5 x 8 flashcards

36
4.0 Integration 5.0 Scope 6.0 Time 4.1 Develop Project Charter 4.2 Develop Preliminary Scope Statement 4.3 Develop Project Management Plan 4.4 Direct and Manage Project Execution 4.5 Monitor and Control Project Work 4.6 Integrated Change Control 4.7 Close Project 5.1 Scope Planning 5.2 Scope Definition 5.3 Create WBS 5.4 Scope Verification 5.5 Scope Change Control 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Activity Resource Estimating 6.4 Activity Duration Estimating

Upload: scorpionday

Post on 10-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 1/37

4.0 Integration 5.0 Scope 6.0 Time

4.1 Develop Project Charter

4.2 Develop PreliminaryScope Statement

4.3 Develop Project

Management Plan

4.4 Direct and Manage

Project Execution

4.5 Monitor and Control

Project Work

4.6 Integrated Change

Control

4.7 Close Project

5.1 Scope Planning

5.2 Scope Definition

5.3 Create WBS

5.4 Scope Verification

5.5 Scope Change Control

6.1 Activity Definition

6.2 Activity Sequencing

6.3 Activity Resource

Estimating

6.4 Activity Duration

Estimating

Page 2: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 2/37

7.0 Cost 8.0 Quality 9.0 Human

Resources

7.1 Cost Estimation

7.2 Cost Budgeting

7.3 Cost Control

8.1 Quality Planning

8.2 Perform Quality

Assurance

8.3 Perform Quality Control

9.1 Human ResourcesPlanning

9.2 Acquire Project Team

9.3 Develop Project Tea

9.4 Manage Project Team

Page 3: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 3/37

10.0Communication

11.0 Risk 12.0 Procurem

Page 4: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 4/37

10.1 Communication

Planning

10.2 Information

Distribution

10.3 Performance Reporting

10.4 Manage Stakeholders

11.1 Risk Management

Planning

11.2 Risk Identification

11.3 Qualitative Risk

Analysis

11.4 Quantitative Risk

Analysis

11.5 Risk Response Planning

11.6 Risk Monitoring & 

Controlling

12.1 Plan Purchases & 

Acquisitions

12.2 Plan Contracting

12.3 Request Seller

Responses

12.4 Select Sellers

12.5 Contract Administr

12.6 Contract Closure

4.1 Develop Project Charter

Page 5: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 5/37

Knowledge Area: Integration

Process Group: Initiating

* Process necessary for documenting thebusiness needs & requirements* PC links to ongoing work of the organizatand authorize the project* Project is charted by org or program or

portfolio bodyInputs Tools & Techniques Outputs1. Contract

2. SOW (includes businessneed, scope description,

strategic plan)3. Enterprise environmental

factors

4. Organizational processassets (templates,

procedures)

1. Project selection methods

2. Project managementmethodology

3. Project managementinformation system

4. Expert judgment

1. Project Charter

4.2 Develop Preliminary Project Scope StatementKnowledge Area: Integration

Process Group: Initiating

* Produces preliminary high level definitionthe project* contains deliverable requirements, produc

requirements, boundaries of the project,methods of acceptance and high level scope

Page 6: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 6/37

control

Inputs Tools & Techniques Outputs

1. Project Charter2. Statement Of Work

(SOW)3. Enterprise environmental

factors4. Organizational process

Assets

1. Project managementmethodology

2. Project managementinformation system

3. Expert judgment

1. Prelimnary Project ScStatement

4.3 Develop Project Management PlanKnowledge Area: IntegrationProcess Group: Planning

* Process for defining, prepating, integratin

and coordinating all subsidiary plans into aproject management plan* Project mgmt plan becomes primary scouof info for how the project will be planned,executed, monitored and controlled and clo

Inputs Tools & Techniques Outputs1. Preliminary project scope

statement

2. Project managementprocesses

1. Project management

methodology

2. Project managementinformation system

1. Project management

Page 7: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 7/37

3. Enterprise environmental

factors4. Organizational process

Assets

(configuration management

system, change controlsystem)

3. Expert judgment

4.4 Direct and Manage Project ExecutionKnowledge Area: Integration

Process Group: Executing

* Process for directing technical & org interto work defined in project management pla* Deliverables are outputs of processes defin project management plan* Deliverable status and work performed isfurther used as input to performance reportprocess

