING AND RESURFACING ON SR-87 FROM SR-12 (US-84) TO SR-203
Project Length in Miles 0.792 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068701 STPAA 0087 (516) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $290 $73 $0 $363
TOTAL COST: $290 $73 $0 $363
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
35 of 206
HIGHWAY PROJECTS - COFFEESTIP PLAN: 2020 - Original
Route CR-24 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 011420) ON CR-24 OVER TOWN CREEK; SITE 2 - (BIN 009705) ON CR-36 OVER LITTLE BEAR CREEK; SITE 3 - (BIN 001265) ON CR-61 OVER POLK CREEK
Project Length in Miles 0.000 Urban Area SHOALS Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071458 HRRR 1720 () CONSTRUCTION GUARDRAIL 2020 $117 $0 $13 $130
TOTAL COST: $117 $0 $13 $130
Route CR-48 Project Description UPGRADE RR CROSSING DEVICES ON MAIN ST. DOT NO. 731919B AND SADIE ROBERSON ST. DOT NO. 731921C, REF#1412(XVII-R) IN LEIGHTON TO INCLUDE MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, MARKINGS AND LEGENDS
Project Length in Miles 0.057 Urban Area SHOALS Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070148 RHCH RR19 (911) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $732 $0 $183 $915
TOTAL COST: $732 $0 $183 $915
Route CR-55 Project Description RESURFACING ON CR-55 (WOODMONT DRIVE) FROM PONDEROSA DRIVE TO TUSCUMBIA CITY LIMITS
Project Length in Miles 0.000 Urban Area SHOALS Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071742 STPOA 1720 (250) CONSTRUCTION RESURFACING 2020 $1,082 $0 $270 $1,352
TOTAL COST: $1,082 $0 $270 $1,352
Route CR-NA Project Description NATCHEZ TRACE PARKWAY OVERLAY PARK ROAD FROM MP 316.55 TO MP 334.55
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067955 FLAP FLAP () CONSTRUCTION RESURFACING 2020 $4,170 $0 $1,042 $5,212
TOTAL COST: $4,170 $0 $1,042 $5,212
Route CR-NA Project Description SIDEWALKS ALONG BROWN ST FROM ROOSEVELT AVE TO GIRARD AVE, ALONG ELLEDGE LANE FROM 6TH ST TO HUSTON DR, ALONG WEBSTER ST FROM WEBSTER CIR TO EAST AVALON AVE AND ALONG EDWARDS AVE / BROOKFORD ST FROM FIRESTONE AVE TO EAST AVALON AVE
Project Length in Miles 0.000 Urban Area SHOALS Sponsor MUSCLE SHOALS LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068358 TAPOA TA18 (909) CONSTRUCTION SIDEWALK 2020 $413 $0 $103 $517
TOTAL COST: $413 $0 $103 $517
Route CR-NA Project Description RAILROAD GRADE CROSSING IMPROVEMENTS, MAST MOUNTED SIGNALS, BELLS, GATES, SIGNS, MARKINGS AND LEGENDS AT WEST 2ND STREET AND NORFOLK SOUTHERN RAILROAD IN TUSCUMBIA, DOT NO. 731950M
Project Length in Miles 0.081 Urban Area SHOALS Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070181 RHPD RR19 (910) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $298 $0 $33 $331
TOTAL COST: $298 $0 $33 $331
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
36 of 206
HIGHWAY PROJECTS - COLBERTSTIP PLAN: 2020 - Original
Route CR-NA Project Description IMP RVR RD FR BR HATN TO SR184, RVR RD FR SR133 TO FRD RD, LIME KLN RD, CL RD FR SR20 TO OLD SR20, SKWL LN FR SR157 TO SR20, SPR VA RD FR 3 MI LN TO LGR RD, RVR RD FR FORD RD TO BR HTN, CL RD SR184 TO RVR RD
Project Length in Miles 0.000 Urban Area SHOALS Sponsor COLBERT COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065034 STPOA 1716 () CONSTRUCTION RESURFACING 2023 $1,973 $0 $493 $2,466
TOTAL COST: $1,973 $0 $493 $2,466
Route CR-NA Project Description RESURFACING, LEVELING, AND DRAINAGE IMPROVEMENTS ON COX BOULEVARD FROM AVALON AVENUE TO SECOND STREET INCLUDING NORFOLK-SOUTHERN RAILROAD CROSSING
Project Length in Miles 2.000 Urban Area SHOALS Sponsor SHEFFIELD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056074 PE 2011 / 100056076 RW 2019
100056077 STPOA 8822 (601) UTILITIES RESURFACING 2020 $71 $0 $18 $88100056078 STPOA 8822 (601) CONSTRUCTION RESURFACING 2020 $2,042 $0 $510 $2,552
TOTAL COST: $2,112 $0 $528 $2,641
Route CR-NA Project Description RAILROAD GRADE CROSSING IMPROVEMENTS, SIGNS, MARKINGS AND LEGENDS AT SOUTHWEST 12TH STREET AND NORFOLK SOUTHERN RAILOAD IN SHEFFIELD, AL
Project Length in Miles 0.000 Urban Area SHOALS Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069655 RHCH RR19 (903) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $3 $0 $0 $4
TOTAL COST: $3 $0 $0 $4
Route NA Project Description BICYCLE AND PEDESTRIAN TRAIL EXTENDING IN THE NORTHEAST QUADRANT OF WHIPPORWILL PARK IN THE CITY OF SHEFFIELD
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069005 TAPAA TA19 (900) CONSTRUCTION SIDEWALK 2020 $293 $0 $73 $366
TOTAL COST: $293 $0 $73 $366
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
37 of 206
HIGHWAY PROJECTS - COLBERTSTIP PLAN: 2020 - Original
Route SR-2 Project Description REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)
Project Length in Miles 0.200 Urban Area SHOALS Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049337 PE 2008 / 100068037 RW 2018 / 100055932 UT 2019
100049340 BR 0002 (529) CONSTRUCTION BRIDGES AND APPROACHES 2020 $5,333 $1,333 $0 $6,666TOTAL COST: $5,333 $1,333 $0 $6,666
Route SR-2 Project Description RESURFACING ON SR-2 (US-72) FROM MILL CREEK LOOP TO LAIR LANE
Project Length in Miles 3.499 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068252 NH 0002 (588) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,820 $455 $0 $2,275
TOTAL COST: $1,820 $455 $0 $2,275
Route SR-20 Project Description SAFETY IMPROVEMENTS TO INTERSECTION OF SR-20 AND SR-157
Project Length in Miles 1.000 Urban Area SHOALS Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056499 PE 2012
100056500 NH 0020 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $767 $192 $0 $959TOTAL COST: $767 $192 $0 $959
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
38 of 206
HIGHWAY PROJECTS - COLBERTSTIP PLAN: 2020 - Original
Route I-65 Project Description BRIDGE RAISING (BIN 006461) OVER I-65 (EXIT 83) AT CR-6 OVERPASS
Project Length in Miles 0.388 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071126 CN 2020
100071125 IM I065 (513) PRELIMINARY ENGINEERING BRIDGE RAISING 2020 $30 $3 $0 $33100071126 IM I065 (513) CONSTRUCTION BRIDGE RAISING 2020 $295 $33 $0 $328
TOTAL COST: $325 $36 $0 $361
Route I-65 Project Description REPLACE BRIDGES I-65 OVER SEPULGA RIVER AND RELIEF,BIN 6808,6809,6810,6811,6812 AND 6813
Project Length in Miles 1.277 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057624 PE 2019
100057625 IM I065 (497) CONSTRUCTION BRIDGE REPLACEMENT 2023 $22,971 $2,552 $0 $25,523TOTAL COST: $22,971 $2,552 $0 $25,523
Route I-65 Project Description RESURFACING ON I-65 FROM CR-6 UNDERPASS TO .5 MILE SOUTH OF SR-12(US-84)
Project Length in Miles 9.421 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069089 PE 2019 / 100069059 CN 2021
100069059 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2021 $3,772 $419 $0 $4,191TOTAL COST: $3,772 $419 $0 $4,191
Route SR-12 Project Description SR-12 (US-84) ADDITIONAL LANES FROM MP 96.3 TO I-65
Project Length in Miles 3.720 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064647 PE 2016 / 100064649 RW 2018
100064652 HPPF A107 (900) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $2,094 $523 $0 $2,617100064653 HPPF-NHF A107 (900) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $4,885 $1,221 $0 $6,107
TOTAL COST: $6,979 $1,745 $0 $8,724
Route SR-3 Project Description INTERSECTION RE-ALIGNMENT AND MODIFICATIONS OF SR-3 (US-31) AND SR-12 (US-84) FROM MP 92.7 TO MP 93.1
Project Length in Miles 1.600 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070623 RW 2021 / 100070622 UT 2022 / 100070624 CN 2022
100070621 HSIP 0003 (628) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $262 $29 $0 $291100070623 HSIP 0003 (628) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $37 $4 $0 $41100070622 HSIP 0003 (628) UTILITIES SAFETY IMPROVEMENTS 2022 $417 $46 $0 $464100070624 HSIP 0003 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $2,194 $244 $0 $2,437
TOTAL COST: $2,910 $323 $0 $3,233
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
39 of 206
HIGHWAY PROJECTS - CONECUHSTIP PLAN: 2020 - Original
Route CR-32 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT A CULVERT ON CR-32 BETWEEN SR-55 AND CR-45
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071460 HRRR 2020 () CONSTRUCTION GUARDRAIL 2020 $31 $0 $3 $34
TOTAL COST: $31 $0 $3 $34
Route CR-85 Project Description RESURFACING, WIDENING AND LEVELING ON CR-85 FROM CR-38 (POTTER ROAD) TO SR-9 (US-331) - CCP 20-378-19
Project Length in Miles 2.263 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071692 STPNU 2020 () CONSTRUCTION RESURFACING 2021 $584 $0 $146 $729
TOTAL COST: $584 $0 $146 $729
Route CR-89 Project Description LEVELING AND TRIPLE SURFACE TREAMENT ON CR-89 FROM FOREST ROAD TO THE GENEVA COUNTY LINE - CCP 20-379-19
Project Length in Miles 1.860 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071691 STPNU 2020 () CONSTRUCTION RESURFACING 2021 $270 $0 $68 $338
TOTAL COST: $270 $0 $68 $338
Route CR-93 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 011305) ON CR-93 OVER POND CREEK; SITE 2 - (BIN 007466) ON CR-93 OVER POND CREEK; SITE 3 - (BIN 007111) ON CR-93 OVER A STREAM
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071459 HRRR 2020 () CONSTRUCTION GUARDRAIL 2020 $115 $0 $13 $128
TOTAL COST: $115 $0 $13 $128
Route CR-NA Project Description FIVE BRIDGE REPLACEMENTS IN CONECUH NF: CR-11 OVER BLACK WATER CREEK (BIN 017111); GILES RD OVER HURRICANE CREEK (BIN 013826); GILES RD OVER PANTHER CREEK (BIN 013722); SANDERS RD OVER RUM CREEK (BIN 015884); CR-11 OVER BLACK WATER CREEK (BIN 014361)
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067952 N-FLAP FLAP (020) CONSTRUCTION BRIDGE REPLACEMENT 2020 $638 $0 $160 $798
TOTAL COST: $638 $0 $160 $798
Route SR-12 Project Description PLANING AND RESURFACING ON SR-12 (US-84) FROM CR-77 TO SR-9 (US-331)
Project Length in Miles 3.554 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068715 NH 0012 (570) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,883 $471 $0 $2,354
TOTAL COST: $1,883 $471 $0 $2,354
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
40 of 206
HIGHWAY PROJECTS - COVINGTONSTIP PLAN: 2020 - Original
Route SR-52 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-52 FROM SR-9 (US-331) IN OPP TO HARVEST TIME ROAD
Project Length in Miles 14.560 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068697 STPAA-HSIP 0052 (517) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR
REHAB W/ SAFETY WIDENING2020 $4,571 $1,017 $0 $5,588
TOTAL COST: $4,571 $1,017 $0 $5,588
Route SR-55 Project Description ROUNDABOUT INSTALLATION AT THE INTERSECTION OF SR-55 AND SR-12 (US-84)
Project Length in Miles 0.248 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068778 PE 2019 / 100068779 RW 2021 / 100071676 UT 2022 / 100068780 CN 2022
100068779 HSIP 0055 (514) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $111 $12 $0 $124100071676 HSIP 0055 () UTILITIES UTILITY ADJUSTMENT 2022 $322 $36 $0 $358100068780 HSIP 0055 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $2,352 $261 $0 $2,613
TOTAL COST: $2,785 $309 $0 $3,094
Route SR-9 Project Description BRIDGE REPLACEMENT (BIN 002285) ON SR-9 (US-331) OVER LIGHTWOOD KNOT CREEK
Project Length in Miles 1.140 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068901 PE 2019
100033503 BR 0009 (573) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $23 $6 $0 $28100038583 BR 0009 (573) UTILITIES BRIDGE REPLACEMENT 2021 $292 $73 $0 $365100033501 BR 0009 (573) CONSTRUCTION BRIDGE REPLACEMENT 2021 $6,287 $1,572 $0 $7,859
TOTAL COST: $6,601 $1,650 $0 $8,252
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
41 of 206
HIGHWAY PROJECTS - COVINGTONSTIP PLAN: 2020 - Original
Route SR-10 Project Description PAVEMENT PRESERVATION ON SR-10 (US-29) FROM GLENWOOD AVENUE TO SR-53 (US-231)
Project Length in Miles 20.150 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068708 STPNU 0010 (549) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12021 $2,742 $685 $0 $3,427
TOTAL COST: $2,742 $685 $0 $3,427
Route SR-9 Project Description INTERSECTION IMPROVEMENTS ON SR-9 (US-331) AT SR-10 (US-29)
Project Length in Miles 0.480 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069730 CN 2025
100069729 NH 0009 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2021 $122 $31 $0 $153100069741 NH 0009 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $245 $61 $0 $306100069742 NH 0009 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $250 $62 $0 $312
TOTAL COST: $617 $154 $0 $771
Route SR-9 Project Description REPLACE BRIDGE, BIN 003021, SR-9 (US-331) OVER PATSALIGA CREEK (SUFF=57.9, STATUS=FO)
Project Length in Miles 1.059 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049231 PE 2010 / 100068211 RW 2019 / 100068556 UT 2019
100049232 BR 0009 (541) CONSTRUCTION BRIDGE REPLACEMENT 2020 $11,287 $2,822 $0 $14,109TOTAL COST: $11,287 $2,822 $0 $14,109
Route SR-97 Project Description RESURFACING, 2FT SAFETY WIDENING,CULVERT EXTENSIONS AND GUARDRAIL ON SR-97 FROM SR-9 (US-331) TO THE MONTGOMERY COUNTY LINE
Project Length in Miles 7.780 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068684 STPAA-HSIP 0097 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,530 $482 $0 $3,012
TOTAL COST: $2,530 $482 $0 $3,012
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
42 of 206
HIGHWAY PROJECTS - CRENSHAWSTIP PLAN: 2020 - Original
Route CR-1141 Project Description RESURFACING ON CR-1141 FROM CR-1147 TO CR-1246 - CCP 22-67-21
Project Length in Miles 3.277 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069674 RASTPNU 2219 (250) CONSTRUCTION RESURFACING 2020 $536 $0 $134 $670
TOTAL COST: $536 $0 $134 $670
Route CR-NA Project Description STREETSCAPES ON 1ST AVENUE NE FROM ARNOLD STREET NE TO 2ND STREET NE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068360 TAPAA TA18 (910) CONSTRUCTION STREETSCAPE 2019 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route SR-157 Project Description SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVER LAKE CATOMA AND CSX RAILROAD
Project Length in Miles 8.834 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038838 PE 2001 / 100038839 RW 2007
100038840 NHF 0157 (506) UTILITIES GRADE, DRAIN, BASE AND PAVE 2020 $2,942 $735 $0 $3,677100038842 BUILD-NHF 0157 (506) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2020 $22,809 $1,202 $1,000 $25,011
TOTAL COST: $25,751 $1,938 $1,000 $28,688
Route SR-3 Project Description RESURFACE SR-3 (US-31) FROM SR-69 TO THE INTERSECTION OF 7TH STREET
Project Length in Miles 0.900 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062744 STPAA 0003 () FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2022 $1,561 $390 $0 $1,951
TOTAL COST: $1,561 $390 $0 $1,951
Route SR-69 Project Description RESURFACE SR-69 FROM 0.4 MILES SOUTH OF CR-112 NEAR BREMEN TO NORTH OF I-65 IN DODGE CITY
Project Length in Miles 8.340 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067158 STPAA 0069 (560) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,409 $602 $0 $3,012
TOTAL COST: $2,409 $602 $0 $3,012
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
43 of 206
HIGHWAY PROJECTS - CULLMANSTIP PLAN: 2020 - Original
Route SR-74 Project Description BRIDGE REPLACEMENT AND APPROACHES ON SR-74 (US-278) OVER CROOKED CREEK, BIN 001617
Project Length in Miles 1.610 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068182 PE 2019 / 100068185 UT 2025 / 100068183 CN 2025
100068184 BR 0074 (544) RIGHT OF WAY BRIDGES AND APPROACHES 2023 $84 $21 $0 $105TOTAL COST: $84 $21 $0 $105
Route SR-74 Project Description RESURFACING ON SR-74(US-278) FROM SR-91 IN HOLLY POND TO THE EAST END OF THE BRIDGE OVER BLACK WARRIOR RIVER / BLOUNT COUNTY LINE
Project Length in Miles 3.195 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070102 RP-NH 0074 (545) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $1,301 $325 $0 $1,626
TOTAL COST: $1,301 $325 $0 $1,626
Route SR-91 Project Description BRIDGE REPLACEMENT AND APPROACHES ON SR-91 OVER DUCK RIVER, BIN 004129
Project Length in Miles 1.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068169 PE 2019 / 100068170 CN 2024
100068171 BR 0091 (506) RIGHT OF WAY BRIDGES AND APPROACHES 2022 $83 $21 $0 $104100068172 BR 0091 (506) UTILITIES BRIDGES AND APPROACHES 2023 $84 $21 $0 $105
TOTAL COST: $167 $42 $0 $209
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
44 of 206
HIGHWAY PROJECTS - CULLMANSTIP PLAN: 2020 - Original
Route CR-21 Project Description RESURFACING ON CR-21 FROM SR-123 TO THE OZARK CITY LIMITS (SITE 1); RESURFACING ON CR-82 FROM THE COFFEE COUNTY LINE TO SR-53(US-231) (SITE 2); WIDENING AND RESURFACING ON CR-33 FROM CR-20 TO CR-54 (SITE 3)
Project Length in Miles 3.241 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070303 RASTPAA 2319 (252) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $525 $131 $0 $656
TOTAL COST: $525 $131 $0 $656
Route CR-47 Project Description RESURFACING ON CR-47 FROM THE HOUSTON COUNTY LINE TO SR-134
Project Length in Miles 5.180 Urban Area DOTHAN Sponsor DALE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065700 STPOA 2319 (250) CONSTRUCTION RESURFACING 2020 $729 $0 $182 $912
TOTAL COST: $729 $0 $182 $912
Route CR-9 Project Description WIDENING AND RESURFACING ON CR-9 FROM THE HOUSTON COUNTY LINE TO SR-134
Project Length in Miles 4.031 Urban Area DOTHAN Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070304 RASTPNU 2319 (251) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $692 $0 $173 $865
TOTAL COST: $692 $0 $173 $865
Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS (BIN 012726) CR-2 AT CLAYBANK CRK, (BIN 012976) CR-113 AT JUDY CRK, (BIN 012995) CR-19W AT JUDY CRK, (BIN 008291) CR-19E AT LITTLE JUDY CRK, (BIN 010981) CR-60 AT LITTLE JUDY CRK, AND (BIN 003095) CR-54 AT COTTON CRK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069567 HRRR 2319 () CONSTRUCTION GUARDRAIL 2020 $74 $0 $8 $82
TOTAL COST: $74 $0 $8 $82
Route SR-134 Project Description RESURFACING AND 2' SAFETY WIDENING ON SR-134 FROM SR-123 TO CR-67
Project Length in Miles 6.480 Urban Area DOTHAN Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068717 STPAA-HSIP 0134 (509) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2021 $1,171 $257 $0 $1,428
TOTAL COST: $1,171 $257 $0 $1,428
Route SR-53 Project Description RESURFACING ON SR-53 (US-231) NORTH OF OZARK FROM SOUTH OF SR-27 TO NORTH OF CR-2
Project Length in Miles 6.040 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068686 NH 0053 (585) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $4,973 $1,243 $0 $6,217
TOTAL COST: $4,973 $1,243 $0 $6,217
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
45 of 206
HIGHWAY PROJECTS - DALESTIP PLAN: 2020 - Original
Route SR-85 Project Description REALIGNING OF SR-85, SIGNING UPGRADE, AND REMOVING OVERHEAD FLASHER AT SR-85 AND SR-167
Project Length in Miles 1.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071549 HSIP 0085 (504) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $32 $4 $0 $35
TOTAL COST: $32 $4 $0 $35
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
46 of 206
HIGHWAY PROJECTS - DALESTIP PLAN: 2020 - Original
Route CR-140 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 004660) ON HARRISON AVENUE OVER BEECH CREEK; SITE 2 - (BIN 007960) ON CR-21 OVER CAINE CREEK; SITE 3 - (BIN 007961) ON CR-21 OVER BEAR CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071461 HRRR 2420 (250) CONSTRUCTION GUARDRAIL 2020 $233 $0 $26 $258
TOTAL COST: $233 $0 $26 $258
Route CR-NA Project Description RIVERFRONT BOARDWALK-PHASE II CITY OF SELMA
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067164 TAPAA TA17 (924) CONSTRUCTION SIDEWALK 2020 $371 $0 $93 $464
TOTAL COST: $371 $0 $93 $464
Route NA Project Description RIVERFRONT BOARDWALK-PHASE I LOCATED ALONG THE ALABAMA RIVER ON AN ELEVATED BANK RUNNING PARALLEL TO WATER AVENUE IN THE CITY OF SELMA.
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065546 TAPAA TA16 (922) CONSTRUCTION SIDEWALK 2020 $393 $0 $98 $491
TOTAL COST: $393 $0 $98 $491
Route NA Project Description ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT ON STATE ROUTES 8, 14 AND 22 FOR DALLAS COUNTY (DISTRICT 5) PHASE 3
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060240 PE 2014
100060243 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $187 $47 $0 $233TOTAL COST: $187 $47 $0 $233
Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 AT BLUE GIRTH SWAMP (BIN 1556 AND 1557)
Project Length in Miles 0.783 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061667 PE 2017
100068988 BR 0014 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $63 $16 $0 $79100068984 BR 0014 () UTILITIES BRIDGE REPLACEMENT 2021 $122 $31 $0 $153100061670 BR 0014 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $6,178 $1,545 $0 $7,723
TOTAL COST: $6,364 $1,591 $0 $7,954
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
47 of 206
HIGHWAY PROJECTS - DALLASSTIP PLAN: 2020 - Original
Route SR-22 Project Description SR-22 FR END OF EXISTING 4-LN TO CR-63
Project Length in Miles 5.436 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100008926 PE 2000 / 100037669 RW 2006 / 100008924 CN 2024
100008928 STPAA 0022 (504) UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG
2022 $2,170 $543 $0 $2,713TOTAL COST: $2,170 $543 $0 $2,713
Route SR-41 Project Description PLANING AND RESURFACING ON SR-41 (US-80 TRUCK ROUTE) FROM 50' NORTH OF THE MERIDIAN AND BIGBEE RAILROAD (MP 122.813) TO SOUTH OF SR-14 (MP127.446)
Project Length in Miles 4.633 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067822 NH 0041 (519) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $3,043 $761 $0 $3,804
TOTAL COST: $3,043 $761 $0 $3,804
Route SR-8 Project Description PLANING AND RESURFACING ON SR-8 (US-80) (EASTBOUND ONLY) FROM THE PERRY COUNTY LINE (MP 59.941) TO .4 MILE WEST OF THE CAHABA RIVER BRIDGE (MP 73.765)
Project Length in Miles 13.824 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069865 NH 0008 (595) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $3,432 $858 $0 $4,290
TOTAL COST: $3,432 $858 $0 $4,290
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
48 of 206
HIGHWAY PROJECTS - DALLASSTIP PLAN: 2020 - Original
Route CR-89 Project Description ROADWAY SIGNING IMPROVEMENTS ALONG THE CORRIDOR OF CR-89(DESOTO PARKWAY NE) FROM SR-35 TO THE ENTRANCE OF DESOTO STATE PARK
Project Length in Miles 5.100 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071462 HRRR 2520 (250) CONSTRUCTION SIGNING 2020 $42 $0 $5 $47
TOTAL COST: $42 $0 $5 $47
Route CR-89 Project Description SIGN UPGRADES AND PAVEMENT MARKERS ON CR-89 BEGINNING AT SOUTH END OF DESOTO STATE PARK TO CR-165
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071464 HRRR 2520 () CONSTRUCTION SIGNING 2020 $212 $0 $24 $236
TOTAL COST: $212 $0 $24 $236
Route CR-NA Project Description ADA COMPLIANT SIDEWALK ALONG THE NORTH SIDE OF SR-117 FROM COVE ROAD TO DEMPSEY AVENUE - PHASE I
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069011 TAPNU TA19 (906) CONSTRUCTION SIDEWALK 2020 $382 $0 $96 $478
TOTAL COST: $382 $0 $96 $478
Route I-59 Project Description RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.350)
Project Length in Miles 7.750 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066507 PE 2018 / 100066508 CN 2020
100066508 IM I059 (407) CONSTRUCTION PAVEMENT REHABILITATION 2020 $32,133 $3,570 $0 $35,704TOTAL COST: $32,133 $3,570 $0 $35,704
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 2, 7, 35, 75, 79, 117, 227 AND 279 IN DEKALB AND JACKSON COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060150 PE 2014
100060151 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $158 $39 $0 $197TOTAL COST: $158 $39 $0 $197
Route NA Project Description WELCOME CENTER REHABILITATION ALONG I-59 NEAR GEORGIA STATE LINE
Project Length in Miles 0.100 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100047076 IM I059 (334) CONSTRUCTION REST AREA REHABILITATION 2024 $9,459 $1,051 $0 $10,510
TOTAL COST: $9,459 $1,051 $0 $10,510
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
49 of 206
HIGHWAY PROJECTS - DEKALBSTIP PLAN: 2020 - Original
Route SR-176 Project Description SURFACE TREATMENT ON SR-176 FROM CR-669 IN DOGTOWN TO SR-35 AT LITTLE RIVER CANYON
Project Length in Miles 11.940 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068423 STPAA 0176 (502) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12021 $808 $202 $0 $1,010
TOTAL COST: $808 $202 $0 $1,010
Route SR-35 Project Description ROUNDABOUT AND ACCESS MANAGEMENT ON SR-35 FROM 0.25 MILES EAST OF I-59 TO I-59
Project Length in Miles 0.512 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065373 CN 2023
100065372 HSIP 0035 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2021 $109 $0 $0 $109100065373 HSIP 0035 () CONSTRUCTION SAFETY IMPROVEMENTS 2023 $750 $0 $0 $750
TOTAL COST: $860 $0 $0 $860
Route SR-35 Project Description INTERSECTION IMPROVEMENTS AT SR-35 AND AIRPORT ROAD / JORDAN ROAD IN FORT PAYNE
Project Length in Miles 0.410 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068764 PE 2019
100071437 NH 0035 (535) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $120 $30 $0 $150100065375 NH 0035 (535) CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $624 $0 $156 $780
TOTAL COST: $744 $30 $156 $930
Route SR-68 Project Description RESURFACING ON SR-68 FROM SR-7 (US-11) TO THE CHEROKEE COUNTY LINE
Project Length in Miles 2.380 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067156 STPAA 0068 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $734 $184 $0 $918
TOTAL COST: $734 $184 $0 $918
Route SR-75 Project Description BRIDGE REPLACEMENT (BIN 002717) AND APPROACHES ON SR-75 OVER TOWN CREEK
Project Length in Miles 2.100 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068513 PE 2019
100068517 BR 0075 (536) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $265 $66 $0 $332100068518 BR 0075 (536) UTILITIES BRIDGE REPLACEMENT 2022 $260 $65 $0 $325100068519 BR 0075 (536) CONSTRUCTION BRIDGE REPLACEMENT 2022 $10,303 $2,576 $0 $12,879
TOTAL COST: $10,828 $2,707 $0 $13,535
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
50 of 206
HIGHWAY PROJECTS - DEKALBSTIP PLAN: 2020 - Original
Route CR-154 Project Description SAFETY WIDENING, GUARDRAIL IMPROVEMENTS, AND TRAFFIC STRIPING ON BURT MILL ROAD FROM FLAT ROCK ROAD TO SR-14
Project Length in Miles 4.100 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071463 HRRR 2620 (251) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $239 $0 $27 $266
TOTAL COST: $239 $0 $27 $266
Route CR-23 Project Description MICROSURFACING ON S EDGEWOOD AND EDGEWOOD ROADS (CR-23) FROM COBBS FORD ROAD (CR-2) TO SR-143 - ECP 26-57-19
Project Length in Miles 2.100 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070658 STPMN 2619 (261) CONSTRUCTION RESURFACING 2020 $176 $0 $44 $220
TOTAL COST: $176 $0 $44 $220
Route CR-8 Project Description WIDENING ON CR-8 (REDLAND ROAD) FROM SR-9 (US-231) TO CR-4 (RIFLE RANGE ROAD) AND BRIDGE REPLACEMENT AT HARWELL MILL CREEK (BIN #10936) AND INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)
Project Length in Miles 2.960 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063125 PE 2015 / 100063230 RW 2018
100063232 STPMN 2615 (250) UTILITIES WIDENING AND RESURFACING (RDWY)
2020 $700 $0 $175 $875100063233 STPMN 2615 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $1,200 $0 $300 $1,500
TOTAL COST: $1,900 $0 $475 $2,375
Route CR-8 Project Description INSTALLATION OF A ROUNDABOUT AT THE INTERSECTION OF REDLAND ROAD (CR-8) AND FIRETOWER/DOZIER ROAD (CR-59).
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065211 HSIP 2616 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,123 $0 $125 $1,248
TOTAL COST: $1,123 $0 $125 $1,248
Route CR-8 Project Description WIDENING AND RESURFACING WITH INTERSECTION IMPROVEMENTS AT CR-8 (REDLAND ROAD) AND CR-4 (RIFLE RANGE ROAD)
Project Length in Miles 0.550 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067261 STPMN 2615 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $1,520 $0 $380 $1,900
TOTAL COST: $1,520 $0 $380 $1,900
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
51 of 206
HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original
Route CR-NA Project Description INTERSECTION IMPROVEMENTS WITH ROUNDABOUT AT ORLINE ST AND COMPANY ST; SIDEWALKS, PEDESTRIAN LIGHTING AND LANDSCAPING ON COMPANY ST FROM E BRIDGE ST TO ORLINE ST, ORLINE ST FROM COMPANY ST TO HILL ST AND HILL ST FROM ORLINE ST TO E BRIDGE ST
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071163 STPMN 2620 (252) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $186 $0 $47 $233100071164 STPMN 2620 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $1,243 $0 $311 $1,553
TOTAL COST: $1,429 $0 $357 $1,786
Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON FOXWOOD ROAD FROM THE AUTAUGA COUNTY LINE TO DEATSVILLE HIGHWAY - ECP 26-11-19
Project Length in Miles 0.300 Urban Area MONTGOMERY Sponsor ELMORE COUNTY COMMISSION LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069844 STPAA 2619 (254) CONSTRUCTION RESURFACING 2020 $81 $0 $21 $102
TOTAL COST: $81 $0 $21 $102
Route CR-NA Project Description MICROSURFACING ON COOSADA ROAD (CR-23) FROM SR-143 TO BLACKWELL DRIVE
Project Length in Miles 4.400 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070657 STPMN 2619 (256) CONSTRUCTION RESURFACING 2020 $296 $0 $74 $370
TOTAL COST: $296 $0 $74 $370
Route CR-NA Project Description MICRO-SURFACE AND TRAFFIC STRIPE ON FLATWOOD ROAD FROM CEASERVILLE ROAD TO THE FLATWOOD ROAD DEAD END - ECP 26-53-19
Project Length in Miles 4.650 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070682 STPMN 2619 (257) CONSTRUCTION RESURFACING 2020 $176 $0 $54 $230
TOTAL COST: $176 $0 $54 $230
Route CR-NA Project Description MICRO-SURFACE ON FLATWOOD CURVE FROM MEHEARG ROAD TO FLATWOOD ROAD
Project Length in Miles 0.480 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070683 STPMN 2619 (258) CONSTRUCTION RESURFACING 2020 $28 $0 $8 $37
TOTAL COST: $28 $0 $8 $37
Route CR-NA Project Description MICRO-SURFACE ON MEHEARG ROAD FROM SR-14 TO FLATWOOD ROAD
Project Length in Miles 1.620 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070684 STPMN 2619 (259) CONSTRUCTION RESURFACING 2020 $98 $0 $29 $127
TOTAL COST: $98 $0 $29 $127
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
52 of 206
HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Amendment # 3
Route CR-NA Project Description MICRO-SURFACING ON FORT TOULOUSE ROAD FROM FORT TOULOUSE PARK ENTRANCE TO THE WETUMPKA CITY LIMITS
Project Length in Miles 2.430 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070685 STPMN 2619 (260) CONSTRUCTION RESURFACING 2020 $145 $0 $43 $187
TOTAL COST: $145 $0 $43 $187
Route CR-NA Project Description RESURFACING ON LAUREL CREEK ROAD AND REA ROAD FROM SR-21 (US-231) TO WEOKA ROAD
Project Length in Miles 3.550 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070686 STPMN 2620 (250) CONSTRUCTION RESURFACING 2020 $323 $81 $0 $403
TOTAL COST: $323 $81 $0 $403
Route CR-NA Project Description RESURFACE DEATSVILLE HIGHWAY FROM THE MILLBROOK CITY LIMITS TO ALPHA LANE - ECP 26-10-19
Project Length in Miles 5.500 Urban Area MONTGOMERY Sponsor ELMORE COUNTY COMMISSION LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069845 RASTPAA 2619 (255) CONSTRUCTION RESURFACING 2020 $712 $0 $178 $890
TOTAL COST: $712 $0 $178 $890
Route CR-NA Project Description UTILITY RELOCATION AND STREET IMPROVEMENTS ON COMPANY STREET FROM LOGAN STREET TO EAST BRIDGE STREET AND SOUTH MAIN STREET FROM EAST BRIDGE STREET TO SR-9 (US-231)
Project Length in Miles 2.520 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056089 PE 2012
100057512 STPMN 2619 () UTILITIES RESURFACING 2020 $95 $0 $24 $118100056090 STPMN 2619 () CONSTRUCTION RESURFACING 2020 $640 $0 $160 $800
TOTAL COST: $735 $0 $184 $918
Route I-65 Project Description INTERCHANGE LIGHTING ON I-65 AT SR-14 (EXIT 181) - PRATTVILLE / MILLBROOK
Project Length in Miles 1.200 Urban Area MONTGOMERY Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055338 PE 2011 / 100055339 CN 2020
100055339 IM I065 (418) CONSTRUCTION LIGHTING 2020 $1,890 $210 $0 $2,100TOTAL COST: $1,890 $210 $0 $2,100
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
53 of 206
HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original
Route NA Project Description STREETSCAPE IMPROVEMENTS ALONG SR-14, SISTRUNK STREET, JAMES STREET AND SOUTH ANN AVENUE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069023 TAPNU TA19 (917) CONSTRUCTION STREETSCAPE 2020 $580 $0 $145 $725
TOTAL COST: $580 $0 $145 $725
Route NA Project Description CITY OF WETUMPKA RIVERWALK - PHASE 2
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069432 TAPMN TA18 () CONSTRUCTION UNCLASSIFIED 2020 $48 $0 $12 $60
TOTAL COST: $48 $0 $12 $60
Route NA Project Description ADDING CURB RAMPS TO EXISTING SIDEWALKS OR REPAIRS TO CURB RAMPS THAT ARE NON-ADA COMPLIANT ON STATE ROUTES 63, 111 AND 143 IN ELMORE AND MONTGOMERY COUNTIES (DISTRICTS 1 AND 3)
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060168 PE 2013
100060170 STPAA NR13 (925) CONSTRUCTION SIDEWALK 2022 $171 $43 $0 $214TOTAL COST: $171 $43 $0 $214
Route SR-14 Project Description ADD LANE SR-14 FROM 0.5 MILE WEST CR-3 (INGRAM RD) TO CR-153 (COOSADA PKWY)
Project Length in Miles 8.610 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054493 PE 2017
100064189 STPAA 0014 (541) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $3,863 $966 $0 $4,829100064194 STPAA 0014 (541) UTILITIES ADDITIONAL ROADWAY LANES 2023 $780 $195 $0 $975100054496 STPAA 0014 (541) CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $7,775 $1,944 $0 $9,719
TOTAL COST: $12,418 $3,105 $0 $15,523
Route SR-14 Project Description ADDING TURN LANES WHERE COOSADA PARKWAY AND INGRAM ROAD INTERSECT WITH SR-14; ADDING OR RECONFIGURING LANES AT SR-143 AND COBBS FORD ROAD; STUDY INTERSECTION OF SR-14 AND OAK TREE ROAD
Project Length in Miles 0.072 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070735 PE 2020
100071072 ATRP2-26-2020-026-CN ()
CONSTRUCTION TURN LANES 2021 $0 $1,202 $0 $1,202TOTAL COST: $0 $1,202 $0 $1,202
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
54 of 206
HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Amendment # 3
Route SR-229 Project Description PAVEMENT PRESERVATION ON SR-229 FROM SR-14 (MP 11.566) TO SR-63 (MP 22.751)
Project Length in Miles 11.233 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070057 STPAA 0229 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12020 $1,359 $340 $0 $1,699
TOTAL COST: $1,359 $340 $0 $1,699
Route SR-9 Project Description UPGRADE TRAFFIC SIGNALS ON SR-9 (US-231) FROM TODD ROAD TO SR-9 (CENTRAL PLANK ROAD)
Project Length in Miles 11.271 Urban Area MONTGOMERY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070139 HSIP 0009 (576) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $167 $19 $0 $185
TOTAL COST: $167 $19 $0 $185
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
55 of 206
HIGHWAY PROJECTS - ELMORESTIP PLAN: 2020 - Original
Route CR-4 Project Description INSTALL TRAFFIC STRIPING, RAISED PAVEMENT MARKERS, TRAFFIC CONTROL MARKINGS AND LEGENDS ON CR-4 (BRADLEY ROAD) FROM SR-15 (US-29) TO THE COVINGTON COUNTY LINE
Project Length in Miles 17.700 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069585 HRRR 2719 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2019 $101 $1 $10 $112
TOTAL COST: $101 $1 $10 $112
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG ALCO DRIVE, COLLEGE DRIVE, FLEMING LANE, BLACKSHER LANE, SCOTT STREET, EDWARDS STREET, DENARD STREET, DAWSON STREET, STALLWORTH STREET, WEST SHORE DRIVE AND STALLWORTH STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069028 TAPAA TA19 (922) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route NA Project Description SIDEWALK IMPROVEMENTS ALONG WILLIAMSON STREET FROM W.S. NEAL ELEMENTARY AND W.S. MIDDLE SCHOOL TO R.T. JOHNSON RECREATIONAL FACILITIES AND SUMMERCHASE APARTMENTS IN EAST BREWTON
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067319 TAPAA TA17 (939) CONSTRUCTION SIDEWALK 2020 $212 $0 $53 $265
TOTAL COST: $212 $0 $53 $265
Route SR-15 Project Description RESURFACING ON SR-15 (US-29) FROM .3 MILE SOUTH OF FINLAY LANE TO .16 MILE SOUTH OF WILLIAM COOK ROAD
Project Length in Miles 11.420 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068013 STPAA 0015 (534) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,926 $481 $0 $2,407
TOTAL COST: $1,926 $481 $0 $2,407
Route SR-15 Project Description RESURFACING SR-15 (US-29) FROM SR-3 TO 0.44 MILE NORTH OF EAST BREWTON CITY LIMIT WITH CSX RAILROAD RESURFACING AT CROSSING 351319Y
Project Length in Miles 1.290 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068303 STPAA 0015 (535) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $507 $127 $0 $633
TOTAL COST: $507 $127 $0 $633
Route SR-15 Project Description RESURFACING ON SR-15 (US-29) FROM WILLIAM COOK ROAD TO THE COVINGTON COUNTY LINE. HSIP FUNDING FOR GUARDRAIL WITH STEEL BLOCKOUTS.
