Submittal/Approval Letter To: Patrick Muench, P.E. Date: May 1, 2017 Turnpike Design Engineer Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( ) Federal Aid Number: Not Applicable Project Name: Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM169.320 State Road Number: 91 Co./Sec./Sub.: 94/470/000 Begin Project MP: 153.230 End Project MP: 169.320 Full Federal Oversight: Yes ( ) No ( ) Request for: Design Exception ( ), Design Variation ( ) Community Aesthetic Feature: Conceptual ( ), Final ( ) Re-submittal: Yes ( ) No( ) Original Ref# - - Requested for the following element(s): ( ) Design Speed ( ) Lane Width ( ) Shoulder Width ( ) Cross Slope ( ) Design Loading Structural Capacity ( ) Vertical Clearance ( ) Maximum Grade ( ) Stopping Sight Distance ( ) Superelevation ( ) Horizontal Curve Radius ( ) Other This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non- compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings. SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions. There are seven bridges within the project limits, four of which are a part of SR 91 Mainline. The SR 91 northbound and southbound travel ways have separate bridges at the Belcher canal and the L-20 canal crossings. Structure Nos. 940057 and 940073 cross Angle Road and Belcher Canal, and Structure Nos. 940058 and 940083 cross over the L-20 Canal. The remaining bridges on the project are the three overpasses across SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). The existing vertical clearances at the Picos Road crossing over SR 91 (Structure No. 940055) of 15’-8¼” on the northbound side, and 15’-10 1/8” on the southbound side, do not meet the governing AASHTO or FDOT criteria. In addition, the Minute Maid Road overpass (Structure No. 940059) across southbound SR 91 has an existing vertical clearance of 15’-10 5/8” which also is below the minimum AASHTO or FDOT vertical clearance requirements. As required by Table 25.5.1 of the Turnpike Plans Preparation and Practices Handbook (TPPPH), the vertical clearances were evaluated against the Plans Preparation Manual (PPM) Chapter 25 requirements for a final determination whether a design exception is needed, however, PPM Chapter 25 does not provide any additional criteria regarding vertical clearance. Therefore, in accordance with TPPPH Table 25.5.1, a Design Exception is required for these bridges to remain in place without any improvements.

Upload: others

Post on 28-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Submittal/Approval LetterTo: Patrick Muench, P.E. Date: May 1, 2017 Turnpike Design Engineer

Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( )Federal Aid Number: Not ApplicableProject Name: Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM169.320State Road Number: 91 Co./Sec./Sub.: 94/470/000Begin Project MP: 153.230 End Project MP: 169.320 Full Federal Oversight: Yes ( ) No ( )Request for: Design Exception ( ), Design Variation ( )

Community Aesthetic Feature: Conceptual ( ), Final ( )Re-submittal: Yes ( ) No( ) Original Ref# - -

Requested for the following element(s):( ) Design Speed ( ) Lane Width ( ) Shoulder Width ( ) Cross Slope( ) Design Loading Structural Capacity ( ) Vertical Clearance ( ) Maximum Grade ( ) Stopping Sight Distance( ) Superelevation ( ) Horizontal Curve Radius ( ) Other

This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings.

SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions.

There are seven bridges within the project limits, four of which are a part of SR 91 Mainline. The SR 91 northbound and southbound travel ways have separate bridges at the Belcher canal and the L-20 canal crossings. Structure Nos. 940057 and 940073 cross Angle Road and Belcher Canal, and Structure Nos. 940058 and 940083 cross over the L-20 Canal. The remaining bridges on the project are the three overpasses across SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059).

The existing vertical clearances at the Picos Road crossing over SR 91 (Structure No. 940055) of 15’-8¼” on the northbound side, and 15’-10 1/8” on the southbound side, do not meet the governing AASHTO or FDOT criteria. In addition, the Minute Maid Road overpass (Structure No. 940059) across southbound SR 91 has an existing vertical clearance of 15’-10 5/8” which also is below the minimum AASHTO or FDOT vertical clearance requirements. As required by Table 25.5.1 of the Turnpike Plans Preparation and Practices Handbook (TPPPH), the vertical clearances were evaluated against the Plans Preparation Manual (PPM) Chapter 25 requirements for a final determination whether a design exception is needed, however, PPM Chapter 25 does not provide any additional criteria regarding vertical clearance. Therefore, in accordance with TPPPH Table 25.5.1, a Design Exception is required for these bridges to remain in place without any improvements.

Page 2: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

The County Road 68 overpass (Structure No. 940056) has sufficient vertical clearance to meet AASHTO and FDOT minimum vertical clearance requirements of 16’-0”.

Three of the SR 91 mainline bridges (Structure Nos. 940057, 940083, and 940058) are compliant with FDOT vertical clearance requirement of 16’-0”, as well as the AASHTO requirement of 14’-0”, for local roads passing under bridges. With an existing vertical clearance of 15’-9 ¾”, the northbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940073) is compliant with the AASHTO requirement; however, it does not meet the FDOT minimum vertical clearance criterion. Therefore, a Design Variation, which has been applied for under a separate cover, will be required to maintain the bridge as is, without any improvements.

The reconstruction of the facilities at Picos Road and Minute Maid Road to achieve a vertical clearance meeting the FDOT new construction criteria will increase the construction cost significantly as well as impacting the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Increasing the vertical clearance will negatively impact the budget and the schedule, however, since there are no documented collisions with the referenced structures, the benefit/cost ratio for providing the improvements will be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing the improvements discussed in this report. Furthermore, maintaining the current vertical clearances will eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Exception is requested for the two bridge crossings over SR 91 at Picos Road and Minute Maid Road to remain in place without any improvements.

