  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    1/19

    for New Buildin Shi s

    December 2009

    The Shipbuilders Association of Japan

    1

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    2/19

    Preparation of the Inventory

    for New Building Ships

    1. Procedure of Inventory Preparation

    2. Trial Results of Inventory Preparation

    3. Inventory Preparation from now on

    2

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    3/19

    1. Procedure of Inventory Preparation

    (1) Collection of Hazardous Materials Information(2) Check of Hazardous Materials Information

    repara on o e nven ory ar

    (4) Submission of the Inventory Part I for the Certification

    3

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    4/19

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    5/19

    (2) Check of Hazardous Materials Information

    Because of long period of construction after purchase, following itemsshould be checked at the time of receiving the Materials DeclarationMD and Su liers Declaration of Conformit SDoC .

    - SDoC ID No. described in Materials Declaration (MD) coincides

    with the ID No. of Suppliers Declaration of Conformity (SDoC).- To check the hazardous materials on the Materials Declaration (MD)

    The products containing table A materials over the threshold level are

    pro e . xcep on: y roc oro uorocar ons s- All information available to calculate the amount of hazardous.

    5

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    6/19

    (2) Check of Hazardous Materials Information

    6

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    7/19

    (3) Preparation of the Inventory Part I

    ass ca on o nven oryTo classify the products containing the materials listed in table A andB in three cate ories.

    Category Products

    1.1 Paints and Coatin S stems Paint used for Shi buildin

    1.2 Equipment and Machinery Machinery, equipment, parts, pipes,

    electric cables, etc.

    1.3 Structure and Hull Construction materials, joiner workssuch as interior walls, floors, etc.

    e at on etween t e contents o nventory an ater a s ec arat on(MD) information

    , . .

    4) To calculate the amount of hazardous materials.

    5 The location of hazardous materials on board to be described with the

    7name of location used in General Arrangement, MachineryArrangement, Cabin Plans, etc.

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    8/19

    (3) Preparation of the Inventory Part I

    (A),(B) Copy

    (C) Calculate quantitya n name norma y use

    (E) Location onthe ship

    8(F) Number

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    9/19

    (4) Submission of the Inventory Part I

    or e er ca onShipbuilders prepare the Inventory Part I based on Materials

    ec ara on rom pro uc s supp ers, an su m o e agadministration or Recognized Organizations (RO) to get certification.

    Shi builders rovide on board with the International Certificate onInventory of Hazardous Materials together with the Inventory Part I.

    Drawings and documents requested for verifying the Inventory;- Materials Declaration (MD)

    - Suppliers Declaration of Conformity (SDoC)

    - Reference drawings (General Arrangement, Machinery, .

    - Other drawings or documents requested by the flag administrationor Reco nized Or anizations RO

    9

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    10/19

    2. Trial Results of Inventory Preparation

    The Shipbuilders Association of Japan (SAJ) conducted trials forInventory preparation two times according to the drafts of the

    onven on an u e ne.

    First time: from Oct. 2007 to Feb. 2008 , .

    Second time: from Jan. 2009 to Dec.2009 (currently ongoing)Inventory of 10 vessels prepared by using the PrimeShip-

    INVENTORY (NK software)

    Rate of Materials declaration MDobtained

    First time: 75 to 85% Second time: 80 to 99%Problem: Materials declaration MDand Suppliers Declaration of

    Conformity (SDoC) were found not correctly described.

    10Following points are important check points of MD and SDoC fromthe trial results.

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    11/19

    (1) Preparation of MD and SDoC

    Shipbuilders should obtain the Materials Declaration (MD) andSuppliers Declaration of Conformity (SDoC) from productssu liers.

    Supplier: A company such as manufacturer, trader or agency who

    provides products and has responsibility for the productsater a s ec arat on :

    Document identifying whether the material contained in table A

    (specific chemical substance) designated in accordance with theConvention and Guidelines

    The document assuring that the product and its related MD conforms

    to the law and is suitable for the management and control of then ormat on on c em ca su stances conta ne , an w o sresponsible for the product and MD

    11

    existence of materials listed in table A and table B.