Project Length in Miles 7.291 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068014 STPAA-HSIP 0015 (536) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,325 $329 $0 $1,653
TOTAL COST: $1,325 $329 $0 $1,653
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
56 of 206
HIGHWAY PROJECTS - ESCAMBIASTIP PLAN: 2020 - Original
Route SR-21 Project Description RESURFACING ON SR-21 FROM .2 MILE SOUTH OF POARCH ROAD TO .16 MILE SOUTH OF I-65
Project Length in Miles 0.585 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070127 STPAA 0021 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $420 $105 $0 $525
TOTAL COST: $420 $105 $0 $525
Route SR-3 Project Description RESURFACING ON SR-3 (US-31) FROM NORTH END OF BURNT CORN CREEK BRIDGE TO 500 FEET NORTH OF TIGER DRIVE ALONG CSX RAILROAD WITH RESURFACING AT CROSSINGS 351319Y, 351317K AND 351315W
Project Length in Miles 2.849 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067962 NH 0003 (622) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,285 $321 $0 $1,606
TOTAL COST: $1,285 $321 $0 $1,606
Route SR-41 Project Description BRIDGE REPAIRS AND OVERLAY OVER CONECUH RIVER (BIN 018828) AND DEMOLITION OF EXISTING BRIDGES (BIN 7030 AND 7029) ON SR-41
Project Length in Miles 0.830 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071333 PE 2020
100071334 ST-027-041-001-CN () CONSTRUCTION BRIDGE REPLACEMENT 2020 $0 $6,000 $0 $6,000TOTAL COST: $0 $6,000 $0 $6,000
Route SR-41 Project Description RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-41 FROM SR-3 TO NORTH OF BURNT CORN CREEK
Project Length in Miles 2.350 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068305 STPAA-HSIP 0041 (520) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $711 $175 $0 $886
TOTAL COST: $711 $175 $0 $886
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
57 of 206
HIGHWAY PROJECTS - ESCAMBIASTIP PLAN: 2020 - Original
Route CR-NA Project Description RESURFACING MAIN STREET FROM SR-1 (US-431) TO NORTH OF HATLEY AVENUE IN THE CITY OF GLENCOE
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF GLENCOE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064389 STPOA 2815 () PRELIMINARY ENGINEERING RESURFACING 2020 $29 $0 $7 $36100064392 STPOA 2815 () CONSTRUCTION RESURFACING 2021 $285 $0 $71 $356
TOTAL COST: $313 $0 $78 $392
Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON WALNUT STREET FROM SR-25 (US-411/ALBERT RAINS BLVD) TO 12TH STREET IN THE CITY OF GADSDEN
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064641 STPOA 2815 () PRELIMINARY ENGINEERING RESURFACING 2022 $44 $0 $11 $55100064642 STPOA 2815 () CONSTRUCTION RESURFACING 2023 $250 $0 $63 $313
TOTAL COST: $294 $0 $74 $368
Route CR-NA Project Description PARTIAL REALIGNMENT AND RESURFACING OF SOUTH 11TH STREET FROM THE BRIDGE OVER BLACK CREEK TO RANDALL STREET IN THE CITY OF GADSDEN
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF GADSDEN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064654 STPOA 2815 () PRELIMINARY ENGINEERING RESURFACING 2020 $68 $0 $17 $85100064655 STPOA 2815 () CONSTRUCTION RESURFACING 2021 $390 $0 $97 $487
TOTAL COST: $458 $0 $114 $572
Route CR-NA Project Description RESURFACING AND TRAFFIC STRIPE ON 4TH STREET FROM 4TH AVENUE TO SR-1 (US-431) IN THE CITY OF ATTALLA
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF ATTALLA COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070054 STPOA 2819 () PRELIMINARY ENGINEERING RESURFACING 2022 $58 $0 $14 $72100070055 STPOA 2819 () CONSTRUCTION RESURFACING 2023 $832 $0 $208 $1,041
TOTAL COST: $890 $0 $223 $1,113
Route CR-NA Project Description RESURFACING AND WIDENING ON BLACK CREEK PARKWAY FROM WILLS CREEK ROAD TO SOUTH 11TH STREET IN GADSDEN
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF GADSDEN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070075 STPOA 2819 () PRELIMINARY ENGINEERING RESURFACING 2022 $58 $0 $14 $72100070076 STPOA 2819 () CONSTRUCTION RESURFACING 2023 $832 $0 $208 $1,041
TOTAL COST: $890 $0 $223 $1,113
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
58 of 206
HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original
Route CR-NA Project Description RESURFACING ON SARDIS ROAD FROM SR-1 (US-431) TO THE DEKALB COUNTY LINE - ECP 28-02-20
Project Length in Miles 6.840 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071443 RASTPAA 2820 () CONSTRUCTION RESURFACING 2020 $711 $178 $0 $889
TOTAL COST: $711 $178 $0 $889
Route CR-NA Project Description RESURFACING ON PILGRIMS REST ROAD FROM SR-77 TO GREEN VALLEY ROAD - ECP 28-03-20
Project Length in Miles 2.640 Urban Area GADSDEN Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071501 RASTPNU 2820 () CONSTRUCTION RESURFACING 2020 $251 $0 $63 $313
TOTAL COST: $251 $0 $63 $313
Route CR-NA Project Description RESURFACING AIR DEPOT ROAD FROM COLLEGE PARKWAY TO LONESOME BEND ROAD IN THE CITY OF GLENCOE
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF GLENCOE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064393 PE 2020
100064394 STPOA 2815 () CONSTRUCTION RESURFACING 2021 $309 $0 $77 $387TOTAL COST: $309 $0 $77 $387
Route CR-NA Project Description RECONSTRUCTION OF SOUTH 11TH STREET FROM BLACK CREEK PARKWAY TO THE BRIDGE AT BLACK CREEK
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF GADSDEN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064626 PE 2017
100069735 STPOA 2815 (252) RIGHT OF WAY PAVEMENT REHABILITATION 2020 $410 $0 $103 $513100064625 STPOA 2815 (252) CONSTRUCTION PAVEMENT REHABILITATION 2021 $374 $0 $94 $468
TOTAL COST: $784 $0 $196 $981
Route CR-NA Project Description BRIDGE REPLACEMENT ON HICKORY STREET OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 003666
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor CITY OF GADSDEN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064636 PE 2017
100064638 STPOA 2815 (253) CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,444 $0 $361 $1,805TOTAL COST: $1,444 $0 $361 $1,805
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
59 of 206
HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original
Route NA Project Description CONSTRUCTION OF SEVENTY-FOUR (74) ADA COMPLIANT UPGRADES INCLUDING CURB CUTS, SIDEWALK REPLACEMENTS, AND DETECTABLE WARNING SURFACES EAST OF THE COOSA RIVER AND SOUTH OF THE GOOD YEAR TIRE PLANT IN THE CITY OF GADSDEN
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069010 TAPNU TA19 (905) CONSTRUCTION SIDEWALK 2019 $367 $0 $92 $458
TOTAL COST: $367 $0 $92 $458
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 1, 7, 25, 74, 77, 291 AND 759 IN ETOWAH COUNTY
Project Length in Miles 0.000 Urban Area GADSDEN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061453 PE 2014
100061454 STPAA NR13 () CONSTRUCTION SIDEWALK 2022 $36 $9 $0 $45TOTAL COST: $36 $9 $0 $45
Route SR-205 Project Description BRIDGE REPLACEMENT AND APPROACHES ON SR 205 OVER ATN RAILROAD (BIN 000438) (SUFF = 47.4)
Project Length in Miles 1.140 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064720 PE 2016
100064725 BR 0205 (507) RIGHT OF WAY BRIDGES AND APPROACHES 2021 $85 $21 $0 $106100064724 BR 0205 (507) UTILITIES BRIDGES AND APPROACHES 2021 $64 $16 $0 $80100064723 BR 0205 () CONSTRUCTION BRIDGES AND APPROACHES 2021 $2,403 $601 $0 $3,004
TOTAL COST: $2,552 $638 $0 $3,189
Route SR-211 Project Description RESURFACING ON SR-211 FROM SR-1 (US-431) TO SR-7 (US-11), INCLUDING GUARDRAIL RESET (SAFETY REPLACEMENT FOR STEEL BLOCKOUTS) AND GUARDRAIL RETROFIT
Project Length in Miles 4.610 Urban Area GADSDEN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067159 STPAA-HSIP-FMGR 0211
(500)FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22019 $1,733 $432 $0 $2,165
TOTAL COST: $1,733 $432 $0 $2,165
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
60 of 206
HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original
Route SR-25 Project Description ADDTIONAL LANES ON SR-25 (US-411) FROM TURKEYTOWN TO .65 MILES NORTH OF CHEROKEE CR-20
Project Length in Miles 8.920 Urban Area GADSDEN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070038 STPAA 0025 (556) PRELIMINARY ENGINEERING GRADE, DRAIN, BASE, PAVE AND
BRG2020 $1,600 $400 $0 $2,000
100008734 RAEDAA 0025 (556) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2020 $32,512 $8,128 $0 $40,640TOTAL COST: $34,112 $8,528 $0 $42,640
Route SR-25 Project Description RESURFACING ON SR-25 (US-411) FROM SR-77 IN RAINBOW CITY TO 1000 FEET NORTH OF RIVERBEND DRIVE IN GADSDEN
Project Length in Miles 6.150 Urban Area GADSDEN Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068418 NH 0025 (555) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $3,591 $898 $0 $4,488
TOTAL COST: $3,591 $898 $0 $4,488
Route SR-77 Project Description SR-77 FR I-59 RAMP(WEST SIDE) TO US-11 IN ATTALLA
Project Length in Miles 7.200 Urban Area GADSDEN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064756 NH 0077 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2021 $425 $106 $0 $531100054836 NH 0077 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $1,210 $302 $0 $1,512100049111 NH 0077 () UTILITIES ADDITIONAL ROADWAY LANES 2023 $915 $229 $0 $1,143100004852 NH 0077 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $6,375 $1,594 $0 $7,969
TOTAL COST: $8,924 $2,231 $0 $11,155
Route SR-77 Project Description REPLACE BRIDGE, BIN 002035, SR-77 (NORTH BOUND) OVER COOSA RIVER. (SUFF=56.8, STATUS=FO)
Project Length in Miles 1.200 Urban Area GADSDEN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059992 DE A181 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2022 $825 $0 $0 $825100050052 BR A181 () CONSTRUCTION BRIDGE REPLACEMENT 2024 $17,077 $4,269 $0 $21,347
TOTAL COST: $17,902 $4,269 $0 $22,171
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
61 of 206
HIGHWAY PROJECTS - ETOWAHSTIP PLAN: 2020 - Original
Route NA Project Description CURB RAMP INSTALLATION ON SR-171 IN FAYETTE COUNTY AND ON SR-17, SR-18, AND SR-118 IN LAMAR COUNTY
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061461 PE 2014
100070606 STPAA NR13 (944) RIGHT OF WAY SIDEWALK 2021 $41 $10 $0 $51100061462 STPAA NR13 (944) CONSTRUCTION SIDEWALK 2022 $289 $72 $0 $362
TOTAL COST: $330 $83 $0 $413
Route SR-13 Project Description SR-13 BRIDGE REPLACEMENT OVER CLEAR CREEK BIN #5845 AND BRIDGE REMOVAL OVER SOUTHERN RR (ABAND) BIN #5846
Project Length in Miles 0.900 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038406 CN 2024
100061533 BRF 0013 (513) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2021 $442 $110 $0 $552100038407 BR 0013 (513) RIGHT OF WAY BRIDGE REPLACEMENT 2022 $24 $6 $0 $30
TOTAL COST: $465 $116 $0 $582
Route SR-171 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-171 FROM STOUGH ROAD AT MP 47.101 TO THE MARION COUNTY LINE AT MP 52.775
Project Length in Miles 5.674 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068632 STPAA-HSIP 0171 (517) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $2,777 $613 $0 $3,390
TOTAL COST: $2,777 $613 $0 $3,390
Route SR-18 Project Description BRIDGE REPLACEMENT SR-18 (US-43) OVER DEADWATER CREEK WEST OF BANKSTON, BIN 000278
Project Length in Miles 0.570 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061119 PE 2015 / 100061120 RW 2018 / 100061121 UT 2018
100061122 BR 0018 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,027 $757 $0 $3,783TOTAL COST: $3,027 $757 $0 $3,783
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
62 of 206
HIGHWAY PROJECTS - FAYETTESTIP PLAN: 2020 - Original
Route CR-42 Project Description RAILROAD CROSSING IMPROVEMENTS, GATES, LIGHTS, BELLS, SIGNS, MARKINGS AND LEGENDS AT CR-42 (WALNUT GATE ROAD) AND NORFOLK SOUTHERN RAILROAD
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069654 RHPD RR19 (902) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $335 $0 $37 $372
TOTAL COST: $335 $0 $37 $372
Route CR-60 Project Description RESURFACING ON CR-60 FROM BADGETT ROAD TO CR-56, CR-56 FROM CR-60 TO CR-77, AND CR-77 FROM CR-56 TO THE COLBERT COUNTY LINE o FCP 30-19-01
Project Length in Miles 3.750 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069589 RASTPAA 3019 (251) CONSTRUCTION RESURFACING 2020 $488 $62 $130 $680
TOTAL COST: $488 $62 $130 $680
Route CR-8 Project Description BRIDGE REPLACEMENT OF BIN# 5145 ON CR-8 OVER IVY BRANCH (DISMAL BRANCH)
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062452 RABRZ 3015 (250) CONSTRUCTION BRIDGES AND APPROACHES 2021 $450 $112 $0 $562
TOTAL COST: $450 $112 $0 $562
Route CR-NA Project Description INSTALL RAILROAD CROSSING DEVICES ON BREWER LANE IN RUSSELLVILLE, DOT NO. 727132W, REF#1315 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, MARKINGS AND LEGENDS
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066698 RHPD RR17 (913) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $303 $0 $34 $337
TOTAL COST: $303 $0 $34 $337
Route SR-19 Project Description RESURFACING ON SR-19 FROM ELEVENTH STREET TO THE MISSISSIPPI STATE LINE
Project Length in Miles 1.766 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068474 STPAA 0019 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $781 $195 $0 $976
TOTAL COST: $781 $195 $0 $976
Route SR-24 Project Description INTERCHANGE LIGHTING AT SR-24 (CORR V) AND SR-19
Project Length in Miles 0.760 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060598 PE 2014
100060599 NH 0024 () CONSTRUCTION LIGHTING 2021 $849 $212 $0 $1,062TOTAL COST: $849 $212 $0 $1,062
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
63 of 206
HIGHWAY PROJECTS - FRANKLINSTIP PLAN: 2020 - Original
Route SR-243 Project Description BRIDGE REPLACEMENT (BIN 008912) ON SR-243 OVER CEDAR CREEK (SUFF = 6.0, STAT = 1)
Project Length in Miles 0.075 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063654 PE 2019
100049146 BR 0243 (504) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $288 $72 $0 $360100049147 BR 0243 (504) UTILITIES BRIDGE REPLACEMENT 2021 $116 $29 $0 $145100040791 BR 0243 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,734 $434 $0 $2,168
TOTAL COST: $2,139 $535 $0 $2,674
Route SR-247 Project Description REPLACE BRIDGE, BIN 008467, SR-247 OVER CEDAR CREEK. (SUFF=46.8, STATUS=SD)
Project Length in Miles 1.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049910 PE 2013
100049911 BR 0247 (501) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $58 $14 $0 $72100049912 BR 0247 (501) UTILITIES BRIDGE REPLACEMENT 2021 $58 $15 $0 $73100049913 BR 0247 (501) CONSTRUCTION BRIDGE REPLACEMENT 2021 $4,297 $1,074 $0 $5,371
TOTAL COST: $4,413 $1,103 $0 $5,516
Route SR-247 Project Description BRIDGE REPLACEMENT (BIN 008466) ON SR-247 OVER LITTLE BEAR CREEK
Project Length in Miles 0.800 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069593 PE 2019
100069595 BR 0247 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $3,954 $989 $0 $4,943TOTAL COST: $3,954 $989 $0 $4,943
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
64 of 206
HIGHWAY PROJECTS - FRANKLINSTIP PLAN: 2020 - Original
Route CR-17 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS FOR CULVERTS AT SITE 1 (BIN 003970) ON CR-17 OVER SAMSON BRANCH; SITE 2 (BIN 009982) ON CR-8 OVER LONG BRANCH; SITE 3 (BIN 013483) ON CR-16 OVER JUSTICE MILL CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071466 HRRR 3120 (252) CONSTRUCTION GUARDRAIL 2020 $118 $0 $13 $131
TOTAL COST: $118 $0 $13 $131
Route CR-4 Project Description RESURFACING ON CR-4 FROM CR-53 TO CR-61 - GCP 31-04-19
Project Length in Miles 2.900 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070267 RASTPNU 3119 (253) CONSTRUCTION RESURFACING 2020 $392 $0 $98 $490
TOTAL COST: $392 $0 $98 $490
Route CR-49 Project Description RESURFACE AND TRAFFIC STRIPE ON CR-49 FROM CR-68 TO THE HOUSTON COUNTY LINE
Project Length in Miles 0.910 Urban Area DOTHAN Sponsor GENEVA COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069707 STPOA 3119 (251) CONSTRUCTION RESURFACING 2020 $257 $0 $64 $321
TOTAL COST: $257 $0 $64 $321
Route CR-53 Project Description RESURFACING ON CR-53 FROM THE FLORIDA LINE TO CR-4 - GCP 31-05-19
Project Length in Miles 1.600 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070270 RASTPNU 3119 (252) CONSTRUCTION RESURFACING 2020 $251 $0 $63 $313
TOTAL COST: $251 $0 $63 $313
Route CR-85 Project Description STOP LINES AND RUMBLE STRIPS INSTALLATION FOR THE FOLLOWING SITES: SITE 1 - INTERSECTION OF CR-85 AND CR-44; SITE 2 - INTERSECTION OF CR-49 AND CR-28
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071465 HRRR 3120 (251) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $4 $0 $0 $4
TOTAL COST: $4 $0 $0 $4
Route CR-85 Project Description SAFETY SIGNING INSTALLATION FOR THE FOLLOWING SITES: SITE 1-INTERSECTION OF CR-85 AND CR-44 SITE 2-INTERSECTION OF CR-49 AND CR-28
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071487 HRRR 3120 (250) CONSTRUCTION SIGNING 2020 $4 $0 $0 $4
TOTAL COST: $4 $0 $0 $4
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
65 of 206
HIGHWAY PROJECTS - GENEVASTIP PLAN: 2020 - Original
Route CR-NA Project Description SIDEWALKS ALONG SR-52 FROM 6TH AVENUE TO 4TH AVENUE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068373 TAPNU TA18 (917) CONSTRUCTION SIDEWALK 2020 $352 $0 $88 $440
TOTAL COST: $352 $0 $88 $440
Route NA Project Description CURB RAMP INSTALLATIONS AND MODIFICATIONS ON STATE ROUTES 1, 12, 27, 52, 53, 87, 95, 103, 123, 196 AND 210 IN GENEVA AND HOUSTON COUNTIES
Project Length in Miles 0.000 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060276 STPAA NR13 () CONSTRUCTION SIDEWALK 2022 $600 $150 $0 $750
TOTAL COST: $600 $150 $0 $750
Route SR-153 Project Description INSTALLING RUMBLE STRIPS, UPGRADING SIGNING, AND REMOVAL OF OVERHEAD FLASHER ON SR-153 AT SR-52
Project Length in Miles 1.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071550 HSIP 0153 (501) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $13 $1 $0 $14
TOTAL COST: $13 $1 $0 $14
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
66 of 206
HIGHWAY PROJECTS - GENEVASTIP PLAN: 2020 - Original
Route CR-199 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 011009) ON CR-199 OVER UNNAMED CREEK; SITE 2 - (BIN 007917) ON CR-133 OVER BRUSH CREEK; SITE 3 - (BIN 010965) ON CR-48 OVER MCCONNICO CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071467 HRRR 3220 () CONSTRUCTION GUARDRAIL 2020 $157 $0 $17 $174
TOTAL COST: $157 $0 $17 $174
Route CR-60 Project Description RESURFACING, TRAFFIC STRIPING AND INSTALLING PAVEMENT MARKERS ON CR-60 FROM CR-191 TO THE TUSCALOOSA COUNTY LINE
Project Length in Miles 2.800 Urban Area TUSCALOOSA Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071224 RASTPNU 3218 (251) CONSTRUCTION RESURFACING 2020 $500 $0 $125 $625
TOTAL COST: $500 $0 $125 $625
Route CR-69 Project Description BRIDGE REPLACEMENT (BIN 005106) ON CR-69 OVER MCCONNICO CREEK AND BRIDGE REPAIRS (BIN 005107) ON CR-69 OVER MCCONNICO CREEK - GCP 32-02-18P
Project Length in Miles 0.250 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068564 PE 2018 / 100068599 CN 2021
100068599 RABRZ 3218 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $536 $134 $0 $670TOTAL COST: $536 $134 $0 $670
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS NEAR AND AROUND THE EUTAW COURTHOUSE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068371 TAPNU TA18 (915) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route I-59 Project Description RESURFACING ON I-59 FROM SR-14 (MP 40.307) TO CR-211 (MP 46.989)
Project Length in Miles 6.682 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069093 PE 2019 / 100069094 CN 2021
100069094 IM I059 (415) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2021 $929 $103 $0 $1,032TOTAL COST: $929 $103 $0 $1,032
Route I-59 Project Description I-59/I-20 PARTIAL LIGHTING OF THE SR-14 INTERCHANGE (EXIT 40) IN EUTAW
Project Length in Miles 0.600 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069554 PE 2019 / 100069555 CN 2020
100069555 IM I059 (420) CONSTRUCTION LIGHTING 2020 $599 $67 $0 $665TOTAL COST: $599 $67 $0 $665
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
67 of 206
HIGHWAY PROJECTS - GREENESTIP PLAN: 2020 - Original
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 6, 7, 13, 14, 17, 32, 39, 86, 140 AND 159 IN GREENE AND PICKENS COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060102 PE 2013
100060103 STPAA NR13 (926) CONSTRUCTION SIDEWALK 2022 $241 $60 $0 $301TOTAL COST: $241 $60 $0 $301
Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 OVER THE SIPSEY RIVER (BIN# 002676)
Project Length in Miles 5.200 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070678 BR 0014 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $200 $50 $0 $250100070679 BR 0014 () RIGHT OF WAY BRIDGE REPLACEMENT 2022 $82 $20 $0 $102100070680 BR 0014 () UTILITIES BRIDGE REPLACEMENT 2022 $82 $20 $0 $102100070681 BR 0014 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $3,297 $824 $0 $4,121
TOTAL COST: $3,660 $915 $0 $4,575
Route SR-7 Project Description MICROSURFACING ON SR-7 (US-11) FROM THE TENNESSEE-TOMBIGBEE WATERWAY BRIDGE TO THE ALABAMA AND GULF COAST RAILWAY BRIDGE
Project Length in Miles 6.904 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068553 STPAA 0007 (550) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12020 $958 $239 $0 $1,197
TOTAL COST: $958 $239 $0 $1,197
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
68 of 206
HIGHWAY PROJECTS - GREENESTIP PLAN: 2020 - Original
Route CR-40 Project Description BRIDGE REPLACEMENT AND APPROACHES OF BIN'S 5029 AND 5030 ON CR-40 (GREER CREEK ROAD) OVER A TRIBUTARY TO GREER CREEK, AND BIN 6854 ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060338 ACBRZ60338 ATRP (006) CONSTRUCTION BRIDGES AND APPROACHES 2021 $698 $174 $0 $872
TOTAL COST: $698 $174 $0 $872
Route CR-44 Project Description WIDEN AND RESURFACE CR-44 FROM SR-69 TO CR-50 - HCP 33-03-18
Project Length in Miles 4.746 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068958 RASTPNU 3318 (251) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $573 $221 $400 $1,194
TOTAL COST: $573 $221 $400 $1,194
Route NA Project Description WETLAND MITIGATION AREA AT PRAIRIE CREEK
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100048467 PE 2006
100064688 STPAA 3315 () CONSTRUCTION UNCLASSIFIED 2021 $400 $100 $0 $500TOTAL COST: $400 $100 $0 $500
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 5, 8, 14, 25, 60, 61, 68, 69, 175, 183, 219 AND 289 IN HALE AND PERRY COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060104 PE 2014
100060105 STPAA NR13 () CONSTRUCTION SIDEWALK 2021 $279 $70 $0 $349TOTAL COST: $279 $70 $0 $349
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
69 of 206
HIGHWAY PROJECTS - HALESTIP PLAN: 2020 - Original
Route SR-25 Project Description RESURFACING AND LIME STABILIZATION ON SR-25 FROM 1.7 MILES SOUTH CR-10 (MP-41.180) TO PICKS CREEK (MP-48.026).
Project Length in Miles 6.846 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057824 STPAA 0025 (535) CONSTRUCTION RESURFACING 2022 $2,461 $615 $0 $3,076
TOTAL COST: $2,461 $615 $0 $3,076
Route SR-25 Project Description RESURFACING AND LIME STABILIZATION ON SR-25 FROM MARENGO COUNTY LINE (MP 37.007) TO .35 MILE SOUTH OF CR-57 (MP 41.153) AND FROM .65 MILE SOUTH OF CR-54 (MP 48.180) TO INTERSECTION OF SR-69 IN GREENSBORO.
Project Length in Miles 4.416 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057825 PE 2012
100057826 STPAA 0025 (536) CONSTRUCTION RESURFACING 2021 $876 $219 $0 $1,095TOTAL COST: $876 $219 $0 $1,095
Route SR-69 Project Description RESURFACING, 2 FT SAFETY WIDENING, CENTERLINE AND EDGELINE SCORING ON SR-69 FROM 0.61 MILE SOUTH OF CR-32 TO SR-60
Project Length in Miles 8.039 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070186 STPAA-HSIP 0069 (563) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,896 $653 $0 $3,549
TOTAL COST: $2,896 $653 $0 $3,549
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
70 of 206
HIGHWAY PROJECTS - HALESTIP PLAN: 2020 - Original
Route CR-46 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 010222) ON CR-46 OVER ABBIE CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069572 HRRR 3419 (250) CONSTRUCTION GUARDRAIL 2019 $34 $0 $4 $38
TOTAL COST: $34 $0 $4 $38
Route CR-55 Project Description RESURFACING ON CR-55 FROM SR-134 TO CR-26
Project Length in Miles 4.896 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071176 RASTPNU 3419 (251) CONSTRUCTION RESURFACING 2020 $481 $24 $667 $1,172
TOTAL COST: $481 $24 $667 $1,172
Route SR-1 Project Description RESURFACING SR-1(US-431) FROM JUST NORTH OF INTERSECTION OF SR-173 IN HEADLAND TO JUST NORTH OF CR-18
Project Length in Miles 6.670 Urban Area DOTHAN Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068682 NH 0001 (606) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $3,243 $811 $0 $4,054
TOTAL COST: $3,243 $811 $0 $4,054
Route SR-10 Project Description BRIDGE REPLACEMENT ON SR-10 OVER MCRAE MILL CREEK (BIN #002543) (SUFF=55.2, STATUS=FO)
Project Length in Miles 0.657 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064176 PE 2018
100069448 BR 0010 (545) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $41 $10 $0 $51100049234 BR 0010 (545) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,242 $811 $0 $4,053
TOTAL COST: $3,284 $821 $0 $4,105
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
71 of 206
HIGHWAY PROJECTS - HENRYSTIP PLAN: 2020 - Original
Route CR-203 Project Description RESURFACING ON CR-203/CAMPBELLTON HIGHWAY FROM HADDEN ROAD TO SR-1 (US-231) SOUTH OATES STREET
Project Length in Miles 6.050 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069713 STPOA 3519 () CONSTRUCTION RESURFACING 2023 $1,145 $0 $286 $1,431
TOTAL COST: $1,145 $0 $286 $1,431
Route CR-203 Project Description INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CAMPBELLTON HIGHWAY (CR-203) AND TAYLOR ROAD (CR-64)
Project Length in Miles 0.020 Urban Area DOTHAN Sponsor HOUSTON COUNTY LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066842 PE 2017 / 100066848 RW 2019 / 100067032 UT 2019 / 100066849 CN 2020
100067032 HSIP NR17 (929) UTILITIES INTERSECTION IMPROVEMENTS 2019 $144 $16 $0 $160100066849 HSIP NR17 (929) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $526 $0 $58 $585
TOTAL COST: $671 $16 $58 $745
Route CR-25 Project Description CR-25 (DENTON RD) ADD LANES FROM SR-210 (ROSS CLARK CIRCLE) TO WESTGATE PARKWAY
Project Length in Miles 1.203 Urban Area DOTHAN Sponsor CITY OF DOTHAN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100008620 PE 2009 / 100008621 RW 2015
100008618 STPOA 9450 (602) CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $4,988 $653 $2,560 $8,201TOTAL COST: $4,988 $653 $2,560 $8,201
Route CR-33 Project Description RESURFACING ON S CR-33 (FIRST AVENUE) FROM SR-12 (US-84) TO OLD HIGHWAY 84 - HCP 35-406-19
Project Length in Miles 1.290 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065701 STPOA 3519 (255) CONSTRUCTION RESURFACING 2020 $80 $20 $0 $100
TOTAL COST: $80 $20 $0 $100
Route CR-41 Project Description RESURFACING ON CR-41 (WALDEN DRIVE) FROM KINSEY ROAD TO BROAD STREET - HCP 35-408-19
Project Length in Miles 1.770 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065702 STPOA 3516 () CONSTRUCTION RESURFACING 2021 $424 $0 $106 $530
TOTAL COST: $424 $0 $106 $530
Route CR-51 Project Description RESURFACE CR-51 (BETHEL ROAD) FROM CR-41 (BROAD STREET) TO SR-1 (US-431)
Project Length in Miles 0.890 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065705 STPOA 3516 () CONSTRUCTION RESURFACING 2022 $197 $0 $49 $246
TOTAL COST: $197 $0 $49 $246
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
72 of 206
HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original
Route CR-65 Project Description RESURFACE CR-65 (COWARTS CREEK RD/SOUTH BROAD STREET) FROM CR-24 (LUCY GRADE ROAD) TO SR-12 (US-84)
Project Length in Miles 2.767 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065697 STPOA 3516 () CONSTRUCTION RESURFACING 2023 $498 $0 $124 $622
TOTAL COST: $498 $0 $124 $622
Route CR-65 Project Description RESURFACE N BROAD STREET AND OMUSSEE ROAD FROM SR-12 (US-84) TO SR-52 (COLUMBIA HIGHWAY)
Project Length in Miles 3.320 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065698 STPOA 3519 (253) CONSTRUCTION RESURFACING 2020 $607 $152 $0 $758
TOTAL COST: $607 $152 $0 $758
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG BROAD STREET FROM JORDAN AVENUE TO WICKER ROAD AND ON WICKER ROAD FROM BROAD STREET TO THE DEAD END.
Project Length in Miles 0.000 Urban Area DOTHAN Sponsor TOWN OF COWARTS LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067202 TAPOA TA17 (927) CONSTRUCTION STREETSCAPE 2020 $337 $84 $0 $421
TOTAL COST: $337 $84 $0 $421
Route CR-NA Project Description BIKE AND PEDESTRIAN FACILITIES ALONG HOUSTON STREET FROM GROVE STREET TO CR-55
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069026 TAPNU TA19 (920) CONSTRUCTION SIDEWALK 2020 $140 $0 $35 $175
TOTAL COST: $140 $0 $35 $175
Route CR-NA Project Description RESURFACE SUGGS ROAD FROM HEADLAND AVENUE TO THE HOUSTON/HENRY COUNTY LINE
Project Length in Miles 0.970 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065703 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $258 $0 $65 $323
TOTAL COST: $258 $0 $65 $323
Route CR-NA Project Description RESURFACING ON HOSEA ROAD FROM THE GENEVA COUNTY LINE TO SR-605 - HCP 35-407-19
Project Length in Miles 0.970 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065704 STPOA 3516 () CONSTRUCTION RESURFACING 2022 $194 $0 $49 $243
TOTAL COST: $194 $0 $49 $243
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
73 of 206
HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original
Route CR-NA Project Description RESURFACING ON ASHFORD ROAD FROM ENON ROAD TO BEN IVEY ROAD
Project Length in Miles 1.170 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069704 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $248 $0 $62 $310
TOTAL COST: $248 $0 $62 $310
Route CR-NA Project Description RESURFACING ON HODGESVILLE ROAD FROM E SAUNDERS ROAD TO ROSS CLARK CIRCLE
Project Length in Miles 1.870 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069705 STPOA 3519 (254) CONSTRUCTION RESURFACING 2020 $529 $132 $0 $661
TOTAL COST: $529 $132 $0 $661
Route CR-NA Project Description RESURFACING ON JORDAN AVENUE FROM RUTH CIRCLE TO BEN IVEY ROAD
Project Length in Miles 0.000 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069708 STPOA 3519 () CONSTRUCTION RESURFACING 2021 $243 $0 $61 $303
TOTAL COST: $243 $0 $61 $303
Route CR-NA Project Description RESURFACING ON RONEY ROAD FROM SR-1 (US-431) TO WALDEN DRIVE
Project Length in Miles 3.040 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069710 STPOA 3519 () CONSTRUCTION RESURFACING 2022 $626 $0 $156 $782
TOTAL COST: $626 $0 $156 $782
Route CR-NA Project Description RESURFACING ON TAYLOR ROAD FROM SR-605 TO CAMPBELLTON HIGHWAY
Project Length in Miles 3.930 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069711 STPOA 3519 () CONSTRUCTION RESURFACING 2022 $845 $0 $211 $1,057
TOTAL COST: $845 $0 $211 $1,057
Route CR-NA Project Description RESURFACE SOUTH PARK AVENUE FROM TAYLOR ROAD TO ROSS CLARK CIRCLE
Project Length in Miles 1.088 Urban Area DOTHAN Sponsor HOUSTON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069706 STPOA 3519 (252) CONSTRUCTION RESURFACING 2020 $284 $71 $0 $354
TOTAL COST: $284 $71 $0 $354
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
74 of 206
HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original
Route SR-12 Project Description INSTALL RAILROAD CROSSING DEVICES ON SR-12 (US-84) AND MUSEUM AVENUE IN DOTHAN, DOT NO. 733686N, REF #1325 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS MARKINGS AND LEGENDS
Project Length in Miles 0.000 Urban Area DOTHAN Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066498 RHCH RR17 (903) CONSTRUCTION RR CROSSING IMPROVEMENTS 2021 $270 $30 $0 $300
TOTAL COST: $270 $30 $0 $300
Route SR-12 Project Description INTERSECTION IMPROVEMENTS AND ACCESS MANAGEMENT WEST OF COWARTS ON SR-12 (US-84) FROM 150' WEST OF HEALTH SCIENCES BLVD TO 1470' EAST OF EDDINS RD INCLUDING WIDENING OF TURN LANE, ADDITION OF ACCELERATION LANE AND MEDIAN CROSSOVER PROTECTION
Project Length in Miles 2.000 Urban Area DOTHAN Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070256 CN 2023
100070066 HSIP 0012 (568) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2021 $6 $1 $0 $7100070256 HSIP 0012 (568) CONSTRUCTION SAFETY IMPROVEMENTS 2023 $1,452 $161 $0 $1,613
TOTAL COST: $1,458 $162 $0 $1,620
Route SR-210 Project Description ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM US-231 SOUTH TO BAUMAN DRIVE
Project Length in Miles 2.682 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038196 RW 2023 / 100038197 UT 2024 / 100038198 CN 2024
100062175 NHF 0210 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2022 $4,046 $1,012 $0 $5,058TOTAL COST: $4,046 $1,012 $0 $5,058
Route SR-210 Project Description ADDING LANES ON SR-210 (ROSS CLARK CIRCLE) FROM SOUTH OF MEADOWBROOK DRIVE SOUTH TO NORTH CHEROKEE AVENUE AND ON SR-53 (US-231) FROM GIRARD AVENUE TO BUYERS DRIVE
Project Length in Miles 1.434 Urban Area DOTHAN Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069318 NHF 0210 (509) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $14,963 $3,741 $0 $18,704
TOTAL COST: $14,963 $3,741 $0 $18,704
Route SR-52 Project Description RESURFACING ON SR-52 FROM SR-605 TO SR-210 (US-231/ROSS CLARK CIRCLE)
Project Length in Miles 3.023 Urban Area DOTHAN Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068718 NH 0052 (518) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $2,440 $610 $0 $3,050
TOTAL COST: $2,440 $610 $0 $3,050
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
75 of 206
HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original
Route SR-53 Project Description PAVEMENT PRESERVATION SR-53 (US-231) FROM SR-210 (US-431/ROSS CLARK CIRCLE) TO THE DALE COUNTY LINE
Project Length in Miles 3.690 Urban Area DOTHAN Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068704 NH 0053 (587) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12020 $2,189 $547 $0 $2,736
TOTAL COST: $2,189 $547 $0 $2,736
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
76 of 206
HIGHWAY PROJECTS - HOUSTONSTIP PLAN: 2020 - Original
Route CR-21 Project Description INSTALLING TRAFFIC CONTROL DEVICES ON CR-21 FROM MAPLE AVENUE TO CR-321
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071468 HRRR 3620 () CONSTRUCTION TRAFFIC CONTROL MARKING &
LEGN2020 $38 $0 $4 $42
TOTAL COST: $38 $0 $4 $42
Route CR-61 Project Description RESURFACING ON CR-61 FROM CR-58 TO SR-71 - JCP 36-46-19
Project Length in Miles 2.247 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069957 STPNU 3619 (251) CONSTRUCTION RESURFACING 2020 $510 $0 $134 $644
TOTAL COST: $510 $0 $134 $644
Route CR-90 Project Description RESURFACING ON CR-90 FROM SR-73 TO THE GEORGIA STATE LINE JCP 36-53-19
Project Length in Miles 1.875 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071052 STPNU 3620 (250) CONSTRUCTION RESURFACING 2020 $335 $214 $0 $549
TOTAL COST: $335 $214 $0 $549
Route CR-NA Project Description INSTALL NEW RAILROAD CROSSING DEVICES ON VENSON STREET IN THE TOWN WOODVILLE AT NORFOLK SOUTHERN RAILROAD, DOT NO. 731-754F, REF NO. 1319 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, STRIPING, MARKINGS AND LEGENDS
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100058017 RHCH RR17 (905) CONSTRUCTION RR XING SIGNAL-SIGN-PAVE
MARK2020 $338 $0 $38 $375
TOTAL COST: $338 $0 $38 $375
Route CR-NA Project Description GUARDRAIL END ANCHORS AT (BIN 000988) ON SNODGRASS ROAD OVER DRY CREEK; WILL INCLUDE RELOCATION OF DUCTILE WATER LINE
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071473 HRRR 3620 () CONSTRUCTION GUARDRAIL 2020 $67 $0 $7 $74
TOTAL COST: $67 $0 $7 $74
Route SR-117 Project Description REHABILITATE BIN #006378 OVER TENNESSE RIVER AND BIN #006377 OVER TENNESSEE RIVER RELIEF
Project Length in Miles 2.400 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052835 PE 2009
100002736 BR 0117 (506) RIGHT OF WAY BRIDGE REHABILITATION 2021 $303 $76 $0 $378100002735 BR 0117 () CONSTRUCTION BRIDGE REHABILITATION 2021 $11,678 $2,920 $0 $14,598
TOTAL COST: $11,981 $2,995 $0 $14,976
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
77 of 206
HIGHWAY PROJECTS - JACKSONSTIP PLAN: 2020 - Original
Route SR-2 Project Description ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-2 (US-72) AT COUNTY PARK ROAD IN THE CITY OF SCOTTSBORO
Project Length in Miles 0.920 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069457 CN 2021
100069426 HSIP 0002 (587) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2019 $105 $12 $0 $117100069457 HSIP 0002 (587) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $846 $94 $0 $940
TOTAL COST: $951 $106 $0 $1,057
Route SR-2 Project Description INTERSECTION MODIFICATIONS AT THE INTERSECTION OF SR-2 (US-72) AND SR-79
Project Length in Miles 1.500 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067709 PE 2019 / 100067710 CN 2021
100067710 HSIP 0002 (584) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $695 $77 $0 $773TOTAL COST: $695 $77 $0 $773
Route SR-2 Project Description RESURFACING ON SR-2 (US-72) FROM PORTER ROAD TO 0.44 MILE WEST OF SR-35
Project Length in Miles 3.100 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068424 NH-FMGR 0002 (585) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,209 $552 $0 $2,761
TOTAL COST: $2,209 $552 $0 $2,761
Route SR-35 Project Description RESURFACING ON SR-35 FROM BRELAND BLUFF ROAD TO CR-67
Project Length in Miles 3.800 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068416 NH 0035 (536) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $2,595 $649 $0 $3,243
TOTAL COST: $2,595 $649 $0 $3,243
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
78 of 206
HIGHWAY PROJECTS - JACKSONSTIP PLAN: 2020 - Original
Route CR-143 Project Description RESURFACING AND REALIGNMENT OF CR-143 (GRANTS MILL ROAD) FROM GRANTSWOOD ROAD TO OLD LEEDS ROAD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070201 ST-037-888-009 () CONSTRUCTION RESURFACING 2020 $0 $5,188 $1,297 $6,485
TOTAL COST: $0 $5,188 $1,297 $6,485
Route CR-18 Project Description EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064232 RW 2024 / 100064233 UT 2026 / 100064234 CN 2027
100064231 STPBH 3715 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $480 $0 $120 $600TOTAL COST: $480 $0 $120 $600
Route CR-2303 Project Description CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.