Recommended by:

Date 5/1/2017Houman Assari, P.E., Responsible Professional Engineer

Approvals:

Date Date Patrick Muench, P.E., Turnpike Design Engineer Russ Snyder, P.E., Turnpike Structures Design Engineer

N/A Date N/A Date Michael Shepard, P.E., State Roadway Design Engineer State Structures Design Engineer

N/A Date N/A Date State Chief Engineer FHWA Division Administrator

5/11/1705/22/17

Houman Assari Digitally signed by Houman Assari Date: 2017.05.01 14:56:50 -04'00'

Russell D SnyderDigitally signed by Russell D Snyder DN: c=US, o=IdenTrust ACES Business Representative, ou=FLORIDA DEPARTMENT OF TRANSPORTATION, cn=Russell D Snyder, 0.9.2342.19200300.100.1.1=A01097C00000144FEE2E1C900002D8F Date: 2017.05.11 08:09:25 -04'00'

Patrick Muench

Digitally signed by Patrick Muench DN: cn=Patrick Muench, o=Florida Department of Transportation, ou=Florida's Turnpike Enterprise, [email protected], c=US Date: 2017.05.22 10:07:58 -04'00'

Page 3: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Page | 1  

Request for FTE Design Exceptions & Variations Checklist 

Date: 

     BMP:     EMP: EMP: 

 New Construction 

District:   Project Name: Project Section Exemption FPID:      Requested Control Element(s): 

Design Speed*  Horizontal Curve Radius

 Other __________

Lane Width Vertical Clearance**  Superelevation 

Shoulder Widths Maximum Grade Stopping Sight Distance  

RRR

Design Loading Structural Capacity* Cross Slopes 

*Requires supplementary review (i.e. Planning/Structures/etc)**Requires Utility Accommodation Manual (UAM) Exception Submittals

 Page #/ NA 

Submittal/Approval Letter (independent file from report)  Short description of project, applicable criteria and reason for variation requestApplicable signature fields, names, and titles listed  

Design Exception/Variation Report   Report Cover 

Project Title, FPID, digital sign, seal and date  Project description 

 General project information, typical section, begin/end milepost,    county section number  Include Work Mix, To – From, Objectives, Obstacles and Schedule. 

 Description of the variation element and applicable criteria (AASHTO and    Department value or standard) 

 Detailed explanation of why the criteria or standard cannot be    complied with or is not applicable  Description of any proposed value for project and why it is    appropriate 

 Amount and character of traffic using the facility  Description of the anticipated impact on Operations,    Adjacent Sections, Level Of Service, Safety, Long and Short    Term Effects 

Is the variation   temporary or   permanent?   Description of the anticipated Cumulative Effects 

 A plan view or aerial photo of the variation location  Showing right of way lines, and property lines of adjacent property. 

 A photo of the area.  Typical section or cross‐section of variation/exception location  The milepost and station location of the variation/exception  Any related work programmed or in future work plans 

BMP: 

Florida's Turnpike Enterprise

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.32015.078

05/01/2017

31.168

436517-1-52-01 & 436517-3-52-01 ✔

N/A

S/A Letter

✔ 1

Cover

1, 2, 3

4, E

A

D B

A w/ MM

4

Page 4: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Page | 2  

 The Project Schedule Management (PSM) Project Schedule   Activities submitted 

 < Phase I    Phase I – Phase II     Phase II – Phase III   Phase III – Phase IV     > Phase IV  

Letting:      All mitigating efforts 

 An explanation of what if any associated existing or future    Limitations as a result of public or legal commitments.  Description and explanation of any practical alternatives,    the selected treatment and why. 

 Comments on the most recent 5‐year crash history  Including all pertinent crash reports  Is the location of the variation on the High Crash List? 

 Description of the anticipated Cost (Social and to the Department –    Benefit/Cost)  Summary Conclusions 

Summary description of included support documentation such as:  Location map or description  Typical section  Aerial or Photo logs when they best illustrate the element issues  Crash History and analysis  Plan sheets in the area of the variation elements  Profiles in the area of vertical alignment variation elements  Tabulation of pole offsets for horizontal clearance variation  Applicable Signed and Sealed Engineering Support Documents 

For the specified conditions the following additional documentation is required: For design speed on FIHS/SIS 

 Provide typical sections at mid blocks and at intersections. For lane width 

 Provide locations of alternative routes that meet criteria  Proposal for handling drainage  Proposed signing and pavement markings 

For shoulder width  Proposal for handling stalled vehicles  Proposal for handling drainage 

For bridge width  Plan view of the approaching roadways  Existing bridge plans (these may be submitted electronically) 

For a bridge with a design inventory load rating less than 1.0  Written evaluation and recommendation by the Office of    Maintenance is required  Load rating calculations for the affected structure 

For vertical clearance  Locations of alternative routes that meet criteria 

 Page #/ NA 

✔ H

6

4, 5

5, 6

N/A

N/A

N/A

N/A

N/A

7

7

A, B, D, F

Page 5: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Page | 3  

For cross‐slopeProposal for handling drainage 

Details on how the cross slope impacts intersections 

For conditions that may adversely affect the roadway’s capacity 

 Provide the comments on compatibility of the design and operation   with the adjacent sections  Effects on capacity (proposed criteria vs. AASHTO) using an    acceptable capacity analysis procedure  Calculate reduction for design year, level of service 

For superelevation  Provide the side friction factors for the curve for each lane of different    cross‐slope at the PC of the curve, the point of maximum cross‐slope,    and the PT of the curve using the following equation.   f = (V2 – 15Re)/(V2e+15R) 

For areas with crash histories or when a benefit to cost analysis is requested  Provide a time value analysis between the benefit to society quantified    in dollars and the costs to society quantified in dollars over the life of the    Exception/Variation. 

