N New Standard
R Redrawn Standard C Changed Standard ~ No Change
500
CROSSARMS AND POLES
3/13/2020
~ CR1 8' Standard Crossarm Drilling Guide
~ CR2 10' Standard Crossarm Drilling Guide
~ CR3 12' Standard Crossarm Drilling Guide
~ CR4 5' Standard Crossarm Drilling Guide
~ DEA1 8' Pre-assembled Deadend Assembly 3-position
Drilling Guide
~ DEA2 10' Pre-assembled Deadend Assembly 3-position
Drilling Guide
~ DEA3 10' Pre-assembled Deadend Assembly 4-position
Drilling Guide
~ P1 25' to 35' Distribution Pole Framing Guide
~ P2 40' to 60' Distribution Pole Framing Guide
~ P3 Pole Setting Depth Guide
~ P4 Transmission-Distribution Pole Thru Boring at Ground
Line
~ P5 Transmission-Distribution Pole Thru Boring at Pole Top
N TP2 115kV Transmission Line General Pole Drilling
Specification
TOLERANCES
OVER
UNDER
1/4"
1/8"
1/32"
1/4"
1/8"
1/32"
(A)
(B)
(C)
NOTES
1. HOLES TO BE 11/16" DIA.(c) UNLESS
OTHERWISE INDICATED.
SECTION A-A
A
A
FRONT VIEW
TOP VIEW
C
L
L
C
6"1'-7"4"1'-7"1'-7"4"1'-7"6"
8'-0" (A)
4"1'-2"9"6"1'-3"1'-3"6"9"1'-2"4"
3
3
4
" (B)
1
7
8
"
2
3 8
"
4
3 4
" (B)
3
8
" x 45°
CHAMFER
EASE
1
8
"
7/16" DIA (C)
9/16" DIA (C)
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
CR1CR11 1
HWH
1/22/80
500
8' STANDARD CROSSARM
DRILLING GUIDE
1
1 2/8/93
SECTION A-A
A
A
OTHERWISE INDICATED.
1. HOLES TO BE 11/16" DIA.(c) UNLESS
NOTES
(C)
(B)
(A)
FRONT VIEW
TOLERANCES
1/32"
1/8"
1/4"
OVER
1/32"
1/8"
1/4"
UNDER
TOP VIEW
L
C
C
L
EASE
1
8
"
3
8
" x 45°
CHAMFER
3
3
4
" (B)
1
7
8
"
4
3 4
" (B)
2
3 8
"
9/16" DIA (C)
8"35"19"19"35"8"
10'-0" (A)
4"7"
13"13"7"16"16"7"13"13"
7"4"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDSENGR
REVISIONS
OPS
CAD FILE:PAGE:
CR2
HWH
500
10' STANDARD CROSSARM
DRILLING GUIDE
1
1 2/8/93
SECTION A-A
A
A
OTHERWISE INDICATED.
1. HOLES TO BE 11/16" DIA.(c) UNLESS
NOTES
(C)
(B)
(A)
SIDE VIEW
TOLERANCES
1/32"
1/8"
1/4"
OVER
1/32"
1/8"
1/4"
UNDER
TOP VIEW
L
C
C
L
EASE
1
8
"
3
8
" x 45°
CHAMFER
3
3
4
" (B)
5
3 4
" (B)
9/16" DIA (C)
12'-0" (A)
4"
10"
4"
11" 21"26"10"11"21"
24"
26"
21"21"
6"
24" 21" 21"
6"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
CR3CR31 1
HWH
1/22/80
500
12' STANDARD CROSSARM
DRILLING GUIDE
1
1 2/8/93
TOLERANCES
OVER
UNDER
1/4"
1/8"
1/32"
1/4"
1/8"
1/32"
(A)
(B)
(C)
NOTES
1. HOLES TO BE 11/16" DIA.(c) UNLESS
OTHERWISE INDICATED.
SECTION A-A
3
3
4
" (B)
1
7
8
"
2
3 8
"
4
3 4
" (B)
3
8
" x 45°
CHAMFER
EASE
1
8
"
A
A
7/16" DIA (C)
FRONT VIEW
TOP VIEW
L
C
C
L
3.5"5.5"
21"21"
5.5"3.5"
2"3"
9.75"10"
5.25"5.25"
10"9.75"
3"2"
5'-0" (A)
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
CR4CR41 1
ELM
1/31/80
500
5' STANDARD CROSSARM
DRILLING GUIDE
0
REDRAWN IN CAD
0 4/02
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
DEA1DEA11 1
LB/AH
3/5/08
500
8' PRE-ASSEMBLED DEADEND ASSEMBLY
3-POSITION
DRILLING GUIDE
12"
TOP VIEW
FRONT VIEW
6" 42" 6"42"
4" 23" 4"
6"6"
Notes: 1.) Holes to be 11/16" diameter.