Project Length in Miles 0.560 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064151 PE 2015
100040771 STPBHF-STPAAF 7026 (601)
CONSTRUCTION RAMP REVISIONS 2021 $11,200 $0 $2,800 $14,000TOTAL COST: $11,200 $0 $2,800 $14,000
Route CR-337 Project Description RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337(MCCALLA ROAD) FROM CR-18(EASTERN VALLEY ROAD) TO NORFOLK SOUTHERN RAILROAD (PHASE 1)
Project Length in Miles 1.000 Urban Area BIRMINGHAM Sponsor BESSEMER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059497 ACAA59497 ATRP (007) CONSTRUCTION RESURFACING 2021 $1,257 $0 $314 $1,571
TOTAL COST: $1,257 $0 $314 $1,571
Route CR-337 Project Description RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337(MCCALLA ROAD) FROM CR-18(EASTERN VALLEY ROAD) TO NORFOLK SOUTHERN RAILROAD (PHASE 1)
Project Length in Miles 0.960 Urban Area BIRMINGHAM Sponsor BESSEMER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060504 STPBH 3713 (252) UTILITIES RESURFACING 2021 $360 $0 $90 $450
TOTAL COST: $360 $0 $90 $450
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
79 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-46 Project Description CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE
Project Length in Miles 1.000 Urban Area BIRMINGHAM Sponsor HUEYTOWN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056287 PE 2014 / 100056288 RW 2017
100056289 STPBH 7021 (600) UTILITIES INTERSECTION IMPROVEMENTS 2020 $200 $0 $50 $250100056290 STPBH 7021 (600) CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $1,200 $0 $300 $1,500
TOTAL COST: $1,400 $0 $350 $1,750
Route CR-NA Project Description SIDEWALKS ALONG CR-67 (HAZELWOOD ROAD), FROM BURGANDY DR TO HARRIS AVENUE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ADAMSVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100048382 STPBH 7234 (600) CONSTRUCTION SIDEWALK 2020 $86 $0 $21 $107
TOTAL COST: $86 $0 $21 $107
Route CR-NA Project Description ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS ALONG 13TH STREET SOUTH FROM 4TH AVE SOUTH TO 10TH AVE SOUTH
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor UAB COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068127 CMAQ 3718 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $302 $0 $75 $377100068128 CMAQ 3718 () UTILITIES STREETSCAPE 2023 $84 $0 $21 $105100068129 CMAQ 3718 () CONSTRUCTION STREETSCAPE 2023 $1,749 $0 $437 $2,186
TOTAL COST: $2,135 $0 $534 $2,669
Route CR-NA Project Description SIDEWALKS ALONG ALDEN AVENUE FROM 8TH STREET TO 12TH STREET AND ALONG 12TH STREET FROM ALDEN AVENUE TO 12TH AVENUE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MIDFIELD LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068363 TAPAA TA18 (912) CONSTRUCTION SIDEWALK 2020 $405 $0 $101 $507
TOTAL COST: $405 $0 $101 $507
Route CR-NA Project Description A SIDEWALK ALONG DUNBARTON DRIVE FROM NORTH WOODRIDGE ROAD TO LOCKSLEY DRIVE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MOUNTAIN BROOK LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068450 TAPBH TA18 (931) CONSTRUCTION SIDEWALK 2020 $549 $0 $137 $686
TOTAL COST: $549 $0 $137 $686
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
80 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-NA Project Description GREENWAY AND ROAD DIET ON RICHARD ARRINGTON JR BOULEVARD FROM 15TH AVENUE SOUTH TO VALLEY AVENUE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068467 CMAQ 3718 (252) PRELIMINARY ENGINEERING UNCLASSIFIED 2020 $240 $0 $60 $300
TOTAL COST: $240 $0 $60 $300
Route CR-NA Project Description IMPROVEMENT OF CROSSWALKS AND REFUGE ISLANDS ON UNIVERSITY BOULEVARD AT THE INTERSECTIONS OF 12TH STREET S, 14TH STREET S, AND 16TH STREET S
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069018 TAPAA TA19 (913) CONSTRUCTION SIDEWALK 2020 $208 $0 $52 $260
TOTAL COST: $208 $0 $52 $260
Route CR-NA Project Description SIDEWALKS AND PEDESTRIAN IMPROVEMENTS ALONG HAGOOD STREET FROM EUCLID AVENUE TO MONTCLAIR ROAD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MOUNTAIN BROOK LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069329 TAPBH TA19 (930) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, SIGNS, LEGENDS AND MARKINGS AT THE INTERSECTION OF PAWNEE VILLAGE ROAD AND CSX RAILROAD, DOT NO. 352724S
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070085 RHCH RR19 (907) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $10 $1 $0 $11
TOTAL COST: $10 $1 $0 $11
Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, SIGNALS, GATES, BELLS, SIGNS, LEGENDS AND MARKINGS, AT THE INTERSECTION OF BRASHER ROAD AND CSX RAILROAD, DOT NO. 352236N
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070086 RHCH RR19 (908) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $236 $26 $0 $262
TOTAL COST: $236 $26 $0 $262
Route CR-NA Project Description HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007559 PE 1997 / 100007557 RW 2013 / 100069325 UT 2019
100007555 STPBH 7020 (601) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2019 $10,074 $0 $2,519 $12,593TOTAL COST: $10,074 $0 $2,519 $12,593
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
81 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-NA Project Description >VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.
Project Length in Miles 0.500 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007648 PE 1995 / 100007637 RW 2002
100060490 STPBH 9802 (904) UTILITIES INTERSECTION IMPROVEMENTS 2020 $960 $0 $240 $1,200100007628 STPBH 9802 (904) CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $5,245 $0 $1,311 $6,556
TOTAL COST: $6,205 $0 $1,551 $7,756
Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD ROAD AND MONTEVALLO ROAD. SITE 3 CROSSHAVEN DRIVE AND GREEN VALLEY DRIVE.
Project Length in Miles 0.250 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007654 PE 1995 / 100056486 PE 2012 / 100007638 RW 2014
100060046 STPBH 9802 (924) UTILITIES INTERSECTION IMPROVEMENTS 2020 $120 $0 $30 $150100007629 STPBH 9802 (924) CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $2,655 $0 $664 $3,318
TOTAL COST: $2,775 $0 $694 $3,468
Route CR-NA Project Description OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE
Project Length in Miles 3.300 Urban Area BIRMINGHAM Sponsor HOMEWOOD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100029542 PE 2006
100029563 STPBH 9802 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $243 $0 $61 $304100029566 STPBH 9802 () UTILITIES UTILITY ADJUSTMENT 2022 $658 $0 $164 $822100029510 STPBH 9802 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $3,597 $0 $899 $4,496
TOTAL COST: $4,498 $0 $1,125 $5,623
Route CR-NA Project Description BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM
Project Length in Miles 0.500 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100045073 PE 2005 / 100059893 RW 2019
100033434 HPP-STPBH 1602 (519) UTILITIES BRIDGE REPLACEMENT 2020 $424 $0 $106 $530100059894 STPBH 1602 (519) CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,680 $0 $420 $2,100
TOTAL COST: $2,104 $0 $526 $2,630
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
82 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-NA Project Description STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTATIN HEIGHTS NEIGHBORHOOD
Project Length in Miles 1.100 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056314 PE 2014
100056315 STPBH 7117 (600) UTILITIES UTILITY ADJUSTMENT 2020 $200 $0 $50 $250100056316 STPBH 7117 (600) CONSTRUCTION STREETSCAPE 2021 $2,613 $0 $653 $3,266
TOTAL COST: $2,813 $0 $703 $3,516
Route CR-NA Project Description SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS
Project Length in Miles 2.280 Urban Area BIRMINGHAM Sponsor VESTAVIA HILLS COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057171 PE 2013
100057172 CMAQ 7030 (600) RIGHT OF WAY SIDEWALK 2020 $316 $0 $79 $395100057173 CMAQ 7030 (600) UTILITIES UTILITY ADJUSTMENT 2020 $73 $0 $18 $91100057174 CMAQ 7030 (600) CONSTRUCTION SIDEWALK 2021 $2,137 $0 $534 $2,671
TOTAL COST: $2,526 $0 $631 $3,157
Route CR-NA Project Description STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100058187 PE 2016
100033432 STPBH 3716 (251) CONSTRUCTION STREETSCAPE 2021 $661 $0 $165 $827TOTAL COST: $661 $0 $165 $827
Route CR-NA Project Description DRAINAGE IMPROVEMENTS FOR APPROXIMATELY 0.2 MILE ALONG RUTLEDGE DRIVE, 0.25 MILES WEST OF WOODWARD ROAD
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor MIDFIELD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059488 ACAA59488 ATRP (006) CONSTRUCTION DRAINAGE CORRECTION 2020 $422 $370 $0 $791
TOTAL COST: $422 $370 $0 $791
Route CR-NA Project Description NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH
Project Length in Miles 0.630 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059189 PE 2015
100059190 CMAQ 3715 (257) CONSTRUCTION STREETSCAPE 2022 $520 $0 $130 $650TOTAL COST: $520 $0 $130 $650
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
83 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-NA Project Description INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MOUNTAIN BROOK COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064199 PE 2017
100064200 CMAQ 3715 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $303 $0 $76 $378100064201 CMAQ 3715 () UTILITIES INTERSECTION IMPROVEMENTS 2021 $425 $0 $106 $531100064202 CMAQ 3715 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,797 $0 $449 $2,246
TOTAL COST: $2,524 $0 $631 $3,155
Route CR-NA Project Description PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM LEAF LAKE DRIVE TO VENICE ROAD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064224 PE 2017
100064225 STPBH 3715 (269) CONSTRUCTION PAVEMENT REHABILITATION 2020 $960 $240 $0 $1,200TOTAL COST: $960 $240 $0 $1,200
Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor LEEDS COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064310 PE 2019 / 100064312 UT 2024 / 100064313 CN 2025
100064311 CMAQ 3715 (271) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2023 $160 $0 $40 $200TOTAL COST: $160 $0 $40 $200
Route CR-NA Project Description BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MOUNTAIN BROOK COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066110 PE 2017
100066111 STPBH 3716 (256) RIGHT OF WAY BRIDGE REHABILITATION 2020 $80 $0 $20 $100100066112 STPBH 3716 (256) UTILITIES BRIDGE REHABILITATION 2021 $80 $0 $20 $100100066113 STPBH 3716 () CONSTRUCTION BRIDGE REHABILITATION 2021 $880 $0 $220 $1,100
TOTAL COST: $1,040 $0 $260 $1,300
Route CR-NA Project Description SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MOUNTAIN BROOK COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068123 PE 2019
100068125 CMAQ 3718 () RIGHT OF WAY SIDEWALK 2023 $42 $0 $11 $53100068124 CMAQ 3718 () UTILITIES SIDEWALK 2023 $84 $0 $21 $105100068126 CMAQ 3718 () CONSTRUCTION SIDEWALK 2023 $1,963 $0 $491 $2,454
TOTAL COST: $2,089 $0 $522 $2,612
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
84 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-NA Project Description BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068651 STPBH 3717 (250) UTILITIES BRIDGE REPLACEMENT 2020 $404 $0 $101 $505100059460 STPBH 3717 (250) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,001 $0 $750 $3,752
TOTAL COST: $3,405 $0 $851 $4,257
Route I-20 Project Description PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE ST. CLAIR COUNTY LINE
Project Length in Miles 2.800 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068064 PE 2019 / 100068066 CN 2020
100068066 IM I020 (356) CONSTRUCTION PAVEMENT MINOR REHABILITATION
2020 $7,113 $790 $0 $7,904TOTAL COST: $7,113 $790 $0 $7,904
Route I-20 Project Description PLANING, OVERLAY AND STRIPING ON I-20 FROM THE EAST END OF THE BRIDGE OVER 1ST AVE. NORTH TO THE EAST END OF THE BRIDGE OVER US-78 (AL-4) AT EXIT 140
Project Length in Miles 9.520 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071617 CN 2022
100071617 IM I020 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2022 $7,611 $846 $0 $8,457TOTAL COST: $7,611 $846 $0 $8,457
Route I-22 Project Description PAVEMENT REHABILITATION ON I-22 FROM THE WALKER COUNTY LINE TO COALBURG ROAD
Project Length in Miles 13.085 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068228 PE 2019 / 100068229 CN 2020
100068229 IM-IMGR I022 (315) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $10,123 $1,125 $0 $11,248TOTAL COST: $10,123 $1,125 $0 $11,248
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
85 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route I-459 Project Description INTERCHANGE LIGHTING ON I-459 AT CR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)
Project Length in Miles 9.128 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100005120 CN 2021
100005123 IM I459 () PRELIMINARY ENGINEERING LIGHTING 2020 $129 $14 $0 $143100005120 IM I459 () CONSTRUCTION LIGHTING 2021 $1,633 $181 $0 $1,815
TOTAL COST: $1,762 $196 $0 $1,958
Route I-459 Project Description CONCRETE PAVEMENT REHABILITATION ON I-459 FROM SR-3 (US-31) TO LORNA ROAD
Project Length in Miles 1.856 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068227 CN 2021
100068226 IM I459 (317) PRELIMINARY ENGINEERING PAVEMENT REHABILITATION 2020 $225 $25 $0 $250100068227 IM I459 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $1,818 $202 $0 $2,020
TOTAL COST: $2,043 $227 $0 $2,270
Route I-459 Project Description I-459 INTERSTATE MEDIAN CROSSOVER PROTECTION FROM I-20/I-59 TO 0.56 MILES SOUTH OF SR-150
Project Length in Miles 10.700 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063237 HSIP I459 (312) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $900 $0 $0 $900
TOTAL COST: $900 $0 $0 $900
Route I-59 Project Description CONC PVMT REPAIR, OVERLAY AND BRIDGE RAIL RETROFIT ON I-59 FROM .4 MILE S OF ARKADELPHIA RD TO THE CBD BRIDGE, I-65 FROM 1ST AVE N TO 16TH ST N, SR-3 (US-31) FROM N OF 12TH AVE N TO N OF FINLEY BLVD AND 10TH ST N FROM 3RD AVE N TO 6TH AVE N
Project Length in Miles 2.194 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003905 PE 2012 / 100059959 RW 2015 / 100060200 CN 2016 / 100065792 CN 2016 / 100071628 CN 2020
100063656 IMF-STPAAF I059 (410) CONSTRUCTION PAVEMENT REHABILITATION 2019 $11,769 $1,308 $0 $13,077TOTAL COST: $11,769 $1,308 $0 $13,077
Route I-59 Project Description SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)
Project Length in Miles 46.889 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100042475 CN 2020
100042475 IM I059 () CONSTRUCTION SIGN REHABILITATION 2020 $3,803 $423 $0 $4,226TOTAL COST: $3,803 $423 $0 $4,226
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
86 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route I-59 Project Description RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE
Project Length in Miles 4.570 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062067 PE 2016 / 100062068 CN 2021
100062068 IM I059 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2
2021 $12,719 $1,413 $0 $14,132TOTAL COST: $12,719 $1,413 $0 $14,132
Route I-59 Project Description CONCRETE PAVEMENT REHABILITATION ON I-59 FROM AVIATION AVENUE TO 85TH STREET
Project Length in Miles 2.579 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068224 PE 2019 / 100068225 CN 2021
100068225 IM I059 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $7,804 $867 $0 $8,671TOTAL COST: $7,804 $867 $0 $8,671
Route I-59 Project Description CONCRETE REHABILITATION ON I-59 FROM VALLEY ROAD TO SR-5 (ARKADELPHIA ROAD)
Project Length in Miles 4.791 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069256 PE 2019 / 100069257 CN 2020
100069257 IM I059 (417) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2
2020 $14,500 $1,611 $0 $16,112TOTAL COST: $14,500 $1,611 $0 $16,112
Route I-59 Project Description CONCRETE PAVEMENT REHABILITATION ON I-59 FROM FAIRFIELD BOULEVARD TO VALLEY ROAD
Project Length in Miles 2.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069258 PE 2019 / 100069261 CN 2022
100069261 IM I059 () CONSTRUCTION PAVEMENT REHABILITATION 2022 $25,200 $2,800 $0 $28,000TOTAL COST: $25,200 $2,800 $0 $28,000
Route I-59 Project Description CONCRETE REHABILITATION, SHOULDER RECONSTRUCTION, AND BRIDGE RAIL RETROFIT ON I-59 FROM 0.87 MILE SOUTH OF CR-10 TO THE ST. CLAIR COUNTY LINE"
Project Length in Miles 8.145 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069285 PE 2019 / 100069286 CN 2020
100069286 IM I059 (419) CONSTRUCTION PAVEMENT MINOR REHABILITATION
2020 $12,774 $1,419 $0 $14,193TOTAL COST: $12,774 $1,419 $0 $14,193
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
87 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route I-59 Project Description PAVEMENT REHABILITATION ON I-59 FROM ALABAMA ADVENTURE PKWY(EXIT 110) TO THE SOUTH END OF FAIRFIELD BLVD BRIDGE (END OF ASPHALT PAVEMENT)
Project Length in Miles 13.224 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069855 PE 2020 / 100069856 CN 2021
100069856 IM I059 () CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2021 $2,273 $253 $0 $2,525100069855 IM I059 (421) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE
LEVEL 12020 $225 $25 $0 $250
TOTAL COST: $2,498 $278 $0 $2,775
Route I-65 Project Description CONCRETE PAVEMENT REHABILITATION ON I-65 FROM RALEIGH AVENUE TO 1ST AVENUE NORTH (NORTH END OF BIN #14407)
Project Length in Miles 8.020 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069281 CN 2021
100069272 IM I065 () PRELIMINARY ENGINEERING PAVEMENT REHABILITATION 2020 $450 $50 $0 $500100069281 IM I065 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $10,099 $1,122 $0 $11,221
TOTAL COST: $10,549 $1,172 $0 $11,721
Route I-65 Project Description PAVEMENT REHABILITATION ON I-65 FROM WALKER CHAPEL ROAD INTERCHANGE TO CR-112 (MOUNT OLIVE ROAD INTERCHANGE)
Project Length in Miles 9.188 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069859 CN 2021
100069858 IM I065 (517) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $243 $27 $0 $270100069859 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $3,708 $412 $0 $4,120
TOTAL COST: $3,951 $439 $0 $4,390
Route I-65 Project Description CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT, GUARDRAIL ON I-65 FROM SR-3(US-31) TO RALEIGH AVENUE OVERPASS (PRIORITY #35)
Project Length in Miles 7.520 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066473 PE 2020 / 100055415 CN 2021
100066473 IM I065 () PRELIMINARY ENGINEERING PAVEMENT REHABILITATION 2020 $227 $25 $0 $253100055415 IM I065 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $9,508 $1,056 $0 $10,564
TOTAL COST: $9,735 $1,082 $0 $10,817
Route NA Project Description SIDEWALK IMPROVEMENTS AND LIGHTING ALONG MAIN ST FROM MT OLIVE RD TO FIELDSTOWN RD, ALONG BELL ST TO THE DEAD END AND A PEDESTRIAN TRAIL WITH 1 PED BRIDGE TRAVERSING ACROSS CITY OWNED PROPERTY
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor GARDENDALE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100050724 CMAQ 3717 (253) CONSTRUCTION UNCLASSIFIED 2020 $544 $0 $136 $680
TOTAL COST: $544 $0 $136 $680
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
88 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055374 CTGR-STPBH-FAUP
3714 ()CONSTRUCTION UNCLASSIFIED 2020 $2,673 $0 $668 $3,342
TOTAL COST: $2,673 $0 $668 $3,342
Route NA Project Description 7TH AVENUE SOUTH STREETSCAPE AND IMPROVEMENTS PROJECT LOCATED ON 7TH AVENUE SOUTH AND OTHER VARIOUS STREETS IN THE CITY OF BIRMINGHAM.
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065573 TAPBH TA16 (943) CONSTRUCTION STREETSCAPE 2020 $1,100 $0 $275 $1,375
TOTAL COST: $1,100 $0 $275 $1,375
Route NA Project Description ADVANCED TRAFFIC MANAGEMENT SYSTEM ASSESSMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065798 CMAQ 3716 () SPECIAL TRAFFIC CONTROL MARKING &
LEGN2023 $343 $0 $86 $429
TOTAL COST: $343 $0 $86 $429
Route NA Project Description WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066708 CMAQ 3717 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $204 $0 $51 $255100066710 CMAQ 3717 () UTILITIES STREETSCAPE 2020 $204 $0 $51 $255100066709 CMAQ 3717 () CONSTRUCTION STREETSCAPE 2022 $1,261 $0 $315 $1,577
TOTAL COST: $1,669 $0 $417 $2,087
Route NA Project Description ST SCAPE IMP ALONG:4TH AVE N FR 15TH TO 19TH ST N,5TH AVE N FR 11TH ST N TO 1800 BLOCK,6TH/7TH AVE N FR 14TH TO 17TH ST N,15TH/16TH ST N FR 3RD AVE N TO 8TH ALY N,17TH ST N FR 3RD AVE ALY N TO REV ABR WOODS JR BLVD,18TH ST N FR 3RD TO 4TH AVE N
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067026 CMAQ 3717 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $345 $0 $86 $431100067027 CMAQ 3717 () UTILITIES STREETSCAPE 2023 $127 $0 $32 $159100067028 CMAQ 3717 () CONSTRUCTION STREETSCAPE 2023 $425 $0 $106 $531
TOTAL COST: $897 $0 $224 $1,121
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
89 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description A SIDEWALK FROM MERRYVALE LANE TO 1090 MONTGOMERY HIGHWAY THEN WRAPPING AROUND TO CONNECT TO MAYLAND LANE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor VESTAVIA HILLS LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068361 TAPAA TA18 (911) CONSTRUCTION SIDEWALK 2020 $280 $0 $70 $350
TOTAL COST: $280 $0 $70 $350
Route NA Project Description SIDEWALK, LANDSCAPING AND LIGHTING AROUND THE HOOVER PUBLIC LIBRARY CORNER LOT BETWEEN MUNICIPAL LANE, MONTGOMERY HIGHWAY, AND MUNICIPAL DRIVE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor HOOVER LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068449 TAPBH TA18 (932) CONSTRUCTION SIDEWALK 2020 $583 $0 $146 $729
TOTAL COST: $583 $0 $146 $729
Route NA Project Description BICYCLE/PEDESTRIAN PLAN FOR JEFFERSON COUNTY, SPONSOR IS JEFFERSON COUNTY
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068759 CMAQ NR18 () SPECIAL UNCLASSIFIED 2020 $120 $0 $30 $150
TOTAL COST: $120 $0 $30 $150
Route NA Project Description PURCHASE OF 5 FULLY EQUIPPED (ASAP) VEHICLES FOR THE BIRMINGHAM AREA
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069333 CMAQ NR20 (909) SPECIAL UNCLASSIFIED 2020 $242 $61 $0 $303
TOTAL COST: $242 $61 $0 $303
Route NA Project Description RESURFACING AND ADA UPGRADES IN THE CITY OF BIRMINGHAM
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069758 STPBH 3719 () PRELIMINARY ENGINEERING RESURFACING 2020 $280 $0 $70 $350100069759 STPBH 3719 () CONSTRUCTION RESURFACING 2021 $4,000 $0 $1,000 $5,000
TOTAL COST: $4,280 $0 $1,070 $5,350
Route NA Project Description STREETSCAPE AND SIDEWALK ENHANCEMENTS INCLUDING ADA UPGRADES IN THE CITY OF BIRMINGHAM
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069760 CMAQ NR19 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $250 $0 $63 $313100069761 CMAQ NR19 () CONSTRUCTION STREETSCAPE 2023 $2,081 $0 $520 $2,602
TOTAL COST: $2,331 $0 $583 $2,914
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
90 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2020 AND FY 2021
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor RPCGB COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070047 CMAQ NR19 () SPECIAL UNCLASSIFIED 2020 $889 $0 $222 $1,111
TOTAL COST: $889 $0 $222 $1,111
Route NA Project Description REGIONAL TRANSPORTATION MANAGEMENT CENTER AND ASAP PROGRAM FROM FY- 2020-2021.
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071054 STPAA NR20 (904) SPECIAL UNCLASSIFIED 2020 $1,600 $400 $0 $2,000
TOTAL COST: $1,600 $400 $0 $2,000
Route NA Project Description PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003905 PE 2012 / 100059959 RW 2015 / 100060200 CN 2016 / 100065792 CN 2016 / 100071628 CN 2020
100065615 ACIM-ACCMAQ-CMAQ 3716 (258)
CONSTRUCTION STREETSCAPE 2020 $32,675 $2,706 $2,081 $37,462TOTAL COST: $32,675 $2,706 $2,081 $37,462
Route NA Project Description RESURFACING ON MINOR PARKWAY FROM BIRMINGPORT ROAD (SR-269) TO CRUMLY CHAPEL ROAD
Project Length in Miles 3.000 Urban Area BIRMINGHAM Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071626 STPAA 3720 () CONSTRUCTION RESURFACING 2020 $1,186 $0 $296 $1,482
TOTAL COST: $1,186 $0 $296 $1,482
Route NA Project Description SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor HOMEWOOD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100029549 PE 1999 / 100043449 RW 2016 / 100029526 CN 2024
100029525 CMAQ 9802 (911) CONSTRUCTION UNCLASSIFIED 2021 $4,229 $0 $1,057 $5,286TOTAL COST: $4,229 $0 $1,057 $5,286
Route NA Project Description TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)
Project Length in Miles 5.900 Urban Area BIRMINGHAM Sponsor TRUSSVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100032378 PE 2000 / 100032370 CN 2012 / 100064434 CN 2015
100052630 CMAQ 9802 () CONSTRUCTION UNCLASSIFIED 2023 $1,186 $0 $296 $1,482TOTAL COST: $1,186 $0 $296 $1,482
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
91 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description >SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD
Project Length in Miles 2.500 Urban Area BIRMINGHAM Sponsor IRONDALE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100032392 CN 2042
100032397 CMAQ 9802 () RIGHT OF WAY UNCLASSIFIED 2020 $63 $0 $16 $79TOTAL COST: $63 $0 $16 $79
Route NA Project Description VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET
Project Length in Miles 10.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039843 PE 2006 / 100039849 PE 2024 / 100039850 RW 2025 / 100039845 CN 2015 / 100039848 CN 2024 / 100039851 CN 2027
100039846 CMAQ NR02 () PRELIMINARY ENGINEERING UNCLASSIFIED 2023 $534 $0 $133 $667100039847 CMAQ NR02 () RIGHT OF WAY UNCLASSIFIED 2023 $267 $0 $67 $333
TOTAL COST: $800 $0 $200 $1,000
Route NA Project Description RAILROAD RESERVATION/1ST AVENUE SOUTH PHASE 2 AND 3 ENGINEERING: 1ST AVENUE SOUTH FROM 18TH STREET TO 32ND STREET AND NORTH TO SLOSS FURNACE.
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039855 PE 2010
100056176 CMAQ 3700 () PRELIMINARY ENGINEERING UNCLASSIFIED 2023 $263 $0 $66 $329TOTAL COST: $263 $0 $66 $329
Route NA Project Description PEDESTRIAN BRIDGE OVER US-31 AND SIDEWALKS IN VESTAVIA HILLS NEAR WALD PARK
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor VESTAVIA HILLS COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100050996 PE 2008
100051157 DE-HPP-TAPBH A104 (916)
CONSTRUCTION PEDESTRIAN OVERPASS 2021 $1,067 $0 $266 $1,333TOTAL COST: $1,067 $0 $266 $1,333
Route NA Project Description REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK
Project Length in Miles 6.300 Urban Area BIRMINGHAM Sponsor CENTER POINT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056519 PE 2013
100056520 CMAQ RW13 () RIGHT OF WAY UNCLASSIFIED 2021 $92 $0 $23 $115100056521 CMAQ UT14 () UTILITIES UNCLASSIFIED 2021 $88 $0 $22 $110100056522 CMAQ CN14 () CONSTRUCTION UNCLASSIFIED 2023 $591 $0 $148 $739
TOTAL COST: $771 $0 $193 $964
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
92 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)
Project Length in Miles 2.400 Urban Area BIRMINGHAM Sponsor HOOVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056538 PE 2012 / 100056539 RW 2017
100056540 CMAQ 7282 (600) UTILITIES SIDEWALK 2020 $90 $0 $23 $113100056541 CMAQ 7282 (600) CONSTRUCTION SIDEWALK 2021 $841 $0 $210 $1,051
TOTAL COST: $931 $0 $233 $1,164
Route NA Project Description SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK
Project Length in Miles 1.420 Urban Area BIRMINGHAM Sponsor HOOVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056544 PE 2012 / 100056545 RW 2017
100056547 CMAQ 3715 (254) CONSTRUCTION SIDEWALK 2019 $1,861 $0 $465 $2,327TOTAL COST: $1,861 $0 $465 $2,327
Route NA Project Description SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER
Project Length in Miles 5.430 Urban Area BIRMINGHAM Sponsor HOOVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056556 PE 2018
100056557 CMAQ NR13 (961) RIGHT OF WAY SIDEWALK 2022 $112 $0 $28 $139100056558 CMAQ NR13 (961) UTILITIES SIDEWALK 2022 $103 $0 $26 $129100056559 CMAQ NR13 () CONSTRUCTION SIDEWALK 2023 $2,887 $0 $722 $3,609
TOTAL COST: $3,102 $0 $775 $3,877
Route NA Project Description RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE
Project Length in Miles 0.400 Urban Area BIRMINGHAM Sponsor CENTER POINT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054521 STPBH 3716 (250) CONSTRUCTION UNCLASSIFIED 2020 $3,410 $0 $853 $4,263
TOTAL COST: $3,410 $0 $853 $4,263
Route NA Project Description VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY
Project Length in Miles 2.700 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064283 PE 2017
100064288 CMAQ 3715 (267) RIGHT OF WAY UNCLASSIFIED 2021 $40 $0 $10 $50100064289 CMAQ 3715 (267) UTILITIES UNCLASSIFIED 2021 $40 $0 $10 $50100064290 CMAQ 3715 () CONSTRUCTION UNCLASSIFIED 2022 $320 $0 $80 $400
TOTAL COST: $400 $0 $100 $500
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
93 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description STREETSCAPE IMPROVEMENTS ALONG 2ND AVE S FROM 24TH ST S TO 32ND ST S, 27TH ST S FROM 2ND AVE S TO 3RD AVE S, AND 29TH ST S FROM 2ND AVE S TO 3RD AVE S
Project Length in Miles 1.200 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064291 PE 2016
100064293 CMAQ 3715 (262) UTILITIES STREETSCAPE 2020 $83 $0 $21 $104100064294 TAPBH-CMAQ 3715 () CONSTRUCTION STREETSCAPE 2020 $1,000 $0 $250 $1,250
TOTAL COST: $1,083 $0 $271 $1,354
Route NA Project Description 41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH
Project Length in Miles 0.800 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064295 PE 2016
100064296 CMAQ 3715 (261) UTILITIES STREETSCAPE 2020 $80 $0 $20 $100100064297 CMAQ 3715 () CONSTRUCTION STREETSCAPE 2021 $816 $0 $204 $1,020
TOTAL COST: $896 $0 $224 $1,120
Route NA Project Description SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH AVENUE SOUTH
Project Length in Miles 3.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064301 PE 2016
100064302 CMAQ 3715 (264) UTILITIES SIDEWALK 2021 $40 $0 $10 $50100064303 CMAQ 3715 () CONSTRUCTION SIDEWALK 2021 $1,600 $0 $400 $2,000
TOTAL COST: $1,640 $0 $410 $2,050
Route NA Project Description SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD
Project Length in Miles 5.400 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064309 PE 2016
100064315 CMAQ 3715 (263) RIGHT OF WAY SIDEWALK 2021 $40 $0 $10 $50100064316 CMAQ 3715 (263) UTILITIES SIDEWALK 2021 $40 $0 $10 $50100064317 CMAQ 3715 () CONSTRUCTION SIDEWALK 2022 $960 $0 $240 $1,200
TOTAL COST: $1,040 $0 $260 $1,300
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
94 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route NA Project Description 18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor HOMEWOOD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065218 PE 2019
100065219 CMAQ TA15 (903) RIGHT OF WAY STREETSCAPE 2020 $880 $0 $220 $1,100100065220 CMAQ TA15 (903) UTILITIES STREETSCAPE 2020 $83 $0 $21 $104100064505 TAPAA-CMAQ TA15
(903)CONSTRUCTION STREETSCAPE 2020 $1,200 $0 $300 $1,500
TOTAL COST: $2,163 $0 $541 $2,704
Route NA Project Description DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor MIDFIELD COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065502 PE 2017 / 100062999 CN 2019
100065504 TAPAA-CMAQ TA14 (930)
UTILITIES SIDEWALK 2020 $82 $0 $21 $103TOTAL COST: $82 $0 $21 $103
Route NA Project Description BIKESHARE WAYFINDING SIGNS IN DOWNTOWN BIRMINGHAM
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor BIRMINGHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066621 PE 2019
100066622 CMAQ 3717 () CONSTRUCTION UNCLASSIFIED 2023 $1,166 $0 $291 $1,457TOTAL COST: $1,166 $0 $291 $1,457
Route SR-119 Project Description REPLACE BRIDGE, BIN 001308, SR-119 OVER SHEPARD BRANCH (SUFF=56.3, STATUS=FO)
Project Length in Miles 0.300 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049954 PE 2019
100049986 BR 0119 (513) RIGHT OF WAY BRIDGE REPLACEMENT 2022 $59 $15 $0 $73100049987 BR 0119 (513) UTILITIES BRIDGE REPLACEMENT 2022 $35 $9 $0 $44100049955 BR 0119 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $2,362 $591 $0 $2,953
TOTAL COST: $2,456 $614 $0 $3,070
Route SR-149 Project Description RESURFACING, PLANING, PATCHING, STRIPING, AND LEVELING ON SR-149 FROM COLUMBIANA ROAD TO WILDWOOD CIRCLE
Project Length in Miles 1.150 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070159 NH 0149 (503) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,591 $398 $0 $1,989
TOTAL COST: $1,591 $398 $0 $1,989
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
95 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route SR-150 Project Description SR-150 FR WEST OF CR-6 (PARKWOOD RD) TO WEST OF SHADES CREEK (PHASE 2)
Project Length in Miles 2.349 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100025540 ST-659-17 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND
BRG2021 $0 $10,048 $0 $10,048
TOTAL COST: $0 $10,048 $0 $10,048
Route SR-150 Project Description PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER
Project Length in Miles 0.065 Urban Area BIRMINGHAM Sponsor BESSEMER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064226 PE 2019 / 100064230 CN 2024
100064228 CMAQ 3715 (270) RIGHT OF WAY PEDESTRIAN OVERPASS 2022 $86 $0 $21 $107100064229 CMAQ 3715 (270) UTILITIES PEDESTRIAN OVERPASS 2023 $87 $0 $22 $108
TOTAL COST: $172 $0 $43 $215
Route SR-150 Project Description BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866
Project Length in Miles 1.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066942 PE 2018
100066943 BR 0150 (505) UTILITIES BRIDGE REPLACEMENT 2020 $247 $62 $0 $309100066944 BR 0150 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,096 $1,024 $0 $5,120
TOTAL COST: $4,343 $1,086 $0 $5,429
Route SR-25 Project Description RESURFACE, PLANE, STRIPE, LEVEL, PATCH SR-25 FROM THE SHELBY COUNTY LINE TO SR-4 (US-78)
Project Length in Miles 2.081 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070160 STPAA 0025 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $2,854 $713 $0 $3,567
TOTAL COST: $2,854 $713 $0 $3,567
Route SR-269 Project Description BRIDGE REPLACEMENT (BIN 009187) ON SR-269 (BIRMINGPORT ROAD) OVER THE LOCUST FORK OF THE WARRIOR RIVER
Project Length in Miles 0.436 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069529 PE 2019
100069530 BR 0269 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $7,583 $1,896 $0 $9,479TOTAL COST: $7,583 $1,896 $0 $9,479
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
96 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route SR-3 Project Description SR-3 (US-31)ATSR-150 UPGRADE TRAFFIC CAMERAS AND INSTALL FIBER OPTIC CABLE
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor HOOVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100056560 CMAQF NR13 () PRELIMINARY ENGINEERING SIGNALIZATION 2020 $90 $0 $23 $113
TOTAL COST: $90 $0 $23 $113
Route SR-3 Project Description AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.
Project Length in Miles 3.196 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064506 CMAQ 0003 () PRELIMINARY ENGINEERING STREETSCAPE 2020 $83 $21 $0 $104100064507 CMAQ 0003 () CONSTRUCTION STREETSCAPE 2023 $2,707 $677 $0 $3,384
TOTAL COST: $2,790 $698 $0 $3,488
Route SR-3 Project Description BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B
Project Length in Miles 0.100 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003817 CN 2026
100003818 BR 7044 (600) PRELIMINARY ENGINEERING BRIDGES AND APPROACHES 2023 $126 $31 $0 $157TOTAL COST: $126 $31 $0 $157
Route SR-3 Project Description SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE
Project Length in Miles 0.500 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056425 PE 2012
100056427 NH 0003 () CONSTRUCTION SLIDE CORRECTION 2021 $92 $23 $0 $115TOTAL COST: $92 $23 $0 $115
Route SR-3 Project Description SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER
Project Length in Miles 1.418 Urban Area BIRMINGHAM Sponsor HOOVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064203 PE 2019
100064209 STPBH 0003 (619) CONSTRUCTION LIGHTING 2021 $1,600 $0 $400 $2,000TOTAL COST: $1,600 $0 $400 $2,000
Route SR-3 Project Description RESURFACING, PLANING, STRIPING, LEVELING, PATCHING AND 2FT SAFETY WIDENING ON SR-3(US-31) FROM .2 MILE NORTH OF FINLEY BLVD TO A JOINT AT 52ND AVE NORTH
Project Length in Miles 2.325 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070151 STPAA-HSIP 0003 (620) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,332 $574 $0 $2,906
TOTAL COST: $2,332 $574 $0 $2,906
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
97 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route SR-4 Project Description REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)
Project Length in Miles 0.600 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049956 PE 2010
100049988 BR 0004 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $58 $15 $0 $73100049989 BR 0004 () UTILITIES BRIDGE REPLACEMENT 2022 $35 $9 $0 $44100049957 BR 0004 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $2,639 $660 $0 $3,299
TOTAL COST: $2,732 $683 $0 $3,415
Route SR-4 Project Description INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS
Project Length in Miles 0.780 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065388 PE 2017
100065396 STPAA 0004 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $420 $0 $105 $526100065397 STPAA 0004 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $429 $0 $107 $536100063799 STPAA 0004 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $2,599 $0 $650 $3,249
TOTAL COST: $3,448 $0 $862 $4,310
Route SR-4 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM A SPOT 86 FEET WEST OF 46TH ALLEY SOUTH TO ST. PATRICK CIRCLE
Project Length in Miles 3.541 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068636 STPAA 0004 (548) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,418 $604 $0 $3,022
TOTAL COST: $2,418 $604 $0 $3,022
Route SR-4 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM 1ST AVE NORTH TO A POINT 86 FEET WEST OF 46TH ALLEY SOUTH INCLUDING EASTBOUND AND WESTBOUND LANES
Project Length in Miles 3.964 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068637 STPAA 0004 (546) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22019 $3,486 $872 $0 $4,358
TOTAL COST: $3,486 $872 $0 $4,358
Route SR-4 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-4 (US-78) FROM ANDERSON STREET TO THE ST. CLAIR COUNTY LINE
Project Length in Miles 2.102 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070161 STPAA 0004 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $481 $120 $0 $601
TOTAL COST: $481 $120 $0 $601
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
98 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route SR-5 Project Description BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER
Project Length in Miles 0.681 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100050014 PE 2007
100002809 BR 0005 (517) CONSTRUCTION BRIDGE REPLACEMENT 2020 $7,924 $1,981 $0 $9,905TOTAL COST: $7,924 $1,981 $0 $9,905
Route SR-5 Project Description RESURFACING,PLANING,STRIPING, LEVELING AND PATCHING ON SR-5 (US-11) FROM 31 FEET NORTH OF ACADEMY DRIVE TO 111 FEET NORTH OF 22ND STREET NORTH
Project Length in Miles 3.983 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068644 NH 0005 (557) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,957 $739 $0 $3,696
TOTAL COST: $2,957 $739 $0 $3,696
Route SR-5 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-5 (US-78) FROM FINLEY AVENUE TO CHERRY AVENUE
Project Length in Miles 1.528 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070164 NH 0005 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $979 $245 $0 $1,224
TOTAL COST: $979 $245 $0 $1,224
Route SR-7 Project Description WIDEN SR-7(US-11) FROM CHALKVILLE RD TO THE CAHABA RIVER BRIDGE
Project Length in Miles 0.441 Urban Area BIRMINGHAM Sponsor TRUSSVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039838 PE 2001 / 100050342 UT 2015
100039839 STPBH 7073 (602) CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2020 $2,049 $512 $0 $2,562TOTAL COST: $2,049 $512 $0 $2,562
Route SR-75 Project Description RESURFACING, PLANING, STRIPING, LEVELING, PATCHING AND 2FT SAFETY WIDENING ON SR-75 FROM A JOINT 116FT SOUTH OF FOX HILL DR. TO 240FT SOUTH OF INNSBROOKE PARKWAY
Project Length in Miles 3.934 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068643 RP-NH-HSIP 0075 (535) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,621 $650 $0 $3,271
TOTAL COST: $2,621 $650 $0 $3,271
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
99 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route SR-959 Project Description FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063383 SP 2018
100063385 APDF 1602 (563) SPECIAL UNCLASSIFIED 2020 $1,880 $470 $0 $2,350TOTAL COST: $1,880 $470 $0 $2,350
Route SR-959 Project Description BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.
