500-1209 - playworld · design number: 500-1209 - compliance and technical data 500-1209...
TRANSCRIPT
Posts
ZZPM0016 21 5in OD X 120in STEEL POST W/ RIVETED CAP
ZZPM0026 22 5in OD X 132in STEEL POST W/ RIVETED CAP
ZZPM0036 13 5in OD X 144in STEEL POST W/ RIVETED CAP
ZZPM0046 44 5in OD X 156in STEEL POST W/ RIVETED CAP
ZZPM0047 15 5in OD X 156in STEEL POST W/O CAP
ZZPM0057 16 5in OD X 168in STEEL POST W/O CAP
ZZPM0057GZ 27 5in OD X 168in STEEL POST W/O CAP (GROUND ZERO)
ZZPM0066 48 5in OD X 180in STEEL POST W/ RIVETED CAP
ZZPM0067 19 5in OD X 180in STEEL POST W/O CAP
ZZPM1850 310 5in OD CANTILEVER POST FOR MONORAILS
CityScapes Post Icons
ZZUN4128 111 FRIENDS POST ICON
ZZUN4129 112 SUN POST ICON
ZZUN4136 113 MOON POST ICON
ZZUN4137 114 BIRD POST ICON
ZZUN4139 115 SPACESHIP POST ICON
Decks & Kick Plates
ZZPM0616 216 SQUARE COATED DECK ASSEMBLY
ZZPM0617 217 TRIANGULAR COATED DECK ASSEMBLY
ADA Items
ZZPM2007 118 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 119 APPROACH STEP FOR TRANSFER STATION
Slides
ZZPM2666 220 STAINLESS STEEL LIGHTNING SLIDE (36in DECK)
ZZPM2717 121 360 DEGREE ALUMINUM SPIRAL SLIDE
ZZPM2805 222 ENTRY SUPPORT BRACKET
ZZPM2808 123 12in STEP-UP BRACKET
Barriers
ZZPM4288 124 ACCESS GATE
Climbers
ZZPM7420 125 DEEP RUNG ARCH CLIMBER (60in DECK)
ZZPM7966 126 ROCKY RIDGE CLIMBER (60in DECK)
Ground Zer0 Climbers
ZZPM0297 127 POST W/ LADDER CLIMBER (36in OR 48in DECK)
ZZPM8408 128 THE GRID
ZZPM8467 129 THE VERTICAL WAVE
ZZPM8469 130 THE LOW ARCH LEFT
Overhead Events
ZZPM5736 131 CHINNING/TURNING BAR
ZZPM5770 132 LEG LIFT
ZZPM5970 133 OVERHEAD EVENT ACCESS LADDER (36in DECK)
ZZPM6936 134 HORIZONTAL LADDER W/ PARALLEL BARS
Part No. Description
Design Number: 500-1209 - Bill Of Material
500-1209
Ref.No. Quantity
Wednesday, August 31, 2011 Page of1 2 www.PlayworldSystems.com
ZZUN6990 135 MONORAIL SECTION FOR CANTILEVER POSTS
ZZUN7000 136 MONORAIL EXTENSION FOR CANTILEVER POSTS
ZZUN7010 137 TIRE STEPS ASSEMBLY FOR OVER HEAD EVENTS
Bridges
ZZPM6597 138 6ft ADVENTURE BRIDGE w/ISO43 CHAIN
ZZPM7080 139 6ft CATWALK
Roofs & Arches
ZZPM9828 240 CARNIVAL ROOF - SMALL PERF (SQUARE)
ZZPM9856 241 CARNIVAL ROOF SQUARE CAP
Stairs and Ladders
ZZPM9168 142 12in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZPMGUID 143 PLAYMAKER GUIDELINES
ZZUN9910 144 SURFACING WARNING LABEL KIT
ZZUN9930 145 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZUN9990 146 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
Part No. Description
Design Number: 500-1209 - Bill Of Material
500-1209
Ref.No. Quantity
Wednesday, August 31, 2011 Page of2 2 www.PlayworldSystems.com
CertifiedZZPM00161 5in OD X 120in STEEL POST W/ RIVETED CAP
2 134.22 202 0 2.00 0.26 0
CertifiedZZPM00262 5in OD X 132in STEEL POST W/ RIVETED CAP
