5 hour pbl project (more like 25 hours +)

23
5 Hour PBL Project (More like 25 hours +) By: Stefan Engelhard

Upload: cameo

Post on 24-Feb-2016

30 views

Category:

Documents


0 download

DESCRIPTION

5 Hour PBL Project (More like 25 hours +). By: Stefan Engelhard. Converting A Long Box Pickup into a Short Box. RATIONALE. Sportier look Short box is less common than Long box Harder to find and more expensive Challenge. Required research. What parts are different - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 5 Hour PBL Project (More  like 25 hours +)

5 Hour PBL Project(More like 25 hours +)

By: Stefan Engelhard

Page 2: 5 Hour PBL Project (More  like 25 hours +)

Converting A Long Box Pickup into a Short Box

Page 3: 5 Hour PBL Project (More  like 25 hours +)

RATIONALE

• Sportier look• Short box is less common

than Long box• Harder to find and more

expensive • Challenge

Page 4: 5 Hour PBL Project (More  like 25 hours +)

Required research

• What parts are different • What requires modification

Box Length Wheel Base

Long Box 8 feet or 96” 127”

Short Box 6.5 feet or 78” 115”

Difference 1.5 feet or 18” 12”

Page 5: 5 Hour PBL Project (More  like 25 hours +)

Preliminary Research

• Is it safe? Is it legal? Will it pass a vehicle safety inspection?

• Manitoba vehicle inspections Handbook• Section 8-3 Frame and mounts

– Ok if done correctly

• I-CAR website and Handbook• Proper frame sectioning techniques

Page 6: 5 Hour PBL Project (More  like 25 hours +)

TRUCK PROJECT

• 1. The tear down or disassembly

• 2. Cutting the frame and welding it back

together straight

• 3. Modifying the box

• 4. Other modifications required

Page 7: 5 Hour PBL Project (More  like 25 hours +)

Tear Down

• Removing the front clip

Page 8: 5 Hour PBL Project (More  like 25 hours +)

Tear Down

• Removing the box

Page 9: 5 Hour PBL Project (More  like 25 hours +)

Tear Down

• Removing the cab

Page 10: 5 Hour PBL Project (More  like 25 hours +)

Tear Down

• Removing the cab

Page 11: 5 Hour PBL Project (More  like 25 hours +)

The Frame

Page 12: 5 Hour PBL Project (More  like 25 hours +)

Cutting an Welding the Frame

Straight cut Diagonal cut

Page 13: 5 Hour PBL Project (More  like 25 hours +)

Cutting an Welding the Frame

Z Type cut

Page 14: 5 Hour PBL Project (More  like 25 hours +)

Cutting an Welding the Frame

Page 15: 5 Hour PBL Project (More  like 25 hours +)

Cutting an Welding the Frame

Page 16: 5 Hour PBL Project (More  like 25 hours +)

Cutting an Welding the Frame

Page 17: 5 Hour PBL Project (More  like 25 hours +)

Modifying the Box

Cut 12” front & 8” rear Join and weld back together

Page 18: 5 Hour PBL Project (More  like 25 hours +)

Modifying the Box

Butt Weld Clamps

Page 19: 5 Hour PBL Project (More  like 25 hours +)

Back up plan

Page 20: 5 Hour PBL Project (More  like 25 hours +)

Other modifications required

• Driveshaft needs to be shortened

• Fuel and Brake lines need to be shortened

Page 21: 5 Hour PBL Project (More  like 25 hours +)

The End

Page 22: 5 Hour PBL Project (More  like 25 hours +)

Resources

• http://67-72chevytrucks.com/vboard/showthread.php?t

• =123624http://www.earlyclassic.com/tech.aspx?category=Longbed,%20No!-Shortbed

• -2https://www.youtube.com/watch?v=NddN52Pe7CQ

• http://www.musclecarrestorations.com/articles/tech/metal-work/welding-sheet-metal.html