Inputs Tools & Techniques Outputs1. Project management plan

2. Approved correctiveactions

3. Approved preventiveactions

4. Approved changerequests

5. Approved defect repair6. Validated defect repair

1. Project management

methodology2. Project management

information system

1. Deliverables

2. Requested changes3. Implemented change

requests4. Implemented correcti

actions5. Implemented prevent

actions6. Implemented defect

Page 8: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 8/37

7. Administrative closure

procedure

repair

7. Work performanceinformation (status, bud

% complete)

4.5 Monitor and Control Project WorkKnowledge Area: Integration

Process Group: Monitoring andControlling

* Process for collecting, measuring anddisseminating performance information andassessing measurements and trends to effeprocess improvements* Process includes risk monitoring (identifystatus reporting risk plan executing)* Also includes status reporting, progress

measurement and forecasting* performance reporting with regards to scoschedule, cost, resources, quality and risk

Inputs Tools & Techniques Outputs

1. Project management plan2. Work performance

information3. Rejected change requests

1. Project managementmethodology

2. Project managementinformation system

3. Earned valuemanagement

1. Recommended correcactions

2. Recommended preveactions

3. Forecasts4. Recommended defect

Page 9: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 9/37

4. Expert judgment repair

5. Requested changes

4.6 Integrated Change ControlKnowledge Area: Integration

Process Group: Monitoring andControlling

* Process for controlling factors that create

changes, determining wether change hasoccured and measuring approved changes.* This process is performed throught theproject.(intiating to closure)

Inputs Tools & Techniques Outputs

1. Project management plan2. Requested changes

3. Work performance

information4. Recommended preventive

actions5. Recommended corrective

actions6. Recommended defect

repair7. Deliverables

1. Project managementmethodology

2. Project management

information system3. Expert judgment

1. Approved changerequests

2. Rejected change requ

3. Project management (updates)

4. Project scopemanagement (updates)

5. Approved correctiveactions

6. Approved preventiveactions

7. Approved defect repa8. Validated defect repa

Page 10: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 10/37

9. Deliverables

4.7 Close ProjectKnowledge Area: IntegrationProcess Group: Closing

* Process to finalize all activities across all oprocess groups to formally close the project

phaseInputs Tools & Techniques Outputs

1. Project management plan2. Contract documentation

3. Enterprise environmentalfactors

4. Organizational processassets

5. Work performanceinformation

6. Deliverables

1. Project managementmethodology

2. Project managementinformation system

3. Expert judgment

1. Administrative closurprocedure

2. Contract closureprocedure

3. Final product, serviceresult

4. Organizational procesassets (updates)

(acceptance doc, projec

files, closure doc, historinfo update)

5.1 Scope PlanningKnowledge Area: Scope

Process Group: Planning

* Process necessory for creating a project s

management plan.* It documents how scope will be defined,

Page 11: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 11/37

verified and controlled and how WBS will becreated and defined

Inputs Tools & Techniques Outputs

1. Enterprise environmentalfactors

2. Organizational processassets

3. Project Charter4. Preliminary project scope

statement5. Project management plan

1. Expert judgment2. Templates, forms,

standards (WBS templates,scope management plan

templates, project scopecontrol forms)

1. Project scopemanagement plan

5.2 Scope DefinitionKnowledge Area: ScopeProcess Group: Planning

* Process for developing detailed project scstatement as the basis for future projectdecisions

Inputs Tools & Techniques Outputs1. Organizational process

assets2. Project charter

3. Preliminary project scopestatement

4. Project scope

1. Product analysis [Value

Analysis]2. Alternative identification

(brainstorming & lateralthinking)

3. Expert judgment (SME)

1. Project Scope Statem

2. Requested changes3. Project scope

management plan (upda(include approved chang

requests)

Page 12: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 12/37

management plan

5. Approved changerequests

2. Stakeholder analysis

5.3 Create WBS

Knowledge Area: ScopeProcess Group: Planning

* Process for subdividing the major projectdeliverables and project work into smaller, manageable components (work packages)

