5.2 project vijay training module exercises with review temp

Upload: akash-sharma

Post on 29-May-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    1/29

    Project Vijay

    Training module 5.2Exercises with Review templates

    22 June 2009

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    2/29

    Agenda

    Section 1: Market Retailer Survey

    1

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    3/29

    1Survey Planning sheet to be used by Retailer Coordinator forplanning & area demarcation

    Survey Planning

    List of towns in SSA

    List of villages to be covered

    in survey

    List of villages not to be

    covered in survey

    Exercise

    How many villages in

    Ghatampur sub-district of

    Kanpur SSA do not have

    BSNL network coverage

    2

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    4/29

    2

    Retailer Managers Template

    List of Retailer Managers

    Please fill details of yourself

    and two of your colleagues

    sitting next to you

    3

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    5/29

    3

    Daily Survey Tracking Template

    Daily Survey Tracking

    Details of visits made by

    retailer managers

    Summary generated based on

    'Visits' sheet data

    4

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    6/29

    3

    Exercise: Daily Survey Tracking Template

    You are retailer coordinator of your SSA and on evening of 10thJuly, you have following

    conversation with your retailer manager over the phone.

    RM: Hi, I am Rajaram speaking. I covered 4 villages today. in jhinjhak there was no shop

    selling telecom products but one shopkeeper was willing to sell so I surveyed him. in total, I

    covered Sarsaul, Mandhana, Chaubepur, Jhinjhak.

    RMC: How many forms at each place.

    RM: Jhinjhak 1 as told earlier. Sarsaul 4, Chaubepur 7, Mandhana 5

    RMC: When you will give me these forms

    RM: tomorrow morning.

    RMC: Thanks. Bye

    Exercise:

    Fill Daily tracking sheet

    Based on your training, what more you would like to tell to RM

    5

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    7/29

    4Retailer Coordinator to ensure data entry by operator in givenformat

    Data Entry Template Each row will have record of one retailer (one survey form)

    Various columns in one row to be used to enter all data in one form

    Trainees to be provided sample filled in survey

    questionnaires to practice data entry (by trainer) 6

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    8/29

    5

    Project Vijay Node will prepare a daily summary of each SSA

    Survey Collation

    Copy summary report of a SSA into your collation sheet

    7

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    9/29

    5

    Project Vijay Node will prepare a daily summary of each SSA

    Survey Collation

    Details of any issues

    Summary of each SSA will be

    pasted from daily tracking

    sheet sent by RetailerCoordinator

    8

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    10/29

    Agenda

    Section 2: Channel Norms

    9

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    11/29

    Inputs Process Output

    6FOS beat plans can be created based on the FOS and retailer

    service frequency norms

    Inputs

    For a given

    franchisee

    Prioritized list of

    retailers, by sub-

    district/ town/

    village/ locality asapplicable

    # of FOS required

    Broad area of

    operation ofeach

    FOS (contiguous)

    Process

    Allotment of retailers to each FOS

    Based on area to be covered, and # of retailers (as

    per norms)

    For set of retailers allotted to each FOS

    Allocation of retailers to specific days of the week,based on class (i.e. service freq. norms)

    Class A: Daily

    All: Mon/ Tue/ Wed/ Thu/ Fri/ Sat

    Class B: Every alternate day

    2 equal parts: Mon/ Wed/ Fri, Tue/ Thu/ Sat

    Class C: Twice a week

    3 equal parts: Mon/ Thu, Tue/ Fri, Wed/ Sat

    Class D: Once a week 6 equal parts: Mon, Tue, Wed, Thu, Fri, Sat

    For each FOS, for each day of the week

    Select corresponding retailers, and copy into FOS

    beat plan template

    Franchisee Manager is required to work with the

    Franchisee, to create day-wise beat plans for all FOS

    Output

    Day-wise beat

    plansforeach

    FOS of the given

    franchisee

    6 beat plans for

    each FOS, onefor every day of

    the week

    10

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    12/29

    6

    Exercise: FOS mapping and beat plan creation exercise

    File to be used: 6 Project Vijay Sample beat plan.xls

    Step 1: Divide list of retailers of a franchisee among FOS

    Ref: Sheet "Total list of retailers"

