PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
1
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
2/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
2
Misin
Requerimientos de alto nivel
Supuestos
Restricciones
Entregables:
CAPITULO 1-12
Revisiones QC
Anverso y Reverso
OBS
Criterio de finalizacin
Calendario del Proyecto
Detalle de Hitos
Diagrama de Flujo de Datos / Informacin
Regla fundamental de los ITTOs
PMBOK V5 vs. PMBOK V4
AGENDAAGENDA
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
3/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
3
30-Nov-12 3
La tarea del equipo de proyectos es actualizar y mejorar laGuide to the Project Management Body of Knowledge
(PMBOK Guide)Fourth Edition
Misin
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
4/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
4
La actualizacin deber:
1. Proveer informacin en Administracin de Proyectosque sea clara, completa, relevante, y en generalreconocida como una buena prctica en la mayora
de los proyectos, la mayora de las veces.
2. Reposicionar el Captulo 3 (El estndar del PM) comoun apndice/anexo.
3.Alinearse con la ISO 21500 y manejar las relacionesentre los dos estandares.
Requerimientos de alto nivel
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
5/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
5
La actualizacin deber:
4. Ser consistente con
El Standard del Program Management Tercera Edicin El Standard del Portfolio Management Tercera Edicin
OPM3 Tercera Edicin
5. Asegurar que la terminologa contenida en el PMI Lexiconsea representada en forma consistente e idntica en elestndar
Requerimientos de alto nivel
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
6/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
6
Supuestos
El desarrollo de la ISO 21500 se alinear con los
cronogramas de actualizacin permitiendo manejarlas relaciones entre los dos estandares
Aunque los contenidos necesitan actualizacin, losconceptos y las estructuras del estndar actualson vlidos y no necesitan un retrabajo importante.
Todos los esfuerzos sern hechos buscandoparticipacin global y una representacinbalanceado de todos los sectores.
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
7/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
7
Restricciones
El Exposure Draft, las aprobaciones, ediciones, yprocesos de publicacin tiene plazos y el proyecto ser
fuertemente controlado para que cumpla los
cronogramas.
La cantidad de pginas no debe exceder las 500;el cuerpo del Estandar (actualmente el cpitulo 3) nodebe exceder las 50 pginas.
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
8/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
8
Entregables: CAPITULO 1-12
Comentarios Revisados/adjudicados 4th Ed & post 4th
Ed
Recomendacin Inicial alineacin ISO 21500
Esquema Comentado Actualizado
Contenido Borrador Inicial
Revisin Interna del Borrador
Comentarios Revisados/adjudicados finales 4th Ed
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
9/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
9
Entregables: CAPITULO 1-12 Recomendaciones Finales - alineamiento ISO
21500
Contenido Finalizado del Exposure Draft (ED)
Recomendaciones del ED Adjudicado
Borrador Final PMBOK Guide Fifth Edition
Votacin final del Comit Central (Core Committee )
PMBOK G id Fifth Editi d t
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
10/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
10
QC 1 Comentarios Diferidos
QC 2 Borrador Inicial &
recomendaciones ISO
QC 3 Borrador final (ED)
QC 4 Revisin final
Entregables: Revisiones QC
PMBOK G id Fifth Editi d t
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
11/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
11
Prefacio e introduccin
Apndices
Glosario
Entregables: Anverso y Reverso
PMBOK G id Fifth Editi d t
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
12/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
12
Comit Central (Core Committee)
PMBOK G id Fifth Edition pdate
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
13/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
13
Content Working Groups
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
14/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
14
Internal Review Working Groups
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
15/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
15Presentation Title
Criterio de finalizacinLa obra se completa cuando:
Todos los comentarios delED han sido adjudicados
Las lecciones aprendidashan sido completadas
Y cualquier informacin
adicional requerida por el
Administrador de Proyectos se
ha completado.
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
16/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
16
PMI is a registered trade and service mark of the Project Management Institute, Inc.2010Permission is granted to PMI for PMI Marketplace use only
2010Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Review Fourth Edition Comment
2011Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Draft Init ial Content
Independent Internal Review
Draft Exposure Draft Content Prepare Exposure Draft
2012
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Exposure Draft Adjudication Finalization
Final Draft Submitted to PMI
PMBOK Guide Fif th Edi tion published
Calendario
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
17/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
17
Congratulations on your selection to the Content CommitteeContent Committee
for the PMBOK Guide (R)for the PMBOK Guide (R) -- 5th Edition5th Edition -- Chapter 7Chapter 7 --Project Cost Management.Project Cost Management.