Inputs Tools & Techniques Outputs

1. Organizational processassets

2. Project scope statement3. Project scope

management plan4. Approved change

requests

1. WBS templates2. Decomposition

1. Project scope stateme(updates) (approved cha

requests)2. WBS

3. WBS dicitionary4. Scope baseline

5. Project scope

management plan (upda(approved change reque

6. Requested changes

5.4 Scope Verification

Knowledge Area: ScopeProcess Group: Monitoring and

* Process for formalizing acceptance of thecomplete project deliverables

Page 13: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 13/37

Controlling

Inputs Tools & Techniques Outputs

1. Project scope statement2. WBS directory

3. Project scope mgmt plan4. Deliverables

1. Inspection 1. Accepted deliverables(supporting documents

acknowledgement)2. Requested changes

3. Recommended correcactions

5.5 Scope Change ControlKnowledge Area: ScopeProcess Group: Monitoring andControlling

* Process for controlling changes to the proscope

Inputs Tools & Techniques Outputs

1. Project scope statement2. WBS

3. WBS dictionary4. Project scope

management plan

5. Performance reports6. Approved change

1. Change control system2. Variance analysis

3. Replanning4. Configuration

management system

1. Project scope stateme(updates)

2. WBS (updates)3. WBS dictionary (upda

4. Scope baseline (upda

5. Requested changes6. Recommended correc

Page 14: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 14/37

requests

7. Work performanceinformation

action

7. Organizational procesassets (updates) (varian

learnings & lessons lear

8. Project management(updates)

6.1 Activity DefinitionKnowledge Area: Time

Process Group: Planning

* Process for identifying the specific activitithat need to be performed to produce thevarious project deliverables

Inputs Tools & Techniques Outputs1. Enterprise environmental

factors2. Organizational process

assets

3. Project scope statement4. WBS

5. WBS dictionary

6. Project management plan

1. Decomposition

(Work package --> scheduleactivities)

2. Templates

3. Rolling wave planning4. Expert judgement

5. Planning component

1. Activity list

2. Activity attributes3. Milestone list

4. Requested changes

6.2 Activity Sequencing

Page 15: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 15/37

Knowledge Area: Time

Process Group: Planning

* Process for identifying and documenting lrelationships among schedule activities andlogically sequencing them accordingly

Inputs Tools & Techniques Outputs

1. Project scope statement

2. Activity list3. Activity attributes

4. Milestone list5. Approved change

requests

1. Precedence diagramming

method (PDM)2. Arrow diagramming

method (ADM)3. Schedule network

templates

4. Dependencydetermination

5. Applying leads & lags

1. Project schedule netw

diagrams2. Activity list (updates)

3. Activity attributes(updates)

4. Requested changes

6.3 Activity Resources EstimatingKnowledge Area: Time

Process Group: Planning

* Process for estimating the type and quantof resources required to perform each scheactivity

Inputs Tools & Techniques Outputs

1. Enterprise environmentalfactors

2. Organizational processassets

1. Expert judgment2. Alternate analysis (make-

or-buy decision,automation)

1. Activity resourcerequirements

2. Activity attributes(updates)

Page 16: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 16/37

3. Activity list

4. Activity attributes5. Resource availability

6. Project management plan

3. Published estimating data

(rates & cost data)4. Project management

software

5. Bottom-up estimating

3. Resource breakdown

structure4. Resource calendars

(updates)

5. Requested changes

6.4 Activity Duration EstimatingKnowledge Area: Time

Process Group: Planning

* Process for estimating the number of worperiods that will be needed to completeindividual schedule activities

Inputs Tools & Techniques Outputs

1. Enterprise environmentalfactors

2. Organizational processassets

3. Project scope statement

4. Activity list5. Activity attributes

6. Activity resource

requirements7. Resource calendars

8. Project management plan(Risk register, Activity cost

1. Expert judgment2. Analogous estimating

3. Parametric estimating4. Three point estimating

5. Reserve analysis

1. Activity durationestimates

2. Activity attributes(updates)

Page 17: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 17/37

estimates)

6.5 Schedule DevelopmentKnowledge Area: TimeProcess Group: Planning

* Iterative process and determines plannedand finish dates for the project activities

Inputs Tools & Techniques Outputs1. Organizational process

assets2. Project scope statement

(imposed dates & imposedmilestones by sponsor)

3. Activity list4. Activity attributes

5. Project schedule networkdiagrams

6. Activity resourcerequirements

7. Resource calendars8. Activity duration

estimates

1. Schedule network

analysis2. Critical path method

3. Schedule compression(crashing, fast-tracking)

4. What-if scenario analysis5. Resource leveling

6. Critical chain method7. Project management

software8. Applying calendars

9. Adjust leads & lags10. Schedule model

1. Project schedule

2. Schedule model data3. Schedule baseline

4. Resource requiremen(updates)

5. Activity attributes(updates)

6. Project calendar(updates)

7. Requested changes8. Project management

(updates, including schemanagement plan)