    Each FOS will be allotted an area/ locality, and usually service

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    13/29

    Initial phase of channel norms

    implementation

    Phase of channel norms implementation

    post market retailer survey

    7Area demarcation of Franchisee areas to be done only if

    required

    Market Retailer survey completed

    Retailerdatabase created

    Initial phase of channel norms

    implementation

    Initial check to be done regd. status of area

    demarcation in the SSA

    Whether clearly demarcated

    Whether fully allocated

    If area is not clearly demarcated

    Revisit franchisee agreements to ensure

    clarification issued by SSA Head

    If area is not fully allocated (at sub-districtlevel)

    Use area definition algorithm to allocate area

    (by # of retailers)

    WPI1 analysis to be used to estimate # of

    retailers at sub-district level

    Phase of channel norms implementation

    post market retailer survey

    Consolidate and map retailer database Map to existing franchisees to understand

    existing allocation of retailers among

    franchisees

    Execute area definition algorithm calculation

    To understand desired allocation of retailers

    among franchisees based on performance

    If the existing and desired allocations differsignificantly, use desired allocation to

    demarcate area

    As per the area definition algorithm

    1. Wireless Potential Index

    Area definition to be done only if required by SSA sales

    head, in consultation with SSA head 12

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    14/29

    Example: Area definition proposed for Lucknow SSA

    7

    Key features of proposed area definition algorithmBased on no of retailers in an area; Esp. applicable to urban areas Illustrative

    Area definition for Franchisees

    based on

    Historical performance

    Share of SIM sales within SSA

    Share of RCV sales within SSA

    Share of retailers adjusted toprovide opportunity to new/ smaller

    franchisees also

    New franchisee starts with "equal

    share" within geographical area Large franchisees restricted to

    150% of "equal share" percentage

    Each franchisee given atleast 50%

    of "equal share" percentage

    Natural/ historic allocation

    Ensure geographical contiguity;

    retailerattractiveness

    Example: Area definition proposed for Lucknow SSA

    13

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    15/29

    7

    Exercise: Area definition by no of retailers Illustrative

    File to be used: 7 Project Vijay Area definition by no of retailers.xls

    Step 1: Enter key assumptions

    No of franchisees in the SSA

    No of retailers in SSA (as per Market Retailer Survey)

    Names of Franchisees

    Franchisee-wise performance in last 6 months # of SIMs sold

    Recharge value sold (Rs cr)

    Step 2: View proposed allocation of retailers among franchisees

    Retailers allocated in number only; Range (Max, min specified)

    Allocation of actual retailers will depend on the physical area allocation

    14

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    16/29

    Agenda

    Section 3: Review Templates for Project Vijay team

    15

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    17/29

    Name of file

    Summary

    sheetFile to be

    filled by Frequency Sent to Data inputs

    Summary of Review templates for Project Vijay teamAll files maintain data for one month (till date)

    Name of file

    FM Report

    RMC Report

    SSA Saleshead Report

    Circle Report

    Summary

    sheet

    FM Daily

    summary

    RMC Daily

    summary

    SSA report

    Circle

    File to be

    filled by

    Franchisee

    Manager

    Retailer Mgr

    Coordinator

    SSA Sales head

    Circle level node

    Frequency

    Daily

    Daily

    Daily

    Daily

    Sent to

    SSA saleshead

    SSA sales

    head

    Circle levelnode

    RolloutManager

    (copy to

    Project

    Leader)

    Data inputs

    From franchisee (viaemail)

    From Retailer Managers

    - Verbally- Hard copy templates(entered by data entryoperator)

    All FM Report(s), RMCReport(s)

    All SSA sales headreports

    16

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    18/29

    8

    File details Franchisee Manager Report (I)

    File Filled By Franchisee Manager, through the franchisee

    Frequency Daily

    File Sent To SSA Sales Head

    Sheet Name Description Inputs Output

    FM Daily

    Summary

    Daily summary of franchisee(s)

    performance against targets Includes FM Checklist

    Sheet: Sales

    Sheet: FOS Status Sheet: Activations, CAF, Delivery

    Sales Tracks primary and secondary sales

    numbers on a daily basis

    Primary sales (Franchisee/ AO

    sales/ SDE sales)

    Sheet: Retailer wise Sales

    FM Daily Summary

    Retailer wisesales

    Daily sales by Franchisee FOS toretailers (SIM/ RCV)

    Compiled FOS daily reports

    (Franchisee)

    Sales

    FOS status Tracks FOS appointment, details FOS name, contact details

    (Franchisee)

    FM Daily Summary

    Activations, CAF,

    delivery

    Tracks activations, status of CAF andtime taken for delivery to Franchisee(from time of order by Franchisee)