 Roadside Safety Analysis Program (RSAP)  Historical Crash Method (HCM) 

 Page #/ NA 

N/A

N/A

N/A

N/A

Page 6: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

St. Lucie County, Florida

FPID Numbers 436517-1-52-01 and 436517-3-52-01 Contract Number C9R86

VERTICAL CLEARANCE DESIGN EXCEPTION

Prepared For:

Florida Department of Transportation Florida’s Turnpike Enterprise

MAY 2017

Prepared By: Propel Engineering, Inc. 6685 Forest Hill Boulevard, Suite 205 Responsible Engineer: Greenacres, FL 33413 Houman Assari, PE Certification of Authorization No. 31050 State of Florida, Professional Engineer Vendor No. F463316950 License No. 49029

This item has been electronically signed and sealed by Houman Assari, PE on 05/01/2017 using a Digital Signature.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Houman Assari Digitally signed by Houman Assari Date: 2017.05.01 14:54:34 -04'00'

Page 7: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Table of Contents 1.0 Project Description ....................................................................................................................................................... 1

2.0 Description of the Design Exception ............................................................................................................................. 1 3.0 Design Criteria .............................................................................................................................................................. 3

3.1 American Association of State Highway and Transportation Officials (AASHTO) .................................................... 3

3.2 Florida Department of Transportation (FDOT) ....................................................................................................... 3 4.0 Proposed Criteria .......................................................................................................................................................... 3

5.0 Justification .................................................................................................................................................................. 4

5.1 Operational Conditions .......................................................................................................................................... 4

5.2 Crash History Analysis ............................................................................................................................................ 4 5.3 Costs ...................................................................................................................................................................... 5

5.4 Right-of-Way Impacts ............................................................................................................................................ 6

5.5 Community Impacts ............................................................................................................................................... 6 5.6 Environmental Impacts .......................................................................................................................................... 6

5.7 Mitigation .............................................................................................................................................................. 6

5.8 Alternative Route................................................................................................................................................... 7

6.0 Summary Conclusions ................................................................................................................................................... 7

APPENDICES

Appendix A: Location Map Appendix B: Typical Sections Appendix C: As-Built Plans Appendix D: Photo Log Appendix E: Traffic Data Appendix F: Crash History Appendix G: Cost Estimate Appendix H: Project Schedule

Page 8: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 1

1.0 Project Description This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings. SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions. The project is currently scheduled for letting on 01/09/2018, with a production date of 10/06/2017. There are currently no major obstacles to meeting this schedule. The project schedule is included in Appendix H of this document. 2.0 Description of the Design Exception There are seven bridges within the project limits, four of which are a part of SR 91 Mainline. The SR 91 northbound and southbound travel ways have separate bridges at the Belcher canal and the L-20 canal crossings. Structure Nos. 940057 and 940073 cross Angle Road and Belcher Canal, and Structure Nos. 940058 and 940083 cross over the L-20 Canal. The remaining bridges on the project are the three overpasses across SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). Based on information gathered from field reviews, the design survey for the project, and review of the ERCAR and the as-built plans, the bridges were evaluated for compliance with American Association of State Highway and Transportation Officials (AASHTO), Florida Department of Transportation (FDOT) and Florida’s Turnpike Enterprise (FTE) criteria for Vertical Clearance. The results of the evaluation have been summarized in Table 2.1. The existing vertical clearances at the Picos Road crossing over SR 91 (Structure No. 940055) of 15’-8¼” on the northbound side, and 15’-10 1/8” on the southbound side, do not meet the governing AASHTO or FDOT criteria. In addition, the Minute Maid Road overpass (Structure No. 940059) across southbound SR 91 has an existing vertical clearance of 15’-10 5/8” which also is below the minimum AASHTO or FDOT vertical clearance requirements. As required by Table 25.5.1 of the Turnpike Plans Preparation and Practices Handbook (TPPPH), the vertical clearances were evaluated against the Plans Preparation Manual (PPM) Chapter 25 requirements for a final determination whether a design exception is needed, however, PPM Chapter 25 does not provide any additional criteria regarding vertical clearance. Therefore, in accordance with TPPPH Table 25.5.1, a Design Exception is required for these bridges to remain in place without any improvements. The Design Exception locations have been included in Appendix A of this document.

Page 9: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 2

The County Road 68 overpass (Structure No. 940056) has sufficient vertical clearance to meet AASHTO and FDOT minimum vertical clearance requirements of 16’-0”. Three of the SR 91 mainline bridges (Structure Nos. 940057, 940083, and 940058) are compliant with FDOT vertical clearance requirement of 16’-0”, as well as the AASHTO requirement of 14’-0”, for local roads passing under bridges. With an existing vertical clearance of 15’-9 ¾”, the northbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940073) is compliant with the AASHTO requirement; however, it does not meet the FDOT minimum vertical clearance criterion. Therefore, a Design Variation, which has been applied for under a separate cover, will be required to maintain the bridge as is, without any improvements.

Table 2.1 – Summary of Bridge Vertical Clearances

Structure No.