On behalf of the PMBOK Guide (R) - 5th Edition Core Team,I would like to welcome you to this important committee.
1717--0808--1010
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
18/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
18
2727--1010--1010
Dear team,
I've spent some time trying to enhance somehow the spreadsheet sent by
Juan Carlos, but I must confess, It was impossible !
The only way I can make some changes is, maybe to change the fonts or thecolor !!!
The information is very well structured and covers the formulas and the
needed explanations in a very clear and easy-to-understand way !
So, I give up and let the file as Juan Carlos sent it !
Regards,
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
19/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
20/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
20
0404--1111--1010
EV tables
Juan Carlos,
Attached are two versions of your Earned Value Table.
Because I would like to use your table in a program that I teach, I continued to edit
it (and to put your name as original author at the top).
May I have your permission to use this table in my PMP Prep program?
Thanks again for sharing the original table. I think both our Chapter 7 and my
students will be better off because of your table.
Regards,
Jack
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
21/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
21
0707--1212--1010
PMBOK(R) Fifth Edition - Team Communication
Congratulations, Team!
In discussions with Dave and Joe, we can confidently state that we have made
substantial progress on a much improved, updated version of the PMBOK Guide.
In our experience, we believe we are setting a new benchmark when it comes to pace,
thoroughness, and productivity for PMI Standards teams. Specifically:
Great effort in completing the review of the Fourth Edition comments
o 749 Fourth Edition deferred comments
o 226 Fourth Edition post publication comments
o 975 total comments reviewed/adjudicated
o Total of 508 of these comments were accepted or accepted with modification forinclusion in the Fifth Edition update
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
22/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
PMBOK Guide Fifth Edition update
22
0707--1212--1010
New structure recommendation submitted for PMBOK Guide Fifth Edition to include:
o Separating Project Stakeholder Management from Communications into a newchapter specifically dealing with stakeholder expectations
o The current PMBOK Guide Fourth Edition chapter 3 is being moved into anappendix in the PMBOK Guide Fifth Edition and is being re-titled to The Standard for
Project Management of a Project
o A new Chapter 3 will be developed intended to bridge the content between chapters1 & 2 and the knowledge area chapters
o Three new planning processes - Plan Scope Management, Plan ScheduleManagement, Plan Cost Management
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
23/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
p
23
1010--0303--1111
Re: Chap 7 - suggestion of Cost Management Plan
Dear Chap 7 Team,
We have approved all the changes except for the Kishan proposal forthe definition of 7.1.3.1 Cost Management Plan. Manuela and Carlos
have note yet voted.
Juan Carlos has a last-minute, but interesting, suggestion to rename process"7.3 Determine Budget" to "7.3 Determine Cost Baseline."
I have not made up my mind about that, but I will vote TOMORROW MORNING.!
Please vote on Kishan's suggestion and on Juan Carlos' suggestion by
NOON (Eastern Standard Time). Absent ballots will be voted with the majority vote.
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
24/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
p
24
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.ar
7.3 Determine Budget7.3 Determine Budget
The process of aggregating the estimated costs of individualactivities or work packages to establish an authorized cost
baseline
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
25/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL
p
25
1111--0303--1111
In regards to extra time: From the Core Team meeting yesterday we were
pressed on keeping the milestone for submitting the final draft of the revised
chapter today. They would not be interested in our taking additional time for
changing a process name ("7.3 Determine Budget" to "7.3 Determine Cost
Baseline.") at this time.
I cant tell you why the process was called Determine Budget (other than for
the Fourth Edition we used Verb/Noun to rename processes) and not develop
cost baseline in the first place. In the 2000 version it was Cost Budgeting
and the only output was the Cost Baseline. I think budget is a term that
most people recognize and budget is commonly used, hence it was used inthe PMBOK Guide. Budget is also related to other PM terms such as BAC,
and the old terms BCWP, and BCWS.
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
26/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 26
0505--0808--1111
All,
Congratulations!