6.6 Schedule Control

Page 18: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 18/37

Knowledge Area: Time

Process Group: Monitoring andControlling

* Process for controlling changes to projectschedule

Inputs Tools & Techniques Outputs

1. Schedule managementplan

2. Schedule baseline3. Performance reports

4. Approved change

requests

1. Progress reporting2. Schedule change control

system3. Performance

measurement

4. Project managementsoftware

5. Variance analysis

6. schedule comparison barcharts

1. Schedule model data(updates)

2. Schedule baseline(updates)

3. Performance

measurements4. Requested changes

5. Recommended correc

actions6. Organizational procesAssets

7. Activity list (updates)8. Activity attributes

(updates)9. Project management

(updates)

7.1 Cost Estimation

Page 19: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 19/37

Knowledge Area: Cost

Process Group: Planning

* Process for developing an approximation the costs of the resources needed to complproject activities

Inputs Tools & Techniques Outputs

1. Enterprise environmental

factors2. Organizational process

Assets3. Project scope statement

4. WBS

5. WBS dictionary6. Project management plan

(schedule mgmt plan & staffing mgmt plan, risk

register)

1. Analogous estimating

2. Determine resource costrates

3. Bottom-up estimating4. Parametric estimating

5. Project management

software6. Vendor bid analysis

7. Reserve analysis8. Cost of quality

1. Activity cost estimate

2. Activity cost estimatesupporting detail

(description, basis of estimate, constraint, RO

3. Requested changes

4. Cost management pla(updates)

7.2 Cost BudgetingKnowledge Area: Cost

Process Group: Planning

* Process for aggregating the estimated cosindividual activities or work packages toestablish a cost baseline

Inputs Tools & Techniques Outputs

1. Project Scope Statement2. WBS

1. Cost aggregation2. Reserve Analysis

1. Cost baseline2. Project funding

Page 20: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 20/37

3. WBS Dictionary

4. Activity cost estimates5. Activity cost estimate

supporting detail

6. Project schedule

7. Resource calendars8. Contract9. Cost management plan

3. Parametric estimating

4. Funding limitreconcillation

requirements

3. Cost management pla(updates)

4. Requested changes

7.3 Cost ControlKnowledge Area: Cost

Process Group: Monitoring andControlling

* Process for infleuncing the factors that crvariances and controlling changes to the prbudget

Inputs Tools & Techniques Outputs1. Cost baseline

2. Project fundingrequirements

3. Performance reports

4. Work performanceinformation

5. Approved changerequests

1. Cost change control

system2. Performance

measurement analysis

3. Forecasting4. Project performance

reviews5. Project management

1. Cost estimate (update

2. Cost baseline (update3. Performance

measurements

4. Forecasted completio5. Requested changes

6. Recommended correcactions

Page 21: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 21/37

6. Project management plan software

6. Variance management

7. Organizational proces

assets (updates)8. Project management

(updates)

8.1 Quality PlanningKnowledge Area: Quality

Process Group: Planning

* Process for identifying which quality standare relevent to the project and determiningto satisfy them

Inputs Tools & Techniques Outputs1. Enterprise environmental

factors (govt regulations,standards)

2. Organizational processAssets (Quality policies,

historical database, lessons

learned)3. Project scope statement

4. Project management plan

1. Cost benefit analysis

2. Benchmarking3. Design of 

experiments[TaguchiMethod]

4. Cost of Quality (COQ)

5. Additional qualityplanning tools

1. Quality management

2. Quality metrics3. Quality checklists

4. Process improvementplan(steps to analyze

processes to identify wa

& non-value added item5. Quality baseline

6. Project management

(updates)

8.2 Perform Quality Assurance

Page 22: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 22/37

Knowledge Area: Quality

Process Group: Executing

* Process for applying the planned, systemquality activities to ensure that the projectemploys all processes needed to meetrequirements