Project Length in Miles 2.780 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100048413 APDF 1602 (550) CONSTRUCTION BRIDGE 2023 $42,174 $10,544 $0 $52,718
TOTAL COST: $42,174 $10,544 $0 $52,718
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
100 of 206
HIGHWAY PROJECTS - JEFFERSONSTIP PLAN: 2020 - Original
Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS CR-49 AT BLOWHORN(#4247), YELLOW RELIEF(#4248,#4249), YELLOW(#4250); CR-21 AT EALON BR(#4527), CUT BANK(#6869); CR-36 AT TRIB(#4529); CR-41 AT MILL(#4746), TRIB(#4747); CR-15 AT DRY (#6871); CR-35 AT LOST REED(#9948)
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069573 HRRR 3819 (250) CONSTRUCTION GUARDRAIL 2020 $234 $0 $26 $261
TOTAL COST: $234 $0 $26 $261
Route SR-118 Project Description BRIDGE REPLACEMENT (BIN 001818) AND (BIN 001819) ON SR-118 (US-278) OVER BOGUE CREEK
Project Length in Miles 1.350 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068804 PE 2019
100068805 BR 0118 (517) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $163 $41 $0 $204100068806 BR 0118 (517) UTILITIES BRIDGE REPLACEMENT 2021 $408 $102 $0 $510100068807 BR 0118 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $2,473 $618 $0 $3,091
TOTAL COST: $3,044 $761 $0 $3,805
Route SR-17 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-17 FROM THE PICKENS COUNTY LINE AT MP 220.970 TO THE MILLPORT CITY LIMITS AT MP 227.000
Project Length in Miles 6.030 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068531 STPAA-HSIP 0017 (580) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,852 $670 $0 $3,522
TOTAL COST: $2,852 $670 $0 $3,522
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
101 of 206
HIGHWAY PROJECTS - LAMARSTIP PLAN: 2020 - Original
Route CR-16 Project Description CR-16 BRIDGE REPLACEMENT OVER CYPRESS CREEK IN LAUDERDALE COUNTY BIN #001434
Project Length in Miles 0.300 Urban Area SHOALS Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059048 PE 2014
100059049 STPOA 3914 (251) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $204 $0 $51 $255100059050 STPOA 3914 (251) UTILITIES BRIDGE REPLACEMENT 2022 $346 $0 $87 $433100059051 STPOA 3914 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $3,212 $0 $803 $4,015
TOTAL COST: $3,762 $0 $941 $4,703
Route CR-NA Project Description JOHN COFFEE MEMORIAL BRIDGE RAIL PAINTING. NATCHEZ TRACE PARKWAY
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065123 PFH 3916 () CONSTRUCTION BRIDGE PAINTING 2020 $5,203 $0 $0 $5,203
TOTAL COST: $5,203 $0 $0 $5,203
Route CR-NA Project Description STREETSCAPES ALONG LEE STREET BETWEEN WHEELER STREET AND THE ROGERSVILLE PUBLIC LIBRARY AND ADA CURB RAMPS ALONG WHEELER STREET BETWEEN SR-2 (US-72) AND LEE STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069006 TAPNU TA19 (901) CONSTRUCTION STREETSCAPE 2020 $140 $0 $35 $175
TOTAL COST: $140 $0 $35 $175
Route CR-NA Project Description WIDENING AND PEDESTRIAN FACILITIES ON RICKWOOD RD FROM CHISHOLM RD TO JUST EAST OF TENNESSEE SOUTHERN RAILROAD
Project Length in Miles 0.000 Urban Area SHOALS Sponsor FLORENCE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063587 PE 2016
100063588 STPOA 3915 (250) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $400 $0 $100 $500100063589 STPOA 3915 (250) UTILITIES ADDITIONAL ROADWAY LANES 2021 $376 $0 $94 $470100063590 STPOA 3915 (250) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $1,552 $0 $388 $1,939
TOTAL COST: $2,328 $0 $582 $2,909
Route SR-101 Project Description RESURFACING ON SR-101 FROM SR-2 (US-72) TO THE TENNESSEE STATE LINE
Project Length in Miles 10.867 Urban Area SHOALS Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068266 STPAA 0101 (573) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,886 $472 $0 $2,358
TOTAL COST: $1,886 $472 $0 $2,358
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
102 of 206
HIGHWAY PROJECTS - LAUDERDALESTIP PLAN: 2020 - Original
Route SR-2 Project Description SR-2 (US-72) FLORENCE BLVD ADD LANES FROM INDIAN SPRINGS DRIVE TO SHOAL CREEK
Project Length in Miles 2.210 Urban Area SHOALS Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100053764 RW 2021 / 100031926 UT 2021 / 100031924 CN 2021
100063474 NHF 0002 (516) PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $252 $63 $0 $315TOTAL COST: $252 $63 $0 $315
Route SR-2 Project Description BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20
Project Length in Miles 1.110 Urban Area SHOALS Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066652 PE 2018
100038052 BR 0002 (579) RIGHT OF WAY BRIDGES AND APPROACHES 2021 $2,324 $581 $0 $2,906100038505 BR 0002 (579) UTILITIES BRIDGES AND APPROACHES 2021 $698 $175 $0 $873100002587 BR 0002 () CONSTRUCTION BRIDGES AND APPROACHES 2021 $4,784 $1,196 $0 $5,980
TOTAL COST: $7,807 $1,952 $0 $9,759
Route SR-2 Project Description RESURFACING ON SR-2 (US-72) FROM HARRIS DRIVE TO CR-66 (JC MAULDIN HIGHWAY)
Project Length in Miles 1.881 Urban Area SHOALS Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068265 NH 0002 (589) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,486 $371 $0 $1,857
TOTAL COST: $1,486 $371 $0 $1,857
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
103 of 206
HIGHWAY PROJECTS - LAUDERDALESTIP PLAN: 2020 - Original
Route CR-270 Project Description BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER BIG NANCE CREEK (BIN # 349) AND RELIEF BRIDGE (BIN # 348) IN THE CITY OF COURTLAND (R.A.M.P.)
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060555 ACBRZ60555 ATRP (011) CONSTRUCTION BRIDGE REPLACEMENT 2020 $910 $227 $0 $1,137
TOTAL COST: $910 $227 $0 $1,137
Route CR-434 Project Description THE REALIGNMENT OF CR-434 FROM CR-429 TO 900 FEET NORTH OF THE PROPOSED AT-GRADE NORFOLK SOUTHERN RAILROAD CROSSING - LCP 40-137-17
Project Length in Miles 0.507 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070464 RASTPNU 4017 (251) CONSTRUCTION RESURFACING 2020 $242 $61 $0 $303
TOTAL COST: $242 $61 $0 $303
Route CR-NA Project Description SIDEWALK ALONG BYLER ROAD FROM SOMMERVILLE AVENUE TO SR-157
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068353 TAPNU TA18 (905) CONSTRUCTION SIDEWALK 2020 $424 $0 $106 $530
TOTAL COST: $424 $0 $106 $530
Route SR-101 Project Description REPLACE BRIDGE, BIN 001493, SR-101 OVER BIG NANCE CREEK. (SUFF=36.0, STATUS=SD)
Project Length in Miles 1.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049905 PE 2018
100049906 BR 0101 (570) RIGHT OF WAY BRIDGES AND APPROACHES 2020 $1,000 $250 $0 $1,250100049907 BR 0101 (570) UTILITIES BRIDGES AND APPROACHES 2021 $114 $29 $0 $143100049908 BR 0101 (570) CONSTRUCTION BRIDGES AND APPROACHES 2021 $2,895 $724 $0 $3,618
TOTAL COST: $4,009 $1,002 $0 $5,011
Route SR-101 Project Description RESURFACING ON SR-101 FROM SR-157 TO SR-20 (US-72)
Project Length in Miles 6.893 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068236 STPAA 0101 (571) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,115 $279 $0 $1,394
TOTAL COST: $1,115 $279 $0 $1,394
Route SR-101 Project Description RESURFACING ON SR-101 FROM SR-20 (US-72A) TO SR-184 INCLUDING NORFOLK SOUTHERN RAILROAD CROSSING
Project Length in Miles 4.955 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068251 STPAA 0101 (572) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $786 $196 $0 $982
TOTAL COST: $786 $196 $0 $982
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
104 of 206
HIGHWAY PROJECTS - LAWRENCESTIP PLAN: 2020 - Original
Route SR-157 Project Description RESURFACE SR-157 FROM STA. 19+00 (MP. 36.573) JUST SOUTH OF BYLER RD. TO STA. 175+82 (MP. 39.500) JUST SOUTH OF GORDON DR.
Project Length in Miles 2.927 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068238 NH 0157 (526) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,575 $394 $0 $1,969
TOTAL COST: $1,575 $394 $0 $1,969
Route SR-20 Project Description RESURFACING SR-20(US-72A) FROM 0.10 MILE EAST OF CR-585 TO 0.12 MILE WEST OF SR-33 INCLUDING NORFOLK SOUTHERN RAILROAD CROSSING
Project Length in Miles 4.874 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068235 NH 0020 (530) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,980 $495 $0 $2,475
TOTAL COST: $1,980 $495 $0 $2,475
Route SR-33 Project Description SURFACE TREATMENT ON SR-33 FROM THE WINSTON COUNTY LINE TO CR-70
Project Length in Miles 6.030 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068267 STPAA 0033 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12021 $364 $91 $0 $456
TOTAL COST: $364 $91 $0 $456
Route SR-33 Project Description RESURFACING (HMA; MILL AND FILL) ON SR-33 FROM CR-460 (COURT STREET) TO 0.15 MILE NORTH OF COX ROAD
Project Length in Miles 2.196 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068232 STPAA 0033 (507) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $432 $108 $0 $540
TOTAL COST: $432 $108 $0 $540
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
105 of 206
HIGHWAY PROJECTS - LAWRENCESTIP PLAN: 2020 - Original
Route CR-137 Project Description RESURFACING AND WIDENING ON CR-137 FROM THE MACON COUNTY LINE TO CHADWICK LANE
Project Length in Miles 3.562 Urban Area AUBURN-OPELIKA Sponsor LEE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070043 STPOA 4119 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2023 $837 $0 $209 $1,046
TOTAL COST: $837 $0 $209 $1,046
Route CR-188 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-188 FROM SR-14 TO SOUGAHATCHEE CREEK
Project Length in Miles 2.694 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069408 RASTPNU 4119 (252) CONSTRUCTION RESURFACING 2020 $604 $0 $295 $899
TOTAL COST: $604 $0 $295 $899
Route CR-197 Project Description FULL DEPTH RECLAMATION, PAVE, AND TRAFFIC STRIPE CR-197 FROM CR-208 TO CR-240 - LCP 41-147-17
Project Length in Miles 2.400 Urban Area PHENIX CITY Sponsor LEE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062982 STPPC 4118 (252) CONSTRUCTION RESURFACING 2020 $788 $0 $197 $985
TOTAL COST: $788 $0 $197 $985
Route CR-243 Project Description FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-243 FROM THE RUSSELL COUNTY LINE TO CR-248
Project Length in Miles 3.200 Urban Area PHENIX CITY Sponsor LEE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067543 STPPC 4119 (253) CONSTRUCTION RESURFACING 2020 $586 $147 $0 $733
TOTAL COST: $586 $147 $0 $733
Route CR-249 Project Description RESURFACING ON CR-249 FROM CR-379 TO CR-318 IN SMITHS STATION
Project Length in Miles 1.700 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067545 STPPC 4117 () CONSTRUCTION RESURFACING 2020 $442 $0 $111 $553
TOTAL COST: $442 $0 $111 $553
Route CR-318 Project Description RESURFACING ON CR-318 FROM CR-248 (SUMMERVILLE ROAD) TO CR-249 IN SMITHS STATION
Project Length in Miles 4.800 Urban Area PHENIX CITY Sponsor LEE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067544 STPPC 4117 () CONSTRUCTION RESURFACING 2020 $1,056 $0 $264 $1,320
TOTAL COST: $1,056 $0 $264 $1,320
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
106 of 206
HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original
Route CR-379 Project Description RESURFACING ON CR-379 FROM SR-1 (US-280) TO THE BRIDGE OVER HARDING LAKE IN SMITHS STATION
Project Length in Miles 9.700 Urban Area PHENIX CITY Sponsor LEE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067546 STPPC 4117 () CONSTRUCTION RESURFACING 2021 $1,300 $0 $325 $1,625
TOTAL COST: $1,300 $0 $325 $1,625
Route CR-379 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (4430) CR-379 MILL CR; (4750) CR-148 PHELPS CR; (10292) CR-188 LOBLOCKEE CR; (3310) CR-175 TRIB TO LITTLE UCHEE CR; (4416) CR-183 WACOOCHEE CR; (3645) CR-126 BRUSH CR; (5051) CR-29 COSSEY BR
Project Length in Miles 0.000 Urban Area PHENIX CITY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071469 HRRR 4120 (250) CONSTRUCTION GUARDRAIL 2020 $180 $0 $20 $200
TOTAL COST: $180 $0 $20 $200
Route CR-40 Project Description RESURFACING,WIDENING,TRAFFIC SIGNALS AND DRAINAGE IMPROVEMENTS ON SOUTH COLLEGE STREET,SAMFORD AVENUE, GAY STREET, AND REESE AVENUE
Project Length in Miles 0.968 Urban Area AUBURN-OPELIKA Sponsor AUBURN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065890 PE 2017 / 100065891 RW 2019
100065892 STPOA 4116 (250) UTILITIES WIDENING AND RESURFACING (RDWY)
2021 $109 $0 $27 $136100061106 STPOA 4116 (250) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2021 $3,627 $0 $907 $4,533
TOTAL COST: $3,736 $0 $934 $4,670
Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG CARVER AVE FROM THE COVINGTON RECREATION CENTER PARKING LOT TO CLANTON ST, ON CLANTON ST FROM CARVER AVE TO MCCOY ST, ON MCCOY ST FROM CLANTON ST TO GENEVA ST AND ON GENEVA ST FROM MCCOY ST TO VAUGHN AVE
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor OPELIKA LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067220 TAPAA TA17 (922) CONSTRUCTION UNCLASSIFIED 2019 $391 $0 $98 $489
TOTAL COST: $391 $0 $98 $489
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON N 8TH STREET FROM N RAILROAD AVENUE TO 1ST AVENUE, AND ON 1ST AVENUE FROM N 8TH STREET TO N 7TH STREET
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor OPELIKA LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069022 TAPAA TA19 (916) CONSTRUCTION STREETSCAPE 2020 $331 $0 $83 $414
TOTAL COST: $331 $0 $83 $414
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
107 of 206
HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original
Route CR-NA Project Description ROUNDABOUT AT THE INTERSECTION OF WIRE ROAD AND COX ROAD IN THE CITY OF AUBURN
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor AUBURN LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069293 RW 2021 / 100069292 CN 2021
100069291 HSIP 4119 (251) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $86 $0 $10 $96100069293 HSIP 4119 (251) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $191 $0 $21 $213100069292 HSIP 4119 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,267 $0 $141 $1,408
TOTAL COST: $1,545 $0 $172 $1,716
Route CR-NA Project Description RESURFACING, SIDEWALKS AND SIGNALS ALONG PEPPERELL PARKWAY FROM LOWNDES STREET TO AUBURN CITY LIMITS
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor OPELIKA COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070013 STPOA 4119 () PRELIMINARY ENGINEERING RESURFACING 2022 $55 $0 $14 $69100070014 STPOA 4119 () RIGHT OF WAY RESURFACING 2022 $52 $0 $13 $65100070015 STPOA 4119 () UTILITIES RESURFACING 2023 $140 $0 $35 $175100070016 STPOA 4119 () CONSTRUCTION RESURFACING 2023 $1,357 $0 $339 $1,696
TOTAL COST: $1,604 $0 $401 $2,005
Route CR-NA Project Description ADD TURN LANE ON DONAHUE DRIVE FROM NORTH OF BRAGG AVENUE TO CARY DRIVE
Project Length in Miles 1.410 Urban Area AUBURN-OPELIKA Sponsor AUBURN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065935 PE 2017
100008577 STPOA 4116 () RIGHT OF WAY TURN LANES 2021 $408 $0 $102 $510100033351 STPOA 4116 () UTILITIES TURN LANES 2021 $522 $0 $131 $653100008575 STPOA 4116 () CONSTRUCTION TURN LANES 2022 $1,947 $0 $487 $2,434
TOTAL COST: $2,878 $0 $719 $3,597
Route CR-NA Project Description RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM LOWNDES STREET TO GATEWAY DRIVE (SR-38/US-280)
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor OPELIKA COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068459 PE 2019
100068460 STPOA 4118 (250) RIGHT OF WAY RESURFACING 2021 $21 $0 $5 $26100068461 STPOA 4118 (250) UTILITIES RESURFACING 2021 $52 $0 $13 $64100068462 STPOA 4118 () CONSTRUCTION RESURFACING 2021 $1,385 $0 $346 $1,731
TOTAL COST: $1,457 $0 $364 $1,821
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
108 of 206
HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original
Route CR-NA Project Description RESURFACING, MILLING, PEDESTRIAN SIDEWALKS AND SIGNALS ON PEPPERELL PARKWAY FROM WESTEND COURT (FIVE POINTS) TO GATEWAY DRIVE (SR-38/US-280)
Project Length in Miles 1.776 Urban Area AUBURN-OPELIKA Sponsor OPELIKA COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068464 STPOA 4118 (251) RIGHT OF WAY RESURFACING 2021 $21 $0 $5 $26100068465 STPOA 4118 (251) UTILITIES RESURFACING 2021 $52 $0 $13 $64100068466 STPOA 4118 () CONSTRUCTION RESURFACING 2021 $1,072 $0 $268 $1,339
TOTAL COST: $1,144 $0 $286 $1,430
Route CR-NA Project Description INTERSECTION IMPROVEMENTS ON COLUMBUS PARKWAY AT 4TH, 6TH AND 7TH STREETS
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor OPELIKA LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069300 PE 2019 / 100069306 RW 2021 / 100069307 UT 2021 / 100069301 CN 2021
100069306 HSIP 4119 (250) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $262 $0 $29 $291100069307 HSIP 4119 (250) UTILITIES INTERSECTION IMPROVEMENTS 2021 $294 $0 $33 $326100069301 HSIP 4119 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,111 $0 $123 $1,234
TOTAL COST: $1,666 $0 $185 $1,851
Route I-85 Project Description RESURFACING ON I-85 FROM .4 MILE SOUTH OF SR-147(EXIT 51) TO .38 MILE SOUTH OF BENT CREEK ROAD
Project Length in Miles 5.525 Urban Area AUBURN-OPELIKA Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069862 CN 2022
100071653 IM I085 () PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2021 $164 $18 $0 $182100069862 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22022 $3,095 $344 $0 $3,439
TOTAL COST: $3,258 $362 $0 $3,621
Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO .42 MILE WEST OF SR-15
Project Length in Miles 7.412 Urban Area AUBURN-OPELIKA Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068991 CN 2021
100069065 IM I085 (369) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $205 $23 $0 $227100068991 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22021 $2,525 $281 $0 $2,805
TOTAL COST: $2,729 $303 $0 $3,033
Route I-85 Project Description INTERCHANGE LIGHTING AND LANDSCAPING ON I-85 AT EXIT 50 (COX ROAD)
Project Length in Miles 2.000 Urban Area AUBURN-OPELIKA Sponsor AUBURN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070019 STPOA I085 (371) PRELIMINARY ENGINEERING LIGHTING 2020 $80 $20 $0 $100100070020 STPOA I085 (371) CONSTRUCTION LIGHTING 2021 $889 $0 $222 $1,111
TOTAL COST: $969 $20 $222 $1,211
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
109 of 206
HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original
Route I-85 Project Description INTERCHANGE LIGHTING AND LANDSCAPING ON I-85 AT EXIT 57 (BENT CREEK ROAD)
Project Length in Miles 2.000 Urban Area AUBURN-OPELIKA Sponsor AUBURN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070044 STPOA I085 (370) PRELIMINARY ENGINEERING LIGHTING 2020 $80 $20 $0 $100100070021 STPOA I085 () CONSTRUCTION LIGHTING 2021 $889 $0 $222 $1,111
TOTAL COST: $969 $20 $222 $1,211
Route I-85 Project Description BRIDGE WIDENING ON I-85 (BIN# 008593) AND (BIN# 008594) OVER CHOCTAFAULA CREEK(SITE 1) ; BRIDGE WIDENING ON I-85 (BIN# 007262) AND (BIN# 007263) OVER HALAWAKEE CREEK(SITE 2)
Project Length in Miles 0.300 Urban Area AUBURN-OPELIKA Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066325 PE 2019 / 100051084 CN 2022
100051084 IM I085 (366) CONSTRUCTION BRIDGE WIDENING 2022 $3,254 $362 $0 $3,615TOTAL COST: $3,254 $362 $0 $3,615
Route I-85 Project Description I-85 BRIDGE REPLACEMENTS OVER CR-54 (LONG ST BIN# 6495 AND 6496), NS RR (BIN# 6497 AND 6498) AND SR-51 (MARVYN PKWY BIN# 6499 AND 6500) W/ ACCEL/DECEL EXTENSIONS NB OFF RAMP AND SB ON RAMP
Project Length in Miles 4.300 Urban Area AUBURN-OPELIKA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067235 PE 2018
100067237 IMF I085 (362) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $544 $60 $0 $605100067238 IMF-CHBP I085 (362) CONSTRUCTION BRIDGE REPLACEMENT 2021 $25,213 $1,595 $0 $26,808100070677 IMF I085 (362) UTILITIES BRIDGE REPLACEMENT 2020 $346 $38 $0 $385
TOTAL COST: $26,103 $1,694 $0 $27,798
Route NA Project Description MULTI-USE PATH ALONG MARTIN LUTHER KING DRIVE/SR-14 FROM WEBSTER ROAD TO SHUG JORDAN PARKWAY OVERPASS IN AUBURN
Project Length in Miles 0.000 Urban Area AUBURN-OPELIKA Sponsor AUBURN LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067301 TAPAAF TA17 (923) CONSTRUCTION UNCLASSIFIED 2020 $400 $0 $100 $500
TOTAL COST: $400 $0 $100 $500
Route SR-147 Project Description ROUNDABOUT AT THE INTERSECTION OF SR-147 (NORTH COLLEGE STREET) AND CR-72 (FARMVILLE ROAD)
Project Length in Miles 0.206 Urban Area AUBURN-OPELIKA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068029 PE 2018 / 100068031 RW 2019 / 100068032 UT 2020 / 100068030 CN 2020
100068032 HSIP 0147 (503) UTILITIES SAFETY IMPROVEMENTS 2020 $259 $29 $0 $288100068030 HSIP 0147 (503) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $2,661 $296 $0 $2,957
TOTAL COST: $2,920 $324 $0 $3,244
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
110 of 206
HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original
Route SR-147R Project Description FEASIBILITY STUDY RELOCATE SR-147 BY CONSTRUCTING A NEW ROAD FROM I-85ATCR-26 (BEEHIVE RD) TO SR-38 (US-280)ATMP-101.37, AND WIDENING PREVIOUS ROADWAY
Project Length in Miles 13.000 Urban Area AUBURN-OPELIKA Sponsor AUBURN COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100043913 STPOA 0147 (910) SPECIAL UNCLASSIFIED 2020 $230 $0 $58 $288
TOTAL COST: $230 $0 $58 $288
Route SR-38 Project Description MODIFYING VERTICAL CURVE, ADDING ACCELERATION LANES, AND IMPROVING MEDIAN ON SR-38 (US-280) AT SR-147
Project Length in Miles 3.000 Urban Area AUBURN-OPELIKA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070665 UT 2021 / 100070666 CN 2021
100070664 HSIP 0038 (546) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $167 $19 $0 $185100070665 HSIP 0038 (546) UTILITIES SAFETY IMPROVEMENTS 2021 $91 $10 $0 $101100070666 HSIP 0038 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,265 $141 $0 $1,406
TOTAL COST: $1,523 $169 $0 $1,692
Route SR-51 Project Description BRIDGE REPLACEMENT ON SR-51 OVER WATULA CREEK BIN 002012
Project Length in Miles 0.200 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100012530 CN 2026
100066232 BR 0051 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $42 $11 $0 $53TOTAL COST: $42 $11 $0 $53
Route SR-51 Project Description BRIDGE REPLACEMENT ON SR-51 OVER CHEWACLA CREEK (BIN #004213)
Project Length in Miles 0.069 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069446 PE 2019
100070387 BR 0051 (516) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $92 $23 $0 $115100070377 BR 0051 (516) UTILITIES BRIDGE REPLACEMENT 2021 $73 $18 $0 $92100069445 BR 0051 (516) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,672 $918 $0 $4,590
TOTAL COST: $3,838 $959 $0 $4,797
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
111 of 206
HIGHWAY PROJECTS - LEESTIP PLAN: 2020 - Original
Route CR-109 Project Description INTERSECTION MODIFICATION ON CR-109 (EAST LIMESTONE ROAD) AND CR-36 (CAPSHAW ROAD) TO INSTALL ROUNDABOUT
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065202 PE 2016 / 100065281 RW 2020 / 100065282 UT 2021 / 100065283 CN 2021
100065281 HSIP 4216 (250) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $300 $0 $0 $300100065282 HSIP 4216 (250) UTILITIES INTERSECTION IMPROVEMENTS 2021 $63 $0 $0 $63100065283 HSIP 4216 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $788 $0 $0 $788
TOTAL COST: $1,151 $0 $0 $1,151
Route CR-65 Project Description WIDENING, LEVELING, AND RESURFACING ON CR-65(EASTER FERRY ROAD) FROM 0.03 MILES NORTH OF SULPHUR CREEK BRIDGE FOR 826 FEET
Project Length in Miles 0.250 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069427 PE 2019 / 100069430 CN 2020
100069430 HRRR 4220 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $184 $0 $20 $205TOTAL COST: $184 $0 $20 $205
Route CR-NA Project Description SIDEWALKS ALONG SR-3 FROM SOUTH OF HOBB STREET TO JUNIPER CIRCLE; PRYOR STREET FROM WEST OF SUSSEX DRIVE MOVING EAST TO SR-3 IN THE CITY OF ATHENS
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067253 TAPAA TA17 (911) CONSTRUCTION SIDEWALK 2019 $393 $0 $98 $491
TOTAL COST: $393 $0 $98 $491
Route CR-NA Project Description RESURFACING ON SHAW ROAD FROM .913 MILE NORTH OF NUCLEAR PLANT ROAD TO SR-2 (US-72) - LCP 42-168-17
Project Length in Miles 6.142 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070383 RASTPNU 4218 (250) CONSTRUCTION RESURFACING 2020 $263 $0 $303 $566
TOTAL COST: $263 $0 $303 $566
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
112 of 206
HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original
Route I-565 Project Description RESURFACING AND WIDENING ON I-565 FROM 0.545 MILE WEST OF I-65 TO 1.62 MILES EAST OF GREENBRIER ROAD
Project Length in Miles 5.640 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066496 PE 2019
100066497 RACRNH-RACRIM I565 (313)
CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2
2020 $12,433 $2,027 $0 $14,460TOTAL COST: $12,433 $2,027 $0 $14,460
Route I-565 Project Description RESURFACING AND WIDENING ON I-565 FROM 1.62 MILES EAST OF GREENBRIER RD TO 0.25 MILE WEST OF COUNTY LINE ROAD
Project Length in Miles 1.890 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068887 PE 2019
100068889 RACRNH-RACRIM I565 (314)
CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2
2020 $5,331 $932 $0 $6,262TOTAL COST: $5,331 $932 $0 $6,262
Route I-65 Project Description WELCOME CENTER REPLACEMENT ON I-65 NORTH OF ATHENS
Project Length in Miles 0.100 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063652 PE 2018
100045459 IMF I065 (496) CONSTRUCTION REST AREA COMPLETE 2021 $9,181 $1,020 $0 $10,201TOTAL COST: $9,181 $1,020 $0 $10,201
Route I-65 Project Description RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 1 MILE SOUTH OF CSXT OVERPASS INCLUDING BRIDGE RAISING ON BLACK ROAD AND WALES STREET
Project Length in Miles 7.750 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065907 PE 2018 / 100065908 CN 2020
100065908 IM I065 (492) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 2
2020 $10,786 $1,198 $0 $11,984TOTAL COST: $10,786 $1,198 $0 $11,984
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
113 of 206
HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original
Route SR-2 Project Description SAFETY IMPROVEMENTS ON SR-2 (US-72) AT CAMBRIDGE LANE
Project Length in Miles 0.800 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071157 CN 2022
100071156 HSIP 0002 () PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2022 $69 $8 $0 $77100071157 HSIP 0002 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $689 $77 $0 $765
TOTAL COST: $757 $84 $0 $842
Route SR-2 Project Description INTERSECTION IMPROVEMENTS TO INTERSECTION OF SR-2 (US-72) AND CR-71 (MOORESVILLE RD)
Project Length in Miles 0.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100058226 CN 2024
100058225 NH 0002 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2023 $70 $18 $0 $88TOTAL COST: $70 $18 $0 $88
Route SR-2 Project Description WIDENING SR-2(US-72) FROM JEFFERSON ST TO JUST EAST OF CSX RAILROAD UNDERPASS IN ATHENS GRADE, DRAIN, BASE, PAVE, SIGNAL, AND RETAINING WALLS
Project Length in Miles 0.119 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100053877 PE 2010 / 100067910 RW 2019
100067911 DEF-NHF A205 (937) UTILITIES ADDITIONAL ROADWAY LANES 2022 $125 $31 $0 $156100055214 DEF-NHF A205 (937) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $1,424 $0 $356 $1,780
TOTAL COST: $1,549 $31 $356 $1,936
Route SR-20 Project Description BUILD DISCRETIONARY GRANT (PROJECT SMAART) INTERCHANGE IMPROVEMENTS OVER SR-20/ALT US-72 ALONG BIBB GARRETT ROAD IN LIMESTONE COUNTY
Project Length in Miles 0.835 Urban Area DECATUR Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069665 FAUP NR19 () CONSTRUCTION INTERCHANGE 2020 $14,365 $0 $0 $14,365
TOTAL COST: $14,365 $0 $0 $14,365
Route SR-20 Project Description RESURFACING ON SR-20 (US-72A) FROM .33 MILE WEST OF SR-3 (US-31) TO .54 MILE WEST OF I-65
Project Length in Miles 2.707 Urban Area DECATUR Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068243 NH 0020 (531) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,193 $298 $0 $1,491
TOTAL COST: $1,193 $298 $0 $1,491
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
114 of 206
HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original
Route SR-251 Project Description INTERSECTION MODIFICATION ON SR-251 AT CR-83 (LINDSAY LANE) TO INSTALL ROUNDABOUT
Project Length in Miles 0.250 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065146 PE 2016 / 100065229 RW 2018 / 100065230 UT 2019 / 100065231 CN 2021
100065231 HSIPF 0251 (501) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $2,733 $304 $0 $3,037TOTAL COST: $2,733 $304 $0 $3,037
Route SR-3 Project Description BRIDGE REPLACEMENT BINS 006153 AND 001391 ON SR-3 (US-31) OVER NORFOLK SOUTHERN RAILROAD
Project Length in Miles 0.006 Urban Area DECATUR Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067287 PE 2019
100037845 BR 0003 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $4,995 $1,249 $0 $6,244TOTAL COST: $4,995 $1,249 $0 $6,244
Route SR-304 Project Description WIDENING ON SR-304 (OLD CR-24) FROM SR-3 (US-31) TO THE I-65 (EXIT 347) INTERCHANGE (INCLUDING RAMP MODIFICATIONS AND OVERPASS WIDENING); INCLUDES REPLACING BIN # 006236, 006237, 008955; INCLUDES WIDENING BIN # 010688)
Project Length in Miles 2.800 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069854 PE 2019 / 100071930 UT 2020
100070204 RAED-042-888-035-RW ()
RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $0 $4,091 $0 $4,091100070205 RAED-042-888-035-CN () CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $0 $21,957 $0 $21,957
TOTAL COST: $0 $26,047 $0 $26,047
Route SR-53 Project Description RESURFACE SR-53 FROM JUST NORTH OF CR-122 TO SR-251 IN ARDMORE
Project Length in Miles 5.600 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068234 NH 0053 (586) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,228 $307 $0 $1,535
TOTAL COST: $1,228 $307 $0 $1,535
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
115 of 206
HIGHWAY PROJECTS - LIMESTONESTIP PLAN: 2020 - Original
Route CR-37 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-37 FROM SR-97 TO SR-8 (US-80) - LCP 43-06-18
Project Length in Miles 9.919 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068276 RASTPNU 4318 (250) CONSTRUCTION RESURFACING 2020 $529 $0 $1,084 $1,614
TOTAL COST: $529 $0 $1,084 $1,614
Route SR-21 Project Description RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-21 FROM THE WILCOX COUNTY LINE (MP 97.521) TO 0.5 MILES SOUTH OF CR-45 (MP 108.462)
Project Length in Miles 10.941 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069869 STPAA-FMGR 0021 (570) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,769 $692 $0 $3,461
TOTAL COST: $2,769 $692 $0 $3,461
Route SR-97 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-97 FROM SR-3 (US-31) TO I-65
Project Length in Miles 4.174 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070532 STPAA-HSIP 0097 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 1 W/ SAFETY WIDEN2020 $1,059 $233 $0 $1,292
TOTAL COST: $1,059 $233 $0 $1,292
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
116 of 206
HIGHWAY PROJECTS - LOWNDESSTIP PLAN: 2020 - Original
Route CR-NA Project Description PEDESTRIAN IMPROVEMENTS ALONG BIBB STREET FROM SR-8 (US-80)TO WEST MONTGOMERY ROAD IN THE CITY OF TUSKEGEE.
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065542 TAPAA TA16 (918) CONSTRUCTION SIDEWALK 2020 $314 $0 $78 $392
TOTAL COST: $314 $0 $78 $392
Route CR-NA Project Description NEW SANITARY SEWER LIFT STATION AND FORCE MAIN AT REST AREA, I-85 MACON COUNTY
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069252 PE 2019
100068445 IM I085 () CONSTRUCTION REST AREA REHABILITATION 2022 $139 $15 $0 $155TOTAL COST: $139 $15 $0 $155
Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO SR-138
Project Length in Miles 7.092 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069000 CN 2021
100070852 IM I085 (368) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $45 $5 $0 $50100069000 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $1,997 $222 $0 $2,219
TOTAL COST: $2,042 $227 $0 $2,269
Route I-85 Project Description PAVEMENT PRESERVATION ON I-85 FROM 1.15 MILE NORTH OF CR-36 TO THE LEE COUNTY LINE
Project Length in Miles 23.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069002 CN 2021
100071492 IM I085 (372) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $135 $15 $0 $150100069002 IM I085 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $6,454 $717 $0 $7,171
TOTAL COST: $6,589 $732 $0 $7,321
Route NA Project Description MAIN STREET PEDESTRIAN IMPROVEMENTS BETWEEN THE NEW LOVES TRAVEL STOP AND THE POST OFFICE IN THE TOWN OF SHORTER.