2.) Double guy attachment required.
6" 15" 23"6"15"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
DEA2DEA21 1
LB/AH
3/5/08
500
10' PRE-ASSEMBLED DEADEND ASSEMBLY
3-POSITION
DRILLING GUIDE
12"
TOP VIEW
FRONT VIEW
6" 54" 6"54"
4" 4"
6"6"
Notes: 1.) Holes to be 11/16" diameter.
2.) Double guy attachment required.
33" 7" 16" 33"7"16"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
DEA3DEA31 1
LB/AH
3/5/08
500
10' PRE-ASSEMBLED DEADEND ASSEMBLY
4-POSITION
DRILLING GUIDE
4"
6" 6"
4"
33" 16"
TOP VIEW
19" 19"
6"
35" 19"
6"
35"19"
12"
Notes: 1.) Holes to be 11/16" diameter.
2.) Double guy attachment required.
FRONT VIEW
7" 33"16" 7"
10'-0" ±1"
METAL TAG
REFER TO SPECS FOR
MARKING DETAIL
MARK BUTT TO
INDICATE LENGTH
AND CLASS
90°
1.) Holes to be 11/16" dia.
2.) Call for P1 drilling, 30' pole
class 4 as (P1-30-4)
Notes:
4"
2'-4"
10"
2'-10"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
P1P11 1
1/31/80
500
25' TO 35' DISTRIBUTION POLE
FRAMING GUIDE
1 10/17/08 CM AH
2 12/31/09 KJP
MARK TOP TO
INDICATE LENGTH
AND CLASS
Rev 2: Added length and class tag at top of pole.
POLE TOP BRACKET
*11"
*3"
8'-6"
*3'-8"
*3'-0"
6" ANTI-SPLIT BOLT
TWIGGY
10'-0"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
P2P21 1
HWH
1/22/80
500
40' TO 60' DISTRIBUTION
POLE FRAMING GUIDE
5
3 10/17/08 CM AH
4 12/31/08 KJP AH
5 12/15/16 KJP
6 10/3/17 KJP
NEUTRAL FOR TWIGGY
NEUTRAL (FOR CROSSARM)
TANGENT CROSSARM*1'-6"
DEADEND ASSEMBLY BOTTOM BOLT *1'-11"
CROSSARM BRACE (60") 3'-2 3/8"
TRANSFORMER
8'-10" TRANSFORMER
5'-10 3/4"
6'-10 1/2"
7'-10 1/4"
1Ø NEUTRAL (POLE TOP PIN)
7'-3"
TRANSFORMER
90°
MARK BUTT TO
INDICATE LENGTH
AND CLASS
METAL TAG
REFER TO SPECS FOR
MARKING DETAIL
10'-0" ±1"
SEE NOTE 1
Notes:
1. Brand mark 14'-0" ±1" for poles 55' and
longer.
2. Holes to be 13/16" diameter minimum 25/32"
diameter.
3. * Drill parallel ±1/4" tolerance.
4. All other holes ±1/2" tolerance.
5. Call for P2 drilling, 55' pole class 2 as
(P2-55-2)
20 Holes
MARK TOP TO
INDICATE LENGTH
AND CLASS
14'-6" PUD FIBER
15'-0" PUD FIBER
15'-6" COMMUNICATIONS
16'-6" COMMUNICATIONS
16'-0" COMMUNICATIONS
Rev. 6 - Added star lock on butt.
STAR LOCK
STAR LOCK
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
P3P31 1
ELM
1/31/80
500
POLE SETTING GUIDE
1 10/17/08 CM AH
Rev 1: Redrawn in CAD
1. Setting depth in rock or swamp will be determined as required.
Notes:
LENGHT OF POLE (FT)
MINIMUM SETTING DEPTH
UP TO 30' 5'-0"
35'-0" 5'-6"
40'-0" 6'-0"
45'-0" 6'-6"
50'-0" 7'-0"
55'-0" 7'-6"
60'-0" 8'-0"
65'-0" 8'-6"
70'-0" 9'-0"
75'-0" 9'-6"
80' AND ABOVE
POLE DEPTH SETTING CHART
THE MINIMUM DEPTH FOR SETTING POLES SHALL BE AS FOLLOWS:
10'-0"
4'-0"
9"
9"
9"
9"
9"
9"
9"
9"
1'-0"
3'-0"
FOR DRAINAGE
OF MOISTURE
5°
3'-0"
4'-0"
MARKING DISK
RECESS 1/2" DEEP
ON INSIDE OF
SWEEP. USE AS
SIGHT GAIN.