Inputs Tools & Techniques Outputs

1. Quality management plan2. Quality metrics3. Process improvement

plan4. Work performance

information5. Approved change

requests

6. Quality controlmeasurements7. Implemented change

requests8. Implemented corrective

actions9. Implemented defect

repair10. Implemented preventive

1. Quality planning tools andtechniques2. Quality audits

3. Process analysis4. Quality control tools and

techniques

1. Requested changes2. Recommended correcactions

3. Organizational procesassets (updates)

4. Project management (updates)

Page 23: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 23/37

actions

8.3 Perform Quality ControlKnowledge Area: QualityProcess Group: Monitoring and

Controlling

* Process for monitoring specific project resto determine whether they comply with relequality standards and identifying ways toeliminate causes of unsatisfactory performa

Inputs Tools & Techniques Outputs1. Quality management plan

2. Quality metrics3. Quality checklists

4. Organizational processassets

5. Work performanceinformation

6. Approved changerequests

7. Deliverables

1. Cause and effect diagram

2. Control charts3. Flowcharting

4. Histogram5. Pareto chart

6. Run chart7. Scatter diagram

8. Statistical sampling9. Inspection

10. Defect repair review

1. Quality control

measurements2. Validated defect repa

3. Quality baseline (upd4. Recommended correc

actions5. Recommended preve

actions6. Requested changes

7. Recommended defectrepair

8. Organizational procesAssets

9. Validated deliverables10. Project managemen

Page 24: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 24/37

plan (updates) (complet

checklists, lessons learn

9.1 Human Resource PlanningKnowledge Area: Human Resource

Process Group: Planning

* Process for identifying and documentingproject roles, responsibilities and reportingrelationships as well as creating the staffingmanagement plan

Inputs Tools & Techniques Outputs

1. Enterprise environmentalfactors (organizational,

technical, interpersonal,logistical, political)

2. Organizational processassets (templates,

checklists)3.Project management plan

(activity resourcerequirements)

1. Organization charts andposition descriptions[RAM

Using RACI]2. Networking

3. Organizational theory

1. Roles and responsibil(role, authority,

responsibility, competenrequired)

2. Project organizationcharts

3. Staffing managementplan

9.2 Acquire Project Team

Knowledge Area: Human ResourceProcess Group: Executing* Process for obtaining the human resourceneeded to complete the project

Page 25: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 25/37

Inputs Tools & Techniques Outputs

1. Enterprise environmentalfactors(Availability, ability,

experience, interest, cost)

2. Organizational process

assets3. Roles and responsibilities4. Project organization

charts5. Staffing management

plan

1. Pre-assignment2. Negotiation

3. Acquisition

4. Virtual teams

1. Project staff assignme2. Resource availability

3. Staffing management

plan (updates)

9.3 Develop Project TeamKnowledge Area: Human ResourceProcess Group: Executing

* Process for improving the competencies ainteraction of team members to enhace properformance

Inputs Tools & Techniques Outputs1. Project staff assignments

2. Staffing management

plan3. Resource availability

1. General management

skills (interpersonal skills)

2. Training3. Team-building activities

4. Ground rules5. Co-location[War Room]

1. Team performance

assessment (includes i.

improvements in skills findividuals ii. improvem

in competencies for thegroup as a whole iii. red

Page 26: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 26/37

6. Recognition and rewards staff turnover rate)

9.4 Manage Project TeamKnowledge Area: Human ResourceProcess Group: Monitoring and

Controlling

* Process for tracking team memberperformance, providing feedback, resolvingissues and coordinating changes to enhanceproject performance

Inputs Tools & Techniques Outputs1. Organizational process

assets2. Project staff assignments

3. Roles and responsibilities4. Project organizational

charts5. Staffing management

plan6. Team performance

assessment7. Work performance

information8. Performance reports

1. Observation and

conversation2. Project performance

appraisals3. Conflict management

4. Issue log

1. Requested changes

2. Recommended correcactions

3. Recommended preveactions

4. Organizational procesAssets (updates)

5. Project management (updates)

10.1 Communication Planning

Page 27: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 27/37

Knowledge Area: Communication

Process Group: Planning

* Process for determining the info andcommunication needs of the projectstakeholders

Inputs Tools & Techniques Outputs

1. Enterprise environmental

factors2. Organizational process

assets3. Project scope statement

4. Project management plan

(Constraints & assumptions)

1. Communications

requirements analysis2. Communications

technology

1. Communication

management plan[provides:

(i)stakeholder requirem(ii)info to be communica

(iii)responsibility

(iv)methods(v) escalation

(vi)updating]

10.2 Information DistributionKnowledge Area: Communication

Process Group: Executing

* Process for making information available project stakeholders in a timely manner