Mile Marker Road Name

Minimum Required Vertical Clearance

Existing Vertical

Clearance Recommendation

AASHTO FDOT (4) FTE

940055 154.938 Picos Road over SR 91

16’-0” (1&2) 16’-0” 16’-0”

(4)

15’-8 ¼” (NB) Design Exception

15’-10 1/8” (SB)

940056 156.091 CR 68 over SR 91

16’-0” (1&2) 16’-0”

16’-2 ¾” (NB) (5) 16’-2 ¾” (NB) No Action

Required 16’-2 ¼” (SB) (5) 16’-2 ¼” (SB)

940073 157.975 SR 91 NB over Angle Road

14’-0” * (3) 16’-0” 16’-0”

(4) 15’-9 ¾” Design Variation

940057 157.975 SR 91 SB over Angle Road

14’-0” * (3) 16’-0” 16’-1 ¼”

(5) 16’-1 ¼” **Certified Survey Required

940083 158.657 SR 91 NB over Dirt Road

14’-0” * (3) 16’-0” 16’-6”

(5) 16’-6” No Action Required

940058 158.657 SR 91 SB over Dirt Road

14’-0” * (3) 16’-0” 16’-6”

(5) 16’-6” No Action Required

940059 165.420 Minute Maid Rd. over SR 91

16’-0” (1&2) 16’-0”

16’-5 ½” (5) 16’-5 ½” (NB)

Design Exception 16’-0” (4)

15’-10 5/8” (SB)

(1) AASHTO – A Policy on Design Standards – Interstate System (2005), Page 5 (2) AASHTO – A Policy on Geometric Design of Highways and Streets (2011), Section 8.2.9, Page 8-4 (3) AASHTO – A Policy on Geometric Design of Highways and Streets (2011), Section 5.2.3, Page 5-8 * Allowance for resurfacing required (4) FDOT – Plans Preparation Manual, Volume 1, Section 2.10

** Certified survey confirming the as-built minimum vertical clearance is equal to or greater than the existing vertical clearance is required

(5) FTE – Turnpike Plans Preparation and Practices Handbook, Volume 1, Chapter 2, Section 2.10

Page 10: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 3

3.0 Design Criteria 3.1 American Association of State Highway and Transportation Officials (AASHTO)

A Policy on Design Standards – Interstate System – (2005) (AASHTO IS)

Bridges and Other Structures, Vertical Clearance, Page 5: “On all rural sections, the clear height of structures shall be not less than 16 ft. over the entire roadway width, including the width of paved shoulder.”

A Policy on Geometric Design of Highways and Streets (2011)

Chapter 8 – Freeways, Section 8.2.9, Vertical Clearance:

“The vertical clearance to structures passing over freeways should be at least 16 ft. over the entire roadway width, including auxiliary lanes and the usable width of shoulders with consideration for future resurfacing.”

Chapter 5 – Local Roads and Streets, Section 5.2.3, Vertical Clearance: “Vertical clearance at underpasses should be at least 14 ft. over the entire roadway width, with an allowance for future resurfacing.”

3.2 Florida Department of Transportation (FDOT) Plans Preparation Manual (PPM) (January 2017)

Volume 1, Section 2.10 – Vertical Clearance:

For any construction affecting existing roadway or railroad over roadway bridge clearances (e.g., bridge widenings or resurfacing), FDOT minimum vertical clearance is 16'-0".

Turnpike Plans Preparation and Practices Handbook (TPPPH) (March 3, 2017)

Volume 1, Section 2.10 – Vertical Clearance:

“Existing vertical clearances between 16’-0” and 16’-6” must be maintained or increased, unless otherwise approved by the Turnpike Structures Design Engineer.”

4.0 Proposed Criteria The proposed design is to allow the existing vertical clearances at Picos Road and Minute Maid Road overpasses, as identified in Table 2.1 of this document, to remain as existing.

Page 11: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 4

5.0 Justification The main objective of the project is to extend the service life of the existing asphalt pavement and improve safety related features along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public.

5.1 Operational Conditions A project Traffic Data Report was provided by FTE. The Traffic Data results were as follows:

Table 5.1.1 – SR 91 Traffic Data

Two-Way AADT Trucks (DDHV) Traffic Factors

2016 2018 2038 2016 2018 2028 KSTD (%) D (%) T24 (%) DHT (%)

32,500 33,900 45,200 145 151 202 10.5 60.7 14.0 7.0 The design and posted speed within the project limits is 70 mph. The Traffic Data is included in Appendix E of this document.

The substandard vertical clearance referenced in this Design Exception is limited to two locations where Picos Road and Minute Maid Road cross over SR 91. A collision with these bridges may potentially cause delays as a result of lanes being closed and debris on the roadway. However, the substandard vertical clearances are an existing condition, therefore no increase in potential adverse impacts on the existing capacity and operation of the facility are anticipated if the vertical clearances are maintained. There are additional design elements that are not in compliance with AASHTO and FDOT criteria, namely shoulder width and cross slope/superelevation, that occur in the vicinity of the areas established for this Design Exception. However, no cumulative effects impacting the operation of the facility are expected. The capacity of the roadway is dependent on the number of lanes and the posted speed limit along the corridor, which will not change after the completion of the proposed improvements. The scope of this project is limited to milling and resurfacing, with the milling depth and resurfacing thickness being the same. There will be no increase in the elevation of the resurfaced pavement, therefore the existing vertical clearances will be maintained. Based on the analysis performed, no long or short term adverse impacts are anticipated on operations, Level of Service, or adjacent roadway sections for the areas identified in this Design Exception, which is expected to be in place through the design life of the project. SR 91 from MM 152 to MM 193 is to be evaluated for widening to by year 2035 which may ultimately impact the bridges at Picos and Minute Maid Roads. A Project Development and Environment (PD&E) study would be required, which will address the vertical clearance deficiency, prior to design and construction. 5.2 Crash History Analysis Safety considerations associated with substandard vertical clearance at the referenced locations are collisions with the bridges, and potential subsequent rear-end crashes. The most recent 5-year crash history from the years 2011 through 2015 was reviewed. The crash data is included in Appendix F of this document. This report covers crash data, field investigations, and assessments of the existing conditions along the corridor. The data provided includes the location of each crash, the type of crash, the date, and the existing conditions.

