4ffcda995d243dcff8e8c69edb6046fclabib said update cv6
DESCRIPTION
4ffcda995d243dcff8e8c69edb6046fcLabib Said Update CV6TRANSCRIPT
Briefbogen GLO ohne Klausel
Curriculum Vitae
Name
Date
Curriculum Vitae
Name : labib said labibSeptember .2011
First /Given Name
:
Labib Said
Family / Surname
:
Alwrdany
Date of Birth
:
18/2/1983
Nationality
:
Egyptian
Profession
:
Quality Control Inspector ( Welding & Mechanical ) for Offshore & Onshore projects
Educational Background
:
Bachelors of Science.2004
Additional Qualifications
: API 570 - Certified Piping Inspector , NO # 35814 , API
CSWIP 3.1 Certified Welding Inspector, NO # 31782 ,TWI.
SNT-TC-1A Visual Testing Inspection Level II
SNT-TC-1A Radiographic Testing Inspection Level II
SNT-TC-1A Ultrasonic Testing Inspection (MUT ) Level II
SNT-TC-1A Time of Flight Diffraction (TOFD ) Level II
SNT-TC-1A Dye-Pentrant Testing Inspection Level II
SNT-TC-1A Magnetic particles Testing Inspection Level II API 653 - Certified Tanks Inspector , Under Qulification , API Attended And Participated Training course Of (ASME IX )
Certificate No # 009/07, by SGS Egypt Ltd, 2007
Sea survival for offshore works MS. Windows and Professional Microsoft Word, Excel
Language(s) known:Arabic, English
Summary of Experiences:Over 7 Years of reach experience in the field of Oil and Gas Onshore & OffshoreAs Welding & piping Inspector in Construction & Sites Activates as Following:
Review All Applications Drawing & Standards.
Check the Welding Procedure and Welder qualifications. Check Joint fit up, Welds Joint edge geometric. Check Dimensional accuracy of completed Weldment.
Prepare and maintain Inspection Visual reports. Verify that in process non-destructive examination is performed. Evaluation of NDT results of material and Welding in according Codes, Standards and Specification (interpretation of RT films, UT, PT, MT& PMI evaluation).
Verify that preheating& post weld heat treatment has been done satisfactory..
Supervision of NDT & PWHT process, follow up for repair weld and taking class for welders about the repair welds monitoring and controlling repairs.
Period
From: June 2011To: PresentCompany:GL Noble Denton .UAE
Position:Quality Control Inspector ( OFFSHORE )
Functions & Responsibilities
:
Project: The Iraq Crude Export Expansion Project. (ICOEEP) Offshore (IRAQ)Company: South Oil Company (SOC) and Leighton offshoreDeveloping offshore loading facilities to enable export Capability of 4.5 MMBOPD 48"Welding inspection activitis:
Reviewing the inspection test plan (ITP).
Reviewing of installation manual procedure.
Reviewing of specification for pipeline installation.
Reviewing the welding procedures, welders qualification list, s specifications based on DNV-05-F101-2007.
Monitoring and witness the line pipe receiving inspection and r reporting.
Monitoring of beveling, internal cleaning of pipes, fit up, al alignment check prior to welding activities.
Monitoring of welding parameters (per-heating, consumables, w welding position etc.).
Witnessing of visual inspection And AUT/MPI.Line pipe inspection activities:
Inspect the received pipes visually.
Measure the diameter with the approved tolerance.
Inspect the condition of pipe end against pipe dent or Ovality.
Monitor & ensure the rejected pipes to be out of line pipe
Measure the pipe length
ensure Buckle detector is installing correctly for lines
Monitor the Temporary weld on pulling head to pipes are c completed.
Carry out Procedure for emergency lay down/Pull head ( (welding and inspection) If Required
Period
From: JUNE 2010 To: MAY 2011Company:GL Noble Denton .UAE
Position:Quality Control Inspector ( Welding & Mechanical ) (Station Construction )
Project Description:Abu Dhabi Crude Oil Pipeline Project(ADCOP)
The United Arab Emirates (UAE) authorities assigned International Petroleum Investment Co. (IPIC) to execute the Abu Dhabi Crude Oil Pipeline (ADCOP) project which will facilitate transferring 05~1.5 MMBBLD (1.8 MMBPD with DRA injection) of crude oil from Habshan production facilities to Fujairah main oil terminal (MOT) which is approximately 404 km.
Functions & Responsibilities: Follow up WPS, ITP, Method statements & NDT Procedures and Client Specifications And Related Codes Identification of materials/prefabricated spools with special attention to materials intended for "Sour Service" in accordance with mill sheets and documentation.
Check procedure qualification records are approved and check, if these are applicable.
Checking of welders' qualification.