2 148.42 221 0 2.00 0.24 0
CertifiedZZPM00363 5in OD X 144in STEEL POST W/ RIVETED CAP
1 80.91 120 0 1.00 0.13 0
CertifiedZZPM00464 5in OD X 156in STEEL POST W/ RIVETED CAP
4 350.84 516 0 4.00 0.52 0
CertifiedZZPM00475 5in OD X 156in STEEL POST W/O CAP1 85.31 120 0 1.00 0.13 0
CertifiedZZPM00576 5in OD X 168in STEEL POST W/O CAP1 91.81 129 0 1.00 0.13 0
CertifiedZZPM0057GZ7 5in OD X 168in STEEL POST W/O CAP (GROUND ZERO)
2 192.02 259 0 2.00 0.36 0
CertifiedZZPM00668 5in OD X 180in STEEL POST W/ RIVETED CAP
4 403.24 589 0 4.00 0.52 0
CertifiedZZPM00679 5in OD X 180in STEEL POST W/O CAP1 99.91 139 0 1.00 0.13 0
CertifiedZZPM185010 5in OD CANTILEVER POST FOR MONORAILS3 249.33 562 0 3.00 0.54 0
CertifiedZZUN412811 FRIENDS POST ICON 1 28.96 74 0 0.50 0.00 0
CertifiedZZUN412912 SUN POST ICON 1 20.26 57 0 0.50 0.00 0
CertifiedZZUN413613 MOON POST ICON 1 10.86 40 0 0.50 0.00 0
CertifiedZZUN413714 BIRD POST ICON 1 24.06 59 0 0.50 0.00 0
CertifiedZZUN413915 SPACESHIP POST ICON 1 19.66 49 0 0.50 0.00 0
CertifiedZZPM061616 SQUARE COATED DECK ASSEMBLY 2 180.72 451 8 2.00 0.00 0
CertifiedZZPM061717 TRIANGULAR COATED DECK ASSEMBLY2 92.80 358 4 2.00 0.00 0
CertifiedZZPM200718 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 155.24 349 2 2.00 0.09 0
CertifiedZZUN201919 APPROACH STEP FOR TRANSFER STATION1 35.83 76 1 1.00 0.04 0
CertifiedZZPM266620 STAINLESS STEEL LIGHTNING SLIDE (36in DECK)
2 270.06 5,492 4 4.00 0.14 2
CertifiedZZPM271721 360 DEGREE ALUMINUM SPIRAL SLIDE1 325.00 7,563 3 1.50 0.12 1
CertifiedZZPM280522 ENTRY SUPPORT BRACKET 2 33.88 139 0 1.00 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1209 - Compliance and Technical Data
500-1209
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Wednesday, August 31, 2011 Page of1 4 www.PlayworldSystems.com
CertifiedZZPM280823 12in STEP-UP BRACKET 1 16.60 116 0 1.00 0.00 0
CertifiedZZPM428824 ACCESS GATE 1 34.38 95 0 0.50 0.00 0
CertifiedZZPM742025 DEEP RUNG ARCH CLIMBER (60in DECK)1 118.82 245 2 2.00 0.06 1
CertifiedZZPM796626 ROCKY RIDGE CLIMBER (60in DECK)1 123.05 558 2 2.00 0.07 1
CertifiedZZPM029727 POST W/ LADDER CLIMBER (36in OR 48in DECK)
1 74.81 134 1 0.50 0.13 1
CertifiedZZPM840828 THE GRID 1 107.63 233 3 0.75 0.00 1
CertifiedZZPM846729 THE VERTICAL WAVE 1 66.12 233 2 0.50 0.00 1
CertifiedZZPM846930 THE LOW ARCH LEFT 1 121.41 376 3 2.00 0.12 1
CertifiedZZPM573631 CHINNING/TURNING BAR 1 9.25 48 1 0.50 0.00 1
CertifiedZZPM577032 LEG LIFT 1 7.20 34 1 0.50 0.00 1
CertifiedZZPM597033 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 26.16 79 1 1.50 0.06 0
CertifiedZZPM693634 HORIZONTAL LADDER W/ PARALLEL BARS1 136.23 276 1 0.00 0.00 1
CertifiedZZUN699035 MONORAIL SECTION FOR CANTILEVER POSTS