    Activations (SancharSoft)

    CAF receipt, no pending (CAF In-charge)

    Delivery time (Franchisee/ AO

    sales/ SDE sales/ FM)

    FM Daily Summary

    Note: All details in a particular file are not included. The above tables can be used to give a broad idea of the functions of various important sheets in the file

    17

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    19/29

    8

    File details Franchisee Manager Report (II)

    File Filled By Franchisee Manager, through the franchisee

    Frequency Daily

    File Sent To SSA Sales Head

    Sheet Name Description Inputs Output

    POS Material Tracks how much POS material was

    allotted to the franchisee, and howmuch has been distributed amongst

    how many retailers

    SSA Sales Head (allocation of

    POS material) Franchisee (Distribution of

    allocated material)

    FM Daily Summary

    Retailer List Contains list of all retailers of the

    Franchisee

    Market Retailer Survey

    Issue Log Collate issues raised by franchiseesaccording to type

    Action steps for resolution

    Responsibility, Due date and status

    Franchisee(s)

    Franchisee Manager

    Discussion with SSA sales head

    Note: All details in a particular file are not included. The above tables can be used to give a broad idea of the functions of various important sheets in the file

    18

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    20/29

    8

    Exercise: FM Report - I Illustrative

    Beginning of the month

    Ref: FM daily summary sheet

    Update name of Franchisee and FM (Madhura, Vineet)

    Update month, days in month, day (e.g. July '09,31,1)

    Update target provided by SSA sales head

    # of SIMs in July: 4000; Recharge value: Rs 200 L; # of retailers billed: 500 Inventory for last month to be entered

    # of SIMs: 100 SIMs; RCV+CTOP-UP: 20 L

    Ref: Retailer wise sales sheet

    Update Franchisee name, all retailers attached to Franchisee (Retailer code, name,

    class) from Market Retailer Survey

    Ref: FOS status sheet Update Franchisee name

    Update FOS name, Mobile no, Status whether active or not (Srikanth, 9867014356,

    Yes; Rama, 9957823716, Yes)

    19

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    21/29

    8

    Exercise: FM Report - II Illustrative

    Create daily report as on 10thJuly '09 View on FM daily summary sheet

    Ref: FM daily summary sheet

    Update Day: 10

    Update Checklist status (Part V)

    Ref: Sales sheet

    Primary sales on Day 9: 250 SIMs, RCV: Rs 2.5L, CTOP-UP: Rs 3L

    Primary sales on Day 10: 100 SIMs, RCV: Rs 3.5L, CTOP-UP: Rs 2L

    Ref: Retailer wise sales sheet

    Secondary sales on Day 10

    Retailer code: 4501; 10 SIMs, RCV: Rs 15,000, CTOP-UP: Nil

    Retailer code: 4601; 20 SIMs, RCV: Rs 10,000, CTOP-UP: Rs 2,000

    Ref: Activations, CAF, Delivery sheet

    # of activations: Day 9: 30, Day 10: 50

    # of CAF submitted: Day 9: 10, Day 10: 20

    Time taken for delivery: Day 9:~10 hrs, Day 10: ~24 hrs

    Ref: POS material sheet

    Update Franchisee name

    1,000 danglers assigned ; Of this ~500 distributed among 200 retailers

    20

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    22/29

    9

    File details Retailer Mgr Coordinator Report (I)

    File Filled By Retailer Mgr Coordinator, through the Retailer Managers

    Frequency Daily

    File Sent To SSA Sales Head

    Sheet Name Description Inputs Output sheet

    RMC Daily

    Summary

    Contains overall summary

    Summary of # of RM visits Summary of data collected by RMs

    Issues raised and resolved

    Progress against Checklist

    Sheet: Consolidated Data

    Consolidated Data Contains RM-wise summary

    Summary of # of RM visits

    Summary of data collected by RMs

    Issues raised and resolved

    Sheet: Daily Reports

    Sheet: Questionnaire

    Sheet: Issue log

    Sheet: New retailer contacts

    RMC Daily Summary

    Retailer wise visits Details of visits to particularretailers, data entry of forms

    RMs (verbally), Data entryoperator

    Consolidated data

    Retailer wise

    output

    Summary of data collected by RMs Sheet: Daily Reports

    Sheet: Questionnaire

    Consolidated data

    Daily reports BSNL products availability, FOS

    service frequency, cross-selling etc

    Based on RMT Daily Report hard

    copy template submitted

    Retailer wise output

    Note: All details in a particular file are not included. The above tables can be used to give a broad idea of the functions of various important sheets in the file