SEE DETAIL
3
5
/
8
"
3
5
/
8
"
3
5
/
8
"
6"
2"
5
"
9"
3"
DETAIL
NOTES:
1. ALL HOLES AND MARKING
DISK RECESS TO BE MADE
BEFORE TREATMENT.
2. ALL HOLES SHALL BE
COMPLETELY DRILLED
THROUGH THE POLE FROM
ONE DIRECTION.
3. MAINTAIN 2 INCH MINIMUM
EDGE DISTANCE.
4. ALL HOLES SHALL
BE 7/16 INCH
MAXIMUM DIAMETER.
5. FOR DOUGLAS FIR ONLY.
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
P4P41 1
500
TRANSMISSION-DISTRIBUTION POLE
THROUGH BORING GUIDE
AT GROUND LINE
1 2/11/10 KJP
Rev 1: Added to Standards Book.
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
P5P51 1
500
TRANSMISSION POLE
THROUGH BORING GUIDE
AT THE POLE TOP
1 4/2/14 KJP
Rev 1: Added to Standards Book.
6'-8 1/2"
9"
9"
9"
9"
9"
9"
9"
9"
4"
FOR DRAINAGE
OF MOISTURE
5°
6'-8 1/2"
SEE DETAIL
3
5
/
8
"
3
5
/
8
"
3
5
/
8
"
6"
2"
5
"
9"
3"
DETAIL
NOTES:
1. ALL HOLES AND MARKING
DISK RECESS TO BE MADE
BEFORE TREATMENT.
2. ALL HOLES SHALL BE
COMPLETELY DRILLED
THROUGH THE POLE FROM
ONE DIRECTION.
3. MAINTAIN 2 INCH MINIMUM
EDGE DISTANCE.
4. ALL HOLES SHALL
BE 5/16 INCH
MAXIMUM DIAMETER.
5. FOR DOUGLAS FIR ONLY.
4 1/2"
A A
4
5
°
FRAMING
HOLES
THROUGH DRILLING
HOLES
VIEW A-A
30'-0"
34'-10"
*35'-6"
1'-7"
TWIGGY
28'-6"
DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
TP2TP21 1
HWH/DK
2/02
500
115kV TRANSMISSION LINE
GENERAL POLE DRILLING
SPECIFICATION
1 12/28/16 KJP
2 3/12/20 KJP
NEUTRAL FOR TWIGGY
NEUTRAL (FOR CROSSARM)
CROSSARM BRACE (60")35'-3 5/8"
TRANSFORMER
29'-8" TRANSFORMER
32'-7 1/4"
31'-7 1/2"
30'-7 3/4"
1Ø NEUTRAL (POLE TOP PIN)31'-3"
TRANSFORMER
90°
MARK BUTT TO
INDICATE LENGTH
AND CLASS
METAL TAG REFER TO
SPECS FOR MARKING
DETAIL
14'-0" ±
1"
Notes:
1. All holes are ±1/16" tolerance.
2. * All parallel holes shall be parallel with a
tolerance of ±1/4".
3. Install processor identification tag (metal
tag) with drilling spec "TP2" on both ends
of pole.
21 Holes
MARK TOP TO
INDICATE LENGTH
AND CLASS
STAR LOCK
5'-4"
2'-10"
6'-4"
0"
7"
1" Dia. Holes
13/16" Dia. Holes
(min. 25/32" Dia.)
GROUND
MEASUREMENTS ARE FROM
THE GROUNDLINE (10% OF
POLE HEIGHT PLUS 2 FEET)
MEASUREMENTS ARE FROM
TOP OF POLE
TWIGGY
1'-0"
Rev. 2 - Added star lock on butt and added pre-drilled holes for communications.
24'-0" PUD FIBER
23'-0" COMMUNICATIONS
22'-0" COMMUNICATIONS
23'-6"PUD FIBER
22'-6" COMMUNICATIONS
STAR LOCK