I wanted to let everyone know weve received approval of our recommendedBaseline2 changes for the PMBOK Guide Fifth Edition update. We receivedthis approval with the feedback that the Standards MAG found the baseline2
recommendations reasonable and well considered. This is a significant
accomplishment and I wanted to take time to thank everyone for the hard work putforth in getting us to this point. If you have not reviewed the Baseline2
recommended changes, these can be found on the Kavi site under the PMBOK
Guide 5th Edition group (link:
http://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/334
7/latest). This approval gives us the go ahead to finalize the content for the update
and incorporate all of the recommended changes put forth in our Baseline2.
Dave Violette, PMP
Chair PMBOK Guide Fifth Edition Update Committee
PMBOK Guide Fifth Edition update
http://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latesthttp://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latesthttp://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latesthttp://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latest -
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
27/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 27
1717--1010--1111
[[PMI Standards]pmbok_guide_5th] [PMBOK5] Another milestone met!
Congratulations to the entire team!
This morning the Fifth Edition update met another major milestone. Weve turned overthe draft of the Fifth Edition update to PMI for final clean-up/compilation to hand
over to the PMI Standards MAG. Over the next 2-3 weeks, the PMI editorial staff will do
one last editorial review and compilation of the document. After that it goes to the PMI
Standards MAG for their review and vote on whether the draft is ready to move to theExposure Draft stage. We should hear back from the MAG regarding by early
December whether there are any adjustments needed for the draft text prior to finalizing
the document for Exposure Draft.
Dave Violette, PMPChair PMBOK Guide Fifth Edition Update Committee
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
28/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 28
1717--1010--1111
[[PMI Standards]pmbok_guide_5th] [PMBOK5] Another milestone met!
Our next big milestone is to get our glossary finalized. With the Exposure Draft for
the PMBOK Guide Fifth Edition, we will also be exposing the glossary
terms. Reviewers for the Exposure Draft wil l be given the opportunity to comment
on terms contained within the glossary.
To reach this milestone, each chapter working group needs to review the Fourth Edition
glossary to ensure all of the definitions needed to support the Fifth Edition areincorporated into the glossary. The glossary should contain the following types of terms:
Definitions for each Knowledge Area
Definitions for each Project Management Process Group Definitions for each Project Management Process
Definitions for each Project Management Process Input, Tool & Technique, and
Output
Other terms used in the text of the Fifth Edition update that need to be defined in
context of their usage in the Fifth Edition
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
29/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 29
Dear Chap 7 Team,
You probably know that the PMBOK 5th Review Draft will be out in February for
comments and that we will have 5 weeks from March 20, when comments close, untilApril 28, when we must have "adjudicated" ever comment on our Chapter.
So it seems like a wise thing to make a point of *carefully reading our Chapter 7*
when it comes out in the draft.
if we have a lot of comments we may want to divide them among ourselves.
if we do divide them, we may each want to be a specialist in a part of the chapter.
So after you read Chapter 7, please consider what part you might want to handle
comments on.
For example, i'd be willing to do all the earned-value questions that occur in 7.4.2
Control Costs: Tools and Techniques.
Regards,Jack
1717--0101--1212
Getting Ready to Work
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
30/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 30
2323--0202--1212
Chapter 7 PMBOK News
Dear Chap 7 Team,
Some other interesting news.
1. It looks like our Chapter will have only about 1our Chapter will have only about 1--200 comments200 comments.
2. After we vote individually, we will be able to discuss our votes as a team.
So...rest up and get ready for the end of March. Happy to answer any
questions
that you have.
Regards,
Jack
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
31/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 31
1818--0606--1212
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
32/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 32
1919--0909--1212
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
33/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 33
1212--1010--1212
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
34/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 34
WORKFLOW DE REPORTES
4.3 Dirigir y Gestionar laEjecucin del Proyecto
4.4 Supervisar y Controlarel Trabajo delProyecto
4.5 Ejecutar ControlIntegrado deCambios
10.5 Informar elDesempeo
(ReportPerformance)
Informacin del Rendimiento(Performance Reports)
Informacin del Rendimiento del Trabajo(Work Performance Information)
8.2 Realizar elAseguramiento de
la Calidad
PMBOK Guide Fifth Edition update
Datos (Data): o materia
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
35/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 35
( )
prima, que est compuesta
de mensajes o smbolos sin
procesar
Informacin (Information): que proviene del anlisis de un conjunto de datos
Conocimiento (Knowledge): este proviene del proceso de interpretacin dela informacin en trminos de experiencia y reflexin
abidura (Wisdom): la capacidad de tomar la mejor decisin posible basada en elonocimiento, informacin y datos disponibles
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
36/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 36
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
37/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 37
Se establecieron reglas bsicas en el orden y detalle de la informacin con ITTOs
de la Quinta Edicin del PMBOK Guide
Son Entradas todos los documentos que sean claves para el proceso.