Inputs Tools & Techniques Outputs1. Communications

management plan

1. Communications skills

2. Information gatheringand retrieval system

3. Information distribution

1. Organizational proces

assets (updates)2. Requested changes

Page 28: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 28/37

methods

4. Lessons learned process

10.3 Performance ReportingKnowledge Area: Communication

Process Group: Monitoring andControlling

* Process for collecting and distributingperformance information* Includes status reporting, progressmeasurement and forecasting

Inputs Tools & Techniques Outputs

1. Work performanceinformation

2. Performancemeasurements

3. Forecasted completion4. Quality control

measurements5. Project management plan

(performance measurementbaseline)

6. Approved changerequests

7. Deliverables

1. Information presentationtools

2. Performance informationgathering and compilation

3. Status review meetings4. Time reporting systems

5. Cost reporting systems

1. Performance reports2. Forecasts

3. Requested changes4. Recommended correc

actions5. Organizational proces

assets (updates)

Page 29: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 29/37

10.4 Manage StakeholdersKnowledge Area: CommunicationProcess Group: Monitoring and

Controlling

* Process for managing communications tosatisfy the requirements of and resolve issuwith project stakeholders

Inputs Tools & Techniques Outputs1. Communicationsmanagement plan

2. Organizational processassets

1. Communication methods2. Issue logs

1. Resolved issues2. Approved change

requests3. Approved corrective

actions4. Organizational proces

assets (updates)

5. Project management (updates)

11.1 Risk Management PlanningKnowledge Area: RiskProcess Group: Planning

* Process for deciding how to approach, plaand execute the risk management activitiesproject

Inputs Tools & Techniques Outputs

1. Enterprise environmentalfactors

1. Project meetings andanalysis

1. Risk management pla

Page 30: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 30/37

2. Organizational process

assets3. Project scope statement

4. Project management plan

11.2 Risk IdentificationKnowledge Area: Risk

Process Group: Planning

* Process for determining which risks mightaffect the project and documenting theircharacteristics

Inputs Tools & Techniques Outputs1. Enterprise environmental

factors2. Organizational process

assets3. Project scope statement

4. Risk management plan

5. Project management plan

1. Documentation reviews

2. Information gatheringtechniques

3. Checklist analysis4. Assumptions analysis

5. Diagramming techniques

1. Risk register (include

of risks, potential responroot causes, and update

risk categories)

11.3 Qualitative Risk AnalysisKnowledge Area: Risk

Process Group: Planning

* Process for prioratizing risks for subsequefurther analysis or action by assessing andcombining their probability of occurance an

impact* SUBJECTIVE analysis

Page 31: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 31/37

Inputs Tools & Techniques Outputs

1. Organizational processassets

2. Project scope statement

3. Risk management plan

4. Risk register

1. Risk probability andimpact assessment

2. Probability and impact

matrix

3. Risk data qualityassessment4. Risk categorization

5. Risk urgency assessment

1. Risk register (updates

11.4 Quantitative Risk AnalysisKnowledge Area: Risk

Process Group: Planning

* Process for numerically analysing the effeoverall project objectives of indentified risk

* Objective or Numerical analysisInputs Tools & Techniques Outputs

1. Organizational process

assets2. Project scope statement

3. Risk management plan

4. Risk register5. Project management plan

(project schedule,management plan, project

1. Data gathering and

presentation techniquesA)Interviewing B) Probability

Distribution C) Expert

Judgement2. Quantitative risk analysis

and modeling techniques

1. Risk register(updates

includes1)probabilistic analysis o

project for schedule & co

outcomes 2)prioritized lquantified risks 3)trends

quantitative risk results

Page 32: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 32/37

cost mgmt plan)

11.5 Risk Response PlanningKnowledge Area: RiskProcess Group: Planning

* Process for developing options and actionenhance opportunities and to reduce threatproject objectives

Inputs Tools & Techniques Outputs1. Risk management plan2. Risk register

1. Strategies for negativerisks or threats

2. Strategies for positiverisks or opportunities

3. Strategy for both threatsand opportunities

4. Contingency responsestrategy

1. Risk register(updates2. Project management

plan(updates)3. Risk-related contractu

agreements

11.6 Risk Monitoring and ControllingKnowledge Area: RiskProcess Group: Monitoring and

Controlling

* Process for tracking identified risks,monitoring residual risks, identifying new riexecuting risk response plans, and evaluatitheir effectiveness throughout the project licycle