1 56.38 740 1 2.00 0.00 1
CertifiedZZUN700036 MONORAIL EXTENSION FOR CANTILEVER POSTS
1 40.21 206 0 2.00 0.00 0
CertifiedZZUN701037 TIRE STEPS ASSEMBLY FOR OVER HEAD EVENTS
1 54.41 271 0 1.00 0.00 0
CertifiedZZPM659738 6ft ADVENTURE BRIDGE w/ISO43 CHAIN1 204.34 801 3 3.00 0.00 1
CertifiedZZPM708039 6ft CATWALK 1 253.68 545 3 2.50 0.00 1
CertifiedZZPM982840 CARNIVAL ROOF - SMALL PERF (SQUARE)2 266.52 1,033 0 4.00 0.00 0
CertifiedZZPM985641 CARNIVAL ROOF SQUARE CAP 2 12.22 44 0 0.50 0.00 0
CertifiedZZPM916842 12in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
1 94.46 363 1 1.50 0.00 0
N/AZZPMGUID43 PLAYMAKER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991044 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993045 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 13.07 106 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1209 - Compliance and Technical Data
500-1209
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Wednesday, August 31, 2011 Page of2 4 www.PlayworldSystems.com
N/AZZUN999046 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
1 3.46 85 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1209 - Compliance and Technical Data
500-1209
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
851 1,670 24,183 47 66.25 3.794,873.80 15Totals:
24 Metric Tons752 Kg383 Kg2,193.21 Kg 2.88 m3
Wednesday, August 31, 2011 Page of3 4 www.PlayworldSystems.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1209 - Compliance and Technical Data
500-1209
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 500-1209, has been configured to meet the requirements of the ASTM F1487-07 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487-07 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the ADAAG published 23-July-2004, by the United States Access Board whe installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487-07
Americans with Disabilities Act Accessibility Guidlines (ADAAG)
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Wednesday, August 31, 2011 Page of4 4 www.PlayworldSystems.com
0 5' 10'
0 5' 10'
4572
4572
4572
4572
3963
3963
3963
3963
3658
3353
3048
3048
3353
4572
3963
GZ4267
4267
= S
PIR
AL
SLI
DE
CE
NTE
R P
OS
T FO
OTI
NG
(D
ETAI
L1)
= C
OM
PO
NE
NT
FOO
TIN
G (
DET
AIL
3)
FOO
TIN
G L
EGEN
D
= C
AN
TILE
VE
R, "
T" P
OS
T, A
ND
CO
MP
ON
ENT
POST
FO
OTI
NG
(D
ETAI
L 2)
2845
3658 GZ
(284
5mm
IND
ICA
TES
POST
LEN
GTH
)
(365
8mm
IND
ICA
TES
POST
LEN
GTH
)=
GR
OU
ND
ZE
RO
PO
ST
FOO
TIN
G (
DET
AIL
2)
(ZZC
H18
50 IN
DIC
ATES
PAR
T N
UM
BER
)
= S
UP
PO
RT
PO
ST
FOO
TIN
G (
DET
AIL
1 or
4)
©20
11 P
layw
orld
Sys
tem
s®, I
nc.
500-1209Catalog Pre-Design
500-
1209
}{
©20
11 P
layw
orld
Sys
tem
s®, I
nc.
500-1209Catalog Pre-Design
500-
1209
}{