4th st workshop, chamonix 2001u. epting, m.c. morodo testa, p. sollander is the cern recommended...

20
4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander Is the CERN recommended SCADA useable for the ST division?

Upload: harvey-owen

Post on 29-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

Is the CERN recommended SCADA useable for the ST

division?

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

Outline

CERN Controls Groups

Controls Board

ST Controls WG

ST-MO Prototype ST-MO Strategy

Controls Divisions Strategy

Conclusions,World Strategy

ST Strategy

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

CERN Controls Groups• Almost everything has to be controlled

– Control Rooms– Data Diffusion Layers

• Monitoring and Supervision

• Data Transmission

• Acquisition

– Techniques• GUI

• Middleware

• PLC

• Standardisation and Coordination necessary

PCR

TCR

MCR

Cryo

XCR

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

Controls Board• Created in 1994• Reports to the Technical Director• Members

– LHC: M. Rabany, PS: B. Frammery, SL: P. Charrue, LHC-CP: R. Lauckner, IT: D. Myers, JCOP: W. Salter, ST: P. Ninin

• ---> Recommendations– Goal: Promote standardisation and common solutions

in CERN’s controls community• Working Groups

– Fieldbuses– PLC– LDIWG– SCADA Supervisory Control And Data Acquisition

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

SCADA WG• Created in 1999• Phase 1:

– Members• IT-CO: W. von Rüden (Chairman), IT-CO: A. Daneels, IT-CO: W. Salter,

LHC-IAS: F. Momal, PS-CO: F. Locci, ST-MO: U. Epting

– Selected Product• PVSS II• Already used for the LHC experiments

• Phase 2: – Members

• IT-CO: W. Salter (Chairman), IT-CO: A. Khodabandeh, LHC-IAS: C.H. Sicard, PS-CO: F. Locci, SL-CO: E. Hatziangeli , ST-MO: U. Epting

– Final CERN wide recommendation – CERN wide support and licensing needs

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST Controls WG• Created in 2000• Purpose:

– Co-ordinate the ST control activity• Goals:

– A control systems’ divisional strategy– Sharing of the controls knowledge– Interface with the other CERN controls WG

• Members:

ST-AA: T. Riesco

ST-CV: D. Blanc

ST-MO: U. Epting

ST-TFM: S. Deleval

ST-EL: S. Poulsen

C168: E. Sánchez-Corral• Subjects:

• LHC Communication Infrastructure• SCADA for the four LHC experiments• SCADA in the ST Division• SL HELIX Project• LEP Dismantling• Future Web Technologies• ST Software Support for Industrial Controls

Chairman: P. NininSecretary: M.C. Morodo

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST/MO Prototype plans• Phase I (October 2000 to January 2001)

– Functional model with alarms, mimics and trends• TDS data acquisition -> PVSS driver

• TDS data loading -> generic data loading mechanism

• Inter system communication with Gamma Irradiation Facility (GIF) experiment

• Phase II (February to June 2001)– Performance tests and further development

• High data rates, many concurrent users, full TDS data set

• Customized general data loader

• Library of reusable standard symbols

• User tests in TCR

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST/MO Prototype architecture

TDSTDrefDB

PVSSTDSclient

PVSSEvtMgr

PVSSRTDB

PVSSAlarms

PVSSTrends

PVSSMimics

Configuration data

RTDBloader

GIFPVSS

EvtMgr

PVSSGIF

client

Data exchange

• 245 Data point elements

• 115 CAS alarms

• 2 trending parameters

• 6 commands

• 1 mimic diagram

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST/MO Prototype results– Data acquisition

• TDS driver available on Linux and NT

– User interfaces• PVSS standard alarm screen with CAS data

– Works, but some configuration issues remain– A CERN wide PVSS alarm screen looked upon by SL/CO

• PVSS mimics– Reusable objects available, drag-and-drop view creation, easy to

use, fair graphics, integrated trending tools

– Data loader• Standard ASCII manager works, can be improved with

specialized tools to obtain better data integrity

– Data distribution• Ok for small scale, to be tested more large scale

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST/MO Migration strategy

Config

SiemensS5

SiemensS7

Schneider

OPCWizcon

ECEFACEC

EC

Equipment

SiemensS5

Ddaq

TDrefDB

SiemensS7

Schneider

WizconEC

EFACECEC

TDS(SmartSockets)