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    12/19

    (2) Description in Materials Declaration (MD)

    One MD should be prepared for one product in principle.Attention to be paid:

    - o escr e t e o o.

    - To specify the content of the hazardous materials (HM) in case ofexceedin the threshold level.

    - To be able to calculate the total amount of the HM.

    - To enter No for materials not exceeding the threshold level.

    Threshold level means the concentration value in homogeneousmaterials (mg/kg).

    , ,theoretical, controlled or measured figures.

    - In case the same material is contained in many parts or portions,suc names o e par s or por ons o e escr e .

    In case the parts of product contain the HM above the threshold

    12

    ,

    of the parts should be prepared separately.

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    13/19

    (2) Description in Materials Declaration (MD)

    Homogeneous materialsElectric cable: Sheath, intervention, insulator and conductor are all

    n v ua omogeneous ma er a s.

    Platin : Base metal and latin la er to be treated as not mechanicallseparable.(Base metal and plating layer consist of one homogeneous material.)

    13

    a n : a n se cons s s o one omogeneous ma er a .

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    14/19

    (3) Object of MD Investigation

    Materials Declarations (MDs) should be collected for all the productsthat consist of hull, machinery, equipment and material.

    - Materials listed in table B that are inherent in solid metals or metal

    allo s, rovided the are used in eneral construction, such as hull,superstructure, pipes, or equipment.

    For example:

    Hull construction, superstructure and other structure such as rudderplate

    , ,stainless steel

    Lar e fittin s such as masts tanks etc.However, MD should be obtained in case the above steel plates andpipes being coated or plated.

    14

    - Products listed in table C and table D

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    15/19

    (3) Object of MD Investigation

    Relation between Table A, B, C and DProducts (hull, machinery, equipment, Products loaded

    Table D

    MD InvestigationTable C

    Potentially

    Regular

    consumableProduct(Investigate contained materials

    listed in Table A and B)

    azar ous

    Items

    goo s

    potentially

    containing

    MD Investigation not to be required

    Materials listed in Table B that are

    Hazardous

    Materials

    n eren n so me a s or me a a oys,

    provided they are used in general

    construction, such as hull, superstructure,

    pipes, or equipment.

    Table A Controls of Hazardous Materials

    (Appendix 1 of the Annex to the Convention)Material

    15

    .

    (Appendix 2 of the Annex to the Convention)

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    16/19

    (3) Object of MD Investigation

    : o en a y azar ous emsThe products listed in table C are those which are loaded on board andthe amount changes during the ship operation.To be listed in the Inventory Part II or Part III before the ship

    recycling as waste generating during operation.Table D: Regular consumable goods potentially containing Hazardous

    Materials

    Inventory Part III.Example for items requiring MD:- nter or uorescent amp oc et requ re

    Lamp MD not required

    - Refri erator Lar e refri erator on the market MD not re uiredRefrigerator composed of part of MD requiredhull construction

    16

    s ou e co ec e n genera , n case s no c ear w e er

    MD is required or not.

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    17/19

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    18/19

    3. Inventory Preparation from now on

    At the earliest case, the Convention may enter into force in 2012.New building ships before entry into force will be treated as existing

    s ps accor ng to t e onvent on.

    18

  • 8/6/2019 5.2 Preparation of the Inventory for New Building Ships R2

    19/19

    Proposal from Japan

    Japan had some trials for development of inventory of hazardous

    ma er a s or new y- u s ps.

    To avoid potential confusion after the Convention entry into force,

    a discussion among experts is needed to develop a manual.

    y on we ave a vo un ary scuss on

    Japan is ready for coordinating the discussion.

    Those who are interested, please e-mail to

    19

    [email protected]