En las Salidas, los documentos se referencian cuando son creados como Salida.
A partir de all se referencian como Project Document Updates en la Salida, y se
describen en la narrativa del captulo.
Los Planes Subsidiarios y las Lneas Base se listan primero.
Los Factores Ambientales y los Activos de los Procesos de la Organizacin se listan al
final.
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
38/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 38
Se establecieron reglas bsicas en el orden y detalle de la informacin con ITTOs
de la Quinta Edicin del PMBOK Guide
Si los Planes Subsidiarios y las Lneas Base se usan como una entrada fundamental
en el proceso, entonces se explicitan.
Para los procesos que crean un Plan Subisidiario, el Project Management Plan se
lista como una entrada clave.
En la Salida los Planes Subsidiarios y las Lneas Base se agrupan como ProjectManagement Plan Updates, y se describen en la narrativa del captulo.
Procesos de Control
La Entrada clave es el Project Management Plan, ms que el Plan Subsididario.
Y la Salida es Project Management Plan Updates ms que una actualizacin al Plan
Subsidiario especfico.
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
39/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 39
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
40/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 40
Se expandi el
universo deStakeholders,
incluyendo
explicitamenteahora a los
llamados
"Operational"OperationalStakeholders"Stakeholders"
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
41/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 41
PMBOK V5 vs. PMBOK V4
Grupos de
Procesos
PMBOK V5.0 PMBOK V4.0 Diferencia
Inicio 2 2 0
Planificacin 24 20 + 4
Ejecucin 8 8 0
Monitoreo &
Control
11 10 + 1
Cierre 2 2 0
Total 47 42 + 5
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
42/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 42
PROCESOS
PMBOK V5 vs PMBOK V4
rea de Conocimiento Entran Salen Delta
Integracin
Alcance PLAN SCOPE MANAGEMENT + 1
Tiempo PLAN SCHEDULE MANAGEMENT + 1
Costo PLAN COST MANAGEMENT + 1
Calidad
Recursos Humanos
Comunicaciones
MANAGE COMMUNICATIONS
CONTROL COMMUNICATIONS
IDENTIFY STAKEHOLDERS
DISTRIBUTE INFORMATION
MANAGE STAKEHOLDER
EXPECTATIONS
REPORT PERFORMANCE
-2
Riesgos
Adquisiciones
Interesados
IDENTIFY STAKEHOLDERS
PLAN STAKEHOLDERS MANAGEMENT
MANAGE STAKEHOLDERS ENGAGEMENT
CONTROL STAKEHOLDERS ENGAGEMENT
+ 4
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
43/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 43
Integration ManagementIntegration Management4
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
44/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 44
Scope ManagementScope Management5
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
45/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 45
Time ManagementTime Management6
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
46/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 46
Cost ManagementCost Management7
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
47/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 47
Quality ManagementQuality Management8
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
48/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 48
Human Resource ManagementHuman Resource Management9
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
49/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 49
Communications ManagementCommunications Management10
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
50/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 50
Risk ManagementRisk Management11
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
51/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 51
Procurement ManagementProcurement Management12
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
52/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 52
Stakeholder ManagementStakeholder Management13
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
53/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 53
Si viene estudiando con la/s
versiones bibliogrficas actuales, rinda
antes de las fechas indicadas.
Si decide rendir antes de esas
fechas, asegrese de solicitar su
puesto con suficiente anticipacin (esde esperar una demanda mayor a la
usual para esas fechas.
Gestione el r iesgo de Tiempos, yanticipe lo ms posible su inscripcin
PMP 31/Julio/2013
CAPM 31/Julio/2013
PMI-SP 31/Agosto/2013
PMI-RMP 31/Agosto/2013
PgMP 31/Julio/2013
PMP y otras certif icaciones Cambio de Fechas
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
54/55
PemepPemepProyectosProyectos
www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 54
PMBOK Guide Fifth Edition update
PMBOK Guide Fifth Edition update
-
8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5
55/55
PMBOK Guide Fifth Edition update
Muchas gracias a
todos por su
atencin