Page 12: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 5

The analysis of the crash history revealed a total of 376 crashes within the project limits. A review of the crash data revealed that there were no collisions with overhead fixed objects. The maintenance and bridge inspection reports were also reviewed to determine whether any collisions and the possible cost associated with bridge repairs could be found. However, no reported repairs as a result of collisions were found. The analysis further revealed the deficient vertical clearance locations, as identified in this Design Exception, are not on the Turnpike’s Top 30 Crash List.

5.3 Costs Cost estimates have been prepared for three alternatives that can eliminate the substandard vertical clearance at the Picos Road and the Minute Maid Bridges. These three options are: reconstruction of the bridges over SR 91, jacking the bridges over SR 91, and reconstructing SR 91 at a lower elevation to achieve the minimum required vertical clearance. The cost estimate for each alternative is included in Appendix G of this document.

5.3.1 Bridge Reconstruction The reconstruction of the overpass bridges would require an increase in elevation at the critical locations of 9¾” for the Picos Road Bridge, and 7 3/8” for the Minute Maid Road Bridge to meet the FDOT new construction minimum vertical clearance of 16’-6”. The approaches to the bridges would have to be improved to accommodate this increase in elevation. The total length of roadway improvements required for both roadways will be 2,385 feet. Additional improvements would also include drainage modifications, embankment, and guardrail replacement. The placement of the required embankment may have impacts on the environmentally sensitive areas adjacent to the roadway. Furthermore, the additional work will impact the maintenance of traffic by increasing the cost and extending the construction duration and disturbance to the FTE consumers. The estimated cost to construct this alternative will be $7,221,494.81. 5.3.2 Bridge Jacking The Jacking of the overpass bridges would also require an increase in elevation at the critical locations of 9¾” for the Picos Road Bridge, and 7 3/8” for the Minute Maid Road Bridge to meet the FDOT new construction minimum vertical clearance of 16’-6”. The approaches to the bridges would have to be improved to accommodate this increase in elevation. The total length of roadway improvements required would be 2,385 feet. Additional improvements would also include drainage modifications, embankment, and guardrail replacement. The placement of the required embankment may have impacts on the environmentally sensitive areas adjacent to the roadway. Furthermore, the additional work will impact the maintenance of traffic by increasing the cost and extending the construction duration and disturbance to the FTE consumers. The estimated cost to construct this alternative will be $2,423,350.56. The bridge jacking alternative is not the preferred option given the age of the structures, which were constructed in 1960s, and the significant distance that the bridges would need to be raised. Furthermore, whether jacking equipment can be placed under the beams or temporary towers will be needed, would have to be determined. 5.3.3 Lowering of SR 91 Northbound SR 91 must be lowered by 9¾” at Picos Road to meet the FDOT new construction minimum vertical clearance of 16’-6”. Southbound SR 91 would have to be lowered by 7 3/8” at the Picos Road Bridge, and by 7 7/8” at the Minute Maid Road Bridge. In order to transition the sections of SR 91 to lower elevations at the bridge, 2400 feet mainline roadway would require reconstruction. The additional work will impact the maintenance of traffic by increasing the cost and extending the construction duration and disturbance to the local communities. The estimated cost to construct this alternative will be $869,024.88.

Page 13: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 6

A Benefit/Cost analysis would result in a B/C ratio of zero regardless of which alternative is constructed since there were no crashes found to be attributed to the deficient vertical clearance in the analysis of the most recent 5-year crash history. There are no anticipated social costs associated with the deficient vertical clearance. 5.4 Right-of-Way Impacts Whether any of the Alternative Improvements to correct the vertical clearance deficiencies are implemented or the existing vertical clearances are allowed to remain in place, no right-of-way impacts are anticipated. Picos Road and Minute Maid Road are low volume facilities for which the cost of maintaining traffic at the same location during construction may not be justifiable. For ease of construction and expediting construction time, as well as cost savings, diversion of traffic to other crossings is the most viable option. Even if the traffic is to be maintained at the bridge locations, only temporary construction easements would most likely be required with no permanent right of way acquisition required. 5.5 Community Impacts Since the substandard vertical clearances are an existing condition, no adverse community impacts are expected if the existing vertical clearances are maintained. However, if any of the Alternative Improvements to correct the vertical clearance deficiencies are implemented, the additional work will impact the maintenance of traffic on SR 91, thereby increasing the cost and extending the construction duration of the project. This will ultimately result in additional disturbance to the FTE consumers and the local community using the existing bridges. 5.6 Environmental Impacts With the implementation of any of the Alternative Improvements to correct the vertical clearance deficiencies, there may be impacts on the roadside slopes in the vicinity of the Picos Road and the Minute Maid Road Bridges. Belcher Canal requiring extensive permitting through South Florida Water Management District (SFWMD). Gopher tortoise burrows were observed which require coordination with Florida Fish and Wildlife Conservation Commission (FWC). The appropriate habitats must be surveyed during design to confirm whether the burrows are active. If the burrows are impacted, a relocation permit will be required prior to moving the tortoise. Relocation permitting does not typically occur until approximately 90 days prior to the start of construction in the area. Since the substandard vertical clearances are an existing condition, no adverse environmental impacts are expected if the existing vertical clearances are maintained.

5.7 Mitigation To enhance the safety of the current conditions regarding the deficient vertical clearance, advance warning signage was considered for installation to alert the traveling public of the vertical clearance limitation. However, the MUTCD guidelines require the placement of low clearance signs when vertical clearances are less than 12 inches above the statutory maximum vehicle height, which does not apply to the vertical clearance deficiencies identified in this exception. Additional mitigation strategies as outlined in the Federal Highway Administration (FHWA) publication Mitigation Strategies for Design Exceptions, dated July 2007, include detours and prohibiting of large vehicles from using the project segment of SR 91 which are infeasible or impractical for application on an interstate facility. There are no associated existing or future limitations as a result of legal or public commitments known for this project.