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065547 TAPNU TA16 (924) CONSTRUCTION STREETSCAPE 2020 $133 $0 $33 $166
TOTAL COST: $133 $0 $33 $166
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
117 of 206
HIGHWAY PROJECTS - MACONSTIP PLAN: 2020 - Original
Route SR-14 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-14 FROM THE TALLAPOOSA COUNTY LINE TO THE LEE COUNTY LINE
Project Length in Miles 9.306 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067908 STPAA-HSIP 0014 (546) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,195 $498 $0 $2,694
TOTAL COST: $2,195 $498 $0 $2,694
Route SR-49 Project Description RESURFACING ON SR-49 FROM I-85 TO THE TALLAPOOSA COUNTY LINE
Project Length in Miles 4.060 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067906 STPAA 0049 (511) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $2,350 $588 $0 $2,938
TOTAL COST: $2,350 $588 $0 $2,938
Route SR-81 Project Description BRIDGE REPLACEMENT ON SR-81 OVER UPHAPEE CREEK BIN # 2853
Project Length in Miles 0.480 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061663 PE 2019
100070391 BR 0081 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $41 $10 $0 $51100070379 BR 0081 () UTILITIES BRIDGE REPLACEMENT 2022 $124 $31 $0 $155100061664 BR 0081 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $6,631 $1,658 $0 $8,288
TOTAL COST: $6,795 $1,699 $0 $8,494
Route SR-81 Project Description BRIDGE REPLACEMENT (BIN 001489) ON SR-81 OVER CSXT RAILROAD
Project Length in Miles 0.270 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068672 PE 2019
100070390 BR 0081 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $41 $10 $0 $51100070378 BR 0081 () UTILITIES BRIDGE REPLACEMENT 2022 $124 $31 $0 $155100068673 BR 0081 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $5,557 $1,389 $0 $6,946
TOTAL COST: $5,721 $1,430 $0 $7,152
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
118 of 206
HIGHWAY PROJECTS - MACONSTIP PLAN: 2020 - Original
Route CR-11 Project Description DOT # 736-007H - RR CROSSING IMPROVEMENTS ON CR-11 (MARTIN ROAD) AND JAMES RECORD ROAD AT HUNTSVILLE MADISON COUNTY AIRPORT AUTHORITY (HMCAA)
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066585 RHCH RR17 (910) CONSTRUCTION RR XING SIGNAL-SIGN-PAVE
MARK2023 $270 $30 $0 $300
TOTAL COST: $270 $30 $0 $300
Route CR-17 Project Description 2 FT SAFETY WIDENING AND RESURFACING OF CR-17(BALCH ROAD)FROM .53 MILE SOUTH OF CR-21(BROWNS FERRY ROAD)TO NORTH OF CR-27(GOOCH LANE)IN THE CITY OF MADISON
Project Length in Miles 2.450 Urban Area HUNTSVILLE Sponsor CITY OF MADISON COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066571 PE 2018
100046745 DE-STPAA-STPHV AL81 (940)
CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2022 $1,486 $0 $195 $1,681TOTAL COST: $1,486 $0 $195 $1,681
Route CR-19 Project Description ADDITIONAL LANES ON JEFF ROAD (CR-19) FROM DOUGLASS ROAD TO SR-53
Project Length in Miles 6.400 Urban Area HUNTSVILLE Sponsor MADISON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062257 UT 2024 / 100062258 CN 2025
100062241 STPHV 4514 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $800 $0 $200 $1,000100062256 STPHV 4514 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2022 $1,800 $0 $450 $2,250
TOTAL COST: $2,600 $0 $650 $3,250
Route CR-19 Project Description ADDITIONAL LANES ON CR-19 (JEFF ROAD) FROM 0.8 MILES SOUTH OF CR-28 (CAPSHAW ROAD) TO NORTH OF DOUGLASS ROAD
Project Length in Miles 2.800 Urban Area HUNTSVILLE Sponsor MADISON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061458 ACAA61458 ATRP (015) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2021 $9,045 $0 $4,455 $13,500
TOTAL COST: $9,045 $0 $4,455 $13,500
Route CR-93 Project Description ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-983 (DOMINION CIRCLE) TO CR-406 (NAUGHER ROAD)
Project Length in Miles 2.300 Urban Area HUNTSVILLE Sponsor CITY OF HUNTSVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061222 ACAA61222 ATRP (010) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $10,385 $0 $5,115 $15,500
TOTAL COST: $10,385 $0 $5,115 $15,500
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
119 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original
Route CR-NA Project Description HUNTSVILLE NORTHERN BYPASS FROM 1500 FEET EAST OF SR-1 (US-231/431) INTERSECTION TO WINCHESTER ROAD
Project Length in Miles 18.180 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062238 CN 2024
100062235 STPHV 4514 () PRELIMINARY ENGINEERING GRADE, DRAIN, BASE AND PAVE 2020 $120 $0 $30 $150100062236 STPHV 4514 () RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $1,520 $0 $380 $1,900100062237 STPHV 4514 () UTILITIES GRADE, DRAIN, BASE AND PAVE 2022 $1,506 $0 $376 $1,882
TOTAL COST: $3,146 $0 $786 $3,932
Route CR-NA Project Description ADDITIONAL LANES ON SLAUGHTER ROAD FROM OLD MADISON PIKE TO SR-20
Project Length in Miles 4.760 Urban Area HUNTSVILLE Sponsor CITY OF HUNTSVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062240 STPHV 4514 () PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $572 $0 $143 $715100062253 STPHV 4514 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $844 $0 $211 $1,055100062254 STPHV 4514 () UTILITIES ADDITIONAL ROADWAY LANES 2021 $1,144 $0 $286 $1,430100062255 STPHV 4514 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $8,800 $0 $2,200 $11,000
TOTAL COST: $11,360 $0 $2,840 $14,200
Route CR-NA Project Description CORRIDOR STUDY FOR WIDENING OF WALL-TRIANA HIGHWAY FROM SR-2 (US-72) TO 500' NORTH OF NICK DAVIS ROAD
Project Length in Miles 3.880 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066076 STPHV 4516 () SPECIAL CORRIDOR STUDY 2020 $250 $0 $63 $313
TOTAL COST: $250 $0 $63 $313
Route CR-NA Project Description SIDEWALK ALONG BRADFORD FARMS DRIVE FROM HUGHES ROAD TRAVELING EAST AND TURNING ON TO GREEN SPRINGS LANE AND ENDING IN THE CUL DE SAC
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068777 TAPHV TA18 (934) CONSTRUCTION SIDEWALK 2020 $224 $0 $56 $280
TOTAL COST: $224 $0 $56 $280
Route CR-NA Project Description SIDEWALK ALONG HAYDEN STREET STARTING AT MAIN DRIVE TRAVELING SOUTH, AND ON WASHINGTON AVENUE FROM HAYDEN STREET TO CITY HALL, AND ON OAK GROVE ROAD FROM MAIN DRIVE SOUTH TO JOHNSON AVENUE, AND ON JOHNSON AVENUE EAST TO MAIN DRIVE
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069009 TAPAA TA19 (904) CONSTRUCTION SIDEWALK 2020 $639 $0 $160 $798
TOTAL COST: $639 $0 $160 $798
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
120 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original
Route CR-NA Project Description REDSTONE ARSENAL EAST CONNECTOR FROM I-565 TO REDSTONE ARSENAL GATE 10 (PATTON ROAD GATE)
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070587 CN 2024
100070584 RP 4519 (251) PRELIMINARY ENGINEERING GRADE, DRAIN, BASE, PAVE AND BRG
2020 $2,259 $0 $565 $2,823100070585 RP 4519 (251) RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND
BRG2021 $800 $0 $200 $1,000
100070586 STPHV 4519 (251) UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG
2022 $1,600 $0 $400 $2,000TOTAL COST: $4,659 $0 $1,165 $5,823
Route CR-NA Project Description PEDESTRIAN BRIDGE IN THE OWENS CROSSROADS AREA ALONG OLD BIG COVE ROAD BETWEEN HIGHLAND PARK DRIVE AND RIVER PARK BOULEVARD
Project Length in Miles 0.250 Urban Area HUNTSVILLE Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070591 TAPHV TA19 (932) CONSTRUCTION PEDESTRIAN OVERPASS 2020 $207 $0 $52 $259
TOTAL COST: $207 $0 $52 $259
Route CR-NA Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 001861) ON PULASKI PIKE OVER LIMESTONE CREEK
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071470 HRRR 4520 () CONSTRUCTION GUARDRAIL 2020 $69 $0 $8 $76
TOTAL COST: $69 $0 $8 $76
Route CR-NA Project Description BRIDGE AND APPRO CHURCH STREET BRIDGE OVER BIG SPRING AT BIG SPRING PARK
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor CITY OF HUNTSVILLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100051832 PE 2009 / 100051833 RW 2019
100051834 DEF A179 (922) UTILITIES BRIDGES AND APPROACHES 2023 $277 $0 $0 $277100051835 DEF-STPHVF A179 (922) CONSTRUCTION BRIDGES AND APPROACHES 2023 $4,072 $0 $718 $4,790
TOTAL COST: $4,349 $0 $718 $5,067
Route CR-NA Project Description HUNTSVILLE NORTHERN BYPASS FROM 1.2 MILES EAST OF CR-86 (PULASKI PIKE) TO 1500 FT EAST OF SR-1 (US-231/431) INTERSECTION
Project Length in Miles 8.400 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054997 PE 2010
100061850 ST-045-000-015-UT () UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG
2020 $0 $0 $3,820 $3,820100061851 ST-045-000-015-CN () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND
BRG2020 $0 $0 $23,688 $23,688
TOTAL COST: $0 $0 $27,508 $27,508
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
121 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original
Route CR-NA Project Description ADDITIONAL LANES ON CR-11 (MARTIN RD) FROM WALL-TRIANA HIGHWAY TO OLD JIM WILLIAMS RD
Project Length in Miles 0.975 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055286 STPAA 4520 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2023 $9,326 $2,332 $0 $11,658
TOTAL COST: $9,326 $2,332 $0 $11,658
Route CR-NA Project Description CONSTRUCT CONNECTOR ROAD FROM MAYSVILLE ROAD TO EPWORTH DRIVE.
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059903 FAUP 8523 () CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $4,416 $552 $552 $5,520
TOTAL COST: $4,416 $552 $552 $5,520
Route CR-NA Project Description PLACEMENT OF WEARING SURFACE AND STRIPING OF TOWN MADISON BOULEVARD FROM THE CITY OF HUNTSVILLE / MADISON BOUNDARY TO ZIERDT ROAD
Project Length in Miles 2.200 Urban Area HUNTSVILLE Sponsor CITY OF MADISON COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061239 ACAA61239 ATRP (010) CONSTRUCTION RESURFACING 2020 $402 $11 $89 $503
TOTAL COST: $402 $11 $89 $503
Route CR-NA Project Description INTERSECTION MODIFICATIONS ON BALCH ROAD AT GILLESPIE ROAD TO INSTALL A ROUNDABOUT
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066681 PE 2018 / 100066682 CN 2021
100066682 HSIP 4517 (250) CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $468 $0 $52 $520TOTAL COST: $468 $0 $52 $520
Route CR-NA Project Description WHEELER NATIONAL WILDLIFE REFUGE REHABILITATE ROCKHOUSE ROAD (ROUTE 15)
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069070 PE 2018 / 100067953 CN 2019
100067956 FLAP FLAP () CONSTRUCTION PAVEMENT REHABILITATION 2020 $960 $0 $240 $1,200TOTAL COST: $960 $0 $240 $1,200
Route CR-NA Project Description SAFETY IMPROVEMENTS (SHOULDER WIDENING, LEFT TURN LANE, PAVING SCORING, SIGNING AND STRIPING) ALONG WALL TRIANA HIGHWAY FROM THE MADISON CITY LIMITS TO THE HUNTSVILLE CITY LIMITS AT MCCRARY ROAD
Project Length in Miles 0.560 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067811 HRRR 4516 (253) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $374 $0 $42 $415
TOTAL COST: $374 $0 $42 $415
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
122 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original
Route CR-NA Project Description WIDENING, RESURFACING, AND RESTRIPING WALL TRIANA HIGHWAY; WIDENING AND RESURFACING GRAPHICS DRIVE; WIDENING AND REALIGNING I-565 EASTBOUND OFF RAMP AT WALL TRIANA HIGHWAY
Project Length in Miles 0.414 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070767 PE 2020
100071084 ATRP2-45-2020-327-RW ()
RIGHT OF WAY WIDENING AND RESURFACING (RDWY)
2021 $0 $42 $0 $42100071083 ATRP2-45-2020-327-CN
()CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2021 $0 $1,608 $0 $1,608
TOTAL COST: $0 $1,649 $0 $1,649
Route I-565 Project Description RESURFACING AND TRAFFIC STRIPING ON I-565 FROM THE LIMESTONE COUNTY LINE (MP 7.025) TO INDIAN CREEK (MP 12.553)
Project Length in Miles 11.056 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068982 CN 2021
100068980 IM I565 (315) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $273 $30 $0 $303100068982 IM I565 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22021 $5,968 $663 $0 $6,631
TOTAL COST: $6,240 $693 $0 $6,934
Route I-565 Project Description RESURFACING AND TRAFFIC STRIPING ON I-565 FROM INDIAN CREEK (MP 12.553) TO .26 MILE EAST OF THE TRIANA BOULEVARD OVERPASS (MP 18.332)
Project Length in Miles 11.558 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069195 CN 2021
100069738 IM I565 (316) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $540 $60 $0 $600100069195 IM I565 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22021 $9,640 $1,071 $0 $10,711
TOTAL COST: $10,180 $1,131 $0 $11,311
Route I-565 Project Description RESURFACING AND TRAFFIC STRIPING ON I-565 FROM .26 MILE EAST OF THE TRIANA BOULEVARD OVERPASS (MP 18.332) TO .45 MILE EAST OF THE SR-2 (US-72) OVERPASS (MP 22.305)
Project Length in Miles 7.946 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068983 CN 2021
100069737 IM I565 (317) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $342 $38 $0 $380100068983 IM I565 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22021 $3,489 $388 $0 $3,876
TOTAL COST: $3,831 $426 $0 $4,256
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
123 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Amendment # 49
Route NA Project Description DRY CREEK GREENWAY FROM INDIAN CREEK GREENWAY/GATES MILL ROAD TO THE INTERSECTION OF ARCH STREET AND BILTMORE DRIVE IN NORTHWEST HUNTSVILLE
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067267 TAPHV TA17 (946) CONSTRUCTION UNCLASSIFIED 2020 $400 $0 $100 $500
TOTAL COST: $400 $0 $100 $500
Route NA Project Description A - GREENWAY STARTING AT JOHNSON ROAD SW AND RUNNING NORTH ALONG PINHOOK CREEK AND TURNING WEST ALONG MERRIMAC BRANCH WITH A PEDESTRIAN BRIDGE AT THE MIDPOINT OF THE WATERS EDGE
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068799 TAPHV TA18 (933) CONSTRUCTION SIDEWALK 2020 $411 $0 $103 $514
TOTAL COST: $411 $0 $103 $514
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 1, 2 AND 53 IN MADISON COUNTY
Project Length in Miles 0.000 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060144 PE 2014
100060145 STPAA NR13 (945) CONSTRUCTION SIDEWALK 2021 $398 $99 $0 $497TOTAL COST: $398 $99 $0 $497
Route SR-1 Project Description SR-1 (MEMORIAL PARKWAY) FROM 0.31 MI S OF CR-75 (MASTIN LAKE RD) TO CR-65 (WINCHESTER RD) INCLUDING AN OVERPASS AT CR-75 AND ACCESS IMPROVEMENTS TO CR-65
Project Length in Miles 1.887 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100041420 NHF 0001 (610) UTILITIES GRADE, DRAIN, BASE, PAVE AND
BRG2020 $683 $171 $0 $853
100004926 NHF 0001 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2022 $34,084 $8,521 $0 $42,606100070087 NH 0001 (611) CONSTRUCTION CLEARING AND GRUBBING 2020 $425 $106 $0 $531
TOTAL COST: $35,192 $8,798 $0 $43,990
Route SR-2 Project Description ADDITIONAL LANES SR-2 (US-72) FROM COUNTY LINE ROAD TO PROVIDENCE MAIN ROAD IN THE CITY OF HUNTSVILLE
Project Length in Miles 5.440 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061841 PE 2014 / 100061846 UT 2024 / 100061847 CN 2024
100061845 NHF 0002 (566) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $6,244 $1,561 $0 $7,805TOTAL COST: $6,244 $1,561 $0 $7,805
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
124 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original
Route SR-53 Project Description ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-53 (US-231) FROM VETERANS DRIVE TO .2 MILE SOUTH OF WEATHERLY ROAD
Project Length in Miles 7.590 Urban Area HUNTSVILLE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061837 PE 2014
100061839 NH 0053 (571) RIGHT OF WAY UNCLASSIFIED 2021 $327 $82 $0 $408100061838 NH 0053 (571) UTILITIES UNCLASSIFIED 2022 $1,271 $318 $0 $1,588100061840 NH 0053 () CONSTRUCTION UNCLASSIFIED 2022 $7,356 $1,839 $0 $9,195
TOTAL COST: $8,953 $2,238 $0 $11,191
Route SR-53 Project Description RESURFACING ON SR-53 FROM SR-1(US-431/231 - MEMORIAL PKWY) TO 14TH STREET
Project Length in Miles 1.540 Urban Area HUNTSVILLE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068421 NH 0053 (588) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,061 $265 $0 $1,326
TOTAL COST: $1,061 $265 $0 $1,326
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
125 of 206
HIGHWAY PROJECTS - MADISONSTIP PLAN: 2020 - Original
Route CR-38 Project Description BRIDGE REPLACEMENT (BIN # 7404) AND APPROACHES ON CR-38 OVER ELAM BRANCH
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060438 BRZ 4614 (252) CONSTRUCTION BRIDGES AND APPROACHES 2021 $295 $0 $74 $369
TOTAL COST: $295 $0 $74 $369
Route CR-44 Project Description BRIDGE REPLACEMENT ON CR-44 OVER DRY CREEK BIN # 13020
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060439 RABRZ 4614 (251) CONSTRUCTION BRIDGE REPLACEMENT 2020 $327 $56 $400 $783
TOTAL COST: $327 $56 $400 $783
Route SR-28 Project Description RESURFACING ON SR-28 FROM 0.4 MILE WEST OF AIRPORT ROAD TO 0.1 MILE WEST OF SR-66
Project Length in Miles 10.700 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068501 STPAA 0028 (514) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,231 $558 $0 $2,788
TOTAL COST: $2,231 $558 $0 $2,788
Route SR-69 Project Description RESURFACING ON SR-69 FROM SR-114 TO SR-13 (US-43)
Project Length in Miles 8.870 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070062 STPAA 0069 (561) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,093 $523 $0 $2,616
TOTAL COST: $2,093 $523 $0 $2,616
Route SR-69 Project Description RESURFACING ON SR-69 FROM SR-13 (US-43) TO SR-8 (US-80)
Project Length in Miles 13.637 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070071 STPAA 0069 (562) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,712 $678 $0 $3,390
TOTAL COST: $2,712 $678 $0 $3,390
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
126 of 206
HIGHWAY PROJECTS - MARENGOSTIP PLAN: 2020 - Original
Route SR-8 Project Description REPL BRIDGE AND RELIEF SR-8 (US-80) BIN 003018 AND BIN # 003017 OVER COTTONWOOD CREEK, EAST OF FAUNSDALE
Project Length in Miles 1.206 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100043728 PE 2007 / 100043729 RW 2018
100043730 BRF 0008 (542) UTILITIES BRIDGE REPLACEMENT 2020 $92 $23 $0 $116100043731 BRF 0008 (542) CONSTRUCTION BRIDGE REPLACEMENT 2021 $7,437 $1,859 $0 $9,296
TOTAL COST: $7,529 $1,882 $0 $9,411
Route SR-8 Project Description RESTRICTED CROSSING U-TURN INTERSECTION ON SR-8 (US-80) AND SR-25
Project Length in Miles 0.610 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069548 PE 2019 / 100069774 CN 2020
100069774 HSIP 0008 (594) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $2,020 $224 $0 $2,244TOTAL COST: $2,020 $224 $0 $2,244
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
127 of 206
HIGHWAY PROJECTS - MARENGOSTIP PLAN: 2020 - Original
Route CR-NA Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 015452) ON CR-56 OVER HURRICANE CREEK; SITE 2 - (BIN 006076) ON CR-47 OVER EAST BRANCH; SITE 3 - (BIN 012641) ON CR-85 OVER FLATT CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069577 HRRR 4719 (252) CONSTRUCTION GUARDRAIL 2020 $88 $0 $10 $98
TOTAL COST: $88 $0 $10 $98
Route CR-NA Project Description RESURFACING, WIDENING AND DRAINAGE IMPROVEMENTS ON WEBB STREET FROM MAIN STREET TO BROOKSIDE ROAD IN THE TOWN OF BRILLIANT
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069100 PE 2019 / 100067744 CN 2020
100069102 APL 4719 (251) CONSTRUCTION RESURFACING 2019 $100 $0 $0 $100TOTAL COST: $100 $0 $0 $100
Route I-22 Project Description RESURFACING ON I-22 FROM MP 0.00 AT THE MISSISSIPPI STATE LINE TO MP 6.00 JUST WEST OF REESE ROAD OVERPASS
Project Length in Miles 6.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068042 PE 2018 / 100068043 CN 2020
100068043 IM I022 (310) CONSTRUCTION PAVEMENT MINOR REHABILITATION
2020 $12,712 $1,412 $0 $14,125TOTAL COST: $12,712 $1,412 $0 $14,125
Route I-22 Project Description RESURFACING ON I-22 FROM MP 6.00 JUST WEST OF REESE ROAD OVERPASS TO MP 16.8 AT EXIT 16
Project Length in Miles 10.800 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068044 PE 2018 / 100068045 CN 2021
100068045 IM I022 (309) CONSTRUCTION PAVEMENT MINOR REHABILITATION
2021 $23,111 $2,568 $0 $25,679TOTAL COST: $23,111 $2,568 $0 $25,679
Route I-22 Project Description RESURFACING ON I-22 FROM THE SR-233 OVERPASS (MP 34.46) TO THE WALKER COUNTY LINE (MP 38.47)
Project Length in Miles 3.970 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069095 PE 2019 / 100069096 CN 2020
100069096 IM I022 (312) CONSTRUCTION PAVEMENT MINOR REHABILITATION
2020 $7,798 $866 $0 $8,665TOTAL COST: $7,798 $866 $0 $8,665
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
128 of 206
HIGHWAY PROJECTS - MARIONSTIP PLAN: 2020 - Original
Route NA Project Description CURB AND RAMP INSTALLATION ON SR-253, SR-17, SR-74, SR-142, SR-118, SR-171, SR-13, AND SR-195
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061281 PE 2014
100070427 STPAA NR13 (931) RIGHT OF WAY SIDEWALK 2020 $21 $5 $0 $26100061282 STPAA NR13 (931) CONSTRUCTION SIDEWALK 2021 $276 $69 $0 $345
TOTAL COST: $298 $74 $0 $372
Route SR-171 Project Description BRIDGE REPLACEMENT ON SR-171 (US-43) OVER BEAVER CREEK (BIN 4677)
Project Length in Miles 0.780 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069594 CN 2026
100069592 BR 0171 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $208 $52 $0 $260TOTAL COST: $208 $52 $0 $260
Route SR-241 Project Description RESURFACING, 2FT SAFETY WIDENING, AND CENTER AND EDGELINE SCORING ON SR-241 FROM CR-143 (MP 6.500) TO BEAR CREEK (MP 11.086)
Project Length in Miles 4.586 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068628 STPAA-HSIP 0241 (502) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2021 $2,016 $455 $0 $2,471
TOTAL COST: $2,016 $455 $0 $2,471
Route SR-241 Project Description RESURFACING, CENTERLINE AND SHOULDER SCORING, AND 2 FT SAFETY WIDENING ON SR-241 FROM SR-172 AT MP 11.548 TO THE FRANKLIN COUNTY LINE AT MP 13.503
Project Length in Miles 1.955 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070144 STPAA-HSIP 0241 (503) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR
REHAB W/ SAFETY WIDENING2020 $1,070 $233 $0 $1,302
TOTAL COST: $1,070 $233 $0 $1,302
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
129 of 206
HIGHWAY PROJECTS - MARIONSTIP PLAN: 2020 - Original
Route CR-NA Project Description CONSTRUCTION OF SIDEWALKS ALONG MAIN STREET FROM NORTH MARSHALL UTILITIES TO 11TH STREET WEST; ALSO ADA RAMPS AND IMPROVEMENTS FROM 11TH STREET WEST TO WYLE AYERS ROAD
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068356 TAPNU TA18 (907) CONSTRUCTION SIDEWALK 2019 $395 $0 $99 $494
TOTAL COST: $395 $0 $99 $494
Route CR-NA Project Description MULTI-USE TRAIL ALONG SR-1 (US-431) FROM LURLEEN B WALLACE DRIVE FOR 0.45 MILE - PHASE II
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069012 TAPAA TA19 (907) CONSTRUCTION SIDEWALK 2019 $1,039 $0 $260 $1,299
TOTAL COST: $1,039 $0 $260 $1,299
Route CR-NA Project Description RESURFACE MARTLING GAP ROAD FROM GILLILAND ROAD TO MARTLING ROAD
Project Length in Miles 3.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068345 STPOA 4818 (251) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $338 $0 $84 $422
TOTAL COST: $338 $0 $84 $422
Route NA Project Description L/N TRAIN DEPOT RESTORATION IN THE CITY OF ALBERTVILLE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067167 TAPNU TA17 (917) CONSTRUCTION UNCLASSIFIED 2019 $318 $0 $80 $398
TOTAL COST: $318 $0 $80 $398
Route SR-1 Project Description INSTALLATION OF TRAFFIC SIGNAL AND ACCELERATION LANE EXTENSION AT SR-1 (US-431) AND SR-79
Project Length in Miles 1.065 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070877 CN 2021 / 100070878 CN 2021
100070876 HSIP 0001 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $108 $12 $0 $120100070877 HSIP 0001 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $1,169 $130 $0 $1,299100070878 HSIP 0001 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $91 $10 $0 $101
TOTAL COST: $1,368 $152 $0 $1,520
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
130 of 206
HIGHWAY PROJECTS - MARSHALLSTIP PLAN: 2020 - Original
Route SR-168 Project Description REPLACE BRIDGE, BIN 003362, SR-168 OVER SHORT CREEK 3 MILES EAST SR-1 (US-431) (SUFF=48.1, STATUS=FO)
Project Length in Miles 0.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049731 PE 2010 / 100049732 RW 2019
100049733 BR 0168 (501) UTILITIES BRIDGE REPLACEMENT 2020 $40 $10 $0 $50100049734 BR 0168 (501) CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,779 $695 $0 $3,474
TOTAL COST: $2,819 $705 $0 $3,524
Route SR-205 Project Description RESURFACING ON SR-205 FROM GUINEVERE DRIVE TO SR-75
Project Length in Miles 2.310 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068415 STPAA 0205 (510) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,061 $265 $0 $1,326
TOTAL COST: $1,061 $265 $0 $1,326
Route SR-68 Project Description RESURFACING ON SR-68 FROM SR-75 TO JUANITA DRIVE
Project Length in Miles 9.020 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070097 STPAA 0068 (508) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,309 $577 $0 $2,886
TOTAL COST: $2,309 $577 $0 $2,886
Route SR-69 Project Description RESURFACING ON SR-69 FROM SR-53 (US-231) TO MAIN STREET
Project Length in Miles 0.950 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067154 STPAA 0069 (564) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $449 $112 $0 $561
TOTAL COST: $449 $112 $0 $561
Route SR-75 Project Description RESURFACING ON SR-75 FROM STRICKLAND STREET TO SR-1 (US-431)
Project Length in Miles 2.040 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068414 STPAA 0075 (537) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,858 $465 $0 $2,323
TOTAL COST: $1,858 $465 $0 $2,323
Route SR-75R Project Description RELOCATION OF SR-75 AROUND THE ALBERTVILLE AIRPORT EXPANSION (HORTON ROAD) FROM CR-152 SOUTH (ONEONTA CUT-OFF ROAD) TO CR-325 NORTH (TURNPIKE ROAD).
Project Length in Miles 1.990 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059032 PE 2013 / 100060127 PE 2049 / 100059033 UT 2044 / 100059060 CN 2045
100060124 STPAA 0075 (529) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2023 $2,252 $563 $0 $2,815TOTAL COST: $2,252 $563 $0 $2,815
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
131 of 206
HIGHWAY PROJECTS - MARSHALLSTIP PLAN: 2020 - Original
Route CR-25 Project Description NEW ALIGNMENT OF CR-25 (MCFARLAND ROAD) FROM CR-28 (OLD PASCAGOULA ROAD) TO CR-358 (THREE NOTCH ROAD)
Project Length in Miles 12.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059788 PE 2018
100059789 STPMB 4918 (250) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $4,800 $0 $1,200 $6,000100059790 STPMB 4918 (250) UTILITIES GRADE, DRAIN, BASE AND PAVE 2022 $1,920 $0 $480 $2,400100059791 STPMB 4918 () CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2023 $10,480 $0 $2,620 $13,100
TOTAL COST: $17,200 $0 $4,300 $21,500
Route CR-32 Project Description THREE NOTCH ROAD (CR-32) ADDITIONAL LANES FROM SCHILLINGER ROAD TO MCDONALD ROAD.
Project Length in Miles 1.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052461 PE 2019 / 100052463 UT 2024 / 100052464 CN 2024
100052462 STPMB 4919 (250) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $732 $0 $183 $915TOTAL COST: $732 $0 $183 $915
Route CR-33 Project Description WIDENING, RESURFACING AND STRIPING ON DAWES ROAD (CR-33) FROM SCOTT DAIRY LOOP ROAD SOUTH TO DIBERVILLE DRIVE WEST
Project Length in Miles 1.336 Urban Area MOBILE Sponsor MOBILE COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068763 RASTPAA 4915 (251) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $667 $167 $0 $833
TOTAL COST: $667 $167 $0 $833
Route CR-39 Project Description MCDONALD ROAD (CR-39) ADDITIONAL LANES FROM NORTH OF I-10 TO OLD PASCAGOULA ROAD.
Project Length in Miles 1.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052447 PE 2010 / 100052448 RW 2018
100052449 STPMB 7612 (600) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $560 $0 $140 $700100052450 STPMB 7612 (600) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $3,840 $0 $960 $4,800
TOTAL COST: $4,400 $0 $1,100 $5,500
Route CR-41 Project Description ADDITIONAL LANES ON CR-41 (CELESTE ROAD) FROM FOREST AVENUE TO JUST WEST OF I-65
Project Length in Miles 3.200 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069498 PE 2019 / 100069501 CN 2025
100069499 STPMB 4919 (251) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $1,600 $0 $400 $2,000100069500 STPMB 4919 (251) UTILITIES ADDITIONAL ROADWAY LANES 2022 $800 $0 $200 $1,000
TOTAL COST: $2,400 $0 $600 $3,000
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
132 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route CR-56 Project Description ADDITIONAL LANES WITH REALIGNMENT ON CR-56 FROM 0.28 MILE WEST OF ELIZA JORDAN ROAD TO SNOW ROAD
Project Length in Miles 4.380 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068532 PE 2019
100068533 STPMB 4918 () RIGHT OF WAY ADDITIONAL ROADWAY LANES 2021 $1,200 $0 $300 $1,500100068534 STPMB 4918 () UTILITIES UNCLASSIFIED 2022 $800 $0 $200 $1,000100068535 STPMB 4918 () CONSTRUCTION UNCLASSIFIED 2023 $7,920 $0 $1,980 $9,900
TOTAL COST: $9,920 $0 $2,480 $12,400
Route CR-656 Project Description ZEIGLER BLVD ADDITIONAL LANES FROM ATHEY RD TO FOREST HILL DR
Project Length in Miles 3.410 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100037214 PE 2004 / 100045453 RW 2014
100037215 DBMB-STPMB 7550 (600)
CONSTRUCTION ADDITIONAL ROADWAY LANES 2020 $16,650 $0 $4,163 $20,813TOTAL COST: $16,650 $0 $4,163 $20,813
Route CR-656 Project Description ADDITIONAL LANES ON CR-656 (ZEIGLER BLVD) FROM CR-70 (TANNER WILLIAMS RD) TO CR-31 (SCHILLINGER RD)
Project Length in Miles 4.200 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055880 PE 2012
100055881 STPMB 7550 (602) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2020 $1,504 $0 $376 $1,880100055882 STPMB 7550 (602) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $905 $0 $226 $1,131100055883 STPMB 7550 (602) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2022 $4,080 $0 $1,020 $5,101
TOTAL COST: $6,489 $0 $1,622 $8,112
Route CR-NA Project Description SIDEWALKS ON DAUPHIN ISLAND PARKWAY BETWEEN THE I-10 INTERCHANGE AND OLD MILITARY ROAD IN MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067315 TAPAA TA17 (938) CONSTRUCTION SIDEWALK 2020 $139 $0 $35 $173
TOTAL COST: $139 $0 $35 $173
Route CR-NA Project Description ADD SIDEWALK ALONG OLD SHELL ROAD FROM MYRTLEWOOD LANE TO WEST I-65 SERVICE ROAD NORTH IN MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067418 TAPMB TA18 (900) CONSTRUCTION SIDEWALK 2020 $161 $0 $40 $201
TOTAL COST: $161 $0 $40 $201
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
133 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route CR-NA Project Description ADD SIDEWALKS ALONG WHISTLER STREET FROM NORTH SHELTON BEACH ROAD TO NORTH PRICE AVENUE IN PRICHARD
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067420 TAPMB TA18 (902) CONSTRUCTION SIDEWALK 2020 $162 $0 $41 $203
TOTAL COST: $162 $0 $41 $203
Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, MARKINGS, LIGHTS, BELLS, LEGENDS, GATES, SIGNS AND SIGNALS ON FERRY AVENUE AT NORFOLK SOUTHERN RAILROAD DOT# 727825T AND ALABAMA AND GULF COAST RAILWAY DOT# 665312V IN SARALAND
Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067738 RHCH RR18 (902) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $502 $0 $56 $558
TOTAL COST: $502 $0 $56 $558
Route CR-NA Project Description SIDEWALKS ALONG THE SOUTH SIDE OF AIRPORT BOULEVARD BETWEEN HILLCREST ROAD AND REGENTS WAY IN MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067749 TAPMB TA18 (903) CONSTRUCTION SIDEWALK 2020 $160 $0 $40 $200
TOTAL COST: $160 $0 $40 $200
Route CR-NA Project Description SIDEWALKS ALONG THE NORTH SIDE OF OLD SHELL ROAD FROM THE WEST SIDE OF PARKWAY DRIVE TO UNIVERSITY BOULEVARD IN MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067750 TAPMB TA17 (950) CONSTRUCTION SIDEWALK 2020 $192 $0 $48 $240
TOTAL COST: $192 $0 $48 $240
Route CR-NA Project Description VARIOUS ADA UPGRADES AT AND AROUND THE PRICHARD CITY HALL
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068379 TAPAA TA18 (922) CONSTRUCTION SIDEWALK 2020 $149 $0 $37 $186
TOTAL COST: $149 $0 $37 $186
Route CR-NA Project Description SIDEWALK ALONG OLD MILITARY ROAD FROM SR-13 (US-43) TO MUNICIPAL STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068395 TAPNU TA18 (929) CONSTRUCTION SIDEWALK 2020 $308 $0 $77 $385
TOTAL COST: $308 $0 $77 $385
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
134 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route CR-NA Project Description SIDEWALKS AND IMPROVEMENTS ALONG EAST STATE STREET AND EAST LEBARON AVENUE FROM NORTH 3RD STREET AND NORTH MAIN STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069029 TAPNU TA19 (923) CONSTRUCTION SIDEWALK 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route CR-NA Project Description SIDEWALK ALONG OLD HIGHWAY 43 FROM CRENSHAW PARK TO BRADLEY ROAD
Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069031 TAPAA TA19 (925) CONSTRUCTION SIDEWALK 2020 $303 $0 $76 $379
TOTAL COST: $303 $0 $76 $379
Route CR-NA Project Description SIDEWALKS ALONG EASTERLING STREET FROM W CLARK AVENUE TO GARRISON AVENUE, ON GARRISON AVENUE FROM EASTERLING STREET TO MAGEE STREET, AND ON MAGEE STREET FROM GARRISON AVENUE TO W CLARK AVENUE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF PRICHARD LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069054 TAPMB TA19 (928) CONSTRUCTION SIDEWALK 2020 $200 $0 $50 $250
TOTAL COST: $200 $0 $50 $250
Route CR-NA Project Description ROUNDABOUT INSTALLATION AT CANAL STREET AND BROAD STREET
Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069797 CN 2020
100069746 HSIP 4919 (252) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2019 $36 $0 $4 $40100069797 HSIP 4919 (252) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $1,382 $0 $154 $1,535
TOTAL COST: $1,418 $0 $158 $1,575
Route CR-NA Project Description RAILROAD CROSSING IMPROVEMENTS, GATES AND SIGNALS ON BAYOU AVENUE EAST IN SATSUMA AT NORFOLK SOUTHERN RAILROAD, JUST EAST OF SR-13 (US-43), AAR/DOT NO. 727820J
Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070116 RHCH RR19 (909) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $297 $0 $33 $330
TOTAL COST: $297 $0 $33 $330
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
135 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route CR-NA Project Description DAUPHIN STREET ADDITIONAL LANES FROM SAGE AVENUE TO WEST OF I-65 AT SPRINGHILL MEMORIAL HOSPITAL.