    21

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    23/29

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    24/29

    9

    Exercise: RMC Report - I Illustrative

    Beginning of the month

    Ref: RMC daily summary sheet

    Update name of RMC, RM and Franchisee (Mr Arun, Vineet, Madhura)

    Update month, days in month, day (e.g. July '09,31,1)

    Update 'Required' retailers and visits for each RM

    # of retailers visited (i.e. # of retailers assigned per RM): 200 for Vineet (Jul '09)

    Total # of visits: Usually, # of retailers visited X 2 Ref: Retailer wise visits sheet

    Update Franchisee name, RM name, all retailers attached to Franchisee and RM(Retailer code, name, class) from Mkt Retailer Survey

    Create daily report as on 10th July '09 View on Consolidated data sheet, RMC dailysummary sheet

    Ref: RMC daily summary sheet

    Update Day: 10

    Update Checklist (Part V)

    Ref: Retailer wise sales sheet

    Day 9: Retailers visited: 1201, 1202, 1203, 1204

    Day 10: Retailers for which daily report is entered: 1201,1202, 1203, 1204

    23

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    25/29

    9

    Exercise: RMC Report - II Illustrative

    Summary of data collected by RMs View on Retailer-wise output sheet, RMC daily

    summary sheet

    Summary based on Daily Reports sheet and Questionnaire sheet

    Ref: Daily Reports sheet

    Data entry of Daily Report hard copy template (filled in)

    Ref: Questionnaire sheet

    Data entry of Questionnaire hard copy template (filled in)

    Summary of issues/ market info/ new retailers collected by RMs View on RMC daily

    summary sheet

    Summary based on Issue log sheet, Market Info sheet and New Retailers sheet

    Ref: Issue log sheet, Market Info sheet

    Data entry of Issue log/ Market Info hard copy template (filled in) Ref: New retailers sheet

    Data entry of New retailers hard copy template (filled in)

    Trainees to be provided sample filled in RM templates (Daily Report, Questionnaire,

    Issue log/ Market Info, New Retailers) to practice data entry (by trainer)

    24

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    26/29

    10

    File details SSA Sales Head Report

    File Filled By SSA Sales Head

    Frequency Daily

    File Sent To Circle Level Nodes

    Sheet Name Description Inputs Output

    SSA

    Report

    Gives performance of SSA at a glance

    Primary sales achieved vs target #Retailers billed vs targets

    # of retailers visited by RMs

    Includes SSA sales head Checklist

    Sheet(s) : FMn1

    Sheet(s): RMCn1

    FMn1 Summary of franchisee(s)

    performance on a daily basis

    FM Reports (from FMs)

    RMCn1 Summary of RMs performance

    Summary of data collected by RMs

    RMC Reports (from RMCs)

    FM/ RMC review Agenda for review of FM/ RMC Sheet: FM RMC Review

    Retailer list Contains list of all retailers in SSA Market Retailer Survey

    POS material Sheet for assignment of POS material SSA sales head

    1. Refers to sheets FM1, FM2 and so on

    Note: All details in a particular file are not included. The above tables can be used to give a broad idea of the functions of various important sheets in the file 25

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    27/29

    10

    Exercise: SSA Sales head Report Illustrative

    SSA head report collation Copy an FM's daily summary sheet and RMC's daily summary sheet into your SSA head daily

    report file

    26

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    28/29

    11

    File details Circle Report

    File Filled By Circle Level Nodes

    Frequency Daily

    File Sent To Rollout Manager

    Sheet Name Description Inputs Output

    Circle

    Report

    Gives performance of circle at a glance

    Primary sales achieved vs target # Retailers billed vs targets

    # of retailers visited by RMs

    Sheet(s) : SSAn1

    SSAn Summary of SSA's performance on a

    daily basis

    SSA sales head report (Sheet:

    )

    Circle Report

    Issue log Resolution of issues where possible List of issues collected forFranchisee and for CircleSurveyor exchange

    Circle Report

    1. Refers to sheets FM1, FM2 and so onNote: All details in a particular file are not included. The above tables can be used to give a broad idea of the functions of various important sheets in the file

    27

  • 8/9/2019 5.2 Project Vijay Training Module Exercises With Review Temp

    29/29