Page 14: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 7

5.8 Alternative Route SR 91 is a Limited Access Expressway on the National Highway System (NHS) and the State Highway System (SHS). The project segment lies between the interchange for SR 70, immediately south of the project, and the SR 60 interchange which is approximately 40 miles to the north of SR 70. The only comparable facility to SR 91 is Interstate 95 which may be accessed at the SR 70 interchange. Interstate 95 diverges from SR 91 going north which does not provide for an ideal alternative route, adding approximately 10 additional miles to the route, but is the only facility that may be used to avoid the low structures. The separation between the interchanges hinders the opportunity to guarantee a viable alternative route that will be effective and potentially utilized by oversized vehicles.

6.0 Summary Conclusions The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders and the paved median openings. Additional safety related improvements would also be provided along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public. The reconstruction of the facilities at Picos Road and Minute Maid Road to achieve a vertical clearance meeting the FDOT new construction criteria would increase the construction cost significantly as well as impacting the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Increasing the vertical clearance would negatively impact the budget and the schedule, however, since there are no documented collisions with the referenced structures, the benefit/cost ratio for providing the improvements would be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing the improvements discussed in this report. Furthermore, maintaining the current vertical clearances would eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Exception is requested for the two bridge crossings over SR 91 at Picos Road and Minute Maid Road to remain in place without any improvements.

Page 15: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix A Location Map

Page 16: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 17: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix B Typical Sections

Page 18: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 19: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 20: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 21: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 22: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 23: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 24: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 25: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 26: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 27: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 28: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 29: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 30: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix C As-Built Plans

Page 31: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix D Photo Log

Page 32: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from 153.230 to 169.320

Figure 1 – Picos Road Over NB SR 91

Figure 3 - Picos Road Over NB SR 91

Figure 2 - Picos Road Over NB SR 91

Figure 4 - Picos Road Over NB SR 91

Page 33: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from 153.230 to 169.320

Figure 5 – Picos Road Over SB SR 91

Figure 7 – Minute Maid Road Over SB SR 91

Figure 6 - Picos Road Over SB SR 91

Figure 8 - Minute Maid Road Over SB SR 91

Page 34: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix E Traffic Data

Page 35: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline
Page 36: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Traffic and Revenue Consultant Florida’s Turnpike Enterprise

Florida Department of Transportation

AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com

MEMORANDUM Date:

To:

From:

Copies:

Subject: Typical Section Traffic Data and Equivalent Single Axle Loading (ESAL) Calculations_Update

FPN:

State Road:

Counties:

FY 2016 Turnpike Annual Traffic Trends Report

Page 37: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Lane Closure Traffic Data Page 2

AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com

U.S. DOT Mitigation Strategies for Design Expectations

Typical Section Traffic Data and Trucks Directional Design Hour Volume

2016 2018 2038 KSTD D T24 (%) DHT (%) 2016 2018 2038

South of Fort Drum Service Plaza (MP 184)

32,500 33,900 45,200 10.5% 60.7% 14.0 7.0 145 151 202

Trucks (DDHV)Segment

Two-Way AADT Traffic Factors

Page 38: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Year AADT Lane Factor ESAL (1000S)

CUM-ESAL(1000S)

2018 33,900 0.763 694 6942019 34,600 0.761 706 1,4002020 35,400 0.759 721 2,1212021 35,900 0.758 730 2,8512022 36,600 0.756 743 3,5942023 37,300 0.755 755 4,3492024 37,900 0.753 766 5,1152025 38,500 0.752 777 5,8922026 39,000 0.751 786 6,6782027 39,600 0.750 797 7,4752028 40,100 0.749 806 8,2812029 40,700 0.748 816 9,0972030 41,200 0.747 825 9,9222031 41,700 0.746 834 10,7562032 42,200 0.745 843 11,5992033 42,700 0.744 852 12,4512034 43,200 0.743 861 13,3122035 43,700 0.742 869 14,1812036 44,200 0.741 878 15,0592037 44,700 0.740 887 15,9462038 45,200 0.739 896 16,842

14.0%

0.5

(1.567 - 0.0826 x Ln(One-Way AADT)-0.12368 x LV)

1.050 *Freeway - Urban - Flexible Pavement

LV = 0.000

ESAL = AADT x T24 x DF x LF x EF x 365

Opening to Mid-Design Year (2025) ESAL Accumulation: 5,198

Opening to Design Year (2032) ESAL Accumulation: 10,905

Opening to Mid-Design Year (2028) ESAL Accumulation: 7,587

Opening to Design Year (2038) ESAL Accumulation: 16,14820-year design

(Years 2018-2038)

14-year design (Years 2018-2032)

Florida's Turnpike - Ticket System

FPN 436517-1 Mainline Resurfacing from MP 153.2 to MP 169.3

Mainline - South of Fort Drum Service Plaza

Two (2) Lanes

(Daily Truck Factor) T24 =

(Directional Distribution Factor) DF =

(Lane Factor) LF =

(Load Equivalency Factor) EF* =

Page 39: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix F Crash History

Page 40: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

2011

8198

4049

01/

2/20

1118

.869

157.

019

141

L1

11

21

10

1414

1S

18

14S

40

081

9861

510

1/2/

2011

18.8

6915

7.01

99

77R

21

51

11

09

21

N1

10

281

9784

110

1/5/

2011

30.8

8416

9.03

427

1R

S1

12

11

027

11

N77

10

081

9636

970

1/6/

2011

20.8

7115

9.02

127

77R

S1

51

11

027

1415

N17

10

081

9748

190

1/6/

2011

20.8

7115

9.02

127

77L

S2

51

11

027

715

S12

10

081

9748

200

1/6/

2011

20.8

7115

9.02

115

3L

22

51

11

014

148

E2

1S

20

081

9636

990

1/13

/201

121

.876

160.

