Page 1 of 6 Inspection & Test Plan Contract No: PB/1302 Activity :FIBRE OPTICAL CABLE Principal: MOC ITP No: FBSB/MOC/ITP-005 Location: BORF Seq No. Holding Point Comments/Re Operation 1.0 Material Receiving Inspection 1.1 W W/R • Material Deficiency Report • Visual Inspection Report 2.0 Material Verification 2.1 • F-I-03 H W/R • Correct specification • Method Statement • On the drum test • Material Deficiency Report • Verify damage Material • Visual Inspection Report 3.0 Storage 3.1 • Correct tagging number • F-I-03 W W • Cleanliness • Quantity • Material Deficiency Report 4.0 INSTALATION AND LAY FO CABLE 4.1 • F-C-01 H W/R M • F-I-03 • Method Statement Provision of Engineering, Procurement, Construction, Installation, Commissioning (EPCIC) of Long Term Power Solution at Bintulu Onshore Receiving Facility (BORF) Description/ Activity Controlling Procedure Form to record results of compliance Specification Acceptance Criteria Reference Contractor (FBSB) 3rd Party (SESCO) Principal (MOC) • Visual inspection • Material Received InspectionReport • ITU-T Standard for fiber Optic (series G.600-G699) Check Quantity/ Condition (Cables/Drum) • Type of material Cable size, type and rating conform to • ITU-T Standard for fiber Optic (series G.600-G699) • Material Received InspectionReport • Refer to drawing 06001-MGP1- EG-IC-DW-0060-08 "Instrument Cable Schedule Fibre Optic". • ITU-T Standard for fiber Optic (series G.600-G699) • Material Received • Refer to drawing 06001-MGP1- EG-IC-DW-0060-08 "Instrument Cable Schedule Fibre Optic". • Fiibre Optic Cable Type • ITU-T Standard for fiber Optic (series G.600-G699) • Check Trenching size (width and depth) and condition • Refer to Drawing MOM-SK309- 64-IC-DW-0061-(Sheet 1 to 3) Fiber Optic Cable Routing (Murphy BORF to SESCO 33KV Substation) • Prevent Bending Radius less than 15D • Handle with care the cable drum not to damage the FO cable • Cable laying into trench and cable laying by fix drum • Refer to Drawing MOM-SK309- 64-EL-DW-0085-(Sheet 1 to 3) 33kV Underground Cable & Fiber Optic - Overall Routing Plan • Verify and ensure before starting under ground placing work, all personnel shall know the communication signal that will be used. Personnel shall be stationed at the reel location during cable pulling activities to maintain • Roller shall be arranged within or on ground surface along trench line. • Refer to drawing 06001-MGP1- EG-IC-DW-0060-08 "Instrument Cable Schedule Fibre Optic". • Manual Cable pulling and assign designated personnel to guide the FO cable • Verify the Spacing between the HV cable and FO as per AFC

Upload: victor-biacolo

Post on 18-Aug-2015

215 views

Category:

Documents


2 download

DESCRIPTION

fIBER oPTIC

TRANSCRIPT

Page 1 of 6Inspection & Test Plan Contract No: PB/1302Activity : FIBRE OPTICAL CABLE Principal: MOCITP No: B!B/MOC/ITP"00# $ocation: BO%Seq No.Holding PointCommentsRema!"sOpe!ation#.$ %ate!ial Recei&ing Inspection1&1' '/% ( Material )e*ciency %eport( +i,-al In,pection %eport'.$ %ate!ial (e!i)cation2&1 ( "I"03. '/%( Correct ,peci*cation( Met/o0 !tate1ent( On t/e 0r-1 te,t( Material )e*ciency %eport( +erify 0a1age Material( +i,-al In,pection %eport*.$ Sto!age3&1 ( Correct tagging n-12er ( "I"03' ' ( Cleanline,,( 3-antity ( Material )e*ciency %eport+.$ INSTALATION AN, LA- FO CABLE4&1( "C"01. '/% M( Prevent Ben0ing %a0i-, le,, t/an 1#) ( "I"03 ( Met/o0 !tate1entP!o&ision o. Enginee!ing/ P!oc0!ement/ Const!0ction/ Installation/ Commissioning 1EPCIC2 o. Long Te!m Po3e! Sol0tion at Bint0l0 Ons4o!e Recei&ing Facilit5 1BORF2,esc!iption Acti&it5 Cont!olling P!oced0!e Fo!m to !eco!d !es0lts o. complianceSpeci)cation Acceptance C!ite!ia Re.e!enceCont!acto! 1FBSB2*!d Pa!t5 1SESCO2P!incipal 1%OC2( +i,-al in,pection ( Material %eceive0 In,pection%eport

( IT5"T !tan0ar0 for *2er Optic 6,erie, 7&600"76889 (C/ec: 3-antity/ Con0ition 6Ca2le,/)r-19( Type of 1aterial Ca2le ,i;e< type an0 rating confor1 to ,peci*cation< in,-lation =ac:et not to 0a1age0

( IT5"T !tan0ar0 for *2er Optic 6,erie, 7&600"76889 ( Material %eceive0 In,pection%eport

( %efer to 0ra>ing 06001"M7P1"?7"IC")'"0060"0@ AIn,tr-1ent Ca2le !c/e0-le i2re OpticA&( IT5"T !tan0ar0 for *2er Optic 6,erie, 7&600"76889( Material %eceive0 In,pection%eport