Checking of weld preparation, welding performance and finishing welds. (Spot)
Review of weld log-book.
Checking of NDT performance with approved procedures Review and endorsement of NDT results/records.
Checking of documentation with respect to weld history, e.g. welding date, welder I.D. No.,
NDT percentage according to pipe class. (Spot)
Check of preheating and post weld heat treatment charts.
Checking for completeness, e.g. isolating valves, pressure relief valves, control valves in accordance with P + IDs. Checking of material for pipes, valves, fittings, flanges, in compliance with piping class requirements.
Period From: July 2008To: MAY 2010Company:Techint Cimi.Montubi .EGYPT
Position:QA/QC Piping & Welding Inspector (Station Construction )
Project Description:Emethanex Damietta 1 Methanol Project" Located At Damietta Port Free Zone Area.
Functions & Responsibilities
: Follow up WPS, ITP, Method statements & NDT Procedures and Client Specifications.
Piping Material identification, piping line walk, monitoring the piping activities and preparing daily and weekly progress.
Witnessing for all tests and review of test packs, welding consumable verification, Visual inspection, dimensional check, welder qualification, Fit-up checking.
Field inspection with different material Carbon Steel (CS) ,Stainless Steel (SS), Low Temperature Carbon steel (LTCS), Low Alloy Steel (P11&P22) includes fabrication and fit-up,
Prepared the test pack ,punch list ,as build drawings
Follow up and finalized the test pack, punch list. with all revisions
Period
From: Sep. 2006To: June 2008Company:SGS Egypt Ltd Society General De Service Egypt
Position:QA/QC Welding Inspector for Tanks & Related piping
Project Description:EBIC AMMONIA PLANT Project ". At. Ain Soukhna,Egypt
Functions & Responsibilities
: Follow Up for reviewing project quality plan, inspection test plan,
Assisting the QA/QC Manager in all aspects of quality assurance matters.
Material receiving & -Visual inspection and dimensional check of completed element against specification requirements and drawings
Witness of Hydrostatic test.
Review of WPS ,PQR ,WPQ and NDT procedures
Witness of NDT ( visual ,RT,UT,MT, & PT)
Visual inspection and dimensional check of completed element against specification requirements and drawings
piping welding activities
Tank welding activities ( Detonate, Ammonia)
Period
From: June 2006To: Oct 2006
Company
:Uhde GmbH .EGYPT
Position:QA/QC WELDING INSPECTOR
Project Description:Ammonia/urea Feritlizer Plant Helwan Line I Project, Egypt
Functions & Responsibilities
: Follow Up for reviewing project quality plan, inspection test plan,
Follow Up for reviewing & approve NDT procedures for subcontractor as per project specification assisting the QA/QC Manager in all aspects of quality assurance matters. Review of Procedure Qualification Records according to project requirements.
Review of Welding Procedure Specifications according to project requirements. Follow Up Piping& Equipment welding activities Witness and reports review for all NDE methods. Review of post weld heat-treatment activities and results.
Witness of welder qualifications.
Period
From: Dec 2005To: May 2006Company:Uhde GmbH .EGYPT
Position:QA/QC WELDING INSPECTOR
Project Description:Ammonia/urea Fertilizer Plant Suez Line II Project,
at Ain Soukhna, Egypt
Functions & Responsibilities
: Follow Up for reviewing project quality plan, inspection test plan,
Follow Up for reviewing & approve NDT procedures for subcontractor as per project specification assisting the QA/QC Manager in all aspects of quality assurance matters.
Review of Procedure Qualification Records according to project requirements.
Review of Welding Procedure Specifications according to project requirements. Follow Up Piping& Equipment welding activities Witness and reports review for all NDE methods. Review of post weld heat-treatment activities and results.
Witness of welder qualifications.
Period
From: June 2004 To: Dec 2005Company:National Steel Fabrication Company .EGYPT
Position:QA/QC Inspector for Fabrication
Project Description:Workshop OF NSF
Functions & Responsibilities
: Follow Up for reviewing, inspection test plan, WPS Procedures , NDT Procedures
For each fabrication projects on the workshop
Material identification, welding consumable verification, visual inspection,
Dimensional check, welder qualification, welder training and performance monitoring.
Review of QC plan, co-ordinations, supervising, monitoring fabrication, installation, inspection and quality control of piping and structural work.
Stage inspection, final inspection & visual inspection.
Preparation of welder performance report.
interpret radiography films and review the NDT resultYOURS SINCERELY Labib said labib
E.mail: [email protected]
EGYPT Mob: +201225724400
Computer Skills:
E:\WORK 2\GL\READY\LABIB SAID UPDATE CV6 .DOCE:\Work 2\Gl\Ready\Labib Said Update Cv6 .Doc