Inputs Tools & Techniques Outputs1. Risk management plan 1. Risk reassessment 1. Risk register (updates

Page 33: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 33/37

2. Risk register

3. Approved changerequests

4. Work performance

information

5. Performance reports

2. Risk audits

3. Variance and trendanalysis

4. Technical performance

measurement

5. Reserve analysis6. Status meetings

2. Requested changes

3. Recommended correcactions

4. Recommended preve

actions

5. Organizational procesassets (updates)6. Project management

(updates)

12.1 Plan Purchases and AcquisitionsKnowledge Area: Procurement

Process Group: Planning

* Process for determining what to purchaseacquire, and determining when and how

Inputs Tools & Techniques Outputs1. Enterprise environmental

factors2. Organizational process

assets3. Project scope statement

4. WBS

5. WBS dictionary6. Project management plan

1. Make-or-buy analysis

2. Expert judgment3. Contract types

1. Procurement

management plan2. Contract SOW

3. Make or buy decision4. Requested changes

Page 34: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 34/37

* Risk regiter

* Risk relatedcontractual agreements

* Resouce

requirements

* Project schedule* Activity cost

estimates

12.2 Plan ContractingKnowledge Area: Procurement

Process Group: Planning

* Process for documenting proucts, serviceresults requirements and identifying potentsellers

Inputs Tools & Techniques Outputs1. Procurement

management plan

2. Contract statement of work

3. Make or buy decisions

4. Project management plan* Risk register

* Risk relatedcontractual agreements

1. Standard forms

2. Expert judgment

1. Procurement docume

2. Evaluation criteria (ca

include cost, technicalcapability, financial capa

business type, reference

etc…)3. Contract SOW (updat

Page 35: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 35/37

* Resouce

requirements* Project schedule

* Activi

12.3 Request Seller ResponseKnowledge Area: Procurement

Process Group: Executing

* Process for obtaining information, quotatibids, offers or proposals as appropriate

Inputs Tools & Techniques Outputs

1. Organizational processassets

2. Procurementmanagement plan

3. Procurement documents

1. Bidder conferences2. Advertising

3. Develop qualified sellerslist

1. Qualified sellers list2. Procurement docume

package3. Proposals

12.4 Select SellerKnowledge Area: ProcurementProcess Group: Executing

* Process for reviewing offers, choosing froamong potential sellers and negotiating awritten contact with the seller

Inputs Tools & Techniques Outputs

1. Organizational process

assets2. Procurement

1. Weighting system

2. Independent estimates[Should-cost]

1. Selected sellers

2. Contract3. Contract managemen

Page 36: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 36/37

management plan

3. Evaluation criteria4. Procurement document

package

5. Proposals

6. Qualified sellers list7. Project management plan(risk register, risk-related

contractual agreements)

3. Screening system

4. Contract negotitaion5. Seller rating system

6. Expert judgement

7.Proposal evaluation

techniques

plan

4. Resource availability5. Procurement

management plan (upda

6. Requested changes

12.5 Contract AdministrationKnowledge Area: Procurement

Process Group: Monitoring and

Controlling

* Process for managing contract & relationsbetween buyer and seller, reviewing and

documenting how a seller is performing andmanaging contactual relationship * IdentifyTriggers

Inputs Tools & Techniques Outputs

1. Contract2. Contract management

plan3. Selected sellers

4. Performance reports5. Approved change

1. Contract change controlsystem

2. Buyer conductedperformance review

3. Inspections and audits4. Performance reporting

1. Contract documentat2. Requested changes

3. Recommended correcactions

4. Organizational procesassets (updates)

Page 37: 5 x 8 Flashcards

8/8/2019 5 x 8 Flashcards

http://slidepdf.com/reader/full/5-x-8-flashcards 37/37

requests

6. Work performanceinformation

5. Payment system

6. Claims administration7. Records management

system

8. Information technology

5. Project management

(updates)(procurementmgmt plan & contract m

plan)

12.6 Contract ClosureKnowledge Area: Procurement

Process Group: Closing

* Process for completing and settling eachcontract, including resolution of any open itand closing each contract applicable

Inputs Tools & Techniques Outputs

1. Procurementmanagement plan

2. Contract managementplan

3. Contract documentation

4. Contract closureprocedure

1. Procurement audits2. Records management

system

1. Closed contracts2. Organizational proces

assets (update contract deliverable acceptance,

lessons learned

documentation)