( %efer to 0ra>ing 06001"M7P1"?7"IC")'"0060"0@ AIn,tr-1ent Ca2le !c/e0-le i2re OpticA&( ii2re Optic Ca2le Type

( IT5"T !tan0ar0 for *2er Optic 6,erie, 7&600"76889( C/ec: Trenc/ing ,i;e 6>i0t/ an0 0ept/9 an0 con0ition( %efer to )ra>ing MOM"!B308"64"IC")'"0061"6!/eet 1 to 39 i2er Optic Ca2le %o-ting 6M-rp/y BO% to !?!CO 33B+ !-2,tation9( .an0le >it/ caret/e ca2le 0r-1 not to 0a1age t/e O ca2le( Ca2le laying into trenc/ an0 ca2le laying 2y *C 0r-1( %efer to )ra>ing MOM"!B308"64"?$")'"00@#"6!/eet 1 to 39 33:+ 5n0ergro-n0 Ca2le D i2er Optic " Overall %o-ting Plan( +erify an0 en,-re 2efore ,tarting -n0er gro-n0 placing >or:< all per,onnel ,/all :no> t/e co11-nication ,ignal t/at >ill 2e -,e0& Per,onnel ,/all 2e ,tatione0 at t/e reel location 0-ring ca2le p-lling activitie, to 1aintain proper reel rotation&

( %oller,/all2earrange0>it/inorongro-n0,-rface along trenc/ line&( %efer to 0ra>ing 06001"M7P1"?7"IC")'"0060"0@ AIn,tr-1ent Ca2le !c/e0-le i2re OpticA&( Man-al Ca2le p-lling an0 a,,ign 0e,ignate0 per,onnel to g-i0e t/e O ca2le( +erify t/e !pacing 2et>een t/e .+ ca2le an0 O a, per ACPage 2 of 64&1( "I"03. '/% M( %efer to 0ra>ing 06001"M7P1"?7"IC")'"0060"0@ AIn,tr-1ent Ca2le !c/e0-le i2re OpticA& ( Pre,erve 2ot/ en0 of ca2le -,ing en0 capPage 3 of 6Inspection & Test Plan Contract No: PB/1302Activity : IB%? OPTICA$ CAB$? Principal: MOCITP No: B!B/MOC/ITP"00# $ocation: Seq No.Holding PointCommentsRema!"sOpe!ation6.$ BAC7FILLIN8#&1( "C"01 . M( !oil Co1paction( Concrete ,la2, lining ( Ca2le ro-te 1a:er ,/o-l0 2e place0( Bac:*lling 9.$ FIBRE OPTIC TER%INATION6&1' . ./% M( )?P 32&E1&00&11 ,ec& 2&2&1( Certi*e0 per,onnel to Ter1inate t/e O( Co1petency certi*cate( O ca2le i, clean an0 0-,t free( Correct !plicing an0 ?F-ip1ent tool,( ?F-ip1ent Certi*cateInspection and testing acti&ities completedCont!acto! 1FBSB2 *!d Pa!t5 1SESCO2 Ope!ationSignat0!e :P!int Name :,ate :P!o&ision o. Enginee!ing/ P!oc0!ement/ Const!0ction/ Installation/ Commissioning 1EPCIC2 o. Long Te!m Po3e! Sol0tion at Bint0l0 Ons4o!e Recei&ing Facilit5 1BORF2,esc!iption Acti&it5 Cont!olling P!oced0!e Fo!m to !eco!d !es0lts o. complianceSpeci)cation Acceptance C!ite!ia Re.e!enceCont!acto! 1FBSB2*!d Pa!t5 1SESCO2P!incipal 1%OC2( C/ec: ,pacing 2et>een ca2le

(%efer to MOM"!B308"64"?$")'"00@6"01( Correct tagging n-12er&

( "I"03

( IT5"T !tan0ar0 for *2er Optic 6,erie, 7&600"76889 ( +erify t/at onlyapprove0 cleaving tool, an0 te,t eF-ip1ent -,e for O& (%efer to MOM"!B308"64"IC")!"0018"00 AIn,tr-1ent )ata,/eet for In0oor i2er Optic Patc/ PanelA(%efer to MOM"!B308"64"IC")!"0020"00 AIn,tr-1ent )ata,/eet for .ig/ !pee0 i2er Optical Mo0e1A ( 'ave lengt/ te,t OT)% 6Optical Ti1e)o1ain %eGecto1eter9;Inspection and test ma!" = >itness/ H = Hold Point/ R = ,oc0ment Re&ie3/ A = ,oc0ment App!o&al/ SCE = Sa.et5 c!itical Item/ 6 ? ( < 6 ? P!incipal (e!i)cation !eq0i!edPage 4 of 6Contract No: PB/1302Principal: MOC$ocation: BO%CommentsRema!"s%ate!ial Recei&ing Inspection%ate!ial (e!i)cationSto!ageINSTALATION AN, LA- FO CABLEPage # of 6Page 6 of 6Contract No: PB/1302Principal: MOC$ocation: CommentsRema!"sBAC7FILLIN8FIBRE OPTIC TER%INATIONInspection and testing acti&ities completedP!incipal 1%OC2;Inspection and test ma!" = >itness/ H = Hold Point/ R = ,oc0ment Re&ie3/ A = ,oc0ment App!o&al/ SCE = Sa.et5 c!itical Item/ 6 ? ( < 6 ? P!incipal (e!i)cation