Project Length in Miles 3.300 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052457 PE 2012
100052458 STPMB 7533 () RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND BRG
2021 $216 $0 $54 $270100052459 STPMB 7533 () UTILITIES GRADE, DRAIN, BASE, PAVE AND
BRG2021 $225 $0 $56 $281
100052460 STPMB 7533 () CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2021 $5,656 $0 $1,414 $7,070TOTAL COST: $6,097 $0 $1,524 $7,621
Route CR-NA Project Description MCGREGOR AVENUE WIDENING FROM AIRPORT BOULEVARD TO DAUPHIN STREET AND INSTALLATION OF A ROUNDABOUT AT DAUPHIN STREET
Project Length in Miles 0.980 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052468 PE 2012 / 100052600 RW 2018
100052601 STPMBF 7508 (600) UTILITIES GRADE, DRAIN, BASE AND PAVE 2021 $1,200 $0 $300 $1,500100052602 STPMBF 7508 (600) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $2,706 $0 $676 $3,382
TOTAL COST: $3,906 $0 $976 $4,882
Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - DAUPHIN STREET FROM SAGE AVENUE TO SPRINGHILL HOSPITAL
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066705 STPMB 4918 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $500 $0 $125 $625
TOTAL COST: $500 $0 $125 $625
Route CR-NA Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - AIRPORT BLVD FROM UNIVERSITY BLVD TO HILLCREST ROAD
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066707 STPMB 4918 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $500 $0 $125 $625
TOTAL COST: $500 $0 $125 $625
Route I-065 Project Description RESURFACING ON I-65 FROM 0.56 MILE NORTH OF SR-158 TO 2.39 MILE NORTH OF SR-13(US-43)
Project Length in Miles 15.940 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069061 CN 2021
100069090 IM I065 (512) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $222 $25 $0 $247100069061 IM I065 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $2,243 $249 $0 $2,493
TOTAL COST: $2,466 $274 $0 $2,740
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
136 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route I-10 Project Description RESURFACING ON I-10 FROM 1.36 MILES EAST OF SR-193 TO THE WALLACE TUNNEL
Project Length in Miles 17.158 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069062 CN 2021
100069091 IM I010 (349) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1
2020 $491 $55 $0 $546100069062 IM I010 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 12021 $6,518 $724 $0 $7,243
TOTAL COST: $7,010 $779 $0 $7,789
Route I-10 Project Description RESURFACE I-10 THROUGH WALLACE TUNNEL
Project Length in Miles 1.437 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070821 CN 2021
100071432 IM I010 (348) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $68 $8 $0 $75100070821 IM I010 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22021 $682 $76 $0 $758
TOTAL COST: $749 $83 $0 $833
Route I-10 Project Description ADDITIONAL LANES ON I-10 FROM CR-39 TO CR-59 (CAROL PLANTATION RD)
Project Length in Miles 8.920 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071997 CN 2021
100064147 NH I010 (346) PRELIMINARY ENGINEERING ADDITIONAL ROADWAY LANES 2020 $252 $63 $0 $315100033461 RACRNH I010 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $10,238 $2,560 $0 $12,798
TOTAL COST: $10,491 $2,623 $0 $13,113
Route I-10 Project Description RESURFACING ON I-10 FROM .28 MILE WEST OF CAROL PLANTATION ROAD TO 1.36 MILES EAST OF SR-193
Project Length in Miles 6.913 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069088 PE 2020 / 100069060 CN 2020
100069060 IM I010 (345) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $3,914 $435 $0 $4,349100069088 IM I010 (345) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE
LEVEL 12020 $138 $15 $0 $154
TOTAL COST: $4,052 $450 $0 $4,502
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
137 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route I-65 Project Description BRIDGE PAINTING ON BRIDGES ALONG I-65. ON I-65 OVER AL GULF COAST RR (10195,10196) ON I-65/I-65 NB OFF RAMP OVER US-43 (10197,10198,10199) ON I-65 OVER 1-65 NB OFF RAMP/NORFOLK SO. RR (10200,10201) ON I-65 OVER GUNNISON CRK (10202,10203)
Project Length in Miles 1.568 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069460 BR I065 (515) PRELIMINARY ENGINEERING BRIDGE PAINTING 2022 $82 $21 $0 $103100069478 BR I065 (515) CONSTRUCTION BRIDGE PAINTING 2023 $2,313 $578 $0 $2,891
TOTAL COST: $2,396 $599 $0 $2,994
Route I-65 Project Description RESURFACING ON I-65 FROM I-10 TO MAIN STREET
Project Length in Miles 8.976 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069167 PE 2019 / 100069170 CN 2020
100069170 IM I065 (508) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $6,084 $676 $0 $6,760TOTAL COST: $6,084 $676 $0 $6,760
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
138 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route NA Project Description OLD SHELL ROAD SIDEWALK IMPROVEMENTS IN THE CITY OF MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100065881 TAPMB TA16 (947) CONSTRUCTION SIDEWALK 2020 $192 $0 $48 $240
TOTAL COST: $192 $0 $48 $240
Route NA Project Description SIDEWALKS ON OLD SHELL ROAD BETWEEN DURANT STREET AND UNION AVENUE IN MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor CITY OF MOBILE LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067397 TAPMB TA17 (947) CONSTRUCTION SIDEWALK 2020 $200 $0 $50 $251
TOTAL COST: $200 $0 $50 $251
Route NA Project Description TRAIL LOCATED ON THE NORTH SIDE OF THREE MILE CREEK FROM THE UNIVERSITY OF SOUTH ALABAMA MEDICAL CENTER TOWARDS STRICKLAND YOUTH CENTER
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068380 TAPAA TA18 (923) CONSTRUCTION SIDEWALK 2020 $555 $0 $139 $694
TOTAL COST: $555 $0 $139 $694
Route NA Project Description ADA COMPLIANT CURB RAMPS WITHIN KINGS BRANCH ESTATES NORTH OF SR-42 (US-98) AND WEST OF JARRETT ROAD, ALSO IN WOODBRIDGE PLACE AND CUMBERLAND SUBDIVISIONS SOUTH OF COTTAGE HILL ROAD AND EAST OF SCHILLINGER ROAD S
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069055 TAPMB TA19 (929) CONSTRUCTION SIDEWALK 2019 $200 $0 $50 $250
TOTAL COST: $200 $0 $50 $250
Route NA Project Description CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES 13, 16, 17, 42, 163, I-10 SERVICE ROAD AND I-65 SERVICE ROAD IN MOBILE
Project Length in Miles 0.000 Urban Area MOBILE Sponsor MOBILE COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060121 PE 2013
100060122 STPAA NR13 (910) CONSTRUCTION SIDEWALK 2022 $667 $167 $0 $833TOTAL COST: $667 $167 $0 $833
Route SR-13 Project Description BRIDGE REPLACEMENT (BIN 005712 AND BIN 005856) ON SR-13 (US-43) OVER COLD CREEK
Project Length in Miles 0.200 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068526 BR 0013 (614) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $404 $101 $0 $505100068528 BR 0013 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $4,162 $1,041 $0 $5,203
TOTAL COST: $4,566 $1,142 $0 $5,708
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
139 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route SR-158 Project Description ADDITIONAL LANES ON SR-158 FROM MP 7.75 TO SPARTAN DRIVE
Project Length in Miles 0.485 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070795 PE 2020 / 100071652 RW 2020
100071115 ATRP2-49-2020-442-CN ()
CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $0 $1,825 $0 $1,825TOTAL COST: $0 $1,825 $0 $1,825
Route SR-158X Project Description SR-158 EXTENSION LOTT ROAD OVERPASS AND JUG HANDLE. GRADE, DRAIN, BASE, PAVE AND BRIDGE (EB SEABURY CREEK TRIBUTARY AND PARTIAL LOTT ROAD)
Project Length in Miles 3.863 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100043116 PE 2003 / 100042207 RW 2006 / 100067136 UT 2018 / 100060152 CN 2018 / 100060155 CN 2024 / 100060482 CN 2024 / 100060483 CN 2026 / 100060484 CN 2026
100068084 NHF 0158 (505) UTILITIES GRADE, DRAIN, BASE, PAVE AND BRG
2020 $305 $76 $0 $381100060154 NHF 0158 (505) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND
BRG2020 $15,542 $3,885 $0 $19,427
TOTAL COST: $15,847 $3,962 $0 $19,808
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
140 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route SR-16 Project Description STUDY - CORRIDOR STUDY ON US 90 IN MOBILE NEAR INTERSTATE10
Project Length in Miles 4.500 Urban Area MOBILE Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071607 HSIP 0016 () HIGHWAY PLANNING CORRIDOR STUDY 2020 $52 $6 $0 $57
TOTAL COST: $52 $6 $0 $57
Route SR-16 Project Description BRIDGE REPLACEMENT (BIN 003691) ON SR-16 (US-90) OVER HALLS MILL CREEK
Project Length in Miles 1.400 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068522 CN 2024
100068521 BR 0016 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2021 $734 $184 $0 $918100068523 BR 0016 () UTILITIES BRIDGE REPLACEMENT 2022 $21 $5 $0 $26
TOTAL COST: $755 $189 $0 $944
Route SR-16 Project Description REPLACE BRIDGE, BIN 008714, SR-16 (US-90) WESTBOUND OVER TENSAW-SPANISH RIVER. (SUFF=49.7, STATUS=SD)
Project Length in Miles 1.306 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064691 PE 2017
100056130 BRF 0016 (522) UTILITIES BRIDGE REPLACEMENT 2020 $451 $113 $0 $564100049566 BRF 0016 (522) CONSTRUCTION BRIDGE REPLACEMENT 2020 $28,133 $7,033 $0 $35,166
TOTAL COST: $28,584 $7,146 $0 $35,729
Route SR-16 Project Description INTERSECTION IMPROVEMENTS - CONGESTION MANAGEMENT PROCESS - SR-16 (US-90) FROM BROAD STREET TO BANKHEAD TUNNEL
Project Length in Miles 1.460 Urban Area MOBILE Sponsor CITY OF MOBILE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066702 PE 2019
100066703 STPMB 0016 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $590 $782 $0 $1,373TOTAL COST: $590 $782 $0 $1,373
Route SR-163 Project Description BRIDGE REPLACEMENT ON SR-163 OVER PERCH CREEK BIN 011865 FROM MP 3.931 TO MP 3.983
Project Length in Miles 0.052 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067045 PE 2019
100067047 BR 0163 (505) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,733 $1,183 $0 $5,917TOTAL COST: $4,733 $1,183 $0 $5,917
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
141 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route SR-17 Project Description BRIDGE REPL SR-17(US-45) (STR#17-49-35.7) OVER BENNETTS CK BIN 003218
Project Length in Miles 0.060 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063583 PE 2018
100002812 BR 0017 (574) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $9 $2 $0 $11100043179 BR 0017 (574) UTILITIES BRIDGE REPLACEMENT 2021 $117 $29 $0 $146100002811 BR 0017 (574) CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,548 $637 $0 $3,185
TOTAL COST: $2,673 $668 $0 $3,342
Route SR-188 Project Description RESURFACING ON SR-188 FROM LAKELAND DRIVE TO THE IRVINGTON BAYOU LA BATRE HIGHWAY
Project Length in Miles 3.980 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067957 STPAA 0188 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $950 $237 $0 $1,187
TOTAL COST: $950 $237 $0 $1,187
Route SR-188 Project Description RESURFACING ON SR-188 FROM FRANKLIN ROAD TO LAKELAND DRIVE
Project Length in Miles 4.240 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070541 STPAA 0188 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $717 $179 $0 $897
TOTAL COST: $717 $179 $0 $897
Route SR-188 Project Description INTERSECTION IMPROVEMENTS, INCLUDING ADDING ROUNDABOUT AT SR-188 AND IRVINGTON BAYOU LA BATRE HIGHWAY
Project Length in Miles 0.188 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070772 PE 2020
100071087 ATRP2-49-2020-049-RW ()
RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $0 $86 $0 $86100071086 ATRP2-049-2020-049-CN
()CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $0 $1,028 $0 $1,028
TOTAL COST: $0 $1,114 $0 $1,114
Route SR-193 Project Description RESURFACING ON SR-193 FROM SR-163 TO HIGGINS ROAD
Project Length in Miles 3.278 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068297 NH 0193 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,747 $437 $0 $2,184
TOTAL COST: $1,747 $437 $0 $2,184
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
142 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route SR-213 Project Description RESURFACING ON SR-213 (SHELTON BEACH ROAD) FROM SR-158 TO SR-13(US-43)
Project Length in Miles 2.490 Urban Area MOBILE Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067959 STPAA 0213 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22019 $664 $166 $0 $830
TOTAL COST: $664 $166 $0 $830
Route SR-217 Project Description REPLACE BRIDGE, BIN 004471, SR-217 OVER BIG CREEK. (SUFF=50.6, STATUS=FO)
Project Length in Miles 0.222 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049583 PE 2010 / 100058253 RW 2014
100049586 BR 0217 (501) UTILITIES BRIDGE REPLACEMENT 2022 $29 $7 $0 $37100049584 BR 0217 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $884 $221 $0 $1,105
TOTAL COST: $913 $228 $0 $1,142
Route SR-42 Project Description US-98 EASTBOUND LANES FROM MISSISSIPPI LINE TO 0.5 MILE EAST OF GLENWOOD ROAD. BASE AND PAVE
Project Length in Miles 4.870 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052808 PE 2011 / 100060485 CN 2025
100040584 NH 0042 (509) CONSTRUCTION BASE AND PAVE 2021 $14,560 $3,640 $0 $18,200TOTAL COST: $14,560 $3,640 $0 $18,200
Route SR-42 Project Description INSTALLATION OF NEW GENERATOR TO REPLACE EXISTING GENERATOR FOR BANKHEAD TUNNEL AND ITS DEVICES
Project Length in Miles 0.840 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069483 LB 2019
100069442 NH 0042 (538) CONSTRUCTION INFORMATION TECHNOLOGY SYSTEMS
2020 $950 $237 $0 $1,187TOTAL COST: $950 $237 $0 $1,187
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
143 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Original
Route SR-42R Project Description EXTEND WESTBOUND BRIDGE ON SR-42 (US-98) OVER BIG CREEK BIN # 018684
Project Length in Miles 0.010 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004326 PE 2000 / 100052808 PE 2011 / 100052809 PE 2009 / 100040580 RW 2003 / 100040569 UT 2006 / 100040581 CN 2006 / 100066805 CN 2017
100060481 NHF 0042 () CONSTRUCTION BRIDGE 2023 $4,765 $1,191 $0 $5,956TOTAL COST: $4,765 $1,191 $0 $5,956
Route SR-42R Project Description CONSTRUCT BRIDGE ON GLENWOOD ROAD OVER SR-42 (US-98) GRADE, DRAIN, BASE AND PAVE, BRIDGE AND RETAINING WALLS
Project Length in Miles 0.010 Urban Area MOBILE Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066916 RW 2018
100052812 NHF 0042 (517) CONSTRUCTION BRIDGE 2022 $7,695 $1,924 $0 $9,618TOTAL COST: $7,695 $1,924 $0 $9,618
Route SR-42R Project Description CONSTRUCT BRIDGE ON (CR-63) WILMER-GEORGETOWN ROAD OVER SR-42 (US-98) WITH JUGHANDLE INTERCHANGE ONTO SR-42 (US-98)
Project Length in Miles 0.020 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068081 PE 2018 / 100066917 RW 2018
100071693 NHF 0042 (535) UTILITIES BRIDGE 2021 $129 $32 $0 $162100060480 NHF 0042 (535) CONSTRUCTION BRIDGE 2021 $8,928 $2,232 $0 $11,160
TOTAL COST: $9,057 $2,264 $0 $11,321
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
144 of 206
HIGHWAY PROJECTS - MOBILESTIP PLAN: 2020 - Amendment # 7
Route CR-39 Project Description PLANING AND RESURFACING ON CR-39 FROM SR-12 (US-84) TO THE ALABAMA RIVER CELLULOSE, LLC ENTRANCE (GATE 4) - MCP 50-10-18
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068336 RASTPNU 5018 (251) CONSTRUCTION RESURFACING 2020 $1,011 $0 $400 $1,411
TOTAL COST: $1,011 $0 $400 $1,411
Route CR-NA Project Description SIDEWALKS ALONG SYCAMORE CIRCLE; 2ND STREET; FRISCO CITY STREET FROM DOLLAR GENERAL TO GRIFFIN STREET; KELLY AVENUE FROM E BUFFINGTON STREET TO MIXON STREET; S MAIN STREET FROM HARRISON STREET TO S MANNING STREET; HARRISON STREET AND S MANNING STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068392 TAPNU TA18 (927) CONSTRUCTION SIDEWALK 2019 $323 $0 $81 $404
TOTAL COST: $323 $0 $81 $404
Route CR-NA Project Description SIDEWALKS ALONG SR-265 FROM RAILROAD STREET TO ROBBINS STREET, ALONG SR-21 FROM 0.07 MILE WEST OF GRANT BOULEVARD TO 6TH AVENUE AND ALONG 6TH AVENUE ENDING AT J F SHIELDS HIGH SCHOOL
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068393 TAPNU TA18 (928) CONSTRUCTION STREETSCAPE 2020 $229 $0 $57 $286
TOTAL COST: $229 $0 $57 $286
Route SR-12 Project Description BRIDGE RAIL RETROFIT (BIN 011202) AND GUARDRAIL ON SR-12 (US-84) FROM CLARKE COUNTY LINE TO 0.367 MILE EAST OF CR-1
Project Length in Miles 2.700 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100052611 NH 0012 (535) CONSTRUCTION BRIDGE REHABILITATION 2021 $452 $113 $0 $565
TOTAL COST: $452 $113 $0 $565
Route SR-21 Project Description RESURFACING ON SR-21 FROM HOOKS ROAD TO RUMBLEY ROAD
Project Length in Miles 2.463 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069682 STPAA 0021 (569) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $771 $193 $0 $963
TOTAL COST: $771 $193 $0 $963
Route SR-47 Project Description RESURFACING ON SR-47 FROM SR-12 (US-84) TO SR-41
Project Length in Miles 5.214 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069686 STPAA 0047 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $978 $245 $0 $1,223
TOTAL COST: $978 $245 $0 $1,223
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
145 of 206
HIGHWAY PROJECTS - MONROESTIP PLAN: 2020 - Original
Route CR-234 Project Description RESURFACING AND WIDENING RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY
Project Length in Miles 2.460 Urban Area MONTGOMERY Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064673 STPMN 5115 () PRELIMINARY ENGINEERING WIDENING AND RESURFACING
(RDWY)2020 $286 $0 $71 $357
100064674 STPMN 5115 () RIGHT OF WAY WIDENING AND RESURFACING (RDWY)
2021 $170 $0 $42 $212100064675 STPMN 5115 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2023 $2,400 $0 $600 $3,000
TOTAL COST: $2,855 $0 $714 $3,569
Route CR-236 Project Description RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.
Project Length in Miles 2.130 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059721 PE 2016
100059831 STPMN 5116 () CONSTRUCTION RESURFACING 2021 $2,400 $0 $600 $3,000TOTAL COST: $2,400 $0 $600 $3,000
Route CR-28 Project Description RESURFACING ON CR-28 (MERIWETHER TRAIL) FROM SR-94 TO THE PIKE COUNTY LINE - MCP 51-04-18
Project Length in Miles 7.047 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068888 STPNU 5118 (256) CONSTRUCTION RESURFACING 2020 $908 $103 $223 $1,233
TOTAL COST: $908 $103 $223 $1,233
Route CR-33 Project Description BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055806 PE 2011 / 100055807 CN 2024
100060092 STPMN 7702 (601) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $60 $0 $15 $75100060091 STPMN 7702 (601) UTILITIES BRIDGE REPLACEMENT 2023 $160 $0 $40 $200
TOTAL COST: $220 $0 $55 $275
Route CR-39 Project Description BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055808 PE 2011
100060096 STPMN 7701 (602) RIGHT OF WAY BRIDGE REPLACEMENT 2021 $93 $0 $23 $116100060095 STPMN 7701 (602) UTILITIES BRIDGE REPLACEMENT 2021 $160 $0 $40 $200100055809 STPMN 7701 (602) CONSTRUCTION BRIDGE REPLACEMENT 2023 $2,340 $0 $585 $2,925
TOTAL COST: $2,592 $0 $648 $3,240
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
146 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route CR-42 Project Description RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION
Project Length in Miles 2.700 Urban Area MONTGOMERY Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064378 STPMN 5118 (251) CONSTRUCTION RESURFACING 2020 $740 $185 $0 $925
TOTAL COST: $740 $185 $0 $925
Route CR-54 Project Description WIDENING, RESURFACING, AND TRAFFIC SIGNAL IMPROVEMENTS ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3(US-31)
Project Length in Miles 3.700 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067638 PE 2019
100067639 STPMN 5118 (255) CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2021 $2,800 $0 $700 $3,500TOTAL COST: $2,800 $0 $700 $3,500
Route CR-626 Project Description FEASIBILITY STUDY FOR SIDEWALKS/MULTI-USE PATH ON (CR-626) VAUGHN ROAD FROM TAYLOR ROAD TO CHANTILLY PARKWAY
Project Length in Miles 4.400 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100062338 STPMN 5115 () SPECIAL SIDEWALK 2021 $240 $0 $60 $300
TOTAL COST: $240 $0 $60 $300
Route CR-70 Project Description RESURFACING ON CR-70 (PAULK ROAD) FROM CR-70 (HILLABEE ROAD) TO CR-39 (MT ZION ROAD) - MCP 51-01-19
Project Length in Miles 2.000 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070372 STPMN 5119 (251) CONSTRUCTION RESURFACING 2020 $286 $12 $59 $358
TOTAL COST: $286 $12 $59 $358
Route CR-NA Project Description RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.
Project Length in Miles 4.200 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063731 STPMN 5115 () PRELIMINARY ENGINEERING RESURFACING 2020 $342 $0 $86 $428100063732 STPMN 5115 () CONSTRUCTION RESURFACING 2021 $3,939 $0 $985 $4,923
TOTAL COST: $4,281 $0 $1,070 $5,351
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
147 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route CR-NA Project Description LIGHTING IMPROVEMENTS ON MONROE STREET FROM S DECATUR STREET TO N UNION STREET, AND ON WASHINGTON AVENUE FROM S BAINBRIDGE STREET TO S UNION STREET - PHASE II
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069024 TAPAA TA19 (918) CONSTRUCTION LIGHTING 2019 $445 $0 $111 $556
TOTAL COST: $445 $0 $111 $556
Route CR-NA Project Description PIKE ROAD NATURE TRAIL: MERIWEATHER ROAD
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor TOWN OF PIKE ROAD LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069433 TAPMN TA18 (938) CONSTRUCTION UNCLASSIFIED 2020 $200 $0 $50 $250
TOTAL COST: $200 $0 $50 $250
Route CR-NA Project Description WIDENING AND RESURFACING ON DOZIER ROAD FROM CR-64(WARES FERRY ROAD) TO THE EMERALD MOUNTAIN TOLL BRIDGE
Project Length in Miles 1.700 Urban Area MONTGOMERY Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070368 STPMN 5119 (252) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $396 $0 $99 $495
TOTAL COST: $396 $0 $99 $495
Route CR-NA Project Description WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)
Project Length in Miles 1.710 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100044273 STPMN 7724 () RIGHT OF WAY WIDENING AND RESURFACING
(RDWY)2021 $2,368 $0 $592 $2,960
TOTAL COST: $2,368 $0 $592 $2,960
Route CR-NA Project Description WIDENING AND RESURFACING ON PERRY HILL RD FROM SOUTH OF CARDINAL LN TO NORTH OF ATLANTA HWY AND ALONG ATLANTA HWY FROM W OF PERRY HILL RD TO BELLHURST DR
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067740 STPMN 5115 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $444 $0 $111 $555
TOTAL COST: $444 $0 $111 $555
Route CR-NA Project Description WIDEN AND RESURFACE ANN STREET FROM BREWTON ST. AND REALIGN TO FEDERAL DRIVE (PHASE 1)
Project Length in Miles 0.220 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100047399 PE 2006 / 100053060 RW 2014
100053059 STPAA 7733 (601) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $1,898 $474 $0 $2,372TOTAL COST: $1,898 $474 $0 $2,372
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
148 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route CR-NA Project Description WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Project Length in Miles 1.000 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100040817 STPMN 5116 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2023 $1,248 $0 $312 $1,560
TOTAL COST: $1,248 $0 $312 $1,560
Route CR-NA Project Description WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD
Project Length in Miles 2.000 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064606 STPMN 5116 (250) RIGHT OF WAY WIDENING AND RESURFACING
(RDWY)2020 $200 $0 $50 $250
100064607 STPMN 5116 (250) UTILITIES WIDENING AND RESURFACING (RDWY)
2023 $40 $0 $10 $50TOTAL COST: $240 $0 $60 $300
Route CR-NA Project Description RESURFACING, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD
Project Length in Miles 2.500 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063694 PE 2016
100059726 STPMN 5115 (251) UTILITIES RESURFACING 2020 $80 $0 $20 $100100063695 STPMN 5115 () CONSTRUCTION RESURFACING 2022 $3,200 $0 $800 $4,000
TOTAL COST: $3,280 $0 $820 $4,100
Route CR-NA Project Description INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067610 PE 2019
100067611 STPMN 5117 (254) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $32 $0 $8 $40100067613 STPMN 5117 (254) UTILITIES INTERSECTION IMPROVEMENTS 2021 $80 $0 $20 $100100067614 STPMN 5117 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $400 $0 $100 $500
TOTAL COST: $512 $0 $128 $640
Route CR-NA Project Description RESURFACING, TRAFFIC SIGNALS AND SIDEWALKS ON WARES FERRY ROAD FROM EASTERN BOULEVARD TO THE WEST SIDE OF THE FOGGY BOTTOM BRIDGE (PHASE II)
Project Length in Miles 9.750 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068971 PE 2019
100068972 STPMN 5118 (254) RIGHT OF WAY RESURFACING 2021 $160 $0 $40 $200100068973 STPMN 5118 (254) UTILITIES RESURFACING 2022 $80 $0 $20 $100100068974 STPMN 5118 () CONSTRUCTION RESURFACING 2023 $2,600 $0 $650 $3,250
TOTAL COST: $2,840 $0 $710 $3,550
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
149 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route CR-NA Project Description WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)
Project Length in Miles 0.900 Urban Area MONTGOMERY Sponsor CITY OF MONTGOMERY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100053061 STPMN 7733 (602) RIGHT OF WAY WIDENING AND RESURFACING
(RDWY)2021 $983 $0 $246 $1,229
100045392 STPMN 7733 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2023 $1,474 $0 $368 $1,842TOTAL COST: $2,457 $0 $614 $3,071
Route I-65 Project Description INSTALL WRONG-WAY ENTRY COUNTERMEASURES, SIGNS AND CONCRETE CURBS AT I-65 AND EDGEMONT AVENUE
Project Length in Miles 0.200 Urban Area MONTGOMERY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070138 HSIP I065 (509) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $20 $2 $0 $22
TOTAL COST: $20 $2 $0 $22
Route I-65 Project Description RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE
Project Length in Miles 2.030 Urban Area MONTGOMERY Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066458 PE 2018 / 100066459 CN 2020
100066459 IM I065 (493) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $3,381 $376 $0 $3,757TOTAL COST: $3,381 $376 $0 $3,757
Route I-65 Project Description PAVEMENT PRESERVATION ON I-65 FROM THE NORTH END OF THE ALABAMA RIVER BRIDGE TO THE ELMORE COUNTY LINE
Project Length in Miles 4.650 Urban Area MONTGOMERY Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069067 PE 2019 / 100068992 CN 2020
100068992 IM I065 (507) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $1,689 $188 $0 $1,877TOTAL COST: $1,689 $188 $0 $1,877
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
150 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route I-85 Project Description SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY, MACON AND LEE COUNTY TO THE CHAMBERS COUNTY LINE
Project Length in Miles 47.460 Urban Area MONTGOMERY Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100054301 PE 2010 / 100054302 CN 2021
100054302 IM I085 (333) CONSTRUCTION SIGN REHABILITATION 2021 $2,561 $285 $0 $2,845TOTAL COST: $2,561 $285 $0 $2,845
Route I-85 Project Description BRIDGE WIDENING ON I-85 NB AND SB OVER LINE CREEK (BIN # 007554 AND 007555) AND RELIEF BRIDGES (BIN # 007556, 007557, 007566 AND 007567)
Project Length in Miles 0.480 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059252 PE 2019
100059253 IM I085 (365) CONSTRUCTION BRIDGE WIDENING 2022 $12,843 $1,427 $0 $14,270TOTAL COST: $12,843 $1,427 $0 $14,270
Route NA Project Description MULTI-PURPOSE NATURE TRAIL,WALLAHATCHIE ROAD - PHASE 3, LOCATED ALONG MARLER ROAD NORTH WAUGH TOWN CENTER CONNECTOR
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066530 TAPMN TA16 (949) CONSTRUCTION UNCLASSIFIED 2020 $188 $0 $47 $235
TOTAL COST: $188 $0 $47 $235
Route NA Project Description PIKE ROAD NATURE TRAIL: WALLAHATCHIE ROAD-PHASE 4
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066847 TAPMN TA17 (900) CONSTRUCTION UNCLASSIFIED 2020 $200 $0 $50 $250
TOTAL COST: $200 $0 $50 $250
Route NA Project Description PROTECTIVE PURCHASE FOR PROPERTIES ON THE EAST SIDE OF ANN STREET BETWEEN MCQUEEN ST AND THRASHER ST
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071638 STPMN 5120 () RIGHT OF WAY WIDENING AND RESURFACING
(RDWY)2020 $240 $0 $60 $300
TOTAL COST: $240 $0 $60 $300
Route NA Project Description RESURFACING AND BRIDGE REPLACEMENT (BIN 005831) ON WARES FERRY RD FROM WEST SIDE OF FROGGY BOTTOM BRIDGE TO MCLEMORE RD
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071639 STPMN 5120 () PRELIMINARY ENGINEERING RESURFACING 2020 $180 $0 $45 $225
TOTAL COST: $180 $0 $45 $225
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
151 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Amendment # 7
Route SR-3 Project Description ADDITION OF TURNLANE ON SR-3 (US-31) AT HYUNDAI BOULEVARD (MP 174.663)
Project Length in Miles 0.530 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071496 STPAA 0003 (629) PRELIMINARY ENGINEERING TURN LANES 2020 $40 $10 $0 $50100071436 STPAA 0003 (629) CONSTRUCTION TURN LANES 2020 $258 $64 $0 $322
TOTAL COST: $298 $74 $0 $372
Route SR-53 Project Description RESURFACING ON SR-53(US-231) FROM CR-89 TO ATHEY ROAD
Project Length in Miles 4.657 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069868 NH 0053 (589) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2021 $4,746 $1,187 $0 $5,933
TOTAL COST: $4,746 $1,187 $0 $5,933
Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN # 000735
Project Length in Miles 1.200 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004316 PE 2016 / 100004317 RW 2019
100004312 BR 0006 (563) CONSTRUCTION BRIDGES AND APPROACHES 2020 $5,853 $1,463 $0 $7,316TOTAL COST: $5,853 $1,463 $0 $7,316
Route SR-6 Project Description INTERSECTION IMPROVEMENTS TO SR-6 (US-231) AT MERIWETHER ROAD AND TROTMAN ROAD; INCLUDING TURN LANES, AND RAISED MEDIANS
Project Length in Miles 1.147 Urban Area MONTGOMERY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070788 PE 2020
100071082 ATRP2-51-2020-402-CN ()
CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $0 $520 $0 $520TOTAL COST: $0 $520 $0 $520
Route SR-8 Project Description INSTALLING INTERSECTION CONFLICT WARNING SYSTEM AT THE INTERSECTION OF SR-8 (US-80) AND WARES FERRY ROAD
Project Length in Miles 0.300 Urban Area MONTGOMERY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071948 TDAI 0008 (596) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $15 $4 $0 $19
TOTAL COST: $15 $4 $0 $19
Route SR-8 Project Description TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD
Project Length in Miles 0.269 Urban Area MONTGOMERY Sponsor MONTGOMERY COUNTY COMMISSION COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064157 STPMN 5115 () SPECIAL CORRIDOR STUDY 2023 $96 $0 $24 $120
TOTAL COST: $96 $0 $24 $120
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
152 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route SR-NA Project Description INSTALLATION OF ROUNDABOUTS ON SR-126 AT BOTH I-85 EXIT 16 RAMPS, AND AT SR-126/SR-8 (US-80) INTERSECTION, AND ON SR-8 (US-80) AT MARLER ROAD
Project Length in Miles 0.000 Urban Area MONTGOMERY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068811 PE 2019 / 100068821 RW 2021 / 100068820 UT 2021 / 100068810 CN 2021
100068821 HSIP 5119 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $227 $25 $0 $253100068820 HSIP 5119 (250) UTILITIES SAFETY IMPROVEMENTS 2021 $161 $18 $0 $179100068810 HSIP 5119 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,716 $191 $0 $1,906
TOTAL COST: $2,104 $234 $0 $2,337
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
153 of 206
HIGHWAY PROJECTS - MONTGOMERYSTIP PLAN: 2020 - Original
Route CR-1 Project Description REPLACE ROADWAY CULVERT AND APPROACHES ON WEST MORGAN ROAD OVER BAKERS CREEK
Project Length in Miles 1.200 Urban Area DECATUR Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070845 STPOA 5220 () PRELIMINARY ENGINEERING DRAINAGE CORRECTION 2020 $32 $0 $8 $40100070846 STPOA 5220 () RIGHT OF WAY DRAINAGE CORRECTION 2020 $50 $0 $12 $62100070847 STPOA 5220 () UTILITIES DRAINAGE CORRECTION 2021 $109 $0 $27 $136100070848 STPOA 5220 () CONSTRUCTION DRAINAGE CORRECTION 2021 $640 $0 $160 $800
TOTAL COST: $831 $0 $208 $1,038
Route CR-1297 Project Description WIDENING AND TRAFFIC STRIPE ON HULACO ROAD (CR-1297) FROM SR-67 TO THE MARSHALL COUNTY LINE (SITE 1); LEVELING AND RESURFACING ON BOWLES BRIDGE ROAD (CR-1193) FROM 0.6 MILES EAST OF ANTIQUE LANE FOR 849 FEET (SITE 2)
Project Length in Miles 1.230 Urban Area DECATUR Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071471 HRRR 5220 (250) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $236 $0 $26 $262
TOTAL COST: $236 $0 $26 $262
Route CR-684 Project Description RESURFACING ON CR-684 (CHURCH STREET) FROM SOMERVILLE ROAD TO RIVERVIEW AVENUE IN THE CITY OF DECATUR
Project Length in Miles 0.820 Urban Area DECATUR Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071485 STPOA 5220 () PRELIMINARY ENGINEERING RESURFACING 2020 $100 $0 $25 $125100071486 STPOA 5220 () CONSTRUCTION RESURFACING 2021 $707 $0 $177 $884
TOTAL COST: $807 $0 $202 $1,009
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
154 of 206
HIGHWAY PROJECTS - MORGANSTIP PLAN: 2020 - Amendment # 2
Route CR-NA Project Description SIDEWALKS ON BEECH STREET, 14TH AVENUE, 7TH STREET SE, 8TH STREET SE, 19TH AVENUE SE, AND 16TH AVENUE
Project Length in Miles 0.000 Urban Area DECATUR Sponsor CITY OF DECATUR LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069007 TAPOA TA19 (902) CONSTRUCTION SIDEWALK 2020 $332 $0 $83 $415
TOTAL COST: $332 $0 $83 $415
Route CR-NA Project Description RESURFACING ON NORTH SENECA DRIVE FROM OLD HIGHWAY 24 TO SR-20 (US-72A) IN THE TOWN OF TRINITY
Project Length in Miles 2.750 Urban Area DECATUR Sponsor TOWN OF TRINITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069658 STPOA 5219 (251) PRELIMINARY ENGINEERING RESURFACING 2020 $13 $0 $3 $16100069659 STPOA 5219 (251) CONSTRUCTION RESURFACING 2020 $463 $0 $116 $579
TOTAL COST: $476 $0 $119 $595
Route CR-NA Project Description INTERSECTION IMPROVEMENTS ON VAUGHN BRIDGE ROAD AT SR-3 (US-31)
Project Length in Miles 2.000 Urban Area DECATUR Sponsor CITY OF HARTSELLE COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069660 STPOA 5219 (252) PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $80 $0 $20 $100100069661 STPOA 5219 (252) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $12 $0 $3 $15100069662 STPOA 5219 (252) UTILITIES INTERSECTION IMPROVEMENTS 2021 $30 $0 $7 $37100069663 STPOA 5219 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $571 $0 $143 $714
TOTAL COST: $693 $0 $173 $867
Route I-65 Project Description PAINT, RETROFIT BRIDGE RAILS AND REPLACE BEARING ASSEMBLIES ON I-65 BRIDGES OVER THE TENNESSEE RIVER, BIN# 010882 AND 010883
Project Length in Miles 1.880 Urban Area DECATUR Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067272 PE 2019
100042493 IM I065 () CONSTRUCTION BRIDGE REHABILITATION 2022 $10,193 $1,133 $0 $11,325TOTAL COST: $10,193 $1,133 $0 $11,325
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
155 of 206
HIGHWAY PROJECTS - MORGANSTIP PLAN: 2020 - Original
Route SR-3 Project Description REPLACE SOUTHBOUND BRIDGE, BIN 000882, SR-3 (US-31) OVER CEDAR CREEK
Project Length in Miles 0.250 Urban Area DECATUR Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049716 PE 2015 / 100049717 RW 2019 / 100049718 UT 2019
100049719 BR 0003 (591) CONSTRUCTION BRIDGE REPLACEMENT 2020 $5,253 $1,313 $0 $6,566TOTAL COST: $5,253 $1,313 $0 $6,566
Route SR-3 Project Description RESURFACE SR-3 (US-31) FROM SR-36 TO THE SOUTH END OF THE FLINT CREEK BRIDGE
Project Length in Miles 3.710 Urban Area DECATUR Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068239 NH 0003 (625) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,652 $413 $0 $2,066
TOTAL COST: $1,652 $413 $0 $2,066
Route SR-36 Project Description RESURFACING ON SR-36 FROM SR-3 (US-31) (MP 21.136) TO THE WEST END OF THE I-65 BRIDGE (MP 23.555) INCLUDING CXS RAILROAD CROSSING
Project Length in Miles 2.419 Urban Area DECATUR Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068237 NH 0036 (512) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $924 $231 $0 $1,155
TOTAL COST: $924 $231 $0 $1,155
Route SR-67 Project Description RESURFACE SR-67 FROM MP 24.050 JUST SOUTH OF SR-36 TO MP 35.670 JUST NORTH OF INDIAN HILLS RD.