Equipment

UMMI CAS

Custom

JGuils

TDS - PVSS interface APIEvent

ManagerSCADA

Link

Mimics Trends Alarms

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST/MO integration strategy

TDrefDB

TCRPVSS

PVSSUI

GIFPVSS

Direct equipmentdata acquisition

ST/AAPVSS

LHCPVSS

LHCXPVSSAccess to all

PVSS data

• PVSS systems communicate

• LDIWG communication– PVSS or

– Other with PVSS driver

• Common tools:– CAS alarms

– standard symbols

• User has access to all information

• Former TDS data acquired directly from PLCs

Non PVSSsystems

LDIWG

Databusdriver

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST Strategy (1)• Needs in terms of controls are not uniform

• ST-AA, ST-MO:– Some common requirements:

• Multi-platform

• Data exchange and integration

• CERN wide support

– Various systems used today• TDS (component ware)

• LabView, FactoryLink, DataViews, Tcl/Tk

– PVSS can fit (if evaluation results are positive)

– Towards a single SCADA by LHC start-up

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST Strategy (2)ST-CV, ST-EL, ST-TFM:

– Control requirements are specific to their processes– Standard industrial control architectures for the LHC in use

• Feasibility and design phases have been completed• Installations are already in operation• Implementation is integrated in large-scale industrial contracts• Long-term maintainability with C168 contract

ST-CV, ST-TFM: Wizcon®

– Project started in 1997– Israeli product (free)– PVSS/Wizcon® integration foreseen with Atlas/CMS

ST-EL: Scatex® – Project started in 1998– Specifically adapted to ENS requirements– Turn-key approach

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

CERN Controls Division Strategy• Keep numbers of SCADA products as small as

possible– Today: WIZCON, PCvue, WinCC and PVSS, ScateX

• Converge to a single product if possible– Migration costs and effort?

• Define clear interfaces between systems– OLE for Process Control (OPC)– PS/SL - Middleware project

• Provide central support and guidelines– SCADA User Group? PVSS seminar ...

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

World Strategy• Let’s see at the next ICALEPCS 2001 …

– 8th International Conference on Accelerator and Large Experimental Physics and Control Systems

– http://icalepcs2001.slac.stanford.edu/

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

Questions

?

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

Alarm Handling in PVSS

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

PVSS view editor

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST Strategy (1)

• Needs in terms of controls are not uniform• ST-AA, ST-MO:

– Some common requirements: • Multi-platform • CERN wide support

– PVSS can fit (if evaluation results positive)– Towards a single SCADA by LHC start-up

• ST-CV, ST-EL, ST-TFM:– Control requirements are specific to their processes– Standard industrial control architectures for the LHC in use

• Feasibility and design phases have been completed• Installations are already in operation• Implementation is integrated in large-scale industrial contracts

4th ST Workshop, Chamonix 2001 U. Epting, M.C. Morodo Testa, P. Sollander

ST Strategy (2) ST-CV: Wizcon®

– 1997: SCADA feasibility studies and evaluation for CV Controls

– Fits to CV process controls• Flexible data sharing

• Regulation: accuracy, reliability

• Widely used in industrial environments outside CERN

– Israeli product • Privileged commercial

framework

– PVSS/Wizcon® integration • Already agreed with Atlas/CMS

– Long-term maintainability• In-house expertise + C168

ST-EL: Scatex® – 1998: Initial phases of the CERN

Electrical Distribution Network control system project (ENS)

– Specifically adapted to ENS• Powerful central control system

• Local supervision and interfaces to the electrical equipment (RTUs)

• Operational in other electrical applications outside CERN

– Turn-key approach• The Contractor is responsible for all

the system’s life cycle

– Long-term maintainability• C168: Preventive maintenance

Contact person: D. Blanc Contact person: S Poulsen