026

777

R2

11

11

10

90

1N

115

1N

20

081

9829

250

1/20

/201

124

.878

163.

028

274

RS

15

41

10

2714

1N

771

00

8197

5263

01/

30/2

011

26.8

8116

5.03

113

77L

11

51

11

013

141

S1

10

081

9973

390

2/13

/201

118

.876

157.

026

274

RS

11

11

10

273

1N

171

00

8200

1260

02/

18/2

011

19.9

0115

8.05

114

4L

11

51

11

014

211

S21

6S

20

081

9752

650

2/21

/201

115

.863

154.

013

144

L2

15

11

10

142

11S

2521

1S

20

082

0431

780

2/27

/201

122

.875

161.

025

293

RS

15

21

10

2914

6N

11

00

8199

9008

03/

5/20

1127

.88

166.

030

144

L1

11

21

10

1412

14S

773

14S

20

081

9861

570

3/9/

2011

16.5

5815

4.70

827

3L

S1

51

11

027

101

S2

10

182

0431

790

3/9/

2011

21.8

7616

0.02

627

3L

S1

51

11

027

141

S26

10

281

9829

280

3/14

/201

116

.058

154.

208

141

R1

11

11

10

147

14N

214

1N

30

082

0172

360

3/16

/201

129

.323

167.

473

188

RS

11

11

10

119

1N

251

01

8201

7237

03/

17/2

011

19.9

0115

8.05

127

4M

M1

11

11

027

141

S26

211

S2

03

8202

2051

03/

17/2

011

21.8

7616

0.02

614

1R

21

51

11

018

11

N12

81

N2

03

8206

4726

03/

22/2

011

27.8

816

6.03

027

4M

M1

54

11

027

141

S25

10

081

9752

710

4/10

/201

128

.88

167.

030

141

L2

11

11

10

140

1S

71

S2

02

8198

2933

04/

15/2

011

18.8

6915

7.01

927

77L

11

12

177

027

141

S77

10

081

9748

290

4/27

/201

118

.869

157.

019

2977

LS

11

11

10

292

1S

21

00

8197

4830

05/

1/20

1123

.931

162.

081

2777

RS

11

11

10

2710

1N

11

01

8198

2937

05/

7/20

1117

.864

156.

014

2777

RS

11

11

10

273

1N

11

00

8198

2938

05/

13/2

011

19.9

0115

8.05

114

1R

21

11

11

014

11

N77

81

N2

00

819 9

7349

05/

22/2

011

30.8

8416

9.03

41

77R

11

11

11

042

191

N17

10

482

0650

250

5/24

/201

120

.852

159.

002

2788

LS

11

11

12

272

1S

21

01

8197

4804

05/

30/2

011

28.8

5316

7.00

327

77L

S1

11

11

027

21

S2

10

181

9748

050

6/3/

2011

23.9

3116

2.08

127

77L

S1

31

11

027

21

S1

10

082

0012

750

6/5/

2011

20.8

7115

9.02

127

77M

M1

12

11

027

121

S25

131

N2

00

8197

4806

06/

12/2

011

26.8

8116

5.03

128

77R

S1

11

11

028

415

N2

10

181

9829

220

6/23

/201

127

.88

166.

030

2777

MM

21

31

770

2714

1S

771

00

8197

5275

06/

26/2

011

21.8

7616

0.02

614

4L

21

12

111

014

131

S12

413

S2

01

8204

3181

06/

26/2

011

20.8

7115

9.02

127

77L

S1

12

11

027

141

S1

10

181

9829

350

6/30

/201

117

.864

156.

014

2977

LS

11

11

10

299

1S

771

00

8197

4825

07/

21/2

011

16.8

3815

4.98

814

1R

21

11

11

014

11

N2

211

N2

00

8 199

7341

07/

22/2

011

31.8

8617

0.03

614

4L

21

11

11

014

31

S1

101

S2

00

8198

4048

07/

24/2

011

15.0

1515

3.16

514

4L

11

11

11

014

41

S1

101

S2

00

8206

5031

08/

4/20

1121

.876

160.

026

2777

LS

11

11

10

4314

1S

301

00

8198

2944

08/

7/20

1129

.881

168.

031

2977

LS

25

31

10

292

1S

291

00

Exem

ptio

n fro

m F

lorid

a Pu

blic

Rec

ords

Sec

tion

119,

Flo

rida

Stat

utes

: Th

e in

form

atio

n co

ntai

ned

in th

e C

rash

Ana

lysi

s R

epor

ting

(C.A

.R.)

syst

em h

as b

een

com

pile

d fro

m in

form

atio

n co

llect

ed fo

r the

pur

pose

of i

dent

ifyin

g, e

valu

atin

g, o

r pla

nnin

g sa

fety

en

hanc

emen

ts.

This

sys

tem

and

its

prod

ucts

iden

tify

info

rmat

ion

used

for t

he p

urpo

se o

f dev

elop

ing

high

way

saf

ety

cons

truct

ion

impr

ovem

ent p

roje

cts

whi

ch m

ay b

e im

plem

ente

d ut

ilizi

ng F

eder

al-a

id h

ighw

ay fu

nds.

Sin

ce th

is in

form

atio

n is

col

lect

ed fo

r the

ab

ove-

men

tione

d pu

rpos

e it

is e

xem

pt fr

om d

iscl

osur

e as

a p

ublic

reco

rd p

ursu

ant t

o Fe

dera

l law

. Any

doc

umen

t dis

play

ing

this

ex

empt

ion

from

pub

lic re

cord

s sh

all b

e us

ed o

nly

for t

hose

pur

pose

s de

emed

app

ropr

iate

by

the

Dep

artm

ent.

