5 things developers need to know about dry utilities

18
THINGS DEVELOPERS NEED TO KNOW ABOUT DRY UTILITIES 5 Hosted By: Ian Sanchez, Director of Dry Utilities at Murow|CM

Upload: murowcm

Post on 07-Feb-2017

18 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: 5 Things Developers Need To Know About Dry Utilities

THINGS DEVELOPERS NEED TO KNOW ABOUT DRY UTILITIES5

Hosted By:Ian Sanchez, Director of Dry Utilities at Murow|CM

Page 2: 5 Things Developers Need To Know About Dry Utilities

IAN SANCHEZDirector of Dry Utilities, Murow|CM

• Over 12 Years of Experience in Dry Utility Industry

• Worked with single family, multi-family tract designs, commercial, mixed-use projects, relocations and underground conversation projects, and substation coordination.

• Directs and Manages both public and private jobs

• Contributes to Murow|CM’s pro forma and due diligence services

Page 3: 5 Things Developers Need To Know About Dry Utilities

1. Electric Generation Distribution Basics2. Dry Utility Project Types and Typical Timelines3. Rule 15, Rule 16 and Rule 20 Defined4. PEV Chargers: What it Means For You5. SoCal Gas Master Metered vs Individually Metered

AGENDA

Page 4: 5 Things Developers Need To Know About Dry Utilities

Electric Generation Distribution Basics

Page 5: 5 Things Developers Need To Know About Dry Utilities
Page 6: 5 Things Developers Need To Know About Dry Utilities
Page 7: 5 Things Developers Need To Know About Dry Utilities
Page 8: 5 Things Developers Need To Know About Dry Utilities

Aboveground Equipment

Mini PadsLoadbreak Fuse Cabinets

Page 9: 5 Things Developers Need To Know About Dry Utilities

Aboveground Equipment

3Phase Transformer PadsOr Slab Boxes

Capacitor Pads

Page 10: 5 Things Developers Need To Know About Dry Utilities

Aboveground Equipment

Pad Mounted Switch

Page 11: 5 Things Developers Need To Know About Dry Utilities

Aboveground Equipment

Pad Mounted Equipment w/ Bollards

Page 12: 5 Things Developers Need To Know About Dry Utilities
Page 13: 5 Things Developers Need To Know About Dry Utilities

Dry Utility Project Types and Typical Timelines- Research and Feasibility Reports- Dry Utility Cost Estimating- Master Planning – Loading Study- Substation Requirements- Feeder Systems- Rule 15 Line Extensions- Rule 16 Service Extensions- Relocations- Rule Underground Conversions- Commercial and Residential End Use

Page 14: 5 Things Developers Need To Know About Dry Utilities

Rule 15, Rule 16 and Rule 20 Defined

Rule 15: Line Extensions

Rule 16: Service and Meter Sets

Rule 20: Underground Conversions

Page 15: 5 Things Developers Need To Know About Dry Utilities

PEV Chargers: What it Means For You

Page 16: 5 Things Developers Need To Know About Dry Utilities

SoCal Gas Master Metered vs Individually Metered

Page 17: 5 Things Developers Need To Know About Dry Utilities

[email protected] Line: (949) 398-67281151 Duryea AvenueIrvine, CA 92614

Q & A

Page 18: 5 Things Developers Need To Know About Dry Utilities

18

Let’s Work Together

Southern California1151 Duryea AvenueIrvine, CA 92614

Northern California4900 Hopyard Road, Suite 100-21Pleasanton, CA 94588

Phone(949) 398-6728 Ian Sanchez(949) 988-3271 So Cal(925) 468-4121 Nor Cal

Email / [email protected]

CONTACT US