Project Length in Miles 11.620 Urban Area DECATUR Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066932 RP-NH 0067 (509) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,614 $653 $0 $3,267
TOTAL COST: $2,614 $653 $0 $3,267
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
156 of 206
HIGHWAY PROJECTS - MORGANSTIP PLAN: 2020 - Original
Route CR-12 Project Description FULL DEPTH RECLAMATION ON CR-12 FROM SR-183 TO SR-5 - PCP 53-13-17
Project Length in Miles 9.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068202 RASTPNU 5318 (250) CONSTRUCTION RESURFACING 2020 $0 $0 $0 $0
TOTAL COST: $0 $0 $0 $0
Route CR-12 Project Description FULL DEPTH RECLAMATION ON CR-12 FROM SR-183 TO SR-5 - PCP 53-13-17
Project Length in Miles 9.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071246 RASTPNU 5318 (250) CONSTRUCTION RESURFACING 2020 $2,188 $147 $400 $2,736
TOTAL COST: $2,188 $147 $400 $2,736
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
157 of 206
HIGHWAY PROJECTS - PERRYSTIP PLAN: 2020 - Original
Route SR-14 Project Description REPLACE BRIDGE ON SR-14 OVER LUBBUB CREEK BIN # 002672
Project Length in Miles 1.666 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049164 PE 2010 / 100060609 RW 2019
100060610 BR 0014 (521) UTILITIES BRIDGE REPLACEMENT 2020 $723 $181 $0 $904100049165 BR 0014 (521) CONSTRUCTION BRIDGE REPLACEMENT 2020 $2,749 $687 $0 $3,436
TOTAL COST: $3,472 $868 $0 $4,340
Route SR-14 Project Description BRIDGE REPLACEMENT ON SR-14 OVER BLUBBER CREEK WEST OF ALICEVILLE, BIN # 003677
Project Length in Miles 0.570 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100061123 PE 2016 / 100061124 RW 2019 / 100061125 UT 2019
100061126 BR 0014 (536) CONSTRUCTION BRIDGE REPLACEMENT 2020 $4,118 $1,030 $0 $5,148TOTAL COST: $4,118 $1,030 $0 $5,148
Route SR-17 Project Description RESURFACING, 2 FT SAFETY WIDENING, AND CENTER AND SHOULDER SCORING ON SR-17 FROM BEAVER CREEK ROAD AT MP 215.700 TO THE LAMAR COUNTY LINE AT MP 220.970
Project Length in Miles 5.270 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068630 STPAA-HSIP 0017 (581) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $3,074 $687 $0 $3,761
TOTAL COST: $3,074 $687 $0 $3,761
Route SR-17 Project Description RESURFACE, 1.5 FT SAFETY WIDENING, CENTER AND EDGELINE SCORING ON SR-17 FROM MP 210.425 JUST NORTH OF 8TH AVENUE TO MP 215.700 SOUTH OF BEAVER CREEK ROAD
Project Length in Miles 5.270 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068626 STPAA-HSIP 0017 (579) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,485 $557 $0 $3,042
TOTAL COST: $2,485 $557 $0 $3,042
Route SR-6 Project Description SR-6 (US-82) FROM WEST OF GORDO TO TUSCALOOSA COUNTY LINE
Project Length in Miles 6.740 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100032473 NHF 0006 (576) CONSTRUCTION BASE AND PAVE 2021 $23,164 $5,791 $0 $28,955
TOTAL COST: $23,164 $5,791 $0 $28,955
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
158 of 206
HIGHWAY PROJECTS - PICKENSSTIP PLAN: 2020 - Original
Route CR-2209 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 010958) ON CR-2209 OVER DOUBLE BRANCH CREEK; SITE 2 - (BIN 009776) ON CR-2253 OVER WARRICK CREEK; SITE - 3 (BIN 008382) ON CR-3319 OVER MIMS CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071472 HRRR 5520 () CONSTRUCTION GUARDRAIL 2020 $154 $0 $17 $171
TOTAL COST: $154 $0 $17 $171
Route CR-2238 Project Description CENTERLINE AND EDGELINE RAISED PAVEMENT MARKERS AND EDGELINE STRIPING ON CR-2238 FROM CR-2243 TO CR-2290 AND ON CR-6600 FROM SR-223 TO CR-6602; GUARDRAIL AND GUARDRAIL END ANCHORS AT CULVERT ON CR-2238 1.864 MILES WEST OF CR-2290
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071479 HRRR 5520 () CONSTRUCTION SAFETY IMPROVEMENTS 2020 $128 $0 $14 $143
TOTAL COST: $128 $0 $14 $143
Route CR-NA Project Description SIDEWALK IMPROVEMENTS ON SOUTH 3 NOTCH STREET, WEST CHURCH STREET AND MARKET STREET IN TROY
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067200 TAPOA TA17 (925) CONSTRUCTION SIDEWALK 2019 $399 $0 $100 $499
TOTAL COST: $399 $0 $100 $499
Route CR-NA Project Description A MULTI-USE PATH ALONG ELM STREET FROM COLLEGE DRIVE TO SOUTH GEORGE WALLACE DRIVE
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068376 TAPAA TA18 (919) CONSTRUCTION SIDEWALK 2020 $478 $0 $119 $597
TOTAL COST: $478 $0 $119 $597
Route CR-NA Project Description SIDEWALKS ALONG WINDMILL DRIVE FROM VETERANS BOULEVARD TO GALLOWAY ROAD, AND ALONG GALLOWAY ROAD FROM 6TH AVENUE TRAVELLING ALONG GALLOWAY ROAD TURNING SOUTH ON HENDERSON STREET AND EAST ON VETERANS BOULEVARD BEFORE ENDING SHORT OF MAIN STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069025 TAPNU TA19 (919) CONSTRUCTION SIDEWALK 2020 $385 $0 $96 $481
TOTAL COST: $385 $0 $96 $481
Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS AT (BIN 6602) ON CR-1165 OVER YOUNGBLOOD CR; (BIN 7705) ON CR-3339 OVER WHITEWATER CR; (BIN 9748) ON CR-5534 OVER UNNAMED CR; (BIN 8721) ON CR-1111 OVER BEEMAN CR
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069579 HRRR 5519 (250) CONSTRUCTION GUARDRAIL 2019 $201 $0 $22 $224
TOTAL COST: $201 $0 $22 $224
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
159 of 206
HIGHWAY PROJECTS - PIKESTIP PLAN: 2020 - Original
Route SR-15 Project Description RESURFACING AND 2' SAFETY WIDENING ON SR-15 (US-29) FROM SR-93 IN BANKS TO THE BULLOCK COUNTY LINE
Project Length in Miles 9.977 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068714 STPAA-HSIP 0015 (537) FEDERAL MAINT CN PREVENTATIVE MAINT MINOR
REHAB W/ SAFETY WIDENING2020 $3,601 $780 $0 $4,381
TOTAL COST: $3,601 $780 $0 $4,381
Route SR-167 Project Description FEASIBILITY STUDY FOR ROUNDABOUT AT INTERSECTION OF SR-167 AND SR-87 IN SPRINGHILL
Project Length in Miles 1.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069502 HSIP 0167 (513) SPECIAL PRELIMINARY DESIGN PE 2020 $52 $6 $0 $58
TOTAL COST: $52 $6 $0 $58
Route SR-167 Project Description RESURFACING AND PLANING ON SR-167 FROM THE COFFEE COUNTY LINE TO SR-87 IN SPRINGHILL
Project Length in Miles 4.084 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068710 STPNU 0167 (512) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $1,312 $328 $0 $1,640
TOTAL COST: $1,312 $328 $0 $1,640
Route SR-87 Project Description RESURFACING ON SR-87 FROM SR-167 IN SPRINGHILL TO CR-3304/CR-59
Project Length in Miles 5.444 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068711 STPAA 0087 (514) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $2,599 $650 $0 $3,249
TOTAL COST: $2,599 $650 $0 $3,249
Route SR-87 Project Description RESURFACING ON SR-87 FROM CR-3304(CURTIS ROAD) TO SR-10 ( US-231)
Project Length in Miles 2.140 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068696 STPAA 0087 (515) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,258 $314 $0 $1,572
TOTAL COST: $1,258 $314 $0 $1,572
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
160 of 206
HIGHWAY PROJECTS - PIKESTIP PLAN: 2020 - Original
Route CR-NA Project Description SIDEWALK ALONG CR-64 FROM MAIN STREET TO THE CROSSWALK AT WOODLAND HIGH SCHOOL
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069020 TAPNU TA19 (915) CONSTRUCTION SIDEWALK 2020 $80 $0 $20 $100
TOTAL COST: $80 $0 $20 $100
Route CR-NA Project Description INSTALL GUARDRAIL AND END ANCHORS (BIN 011235) ON CR-37 OVER KNOKES CRK; (BIN 007726) ON CR-46 OVER WEDOWEE CRK; (BIN 005976) ON CR-67 OVER WEDOWEE CRK; (BIN 008712) ON CR-15 OVER THE TALLAPOOSA RIVER; AND (BIN 010074) ON CR-5 OVER WESOBULGA CRK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069580 HRRR 5619 (251) CONSTRUCTION GUARDRAIL 2020 $101 $11 $0 $113
TOTAL COST: $101 $11 $0 $113
Route SR-1 Project Description BRIDGE REPLACEMENT (BIN 000327) ON SR-1 (US-431) OVER CORNHOUSE CREEK
Project Length in Miles 0.345 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069618 BR 0001 (612) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $242 $61 $0 $303100069619 BR 0001 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,731 $433 $0 $2,164
TOTAL COST: $1,973 $493 $0 $2,467
Route SR-22 Project Description BRIDGE REPLACEMENT ON SR-22 OVER TALLAPOOSA RIVER (BIN 001766) AND SR-22 OVER CSX RAILROAD (BIN 001767)
Project Length in Miles 0.346 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069616 BR 0022 (531) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $640 $160 $0 $800100069617 BR 0022 () CONSTRUCTION BRIDGE REPLACEMENT 2023 $11,322 $2,830 $0 $14,152
TOTAL COST: $11,962 $2,990 $0 $14,952
Route SR-22R Project Description REALIGNMENT OF SR-22 FROM SR-22/MAINSTREET INTERSECTION TO US-431 IN ROANOKE
Project Length in Miles 0.670 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004421 PE 2008 / 100004422 RW 2012 / 100004423 UT 2014
100004420 ACSTPAA 0022 (505) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND BRG
2021 $7,926 $1,981 $0 $9,907TOTAL COST: $7,926 $1,981 $0 $9,907
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
161 of 206
HIGHWAY PROJECTS - RANDOLPHSTIP PLAN: 2020 - Original
Route CR-61 Project Description RESURFACING AND TRAFFIC STRIPING ON CR-61 (FREEMAN ROAD) FROM CR-28 (SANDFORT ROAD) TO SR-1 (US-431)
Project Length in Miles 2.300 Urban Area PHENIX CITY Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071684 STPNU 5720 () CONSTRUCTION RESURFACING 2020 $386 $0 $96 $482
TOTAL COST: $386 $0 $96 $482
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON 14TH STREET IN DOWNTOWN PHENIX CITY
Project Length in Miles 0.000 Urban Area PHENIX CITY Sponsor CITY OF PHENIX CITY LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067217 TAPPC TA17 (919) CONSTRUCTION STREETSCAPE 2020 $339 $0 $85 $423
TOTAL COST: $339 $0 $85 $423
Route CR-NA Project Description BRIDGE REPLACEMENT ON SEALE ROAD OVER COCHGALECHEE CREEK BIN # 004291 IN PHENIX CITY
Project Length in Miles 0.000 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067447 STPPC 5717 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $32 $0 $8 $40100067448 STPPC 5717 () UTILITIES BRIDGE REPLACEMENT 2020 $32 $0 $8 $40100067449 STPPC 5717 () CONSTRUCTION BRIDGE REPLACEMENT 2020 $352 $0 $88 $440
TOTAL COST: $416 $0 $104 $520
Route CR-NA Project Description RESURFACING AND WIDENING ON FREEMAN ROAD FROM SANDFORT ROAD TO SR-1 (US-431) IN PHENIX CITY
Project Length in Miles 2.300 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067563 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $322 $0 $81 $403
TOTAL COST: $322 $0 $81 $403
Route CR-NA Project Description WIDEN AND RESURFACE BRADLEY ROAD FROM NUCKOLS ROAD TO SR-165
Project Length in Miles 2.940 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063092 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $412 $0 $103 $515
TOTAL COST: $412 $0 $103 $515
Route CR-NA Project Description WIDEN AND RESURFACE LATO ROAD FROM UCHEE HILL HIGHWAY
Project Length in Miles 2.880 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063093 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2021 $403 $0 $101 $504
TOTAL COST: $403 $0 $101 $504
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
162 of 206
HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original
Route CR-NA Project Description WIDEN AND RESURFACE TARVER ROAD FROM LATO ROAD TO NUCKOLS ROAD
Project Length in Miles 2.240 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063094 STPPC 5714 () CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $314 $0 $78 $392
TOTAL COST: $314 $0 $78 $392
Route CR-NA Project Description RESURFACING AND WIDENING ON OWENS ROAD FROM MCCLENDON ROAD TO PATTERSON ROAD IN FORT MITCHELL
Project Length in Miles 0.496 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067564 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $69 $0 $17 $87
TOTAL COST: $69 $0 $17 $87
Route CR-NA Project Description RESURFACING AND WIDENING ON OWENS ROAD FROM SR-165 TO MCCLENDON ROAD IN FORT MITCHELL
Project Length in Miles 1.200 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067565 STPPC 5717 () CONSTRUCTION RESURFACING 2022 $168 $0 $42 $210
TOTAL COST: $168 $0 $42 $210
Route CR-NA Project Description RESURFACING AND WIDENING ON MCCLENDON ROAD FROM OWENS ROAD TO OWENS ROAD IN FORT MITCHELL
Project Length in Miles 1.884 Urban Area PHENIX CITY Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067566 STPPC 5717 () CONSTRUCTION RESURFACING 2021 $264 $0 $66 $330
TOTAL COST: $264 $0 $66 $330
Route CR-NA Project Description RESURFACING ON BRICKYARD ROAD FROM DILLINGHAM STREET TO STATE DOCKS ROAD
Project Length in Miles 2.100 Urban Area PHENIX CITY Sponsor CITY OF PHENIX CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063080 PE 2016
100063082 STPPC 5716 (253) CONSTRUCTION RESURFACING 2020 $1,038 $0 $260 $1,298TOTAL COST: $1,038 $0 $260 $1,298
Route CR-NA Project Description RESURFACING ON BRICKYARD ROAD FROM STATE DOCKS ROAD TO THE CITY LIMITS
Project Length in Miles 2.100 Urban Area PHENIX CITY Sponsor CITY OF PHENIX CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063085 PE 2016
100063086 STPPC 5716 (252) CONSTRUCTION RESURFACING 2020 $366 $0 $92 $458TOTAL COST: $366 $0 $92 $458
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
163 of 206
HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original
Route CR-NA Project Description RESURFACING ON SOUTH RAILROAD STREET FROM SR-38 (US-280) TO STADIUM DRIVE
Project Length in Miles 1.360 Urban Area PHENIX CITY Sponsor CITY OF PHENIX CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063088 STPPC 5716 (255) CONSTRUCTION RESURFACING 2020 $791 $0 $198 $989
TOTAL COST: $791 $0 $198 $989
Route CR-NA Project Description RESURFACING ON SOUTH RAILROAD STREET FROM STADIUM DRIVE TO SUMMERVILLE DRIVE
Project Length in Miles 0.000 Urban Area PHENIX CITY Sponsor CITY OF PHENIX CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063089 PE 2016
100063090 STPPC 5716 (250) CONSTRUCTION RESURFACING 2020 $633 $0 $158 $791TOTAL COST: $633 $0 $158 $791
Route SR-165 Project Description ADDING LEFT TURN LANE ON SR-165 AT CR-24
Project Length in Miles 0.400 Urban Area PHENIX CITY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070662 RW 2020 / 100070660 UT 2021 / 100070663 CN 2021
100070661 HSIP 0165 (506) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2020 $41 $5 $0 $45100070662 HSIP 0165 (506) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $68 $8 $0 $75100070660 HSIP 0165 (506) UTILITIES SAFETY IMPROVEMENTS 2021 $91 $10 $0 $101100070663 HSIP 0165 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $469 $52 $0 $521
TOTAL COST: $668 $74 $0 $742
Route SR-165 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM THE BARBOUR COUNTY LINE TO .29 MILE SOUTH OF SR-208
Project Length in Miles 6.006 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069870 STPAA-HSIP 0165 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,847 $417 $0 $2,264
TOTAL COST: $1,847 $417 $0 $2,264
Route SR-165 Project Description RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM .36 MILE SOUTH OF NEW HOPE CHURCH ROAD TO .1 MILE SOUTH OF NUCKOLS ROAD
Project Length in Miles 12.389 Urban Area PHENIX CITY Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069871 STPAA-HSIP 0165 (505) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2021 $4,596 $1,009 $0 $5,605
TOTAL COST: $4,596 $1,009 $0 $5,605
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
164 of 206
HIGHWAY PROJECTS - RUSSELLSTIP PLAN: 2020 - Original
Route CR-10 Project Description HYDRO DEMOLISH AND REHABILITATE THE DECKS ON FOLLOWING BRIDGES: ON CR-10 (BIN 005311) OVER BIG BLACK CREEK (SITE 1); ON KELLY CREEK ROAD (BIN 008064) OVER KELLY CREEK (SITE 2) - SCCP 58-38-19
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069883 RABR 5819 (251) CONSTRUCTION BRIDGE REHABILITATION 2020 $366 $0 $92 $458
TOTAL COST: $366 $0 $92 $458
Route CR-31 Project Description BRIDGE REPLACEMENT OF BIN 1045 ON CR-31 (WASHINGTON VALLEY ROAD) OVER WALKER BRANCH.
Project Length in Miles 434.000 Urban Area BIRMINGHAM Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068739 RABRZ 5818 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $247 $62 $0 $309
TOTAL COST: $247 $62 $0 $309
Route CR-NA Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 008027) ON VALLEY ROAD OVER TROUT CREEK; SITE 2 - (BIN 005607) ON PLEASANT VALLEY ROAD OVER FISHING CREEK; AND SITE 3 - (BIN 008435) ON ACMAR ROAD OVER LITTLE BLACK CREEK
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071474 HRRR 5820 () CONSTRUCTION GUARDRAIL 2020 $94 $0 $10 $105
TOTAL COST: $94 $0 $10 $105
Route CR-NA Project Description INSTALLING GUARDRAIL AND END ANCHORS (BIN 008064) ON KELLY CREEK ROAD OVER KELLY CREEK
Project Length in Miles 0.052 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069581 HRRR 5819 (250) CONSTRUCTION GUARDRAIL 2019 $35 $0 $4 $39
TOTAL COST: $35 $0 $4 $39
Route I-20 Project Description BRIDGE AND APPROACHES (BIN 007850 AND 007851) ON I-20 OVER COOSA RIVER AT ST. CLAIR AND TALLADEGA CO LINE
Project Length in Miles 1.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100042214 CN 2025
100064150 BR I020 () PRELIMINARY ENGINEERING BRIDGES AND APPROACHES 2021 $711 $178 $0 $889TOTAL COST: $711 $178 $0 $889
Route I-20 Project Description PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD
Project Length in Miles 4.983 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068217 PE 2019 / 100068218 CN 2020
100068218 IM I020 (357) CONSTRUCTION PAVEMENT MINOR REHABILITATION
2020 $13,243 $1,471 $0 $14,714TOTAL COST: $13,243 $1,471 $0 $14,714
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
165 of 206
HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original
Route I-59 Project Description I-59 REPLACE BRIDGES, BIN 007238 (SUFF=40.1, STATUS=SD) AND BIN 007239 (SUFF=65.4, STATUS=FO), OVER MUCKLEROY CREEK, SOUTH OF SR-53 (US-231)
Project Length in Miles 0.200 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049999 RW 2024 / 100049998 UT 2025 / 100049966 CN 2026
100049965 BRF I059 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2023 $297 $74 $0 $371TOTAL COST: $297 $74 $0 $371
Route I-59 Project Description CONCRETE PAVEMENT REHAB ON I-59 FROM JEFFERSON COUNTY LINE TO NORTH OF SR-23
Project Length in Miles 8.660 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066471 PE 2019 / 100066472 CN 2021
100066472 IM I059 () CONSTRUCTION PAVEMENT REHABILITATION 2021 $14,454 $1,606 $0 $16,060TOTAL COST: $14,454 $1,606 $0 $16,060
Route SR-174 Project Description INTERSECTION IMPROVEMENTS AT SR-174, MURPHREES VALLEY ROAD AND SR-7 (US-11)
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100070050 UT 2024 / 100070051 CN 2025
100070045 CMAQ 0174 () PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $618 $0 $155 $773100070048 CMAQ 0174 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2023 $83 $0 $21 $104
TOTAL COST: $701 $0 $175 $877
Route SR-23 Project Description BR REPL AND APP ON SR-23 OVER BRANCH #000226 STR #23-58-0.7
Project Length in Miles 0.200 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100013033 PE 1999 / 100037997 RW 2002
100040861 BR 5815 (200) UTILITIES BRIDGE REPLACEMENT 2020 $23 $6 $0 $29100013032 BR 5815 (200) CONSTRUCTION BRIDGE REPLACEMENT 2021 $946 $237 $0 $1,183
TOTAL COST: $969 $242 $0 $1,212
Route SR-23 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-23 FROM SR-7 (US-11) IN SPRINGVILLE TO SR-53 (US-231) IN ASHVILLE
Project Length in Miles 12.610 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070163 STPAA 0023 () FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,469 $367 $0 $1,836
TOTAL COST: $1,469 $367 $0 $1,836
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
166 of 206
HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original
Route SR-25 Project Description INTERSECTION IMPROVEMENTS ON SR-25 (US-411) AT PARK AVENUE (PHASE 1)
Project Length in Miles 0.052 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070989 CMAQ 0025 (559) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2020 $40 $10 $0 $50100064324 CMAQ 0025 (559) UTILITIES INTERSECTION IMPROVEMENTS 2021 $121 $0 $30 $152100064325 CMAQ 0025 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $808 $0 $202 $1,010
TOTAL COST: $969 $10 $232 $1,212
Route SR-25 Project Description INTERSECTION IMPROVEMENTS ON SR-25(US-411) AT CR-6(SANIE ROAD/SIMPSON ROAD) PHASE 2
Project Length in Miles 0.010 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100071679 CN 2022
100070990 CMAQ 0025 (558) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $182 $45 $0 $227TOTAL COST: $182 $45 $0 $227
Route SR-34 Project Description INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
Project Length in Miles 0.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066388 PE 2017 / 100066391 UT 2024 / 100066392 CN 2024
100066390 STPAA-HSIP 0034 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $319 $0 $46 $364TOTAL COST: $319 $0 $46 $364
Route SR-53 Project Description SR-53 (US-231) ADD LANES FROM CR-516 (CROPWELL DR) TO SR-34
Project Length in Miles 1.180 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056631 PE 2012 / 100056634 RW 2013
100056633 STPAA 0053 (565) UTILITIES ADDITIONAL ROADWAY LANES 2021 $16 $4 $0 $19100056635 STPAA 0053 (565) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $3,397 $849 $0 $4,246
TOTAL COST: $3,412 $853 $0 $4,266
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
167 of 206
HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original
Route SR-7 Project Description DRAINAGE IMPROVEMENTS ON SR-7 (US-11) FROM ROBINSON ST. TO NEAR TERRY ST. AND DOWNTOWN SPRINGVILLE STREET
Project Length in Miles 0.789 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100055162 HPP 10AL (002) CONSTRUCTION DRAINAGE CORRECTION 2020 $639 $0 $160 $799
TOTAL COST: $639 $0 $160 $799
Route SR-7 Project Description ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-7(US-11) AT SPRINGVILLE MIDDLE SCHOOL
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052626 PE 2009
100052627 HPP-TCSP A187 (900) UTILITIES DRAINAGE CORRECTION 2020 $40 $10 $0 $50100052628 HPP A187 (900) CONSTRUCTION DRAINAGE CORRECTION 2020 $640 $0 $160 $800
TOTAL COST: $680 $10 $160 $850
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
168 of 206
HIGHWAY PROJECTS - ST. CLAIRSTIP PLAN: 2020 - Original
Route CR-1396 Project Description CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor SHELBY COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059534 ACAA59534 ATRP (015) CONSTRUCTION GRADE, DRAIN, BASE, PAVE AND
BRG2022 $3,200 $0 $800 $4,000
TOTAL COST: $3,200 $0 $800 $4,000
Route CR-17 Project Description ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST
Project Length in Miles 1.500 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100046236 PE 2006 / 100046237 RW 2016
100046238 STPBH 7112 (602) UTILITIES ADDITIONAL ROADWAY LANES 2020 $553 $0 $138 $691100046239 STPBH 7112 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $3,149 $0 $787 $3,936
TOTAL COST: $3,702 $0 $925 $4,627
Route CR-24 Project Description BRIDGE REPLACEMENT (BIN 015617) AND APPROACHES ON CR-24 OVER SPRING CREEK - SCP 59-810-12U
Project Length in Miles 0.202 Urban Area BIRMINGHAM Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070892 BR 5914 (252) UTILITIES UTILITY ADJUSTMENT 2020 $214 $0 $54 $268
TOTAL COST: $214 $0 $54 $268
Route CR-29 Project Description WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.
Project Length in Miles 8.000 Urban Area BIRMINGHAM Sponsor JEFFERSON COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100007541 PE 2002
100045964 STPBH 5939 (200) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $4,274 $0 $1,069 $5,343100007540 STPBH 5939 (200) CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,589 $0 $397 $1,986
TOTAL COST: $5,863 $0 $1,466 $7,329
Route CR-433 Project Description RAILROAD CROSSING IMPROVEMENTS, SIGNS, LEGENDS AND MARKINGS AT THE INTERSECTION OF CR-433 AND CSX RAILROAD/DOT NO. 639418X
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070001 RHCH RR19 (905) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $10 $1 $0 $11
TOTAL COST: $10 $1 $0 $11
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
169 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route CR-52 Project Description BRIDGE REPLACEMENT OF CR-52 BIN # 3267 OVER BUCK CREEK (AASHTO)
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor SHELBY COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059502 ACBR59502 ATRP (009) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,152 $0 $1,269 $4,420
TOTAL COST: $3,152 $0 $1,269 $4,420
Route CR-55 Project Description BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357
Project Length in Miles 0.900 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100056308 PE 2014
100056309 STPBH 5914 (250) RIGHT OF WAY BRIDGES AND APPROACHES 2020 $477 $0 $119 $596100056310 STPBH 5914 (250) UTILITIES BRIDGES AND APPROACHES 2020 $200 $0 $50 $250100056311 STPBH 5914 () CONSTRUCTION BRIDGES AND APPROACHES 2021 $1,000 $0 $250 $1,250
TOTAL COST: $1,677 $0 $419 $2,096
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
170 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route CR-NA Project Description INSTALL RAILROAD CROSSING DEVICES ON PILGREEN DRIVE IN CALERA, DOT NO. 727 400E, REF#1323 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNAL, GATE, BELL, GCP'S, SIGNS
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066434 RHCH RR17 (909) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $315 $35 $0 $350
TOTAL COST: $315 $35 $0 $350
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS FROM DOWNTOWN WILSONVILLE TO NEW COMMERCIAL DEVELOPMENT ON SR-25
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067296 TAPNU TA17 (907) CONSTRUCTION STREETSCAPE 2020 $400 $0 $100 $500
TOTAL COST: $400 $0 $100 $500
Route CR-NA Project Description VALLEYDALE RD FROM CALDWELL MILL RD TO MEADOW DRIVE - PHASE 1
Project Length in Miles 7.000 Urban Area BIRMINGHAM Sponsor HOOVER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100033035 PE 2000 / 100033036 RW 2007
100033067 STPBH 9802 (905) UTILITIES ADDITIONAL ROADWAY LANES 2020 $6,400 $0 $1,600 $8,000100033064 STPBH 9802 (905) CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $16,400 $1,300 $2,800 $20,500
TOTAL COST: $22,800 $1,300 $4,400 $28,500
Route CR-NA Project Description SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM
Project Length in Miles 3.353 Urban Area BIRMINGHAM Sponsor SHELBY COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063240 PE 2015 / 100063241 RW 2018
100063242 STPBH-CMAQ 5915 (250)
UTILITIES INTERSECTION IMPROVEMENTS 2020 $312 $0 $78 $390100063243 STPBH-CMAQ 5915
(250)CONSTRUCTION INTERSECTION IMPROVEMENTS 2020 $6,303 $0 $1,576 $7,879
TOTAL COST: $6,615 $0 $1,654 $8,269
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
171 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route I-65 Project Description BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833
Project Length in Miles 0.020 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055323 CN 2022
100055322 IMF I065 () PRELIMINARY ENGINEERING BRIDGE WIDENING 2020 $746 $83 $0 $829100055323 IMF I065 () CONSTRUCTION BRIDGE WIDENING 2022 $7,000 $778 $0 $7,778
TOTAL COST: $7,746 $861 $0 $8,607
Route I-65 Project Description BRIDGE WIDENING ON I-65 OVER L AND N RAILROAD, 0.8 MILE NORTH OF SR-3 (US-31) IN CALERA, BIN #006484 AND #006485
Project Length in Miles 0.080 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055333 CN 2022
100055332 IMF I065 () PRELIMINARY ENGINEERING BRIDGE WIDENING 2020 $368 $41 $0 $409100055333 IMF I065 () CONSTRUCTION BRIDGE WIDENING 2022 $3,756 $417 $0 $4,173
TOTAL COST: $4,125 $458 $0 $4,583
Route I-65 Project Description BRIDGE WIDENING ON I-65 SOUTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87
Project Length in Miles 1.080 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055335 CN 2022
100055334 IMF I065 () PRELIMINARY ENGINEERING BRIDGE WIDENING 2020 $1,297 $144 $0 $1,442100055335 IMF I065 () CONSTRUCTION BRIDGE WIDENING 2022 $12,212 $1,357 $0 $13,569
TOTAL COST: $13,509 $1,501 $0 $15,010
Route I-65 Project Description PLANING, OVERLAY, AND STRIPING ON I-65 FROM THE CR-52 OVERPASS TO THE SOUTH END OF THE CAHABA RIVER BRIDGE
Project Length in Miles 13.396 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070835 IM I065 (510) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE
LEVEL 12020 $273 $30 $0 $303
100070839 IM-NH I065 (510) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $6,761 $884 $0 $7,646TOTAL COST: $7,034 $915 $0 $7,949
Route NA Project Description MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor PELHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067294 TAPAA-CMAQ TA17
(904)CONSTRUCTION UNCLASSIFIED 2022 $1,183 $0 $296 $1,479
TOTAL COST: $1,183 $0 $296 $1,479
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
172 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route NA Project Description BUCK CREEK MULTI-USE TRAIL FROM BUCK CREEK TO THOMPSON HIGH SCHOOL. TRAIL WILL LINK HIGH DENSITY RESIDENTIAL PARTS OF ALABASTER TO DESTINATIONS SUCH AS PARKS AND SCHOOLS. PROJECT SPONSOR: CITY OF ALABASTER .
Project Length in Miles 1.250 Urban Area BIRMINGHAM Sponsor ALABASTER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100032369 CMAQ 9802 () CONSTRUCTION UNCLASSIFIED 2021 $232 $0 $58 $291
TOTAL COST: $232 $0 $58 $291
Route NA Project Description HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD
Project Length in Miles 7.340 Urban Area BIRMINGHAM Sponsor HELENA COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100032380 PE 2000
100032383 CMAQ 9802 (925) CONSTRUCTION UNCLASSIFIED 2021 $2,306 $0 $577 $2,883100032386 CMAQ 9802 () CONSTRUCTION UNCLASSIFIED 2021 $289 $0 $72 $362
TOTAL COST: $2,596 $0 $649 $3,244
Route NA Project Description NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES 3, 4, 5, 7, 25, 38, 53, 70, 75, 76, 119, 139, 145, 149, 150, 151, 155, 261, 269 AND 378 WITHIN JEFFERSON AND SHELBY COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060181 PE 2013
100060174 STPAA NR13 (909) CONSTRUCTION SIDEWALK 2023 $1,490 $373 $0 $1,863TOTAL COST: $1,490 $373 $0 $1,863
Route NA Project Description TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.
Project Length in Miles 0.000 Urban Area BIRMINGHAM Sponsor PELHAM COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065161 PE 2017
100065162 CMAQ 5916 (253) RIGHT OF WAY SIDEWALK 2021 $84 $0 $21 $105100065163 CMAQ 5916 (253) UTILITIES SIDEWALK 2021 $84 $0 $21 $105
TOTAL COST: $168 $0 $42 $210
Route NA Project Description INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK
Project Length in Miles 1.800 Urban Area BIRMINGHAM Sponsor SHELBY COUNTY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100054519 CMAQ 5917 (904) CONSTRUCTION UNCLASSIFIED 2020 $1,042 $0 $261 $1,303
TOTAL COST: $1,042 $0 $261 $1,303
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
173 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route SR-119 Project Description ADDITIONAL LANES ON SR-119 FROM CR-12 TO CR-26 - PHASE 1
Project Length in Miles 1.694 Urban Area BIRMINGHAM Sponsor ALABASTER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061118 ACNH61118 ATRP (012) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $7,731 $0 $1,933 $9,664
TOTAL COST: $7,731 $0 $1,933 $9,664
Route SR-119 Project Description ADDITIONAL LANES ON SR-119 FROM MEADOWLARK PL TO CR-12 (WEST SIDE ONLY) THEN CONTINUING TO CR-26 (EAST AND WEST SIDES) - PHASE 1
Project Length in Miles 3.388 Urban Area BIRMINGHAM Sponsor ALABASTER COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061286 STPBH 0119 (510) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $2,954 $0 $739 $3,693100063109 STPBH 0119 (510) UTILITIES ADDITIONAL ROADWAY LANES 2020 $100 $0 $25 $125
TOTAL COST: $3,054 $0 $764 $3,818
Route SR-139 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-139 FROM THE BIBB COUNTY LINE TO SR-25 IN WILTON
Project Length in Miles 0.320 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070153 STPAA 0139 (504) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $115 $29 $0 $144
TOTAL COST: $115 $29 $0 $144
Route SR-25 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING, AND 2' SAFETY WIDENING ON SR-25 FROM THE BIBB COUNTY LINE TO CR-73 IN MONTEVALLO
Project Length in Miles 3.685 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070152 STPAA-HSIP 0025 (557) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,801 $441 $0 $2,242
TOTAL COST: $1,801 $441 $0 $2,242
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
174 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route SR-261 Project Description ADDITIONAL LANES ON SR-261 FROM BEARDEN ROAD TO SR-3 (US-31)
Project Length in Miles 5.200 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100009266 PE 2000
100046437 STPAA 7112 () UTILITIES ADDITIONAL ROADWAY LANES 2021 $1,395 $349 $0 $1,743100009265 STPAA 7112 () CONSTRUCTION ADDITIONAL ROADWAY LANES 2022 $22,822 $5,705 $0 $28,527
TOTAL COST: $24,217 $6,054 $0 $30,271
Route SR-261 Project Description HELENA BYPASS FROM CR-52 WEST OF HELENA TO SR-261 NORTH OF HELENA
Project Length in Miles 11.763 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100049207 PE 2012 / 100049211 CN 2028
100049209 HPP A139 () RIGHT OF WAY GRADE, DRAIN, BASE, PAVE AND BRG
2021 $1,945 $486 $0 $2,431100049210 HPP A139 () UTILITIES GRADE, DRAIN, BASE, PAVE AND
BRG2022 $117 $29 $0 $146
TOTAL COST: $2,062 $515 $0 $2,577
Route SR-261 Project Description INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA
Project Length in Miles 0.225 Urban Area BIRMINGHAM Sponsor HELENA COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067711 PE 2018
100067712 CMAQ 0261 (501) RIGHT OF WAY INTERSECTION IMPROVEMENTS 2021 $247 $0 $62 $308100067713 CMAQ 0261 (501) UTILITIES INTERSECTION IMPROVEMENTS 2023 $607 $0 $152 $758100067714 CMAQ 0261 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2023 $1,234 $0 $309 $1,543
TOTAL COST: $2,088 $0 $522 $2,610
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
175 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route SR-3 Project Description SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057650 CN 2025
100057649 BR 0003 () PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2022 $445 $111 $0 $557TOTAL COST: $445 $111 $0 $557
Route SR-3 Project Description PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)
Project Length in Miles 1.125 Urban Area BIRMINGHAM Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100039466 PE 2001
100039450 STPBH 7012 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $449 $112 $0 $561TOTAL COST: $449 $112 $0 $561
Route SR-3 Project Description RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-3 (US-31) FROM I-65 TO CR-68
Project Length in Miles 2.590 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068646 NH 0003 (621) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,790 $447 $0 $2,237
TOTAL COST: $1,790 $447 $0 $2,237
Route SR-38 Project Description RESURFACING, MICRO-MILLING, PLANING, STRIPING, LEVELING, AND PATCHING ON SR-38 (US-280) FROM A JOINT 686 FT WEST OF CR-62 TO THE TALLADEGA COUNTY LINE
Project Length in Miles 7.308 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068641 NH 0038 (541) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $5,943 $1,486 $0 $7,429
TOTAL COST: $5,943 $1,486 $0 $7,429
Route SR-38 Project Description RESURFACING, MICRO-MILLING, STRIPING, LEVELING AND PATCHING ON SR-38 (US-280) FROM THE SHELBY COUNTY LINE TO HUGH DANIEL DRIVE
Project Length in Miles 2.971 Urban Area BIRMINGHAM Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070158 NH 0038 (545) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 12021 $1,883 $471 $0 $2,353
TOTAL COST: $1,883 $471 $0 $2,353
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
176 of 206
HIGHWAY PROJECTS - SHELBYSTIP PLAN: 2020 - Original
Route CR-12 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 009148) ON CR-12 OVER SUCARNOOCHEE RIVER; SITE 2 - (BIN 006243) ON CR-10 OVER CHAPEL BRANCH; SITE 3 - (BIN 003815) ON CR-12 OVER TEOC CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071476 HRRR 6020 () CONSTRUCTION GUARDRAIL 2020 $210 $0 $23 $234
TOTAL COST: $210 $0 $23 $234
Route CR-83 Project Description INSTALLING TRAFFIC CONTROL DEVICES AT THE CR-34/CR-83 INTERSECTION
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071475 HRRR 6020 (250) CONSTRUCTION TRAFFIC CONTROL MARKING &
LEGN2020 $40 $0 $4 $45
TOTAL COST: $40 $0 $4 $45
Route CR-NA Project Description BRIDGE REPLACEMENT (BIN # 007165) BUMKUN ROAD OVER UNNAMED CREEK IN SUMTER COUNTY
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100062964 PE 2015 / 100061887 CN 2020
100061887 BRZ 6014 (258) CONSTRUCTION BRIDGE REPLACEMENT 2020 $130 $0 $32 $162TOTAL COST: $130 $0 $32 $162
Route SR-7 Project Description BRIDGE REPLACEMENT ON SR-7(US-11) OVER TOOMSUBA CREEK BIN 002909 AND BIN 002908 RELIEF (SUFF=50.5, STATUS=2)
Project Length in Miles 0.602 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100038698 PE 2002 / 100042196 RW 2003
100042197 BR 0007 (502) UTILITIES BRIDGE REPLACEMENT 2021 $144 $36 $0 $181100038699 BR 0007 (502) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,485 $871 $0 $4,356
TOTAL COST: $3,629 $907 $0 $4,537
Route SR-7 Project Description BRIDGE REPLACEMENT ON SR-7 (US-11) OVER PARKER CREEK. BIN #002884, STR # 7-60-13.153. (SUFF=45.2, STAT=2)
Project Length in Miles 0.020 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100040201 PE 2002 / 100040204 RW 2003
100040205 BR 0007 (503) UTILITIES BRIDGE REPLACEMENT 2022 $171 $43 $0 $214100040203 BR 0007 (503) CONSTRUCTION BRIDGE REPLACEMENT 2022 $1,285 $321 $0 $1,606
TOTAL COST: $1,456 $364 $0 $1,819
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
177 of 206
HIGHWAY PROJECTS - SUMTERSTIP PLAN: 2020 - Original
Route SR-8 Project Description SAFETY IMPROVEMENTS ON SR-8 (US-80) AT SR-28 AND CR-25
Project Length in Miles 0.681 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064866 PE 2016 / 100070942 RW 2021 / 100064862 CN 2021
100070942 HSIP 0008 (584) RIGHT OF WAY GRADE, DRAIN, BASE AND PAVE 2021 $91 $10 $0 $101100064862 HSIP 0008 (584) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,986 $221 $0 $2,207
TOTAL COST: $2,077 $231 $0 $2,308
Route SR-NA Project Description SIGN INVENTORY AND ASSESSMENT FOR UNSIGNALIZED AND SIGNALIZED INTERSECTIONS AT STATE AND US ROUTES IN SUMTER COUNTY
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070885 HSIP NR20 (906) SPECIAL SAFETY IMPROVEMENTS 2020 $45 $5 $0 $50
TOTAL COST: $45 $5 $0 $50
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
178 of 206
HIGHWAY PROJECTS - SUMTERSTIP PLAN: 2020 - Original
Route CR-175 Project Description RESURFACING ON CR-175 (OAKDALE ROAD) FROM SR-21 TO SR-76 - TCP 61-03-16
Project Length in Miles 5.590 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071538 RASTPOA 6116 (253) CONSTRUCTION RESURFACING 2020 $616 $130 $400 $1,145
TOTAL COST: $616 $130 $400 $1,145
Route CR-190 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITES 1 AND 2 - ON CR-190 (BIN 010422) OVER FANNING BRANCH AND (BIN 008897) OVER HUDSON BRANCH; SITE 3 - (BIN 002871) ON CR-280 OVER CLEAR CREEK; SITE 4 - (BIN 005364) ON CR-382 OVER FAYNE CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071477 HRRR 6120 () CONSTRUCTION GUARDRAIL 2020 $190 $0 $21 $211
TOTAL COST: $190 $0 $21 $211
Route CR-303 Project Description BRIDGE REPLACEMENT (BIN 008086) ON CR-303 (BERNEY STATION ROAD) OVER DRY CREEK
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071573 FLAP FLAP (010) PRELIMINARY ENGINEERING BRIDGE REPLACEMENT 2020 $112 $0 $28 $140100067954 FLAP FLAP (010) CONSTRUCTION BRIDGE REPLACEMENT 2021 $200 $0 $50 $251
TOTAL COST: $312 $0 $78 $391
Route CR-NA Project Description INSTALL RAILROAD CROSSING DEVICES ON GENE E. STEWART BLVD IN SYLACAUGA, DOT NO. 351 492B, REF #1321 (XVI-R), TO INCLUDE SIGNS, MARKINGS AND LEGENDS
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066438 RHCH RR17 (906) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $5 $1 $0 $5
TOTAL COST: $5 $1 $0 $5
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ALONG SR-21 FROM 5TH STREET TO 6TH STREET, ALSO IMPROVEMENTS ALONG 2ND STREET, CALHOUN STREET AND 3RD STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068370 TAPAA TA18 (914) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route CR-NA Project Description STREETSCAPE AND ADA IMPROVEMENTS TO THE PARKING AREA BETWEEN NORTON AVENUE AND SR-21, 3RD STREET AND 1ST STREET
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069019 TAPAA TA19 (914) CONSTRUCTION STREETSCAPE 2020 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
179 of 206
HIGHWAY PROJECTS - TALLADEGASTIP PLAN: 2020 - Original
Route I-20 Project Description INTERCHANGE LIGHTING ON I-20 AT CR-207 (EXIT 165)
Project Length in Miles 0.402 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100004964 CN 2021
100004964 IM I020 (338) CONSTRUCTION LIGHTING 2021 $656 $73 $0 $729TOTAL COST: $656 $73 $0 $729
Route SR-21 Project Description SR-21 REPLACE BRIDGE BIN #001441 NO. 21-61-27.1 OVER SOUTHERN RAILROAD
Project Length in Miles 0.200 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100002464 CN 2024
100002467 BR 0021 () RIGHT OF WAY BRIDGE REPLACEMENT 2021 $393 $98 $0 $491TOTAL COST: $393 $98 $0 $491
Route SR-21 Project Description SR-21 BIN # 2634 BRIDGE REPLACEMENT OVER CHEAHA CREEK
Project Length in Miles 1.400 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100060129 PE 2016
100070895 BR 0021 (554) UTILITIES BRIDGE REPLACEMENT 2020 $120 $30 $0 $150100060130 BR 0021 (554) CONSTRUCTION BRIDGE REPLACEMENT 2020 $3,379 $845 $0 $4,224
TOTAL COST: $3,499 $875 $0 $4,374
