459_handover

Upload: salman-zaheer

Post on 09-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 459_Handover

    1/11

    2008-1-10 1 , 11

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    2/11

    2008-1-10 2 , 11

    In the inter-MSC handover , here devoted to introduce the sequence between different

    MSC/VLR.

    When the MSCA receives the Handover required from the oBSS, the MSCA finds that the new

    cell belongs to the MSCB, then sends the

    Prepare Handover

    message to the MSCB. This requestmay optionally contain an indication that a handover number allocation is not required, target Cell

    Id, for compatibility reasons, and all information required by MSCB to allocate the necessary

    radio resources.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    3/11

    2008-1-10 3 , 11

    Then the MSCB sends Allocate HandoverNo. Message to the VLRB.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    4/11

    2008-1-10 4 , 11

    The VLRB responds with the message Send Handover Report which handover number is

    included in.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    5/11

    2008-1-10 5 , 11

    Then the MSCB transfers the handover number to the MSCA with the message Prepare

    Handover Ack .

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    6/11

    2008-1-10 6 , 11

    The MSCB sends the acknowledgement to the VLRB. The handover number will be reserved until

    a Send Handover Report confirmation is received from MSC-B.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    7/11

    2008-1-10 7 , 11

    The MSCA then sends the message Initial Address Message tagged with handover number

    allocated by VLRB. The MSCB sends the Address Complete Message and Answer to the

    MSCA. The connection between the MSCA and MSCB has been established.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    8/11

    2008-1-10 8 , 11

    Optionally MSC-A can receive, after a Prepare Handover confirmation, a Process Access

    Signaling indication containing BSSAP information.

    When the connection has been established between the MS and MSCB, MSCA will be informed

    by a

    Send End Signal

    indication.If required, the MSCA requests the Forward Access Signaling request containing the

    information to be transferred to the A-interface of MSCB (e.g. call control information).

    The Forward Access Signaling is a non-confirmed service.

    The Forward Access Signaling is composed in such a way that the information can be passed

    transparently to the A-interface for call control and mobility management information.

    Any response received in MSC-B from the A-interface that should be brought to MSC-A will

    require a new independent request from the MSCB to the MSCA by invoking a Process Access

    Signaling request.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    9/11

    2008-1-10 9 , 11

    When the conversation is ended, the MSCA sends the Release message to the MSCB and

    MSCB responds with the message Release Complete .

    When MSCA wants to clear the connection with BSSB, and then sends the Send End Signal

    response to MSCB to close the sequence.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    10/11

    2008-1-10 10 , 11

    After the release of the resources for the call and handover, the inter-VLR location update

    sequence is followed.

    PDF created with FinePrint pdfFactory Pro trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/8/2019 459_Handover

    11/11

    2008-1-10 11 , 11