Route SR-21 Project Description RAILROAD CROSSING IMPROVEMENTS ON SR-21 (NORTH BROADWAY AVENUE) IN SYLACAUGA, REF # 1279, DOT 351-501X
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100063002 RHCH RR15 (900) CONSTRUCTION RR CROSSING IMPROVEMENTS 2019 $192 $21 $0 $213
TOTAL COST: $192 $21 $0 $213
Route SR-21 Project Description RESURFACING AND TRAFFIC STRIPING ON SR-21 FROM .37 MILE SOUTH OF SR-76 (MP 220.345) TO .19 MILE SOUTH OF CR-238 (MP 224.831)
Project Length in Miles 4.460 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069803 NH 0021 (568) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $2,308 $577 $0 $2,885
TOTAL COST: $2,308 $577 $0 $2,885
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
180 of 206
HIGHWAY PROJECTS - TALLADEGASTIP PLAN: 2020 - Original
Route SR-34 Project Description REPL BIN 003153, SR-34 OVER POOR HOUSE BRANCH, 0.23 MILES NORTH OF CR-332. (SUFF=47.8, STAT=FO, 2001 HBRRP LIST)
Project Length in Miles 0.013 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100041644 PE 2016
100041617 BR 0034 (501) CONSTRUCTION BRIDGE REPLACEMENT 2020 $1,589 $397 $0 $1,986TOTAL COST: $1,589 $397 $0 $1,986
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
181 of 206
HIGHWAY PROJECTS - TALLADEGASTIP PLAN: 2020 - Original
Route SR-22 Project Description RESURFACING, TRAFFIC STRIPING AND 2 FT SAFETY WIDENING ON SR-22 FROM .55 MILE SOUTH OF HILLABEE CREEK (MP 122.437) TO SR-49 (MP 130.587)
Project Length in Miles 8.150 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069807 STPAA-HSIP 0022 (532) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $2,398 $559 $0 $2,957
TOTAL COST: $2,398 $559 $0 $2,957
Route SR-49 Project Description RESURFACING, TRAFFIC STRIPING AND 2 FT SAFETY WIDENING ON SR-49 FROM MP 48.302 (SR 22 INT.) TO MP 52.920 (TALLAPOOSA/CLAY COUNTY LINE)
Project Length in Miles 4.619 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069806 STPAA-HSIP 0049 (514) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,359 $292 $0 $1,651
TOTAL COST: $1,359 $292 $0 $1,651
Route SR-50 Project Description REPLACE BRIDGE ON SR-50 OVER WIND CREEK BIN 004389
Project Length in Miles 0.030 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067062 PE 2019
100049968 BR 0050 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,518 $630 $0 $3,148TOTAL COST: $2,518 $630 $0 $3,148
Route SR-50 Project Description RESURFACING, TRAFFIC STRIPE, AND 2 FT SAFETY WIDENING ON SR-50 FROM SR-38 (US-280) (MP 523.108) TO THE CHAMBERS COUNTY LINE (MP 528.520)
Project Length in Miles 5.412 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068385 STPAA-HSIP 0050 (506) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,636 $364 $0 $2,000
TOTAL COST: $1,636 $364 $0 $2,000
Route SR-63 Project Description BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9
Project Length in Miles 0.240 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068200 PE 2018
100067663 BR 0063 (507) CONSTRUCTION BRIDGE REPLACEMENT 2021 $1,236 $309 $0 $1,545TOTAL COST: $1,236 $309 $0 $1,545
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
182 of 206
HIGHWAY PROJECTS - TALLAPOOSASTIP PLAN: 2020 - Original
Route CR-124 Project Description BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059618 ACBRZ59618 ATRP (010) CONSTRUCTION BRIDGE REPLACEMENT 2020 $383 $0 $96 $479
TOTAL COST: $383 $0 $96 $479
Route CR-124 Project Description BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059619 ACBRZ59619 ATRP (010) CONSTRUCTION BRIDGE REPLACEMENT 2020 $241 $0 $60 $302
TOTAL COST: $241 $0 $60 $302
Route CR-1358 Project Description BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059621 ACBRZ59621 ATRP (007) CONSTRUCTION BRIDGE REPLACEMENT 2020 $694 $0 $173 $867
TOTAL COST: $694 $0 $173 $867
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON MAIN AVENUE FROM 4TH STREET TO 1ST STREET - PHASE I
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor NORTHPORT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069015 TAPAA TA19 (910) CONSTRUCTION STREETSCAPE 2020 $593 $0 $148 $742
TOTAL COST: $593 $0 $148 $742
Route CR-NA Project Description RESURFACE ELIGIBLE STREETS IN THE CITY OF TUSCALOOSA FY10
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor TUSCALOOSA CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100053859 STPAA 6314 () CONSTRUCTION RESURFACING 2022 $251 $63 $0 $313
TOTAL COST: $251 $63 $0 $313
Route CR-NA Project Description WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET
Project Length in Miles 1.365 Urban Area TUSCALOOSA Sponsor TUSCALOOSA CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100061873 ACOA61873 ATRP (017) CONSTRUCTION RESURFACING 2020 $1,491 $0 $373 $1,864
TOTAL COST: $1,491 $0 $373 $1,864
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
183 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route CR-NA Project Description INTERSECTION AND SAFETY IMPROVEMENTS, ROUNDABOUTS, ON 5TH STREET AT SR-13 (LURLEEN WALLACE BOULEVARD), ROBERT CARDINAL ROAD, KENTUCK PARK/WEST CIRCLE, AND BRIDGE AVENUE
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064427 PE 2015 / 100068208 RW 2021 / 100068951 UT 2022 / 100064428 CN 2022
100068208 HSIPF 6315 (250) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $227 $25 $0 $253100068951 HSIPF 6315 () UTILITIES SAFETY IMPROVEMENTS 2022 $232 $26 $0 $258100064428 HSIPF 6315 () CONSTRUCTION SAFETY IMPROVEMENTS 2022 $1,930 $214 $0 $2,144
TOTAL COST: $2,389 $265 $0 $2,654
Route CR-NA Project Description MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK
Project Length in Miles 3.450 Urban Area TUSCALOOSA Sponsor NORTHPORT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065002 PE 2017
100008464 STPOA 6317 (250) RIGHT OF WAY TURN LANES 2020 $910 $0 $228 $1,138100043870 STPOA 6317 (250) UTILITIES TURN LANES 2021 $460 $0 $115 $575100008460 ACSTPOA 6317 () CONSTRUCTION TURN LANES 2021 $5,517 $0 $1,379 $6,897
TOTAL COST: $6,888 $0 $1,722 $8,610
Route CR-NA Project Description WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA
Project Length in Miles 1.500 Urban Area TUSCALOOSA Sponsor TUSCALOOSA CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100067467 PE 2019
100008465 STPOA 6314 (253) RIGHT OF WAY WIDENING AND RESURFACING (RDWY)
2020 $455 $0 $114 $569100043871 STPOA 6314 (253) UTILITIES WIDENING AND RESURFACING
(RDWY)2021 $276 $0 $69 $345
100008461 STPOA 6314 () CONSTRUCTION WIDENING AND RESURFACING (RDWY)
2021 $460 $0 $115 $575TOTAL COST: $1,191 $0 $298 $1,489
Route CR-NA Project Description SIDEWALK ALONG CYPRESS CREEK AVENUE FROM SOUTH OF RUNNING BROOK APARTMENTS TO SKYLAND BOULEVARD - PHASE III (SECTION D)
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor TUSCALOOSA CITY LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068781 RW 2021 / 100068372 CN 2021
100068781 TAPAA TA18 (916) RIGHT OF WAY SIDEWALK 2021 $101 $0 $25 $126100068372 TAPAA TA18 (916) CONSTRUCTION SIDEWALK 2021 $194 $0 $48 $242
TOTAL COST: $294 $0 $74 $368
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
184 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route CR-NA Project Description SIDEWALK ON CYPRESS CREEK AVENUE FROM THE CYPRESS CREEK APARTMENTS TO THE REGAL POINTE APARTMENTS
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor TUSCALOOSA CITY LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064558 CN 2017 / 100067288 CN 2020
100067288 TAPOA TA17 (944) CONSTRUCTION SIDEWALK 2020 $400 $0 $100 $500TOTAL COST: $400 $0 $100 $500
Route I-59 Project Description RESURFACING THE SERVICE ROADS ON I-59 AT EXIT 89
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069098 CN 2021
100069097 IM I059 () PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 2
2020 $227 $25 $0 $253100069098 IM I059 () CONSTRUCTION PREVENTATIVE MAINTENANCE
LEVEL 22021 $995 $111 $0 $1,106
TOTAL COST: $1,222 $136 $0 $1,358
Route I-59 Project Description GUIDE RAIL INSTALLATION ON I-59 FROM GREENE COUNTY LINE TO .25 MI SOUTH OF SR-6 (US-82)(MCFARLAND BLVD)
Project Length in Miles 17.651 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064197 PE 2019 / 100060977 CN 2021
100060977 HSIP I059 (413) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,244 $138 $0 $1,382TOTAL COST: $1,244 $138 $0 $1,382
Route I-59 Project Description RESURFACING ON I-59 (I-20) FROM SR-69 (I-359) TO EAST OF SR-6 (US-82) AND ADDITIONAL LANES BETWEEN SR-215 AND SR-6 (US-82), GRADE, DRAIN, BASE, PAVE, SIGNING, STRIPING, AND RESURFACING
Project Length in Miles 2.500 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064910 PE 2017
100039473 IM-NH I059 (399) CONSTRUCTION GRADE, DRAIN, BASE AND PAVE 2021 $3,935 $941 $0 $4,876TOTAL COST: $3,935 $941 $0 $4,876
Route I-59 Project Description ROUNDABOUTS, SIGNING AND STRIPING ON I-59/I-20 ON-RAMPS AND OFF-RAMPS AT EXIT 79 (SR-7/US-11 INTERSECTION)
Project Length in Miles 0.628 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068078 PE 2019 / 100068090 RW 2021 / 100068091 UT 2021 / 100068092 CN 2021
100068092 HSIP I059 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,469 $163 $0 $1,632100068090 HSIP I059 (414) RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068091 HSIP I059 (414) UTILITIES SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103
TOTAL COST: $1,654 $184 $0 $1,838
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
185 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route NA Project Description SR-7 (US-11) SIDEWALK PROJECT FROM WESTLEE DRIVE TO 21ST STREET IN TUSCALOOSA COUNTY
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064557 TAPAAF TA15 (942) CONSTRUCTION SIDEWALK 2019 $625 $0 $156 $782
TOTAL COST: $625 $0 $156 $782
Route NA Project Description WIDEN AND IMPROVE PEDESTRIAN ACCESS 10TH AVENUE FROM 31ST STREET TO 15TH STREET IN TUSCALOOSA TO BE FUNDED BY HOUSING AND URBAN DEVELOPMENT (HUD)
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor TUSCALOOSA CITY COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100059446 HUD FUNDS & LOCAL
FUNDS ()CONSTRUCTION RESURFACING 2020 $5,440 $0 $1,360 $6,800
TOTAL COST: $5,440 $0 $1,360 $6,800
Route NA Project Description GUARDRAIL FOR ROADWAY SAFETY ASSESSMENT SITES ON SR-7 AND SR-171 IN TUSCALOOSA COUNTY
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067055 HSIP NR17 (935) CONSTRUCTION SAFETY IMPROVEMENTS 2020 $624 $69 $0 $693
TOTAL COST: $624 $69 $0 $693
Route NA Project Description CURB RAMP INSTALLATION ON STATE ROUTES 5, 6, 7, 13, 69, 171, 215, 216, 297 AND 300 IN TUSCALOOSA COUNTY
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068201 STPAA NR18 () CONSTRUCTION SIDEWALK 2023 $231 $58 $0 $289
TOTAL COST: $231 $58 $0 $289
Route SR-171 Project Description REALIGNING SR-171 AND ADD TURNING LANE AT PREWITT LOOP ROAD
Project Length in Miles 0.915 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069513 PE 2019 / 100069514 RW 2020 / 100069515 UT 2021 / 100069516 CN 2021
100069516 HSIP 0171 (516) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,377 $153 $0 $1,530100069514 HSIP 0171 (516) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $27 $3 $0 $30100069515 HSIP 0171 (516) UTILITIES SAFETY IMPROVEMENTS 2021 $23 $3 $0 $26
TOTAL COST: $1,427 $159 $0 $1,586
Route SR-297 Project Description SR-297 ROW CORRIDOR PRESERVATION TUSCALOOSA EAST BYPASS
Project Length in Miles 19.962 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100043861 RW 2003
100060575 DESTP-NCPD 0297 (907) PRELIMINARY ENGINEERING UNCLASSIFIED 2020 $6 $2 $0 $8TOTAL COST: $6 $2 $0 $8
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
186 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route SR-5 Project Description SR-5 BRIDGE REMOVAL STR# 5-63-2.3 A AND B OVER ABANDON L AND N RR, BIN 005799 AND 005800
Project Length in Miles 1.380 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100057835 BR 0005 (540) UTILITIES OVERPASS REMOVAL 2022 $67 $17 $0 $84100038399 BR 0005 () CONSTRUCTION OVERPASS REMOVAL 2022 $764 $191 $0 $955
TOTAL COST: $831 $208 $0 $1,038
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
187 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route SR-6 Project Description INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69
Project Length in Miles 1.230 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068735 CN 2024
100068588 TRC-ST-063-006-019-PE ()
PRELIMINARY ENGINEERING INTERSECTION IMPROVEMENTS 2020 $0 $0 $250 $250100068733 NH 0006 () RIGHT OF WAY INTERSECTION IMPROVEMENTS 2022 $416 $104 $0 $520100068734 NH 0006 () UTILITIES INTERSECTION IMPROVEMENTS 2023 $631 $158 $0 $788
TOTAL COST: $1,047 $262 $250 $1,559
Route SR-6 Project Description WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD
Project Length in Miles 0.250 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100064403 PE 2015 / 100065855 RW 2020 / 100065854 UT 2020
100064404 TRC-ACAA64404 ATRP (004)
CONSTRUCTION INTERCHANGE 2020 $7,257 $1,814 $0 $9,072TOTAL COST: $7,257 $1,814 $0 $9,072
Route SR-6 Project Description ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69
Project Length in Miles 4.282 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065113 PE 2020 / 100065115 UT 2022
100065114 TRC-ST-063-999-038-CN ()
CONSTRUCTION INTERSECTION IMPROVEMENTS 2022 $0 $0 $7,195 $7,195TOTAL COST: $0 $0 $7,195 $7,195
Route SR-6 Project Description ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD
Project Length in Miles 8.710 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100065936 PE 2016
100067680 RACR-063-999-033-RW ()
RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $0 $1,100 $0 $1,100100066242 TRC-RACR-063-999-033-
UT ()UTILITIES ADDITIONAL ROADWAY LANES 2020 $0 $312 $0 $312
100004617 TRC-RACR-063-999-033-CN ()
CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $0 $25,322 $0 $25,322TOTAL COST: $0 $26,734 $0 $26,734
Route SR-6 Project Description BRIDGE REPLACEMENT ON SR-6 (US-82) OVER BIG CREEK (BIN 5819 AND 5818)
Project Length in Miles 0.620 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069590 PE 2019
100069591 BR 0006 () CONSTRUCTION BRIDGE REPLACEMENT 2022 $2,061 $515 $0 $2,576TOTAL COST: $2,061 $515 $0 $2,576
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
188 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route SR-69 Project Description INSTALLATION OF CONFLICT WARNING SYSTEM AT SR-69 AND CR-74 (UPPER HULL ROAD)
Project Length in Miles 0.000 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071582 HSIP 0069 () CONSTRUCTION SAFETY IMPROVEMENTS 2020 $90 $10 $0 $100
TOTAL COST: $90 $10 $0 $100
Route SR-69 Project Description SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)
Project Length in Miles 1.430 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100057983 PE 2012 / 100057985 RW 2019 / 100057986 UT 2020
100057987 TRC-NHF 0069 () CONSTRUCTION INTERSECTION IMPROVEMENTS 2021 $41,917 $0 $10,479 $52,396TOTAL COST: $41,917 $0 $10,479 $52,396
Route SR-7 Project Description REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)
Project Length in Miles 0.786 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055889 PE 2017
100055891 BR 0007 (546) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $125 $31 $0 $156100055892 BR 0007 (546) UTILITIES BRIDGE REPLACEMENT 2021 $142 $36 $0 $178100055893 RP-BR 0007 (546) CONSTRUCTION BRIDGE REPLACEMENT 2021 $2,724 $681 $0 $3,405
TOTAL COST: $2,991 $748 $0 $3,739
Route SR-7 Project Description ROUNDABOUT CONSTRUCTION AT THE INTERSECTION OF SR-7 (US-11) AND SR-300 (HOLLEY SPRINGS LANE) IN FOSTERS
Project Length in Miles 0.900 Urban Area TUSCALOOSA Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068206 PE 2019 / 100069423 RW 2020 / 100069424 UT 2021 / 100069425 CN 2021
100069423 HSIP 0007 (551) RIGHT OF WAY SAFETY IMPROVEMENTS 2020 $227 $25 $0 $253100069424 HSIP 0007 (551) UTILITIES SAFETY IMPROVEMENTS 2021 $230 $26 $0 $255100069425 HSIP 0007 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $2,295 $255 $0 $2,550
TOTAL COST: $2,752 $306 $0 $3,058
Route SR-7 Project Description ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION OF SR-5
Project Length in Miles 20.760 Urban Area TUSCALOOSA Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068754 PE 2018 / 100068927 PE 2018
100068755 STPAAF 0007 (549) RIGHT OF WAY ADDITIONAL ROADWAY LANES 2020 $7,052 $1,763 $0 $8,815100068756 STPAAF 0007 (549) UTILITIES ADDITIONAL ROADWAY LANES 2021 $4,945 $1,236 $0 $6,182100068757 ACSTPAAF 0007 (549) CONSTRUCTION ADDITIONAL ROADWAY LANES 2021 $41,964 $10,491 $0 $52,455
TOTAL COST: $53,961 $13,490 $0 $67,451
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
189 of 206
HIGHWAY PROJECTS - TUSCALOOSASTIP PLAN: 2020 - Original
Route CR-11 Project Description WIDENING, RESURFACING, CULVERT EXTENSIONS, AND TRAFFIC STRIPE ON COUNTY ROAD 11 (NAUVOO ROAD) FROM 9TH AVENUE NORTHWEST TO KEETON FARM ROAD
Project Length in Miles 5.789 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070573 RASTPNU 6419 (251) CONSTRUCTION WIDENING AND RESURFACING
(RDWY)2020 $1,212 $0 $453 $1,666
TOTAL COST: $1,212 $0 $453 $1,666
Route CR-27 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-27 (FALL CITY ROAD) FROM SR-195 TO THE WINSTON COUNTY LINE - WCP 64-01-18
Project Length in Miles 6.684 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070272 RASTPAA 6419 (250) CONSTRUCTION RESURFACING 2020 $1,261 $0 $315 $1,577
TOTAL COST: $1,261 $0 $315 $1,577
Route CR-64 Project Description BRIDGE ALONG CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK BIN # 11168
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060969 ACBRZ60969 ATRP (008) CONSTRUCTION BRIDGES AND APPROACHES 2020 $1,558 $0 $389 $1,947
TOTAL COST: $1,558 $0 $389 $1,947
Route CR-NA Project Description STREETSCAPE IMPROVEMENTS ON 18TH STREET WEST FROM ALABAMA AVENUE TO 2ND AVENUE, 18TH STREET WEST FROM 3RD AVENUE TO 4TH AVENUE, 18TH STREET WEST FROM 5TH AVENUE TO 6TH AVENUE, AND ON 6TH AVENUE FROM 18TH STREET WEST TO 19TH STREET WEST
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069014 TAPAA TA19 (909) CONSTRUCTION STREETSCAPE 2019 $640 $0 $160 $800
TOTAL COST: $640 $0 $160 $800
Route CR-NA Project Description BRIDGE REPLACEMENT AND APPROACHES ON SMITH CHAPEL ROAD OVER MILL CREEK BIN# 87
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060970 ACBRZ60970 ATRP (008) CONSTRUCTION BRIDGE REPLACEMENT 2020 $825 $0 $206 $1,031
TOTAL COST: $825 $0 $206 $1,031
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
190 of 206
HIGHWAY PROJECTS - WALKERSTIP PLAN: 2020 - Original
Route I-22 Project Description ROUNDABOUTS, SIGNING AND STRIPING ON I-22 ON-RAMPS AND OFF-RAMPS AT EXIT 70 (CR-22 INTERSECTION)
Project Length in Miles 0.400 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100068095 RW 2021 / 100068096 UT 2021 / 100068097 CN 2021
100068094 HSIP I022 (314) PRELIMINARY ENGINEERING SAFETY IMPROVEMENTS 2019 $227 $25 $0 $253100068095 HSIP I022 () RIGHT OF WAY SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068096 HSIP I022 () UTILITIES SAFETY IMPROVEMENTS 2021 $93 $10 $0 $103100068097 HSIP I022 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $1,170 $130 $0 $1,300
TOTAL COST: $1,583 $176 $0 $1,759
Route I-22 Project Description RESURFACING ON I-22 FROM .8 MILE EAST OF THE CR-61 OVERPASS TO THE JEFFERSON COUNTY LINE
Project Length in Miles 7.696 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069101 PE 2019 / 100069103 CN 2020
100069103 IM-IMGR I022 (313) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1
2020 $7,689 $854 $0 $8,544TOTAL COST: $7,689 $854 $0 $8,544
Route SR-5 Project Description BRIDGE REPLACEMENT ON SR-5 OVER SR-69 (US-78) BIN #007638
Project Length in Miles 0.500 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100003191 PE 1999 / 100038339 RW 2012
100040851 BRF 0005 (534) UTILITIES BRIDGE REPLACEMENT 2021 $23 $6 $0 $29100003188 BR 0005 (534) CONSTRUCTION BRIDGE REPLACEMENT 2021 $5,765 $1,441 $0 $7,206
TOTAL COST: $5,788 $1,447 $0 $7,235
Route SR-5 Project Description REMOVE BIN #004013, SR-5 (US-78) OVER ABANDONED FRISCO (BNSF) RAILROAD, NEAR DORA
Project Length in Miles 0.182 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100042712 RW 2024 / 100042710 CN 2024
100065246 BR 0005 () PRELIMINARY ENGINEERING BRIDGE REMOVAL 2021 $126 $32 $0 $158100042711 BR 0005 () UTILITIES BRIDGE REMOVAL 2023 $59 $15 $0 $74
TOTAL COST: $185 $46 $0 $232
Route SR-5 Project Description MICRO-MILLING AND RESURFACING ON SR-5 FROM THE JASPER CITY LIMITS TO THE 9TH AVENUE OVERPASS
Project Length in Miles 4.452 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068629 NH 0005 (559) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $3,808 $952 $0 $4,761
TOTAL COST: $3,808 $952 $0 $4,761
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
191 of 206
HIGHWAY PROJECTS - WALKERSTIP PLAN: 2020 - Original
Route SR-69 Project Description RESURFACING ON SR-69 FROM MP 200.408 AT INTERSECTION WITH SR-269 TO MP 202.570 AT INTERSECTION WITH SR-118
Project Length in Miles 2.140 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068627 STPAA 0069 (559) FEDERAL MAINT CN PAVEMENT MINOR
REHABILITATION2020 $1,423 $356 $0 $1,779
TOTAL COST: $1,423 $356 $0 $1,779
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
192 of 206
HIGHWAY PROJECTS - WALKERSTIP PLAN: 2020 - Original
Route CR-34 Project Description GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 003074) ON CR-34 OVER MILL CREEK; SITE 2 - (BIN 010751) ON CR-16 OVER BILBO CREEK
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071478 HRRR 6520 () CONSTRUCTION GUARDRAIL 2020 $86 $0 $10 $95
TOTAL COST: $86 $0 $10 $95
Route SR-57 Project Description RESURFACING ON SR-57 (US-45) FROM .34 MILE NORTH OF DOUG PRICE ROAD TO THE MISSISSIPPI STATE LINE
Project Length in Miles 8.210 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070067 NH 0057 (501) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22020 $1,481 $370 $0 $1,851
TOTAL COST: $1,481 $370 $0 $1,851
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
193 of 206
HIGHWAY PROJECTS - WASHINGTONSTIP PLAN: 2020 - Original
Route CR-190 Project Description BRIDGE REPLACEMENT ON CR-190 (WILLIE POWELL ROAD) OVER MUD CREEK BIN # 1147 (R.A.M.P.)
Project Length in Miles 51.400 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100060499 ACBRZ60499 ATRP (008) CONSTRUCTION BRIDGE 2021 $436 $109 $0 $545
TOTAL COST: $436 $109 $0 $545
Route CR-22 Project Description WIDENING, RESURFACING, AND STRIPING ON CR-22 FROM SR-221 TO SR-10 - WCP 66-10-16
Project Length in Miles 1.300 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070597 STPNU 6616 (251) CONSTRUCTION RESURFACING 2020 $381 $95 $0 $477
TOTAL COST: $381 $95 $0 $477
Route CR-24 Project Description BRIDGE REPLACEMENT ON CR-24 (ALLENTON ROAD) OVER BEAR CREEK (R.A.M.P.) BIN # 6600
Project Length in Miles 0.000 Sponsor COUNTY LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100063410 PE 2015 / 100060443 CN 2021
100060443 BRZ 6615 () CONSTRUCTION BRIDGE REPLACEMENT 2021 $260 $0 $65 $325TOTAL COST: $260 $0 $65 $325
Route CR-NA Project Description TRAIN DEPOT RESTORATION IN THE TOWN OF PINE HILL
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069033 TAPNU TA19 (927) CONSTRUCTION UNCLASSIFIED 2019 $31 $0 $8 $39
TOTAL COST: $31 $0 $8 $39
Route SR-265 Project Description RESURFACING AND 2 FOOT SAFETY WIDENING ON SR-265 FROM THE MONROE COUNTY LINE TO 0.97 MILE NORTH OF CR-51
Project Length in Miles 6.037 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069685 STPAA-HSIP 0265 (502) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 2 W/ SAFETY WIDEN2020 $1,121 $244 $0 $1,365
TOTAL COST: $1,121 $244 $0 $1,365
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
194 of 206
HIGHWAY PROJECTS - WILCOXSTIP PLAN: 2020 - Original
Route SR-5 Project Description BRIDGE REPLACEMENT ON SR-5 OVER MUD CREEK (BIN #001717)
Project Length in Miles 2.576 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100051321 PE 2011
100051323 BR 0005 (529) RIGHT OF WAY BRIDGE REPLACEMENT 2020 $42 $11 $0 $53100051324 BR 0005 (529) UTILITIES BRIDGE REPLACEMENT 2021 $221 $55 $0 $276100051325 BR 0005 (529) CONSTRUCTION BRIDGE REPLACEMENT 2021 $3,010 $752 $0 $3,762
TOTAL COST: $3,272 $818 $0 $4,091
Route SR-5 Project Description SR-5 BRIDGE REPLACEMENT BIN 002261 AT CUB CREEK AND BIN 002262 AT MOCCASIN CREEK
Project Length in Miles 0.010 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100052908 PE 2009 / 100052911 RW 2015 / 100052918 UT 2018
100052919 BRF 0005 (527) CONSTRUCTION BRIDGE REPLACEMENT 2020 $5,205 $1,301 $0 $6,506TOTAL COST: $5,205 $1,301 $0 $6,506
Route SR-5 Project Description RESURFACING ON SR-5 FROM CLARKE CO. LINE TO SOUTH OF THE MOCCASIN CREEK BRIDGE PROJECT
Project Length in Miles 4.301 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071532 NH 0005 (560) FEDERAL MAINT CN PREVENTATIVE MAINTENANCE
LEVEL 22021 $1,050 $263 $0 $1,313
TOTAL COST: $1,050 $263 $0 $1,313
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
195 of 206
HIGHWAY PROJECTS - WILCOXSTIP PLAN: 2020 - Original
Route CR-2 Project Description RESURFACING AND TRAFFIC STRIPE ON FOREST HIGHWAY 5 ALONG CR-2 FROM SR-195 TO SR-33 WCP 67-195-17
Project Length in Miles 5.400 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069403 FLAP FLAP (029) CONSTRUCTION RESURFACING 2020 $670 $0 $168 $838
TOTAL COST: $670 $0 $168 $838
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
196 of 206
HIGHWAY PROJECTS - WINSTONSTIP PLAN: 2020 - Original
Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2020
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064435 FRT-NH-BRZ-STPAA-NU
ATRP (999)SPECIAL UNCLASSIFIED 2020 $104,100 $20,185 $0 $124,285
TOTAL COST: $104,100 $20,185 $0 $124,285
Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2023
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064436 FRT-NH-BRZ-STPNU
ATRP (999)SPECIAL UNCLASSIFIED 2023 $104,100 $20,185 $0 $124,285
TOTAL COST: $104,100 $20,185 $0 $124,285
Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2021
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064437 FRT-NH-BRZ-STPOA-NU
ATRP (999)SPECIAL UNCLASSIFIED 2021 $104,100 $20,185 $0 $124,285
TOTAL COST: $104,100 $20,185 $0 $124,285
Route NA Project Description ATRIP AND CBD DEBT SERVICE PAYMENT SCHEDULE FY 2022
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100064438 FRT-NH-BRZ-STPNU
ATRP (999)SPECIAL UNCLASSIFIED 2022 $104,100 $20,185 $0 $124,285
TOTAL COST: $104,100 $20,185 $0 $124,285
Route NA Project Description DEVELOPMENT OF USRAP (PHASE VI); COVERING THE STATE
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100066678 HSIP NR20 (905) SPECIAL UNCLASSIFIED 2020 $312 $35 $0 $347
TOTAL COST: $312 $35 $0 $347
Route NA Project Description STATEWIDE MANAGEMENT FOR THE OUTDOOR ADVERTISING PROGRAM FY2018 AND FY2019
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067541 TAPAA TA18 (903) SPECIAL UNCLASSIFIED 2020 $960 $0 $240 $1,200
TOTAL COST: $960 $0 $240 $1,200
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
197 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original
Route NA Project Description ROADSIDE SAFETY POOLED FUND PROGRAM
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068433 HSIP NR18 () SPECIAL UNCLASSIFIED 2020 $46 $5 $0 $51
TOTAL COST: $46 $5 $0 $51
Route NA Project Description POOLED FUND STUDY - SHRP 2 NATURALISTIC DRIVING STUDY (FOR 5 YEARS)
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100068434 HSIP NR18 () SPECIAL UNCLASSIFIED 2020 $230 $26 $0 $255
TOTAL COST: $230 $26 $0 $255
Route NA Project Description LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2020
Project Length in Miles 0.000 Sponsor ALDOT LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069255 COUNTY LVOE () SPECIAL UNCLASSIFIED 2020 $34,306 $0 $8,576 $42,882
TOTAL COST: $34,306 $0 $8,576 $42,882
Route NA Project Description LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE County COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069259 COUNTY LVOE () SPECIAL UNCLASSIFIED 2021 $10,417 $0 $2,604 $13,021
TOTAL COST: $10,417 $0 $2,604 $13,021
Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2020
Project Length in Miles 0.000 Sponsor ALDOT LVOE Rec Trails COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069264 RECREATIONAL TRAILS
LVOE ()SPECIAL UNCLASSIFIED 2020 $1,732 $433 $0 $2,165
TOTAL COST: $1,732 $433 $0 $2,165
Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE Rec Trails COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069265 RECREATIONAL TRAILS
LVOE ()SPECIAL UNCLASSIFIED 2021 $1,732 $433 $0 $2,165
TOTAL COST: $1,732 $433 $0 $2,165
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
198 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original
Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2022
Project Length in Miles 0.000 Sponsor ALDOT LVOE Rec Trails COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069266 RECREATIONAL TRAILS
LVOE ()SPECIAL UNCLASSIFIED 2022 $1,732 $433 $0 $2,165
TOTAL COST: $1,732 $433 $0 $2,165
Route NA Project Description LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2023
Project Length in Miles 0.000 Sponsor ALDOT LVOE Rec Trails COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069267 RECREATIONAL TRAILS
LVOE ()SPECIAL UNCLASSIFIED 2023 $1,732 $433 $0 $2,165
TOTAL COST: $1,732 $433 $0 $2,165
Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2020
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069268 SAFETY LVOE () SPECIAL UNCLASSIFIED 2020 $63,000 $7,000 $0 $70,000
TOTAL COST: $63,000 $7,000 $0 $70,000
Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069269 SAFETY LVOE () SPECIAL UNCLASSIFIED 2021 $53,071 $5,897 $0 $58,967
TOTAL COST: $53,071 $5,897 $0 $58,967
Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2022
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069270 SAFETY LVOE () SPECIAL UNCLASSIFIED 2022 $53,071 $5,897 $0 $58,967
TOTAL COST: $53,071 $5,897 $0 $58,967
Route NA Project Description LEVEL OF EFFORT SAFETY PROGRAM FY 2023
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069271 SAFETY LVOE () SPECIAL UNCLASSIFIED 2023 $53,071 $5,897 $0 $58,967
TOTAL COST: $53,071 $5,897 $0 $58,967
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
199 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original
Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2020
Project Length in Miles 0.000 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069273 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2020 $224,000 $56,000 $0 $280,000
TOTAL COST: $224,000 $56,000 $0 $280,000
Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069274 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2021 $224,000 $56,000 $0 $280,000
TOTAL COST: $224,000 $56,000 $0 $280,000
Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2022
Project Length in Miles 0.000 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069275 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2022 $224,000 $56,000 $0 $280,000
TOTAL COST: $224,000 $56,000 $0 $280,000
Route NA Project Description LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2023
Project Length in Miles 0.000 Sponsor ALDOT LVOE Non-Interstate Resurface COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069276 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2023 $224,000 $56,000 $0 $280,000
TOTAL COST: $224,000 $56,000 $0 $280,000
Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2020
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069277 TAP LVOE () SPECIAL UNCLASSIFIED 2020 $30,400 $7,600 $0 $38,000
TOTAL COST: $30,400 $7,600 $0 $38,000
Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069278 TAP LVOE () SPECIAL UNCLASSIFIED 2021 $16,276 $4,069 $0 $20,345
TOTAL COST: $16,276 $4,069 $0 $20,345
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
200 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original
Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2022
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069279 TAP LVOE () SPECIAL UNCLASSIFIED 2022 $16,276 $4,069 $0 $20,345
TOTAL COST: $16,276 $4,069 $0 $20,345
Route NA Project Description LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2023
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069280 TAP LVOE () SPECIAL UNCLASSIFIED 2023 $16,276 $4,069 $0 $20,345
TOTAL COST: $16,276 $4,069 $0 $20,345
Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2020
Project Length in Miles 0.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069846 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2020 $171,000 $19,000 $0 $190,000
TOTAL COST: $171,000 $19,000 $0 $190,000
Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069847 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2021 $171,000 $19,000 $0 $190,000
TOTAL COST: $171,000 $19,000 $0 $190,000
Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2022
Project Length in Miles 0.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069848 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2022 $171,000 $19,000 $0 $190,000
TOTAL COST: $171,000 $19,000 $0 $190,000
Route NA Project Description LEVEL OF EFFORT INTERSTATE RESURFACING FY 2023
Project Length in Miles 0.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100069849 STATE RESURFACING
LVOE ()SPECIAL UNCLASSIFIED 2023 $171,000 $19,000 $0 $190,000
TOTAL COST: $171,000 $19,000 $0 $190,000
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
201 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original
Route NA Project Description PRIORITIZING INTERSTATE MAINTENANCE PROJECTS FY-20 AND FY-21
Project Length in Miles 0.000 Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070236 IM NR20 (901) SPECIAL UNCLASSIFIED 2020 $367 $41 $0 $408
TOTAL COST: $367 $41 $0 $408
Route NA Project Description ACCELERATING SAFETY ACTIVITIES PROGRAM (ASAP)
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070667 ASAP NR20 (900) SPECIAL SAFETY IMPROVEMENTS 2019 $20 $5 $0 $25
TOTAL COST: $20 $5 $0 $25
Route NA Project Description STATE/CONSULTANT SUPPORT SERVICES FOR LOCAL TRANSPORTATION BUREAU PROJECTS STATEWIDE, FY 2020 AND FY 2021
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070834 STPAA SP20 (900) SPECIAL UNCLASSIFIED 2020 $162 $40 $0 $202
TOTAL COST: $162 $40 $0 $202
Route NA Project Description FUNDING FOR A US FISH AND WILDLIFE SERVICE (USFWS) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 2020 - FY 2021
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070880 STPAA NR20 (902) SPECIAL UNCLASSIFIED 2020 $400 $100 $0 $500
TOTAL COST: $400 $100 $0 $500
Route NA Project Description FUNDING FOR A US FISH AND WILDLIFE SERVICE (USFWS) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 2022 - FY 2023
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070881 STPAA NR20 () SPECIAL UNCLASSIFIED 2022 $408 $102 $0 $510
TOTAL COST: $408 $102 $0 $510
Route NA Project Description FUNDING FOR A US ARMY CORPS OF ENGINEERS (USACE) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 2020 - FY 2021
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070882 STPAA NR20 (903) SPECIAL UNCLASSIFIED 2020 $400 $100 $0 $500
TOTAL COST: $400 $100 $0 $500
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
202 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Amendment # 1
Route NA Project Description FUNDING FOR A US ARMY CORPS OF ENGINEERS (USACE) POSITION TO PROVIDE PRIORITY REVIEWS FOR DOT PROJECTS FY 22-23
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070883 STPAA NR20 () SPECIAL UNCLASSIFIED 2022 $408 $102 $0 $510
TOTAL COST: $408 $102 $0 $510
Route NA Project Description STATE SUPPORT SERVICES FOR ENVIRONMENTAL DOCUMENT REVIEW FOR VARIOUS PROPOSED AND ONGOING TRANSPORTATION ALTERNATIVE PROJECTS FY 2020 - FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE TAP COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071116 TAPAA TA20 (900) SPECIAL UNCLASSIFIED 2020 $40 $10 $0 $50
TOTAL COST: $40 $10 $0 $50
Route NA Project Description ROAD SAFETY REVIEWS FOR VARIOUS SELECTED LOCATIONS ACROSS THE STATE FOR FY 2020 AND FY 2021
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071173 HSIP NR20 (907) SPECIAL SAFETY IMPROVEMENTS 2020 $225 $25 $0 $250
TOTAL COST: $225 $25 $0 $250
Route NA Project Description SAFETY PERFORMANCE FUNCTION (SPF) DEVELOPMENT FOR URBAN 4 LANE 4 LEG DIVIDED SIGNALIZED INTERSECTIONS
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071574 HSIP NR20 () SPECIAL UNCLASSIFIED 2020 $65 $7 $0 $72
TOTAL COST: $65 $7 $0 $72
Route NA Project Description SAFETY PERFORMANCE FUNCTION (SPF) DEVELOPMENT FOR URBAN 4-LANE FREEWAYS, URBAN 6-LANE FREEWAYS, URBAN 4-LANE DIVIDED HIGHWAYS AND URBAN 6-LANE DIVIDED HIGHWAYS
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071575 HSIP NR20 () SPECIAL UNCLASSIFIED 2020 $384 $43 $0 $427
TOTAL COST: $384 $43 $0 $427
Route NA Project Description LOCAL ROAD SAFETY PLAN DEVELOPMENT PHASE I
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071737 HSIP NR20 (913) SPECIAL SAFETY IMPROVEMENTS 2020 $270 $30 $0 $300
TOTAL COST: $270 $30 $0 $300
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
203 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Original
Route NA Project Description DATA COLLECTION AND ASSET EXTRACTION - PILOT PROJECT (MONTGOMERY COUNTY, MACON COUNTY, AND LEE COUNTY)
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071750 HSIP NR20 (914) SPECIAL SAFETY IMPROVEMENTS 2020 $180 $20 $0 $200
TOTAL COST: $180 $20 $0 $200
Route NA Project Description NATIVE AMERICAN CONSULTATION FOR FY 2020-2021
Project Length in Miles 0.000 Sponsor ALDOT COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100059870 PE 2013
100065268 STPAA NR20 (911) SPECIAL UNCLASSIFIED 2020 $146 $36 $0 $182100071553 STPAA NR22 () SPECIAL UNCLASSIFIED 2022 $122 $31 $0 $153
TOTAL COST: $268 $67 $0 $335
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
204 of 206
HIGHWAY PROJECTS - STATEWIDESTIP PLAN: 2020 - Amendment # 1
Route CR-NA Project Description HIGH FRICTION SURFACE TREATMENT FOR WEST CENTRAL REGION LOOP RAMPS
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067051 HSIP NR17 (933) CONSTRUCTION SAFETY IMPROVEMENTS 2021 $937 $104 $0 $1,041
TOTAL COST: $937 $104 $0 $1,041
Route CR-NA Project Description UPGRADE PASSIVE WARNING DEVICES AT 178 RR CROSSINGS ON SR,CR AND LR IN FAYETTE AREA INVOLVING CROSSBUCKS,STOP SIGNS,YIELD SIGNS,RETROREFLECTIVE STRIPS ON BACK OF CROSSBUCKS,GATE MECHANISMS,ADVANCE WARNING SIGNS,STRIPING, MARKINGS AND LEGENDS.
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067964 RHCH RR19 (914) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $585 $65 $0 $650
TOTAL COST: $585 $65 $0 $650
Route CR-NA Project Description UPGRADE PASSIVE WARNING DEVICES AT 201 RR CROSSINGS ON SR,CR AND LR IN TUSCALOOSA AREA INVOLVING CROSSBUCKS,STOP AND YIELD SIGNS,RETROREFLECTIVE STRIPS ON BACK OF CROSSBUCKS,GATE MECHANISMS,ADVANCE WARNING SIGNS,STRIPING, MARKINGS AND LEGENDS.
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100067965 RHCH RR19 (913) CONSTRUCTION RR CROSSING IMPROVEMENTS 2020 $585 $65 $0 $650
TOTAL COST: $585 $65 $0 $650
Route I-10 Project Description SOUTHWEST REGION, MOBILE AREA SIGN REPLACEMENT ON I-10, I-65 AND I-165
Project Length in Miles 0.000 Urban Area MOBILE Sponsor ALDOT LVOE Interstate Resurfacing COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100055433 PE 2011 / 100055398 CN 2021
100055398 IM MR15 (901) CONSTRUCTION SIGN REHABILITATION 2021 $5,601 $622 $0 $6,224TOTAL COST: $5,601 $622 $0 $6,224
Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 3,4,5,7,23,25,34,38,53,67,70,74,75,76,79,119,132,139,144,145,149,150,151,155,160, 174,261,269,378 (IN THE BHAM AREA,BLOUNT,ST. CLAIR,SHELBY AND JEFFERSON COUNTIES)
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100070820 HSIP MR20 (901) CONSTRUCTION SIGNING 2020 $495 $55 $0 $550
TOTAL COST: $495 $55 $0 $550
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
205 of 206
HIGHWAY PROJECTS - AREAWIDESTIP PLAN: 2020 - Original
Route SR-NA Project Description GUARDRAIL FOR WEST CENTRAL REGION ROAD SAFETY ASSESSMENT SITES ON STATE ROUTES 6, 13, 17, 69 AND 269 IN WALKER, WINSTON, PICKENS, AND LAMAR COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071438 HSIP MR20 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $276 $31 $0 $307
TOTAL COST: $276 $31 $0 $307
Route SR-NA Project Description GUARDRAIL FOR WEST CENTRAL REGION ROAD SAFETY ASSESSMENT SITES ON STATE ROUTES 5, 7 AND 13 IN GREENE, SUMTER, AND PERRY COUNTIES
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL100071439 HSIP MR20 () CONSTRUCTION SAFETY IMPROVEMENTS 2021 $303 $34 $0 $337
TOTAL COST: $303 $34 $0 $337
Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 5, 6, 7, 13, 14, 17, 22, 25, 28, 39, 60, 69, 116, 145, 155, 171, 175, 183, 191, 215, 216, 219, 382 IN THE TUSCALOOSA AREA
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066380 SP 2017 / 100068818 CN 2020
100068818 HSIP NR19 (928) CONSTRUCTION SIGNING 2020 $407 $45 $0 $452TOTAL COST: $407 $45 $0 $452
Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 18, 39, 69, 96, 159, 172 IN THE FAYETTE AREA
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100066379 SP 2017 / 100068817 CN 2020
100068817 HSIP NR19 (929) CONSTRUCTION SIGNING 2020 $459 $51 $0 $510TOTAL COST: $459 $51 $0 $510
Route SR-NA Project Description HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 1,4,9,14,15,21,22,38,46,48,49,50,53,63,74,77,115,120,128,144,147,148,200,202,204,229,259,275,281, AND 301 IN THE ALEXANDER CITY AREA
Project Length in Miles 0.000 Sponsor ALDOT LVOE Safety COST IN THOUSANDS
Database ID Project Number Scope of Work Type of Work FY Federal State Other TOTAL/ 100069610 SP 2019 / 100070569 CN 2020
100070569 HSIP MR20 (900) CONSTRUCTION SIGNING 2020 $476 $53 $0 $529TOTAL COST: $476 $53 $0 $529
6/3/2020 ALABAMA STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM10/1/2019-9/30/2023
206 of 206
HIGHWAY PROJECTS - AREAWIDESTIP PLAN: 2020 - Original