See

Title

23

Uni

ted

Stat

es C

ode

Sect

ion

409.

Page 41: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8200

1282

08/

13/2

011

29.3

2316

7.47

318

77R

11

21

11

040

01

N1

11

N6

00

8197

5279

08/

25/2

011

28.0

816

6.23

01

77M

M2

12

11

01

41

N12

10

182

0172

510

9/2/

2011

27.8

816

6.03

027

77M

M1

11

11

027

41

N26

10

082

0012

850

9/16

/201

128

.88

167.

030

141

L2

15

11

10

141

6N

221

1S

20

081

9840

620

9/22

/201

114

.862

153.

012

141

R2

15

11

10

141

1N

221

1N

30

281

9829

490

9/26

/201

128

.88

167.

030

2777

LS

11

11

10

2714

11S

11

00

8204

3188

010

/1/2

011

26.8

8116

5.03

127

77M

M1

12

11

027

11

N1

10

281

9844

310

10/6

/201

119

.058

157.

208

1477

R1

11

21

10

148

4N

41

8N

20

081

9748

370

10/8

/201

131

.807

169.

957

2777

R1

21

31

10

271

1N

121

00

8198

4066

010

/13/

2011

17.1

2115

5.27

123

77L

S1

11

11

023

161

S2

10

081

9829

530

10/1

5/20

1126

.881

165.

031

2777

LS

12

11

10

2714

1S

291

00

8198

6174

010

/18/

2011

18.8

6915

7.01

929

77L

S2

13

110

09

21

S30

10

081

9861

750

10/2

2/20

1119

.901

158.

051

977

RS

11

11

10

403

1N

21

01

8204

3191

010

/31/

2011

26.8

8116

5.03

127

77M

M2

53

11

027

131

S12

10

081

9840

670

11/3

/201

120

.871

159.

021

2777

LS

11

21

10

277

15S

21

00

8198

6177

011

/16/

2011

24.8

7816

3.02

89

3L

S1

11

11

042

1477

S2

121

S2

01

8201

7263

011

/16/

2011

27.8

816

6.03

018

77R

21

51

11

040

61

N1

11

N2

00

8200

1290

011

/27/

2011

17.3

6715

5.51

727

7 7L

S1

11

11

027

141

S25

10

081

9829

610

12/5

/201

124

.878

163.

028

2777

RS

25

21

10

271

1N

11

00

8201

7267

012

/10/

2011

14.8

6215

3.01

215

2R

22

12

11

014

13

N2

81

N2

00

8198

6185

012

/15/

2011

29.3

2316

7.47

39

77L

X1

52

11

040

141

S2

10

082

0012

910

12/1

6/20

1129

.996

168.

146

153

L1

15

21

10

1413

77S

2914

1S

20

181

9861

860

12/2

2/20

1120

.871

159.

021

1877

RS

15

11

10

1818

1N

11

00

8206

4754

012

/24/

2011

21.8

7116

0.02

11

77R

S1

51

11

027

11

N2

10

282

0650

410

12/2

7/20

1116

.871

155.

021

3477

LS

21

31

10

421

5S

11

00

8197

5289

01/

1/20

1219

.901

158.

051

2788

LS

14

11

10

271

1S

311

00

8201

7274

01/

2/20

1229

.881

168.

031

141

R1

11

11

10

141

1N

28

1N

30

181

9861

880

1/8/

2012

17.0

1515

5.16

59

3M

M1

11

11

09

010

N6

11

N2

00

8206

4760

01/

14/2

012

17.0

5815

5.20

81

88L

S1

51

11

02

191

S1

10

181

9752

900

1/15

/201

225

.68

163.

830

1377

R2

15

11

10

131

1N

11

00

8197

8432

02/

11/2

012

14.9

1515

3.06

514

4L

11

21

11

018

577

S13

1S

30

182

0647

630

2/15

/201

216

.058

154.

208

977

RS

13

11

110

119

77N

301

01

8204

3196

02/

17/2

012

15.1

5815

3.30

814

4R

21

42

11

014

106

N3

1N

20

081

9973

680

3/1/

2012

28.8

816

7.03

09

77L

22

12

11

040

31

S1

10

081

9829

670

3/2/

2012

17.8

6415

6.01

417

77R

21

11

11

05

01

N77

21

N2

00

8198

2968

03/

6/20

1214

.935

153.

085

2777

RS

11

21

10

271

6N

777

1N

20

082

0 201

060

3/29

/201

226

.058

164.

208

2777

LS

11

11

10

2719

1S

771

11

8204

3198

03/

29/2

012

25.2

2316

3.37

327

77L

S1

11

11

027

141

S77

10

381

9555

620

4/16

/201

219

.901

158.

051

274

RS

11

21

10

90

1N

41

N2

00

8197

8446

04/

22/2

012

28.8

816

7.03

018

77L

11

12

11

040

131

S77

31

S2

01

8200

1305

04/

27/2

012

30.3

2316

8.47

327

77M

M1

21

11

027

21

S1

10

282

0432

020

4/27

/201

216

.681

154.

831

2777

RS

11

11

770

273

1N

771

01

8201

7285

05/

9/20

1217

.878

156.

028

273

L1

11

21

10

271

1N

11

1S

20

081

9973

720

5/14

/201

227

.996

166.

146

141

R1

21

31

100

1413

1N

127

1N

20

081

9748

480

5/15

/201

216

.058

154.

208

2777

MM

11

11

10

2714

1N

291

00

8197

5295

05/

26/2

012

27.1

8116

5.33

129

77L

S1

12

11

029

21

S17

10

381

9748

500

5/29

/201

226

.323

164.

473

1777

R2

11

11

10

50

1N

11

1N

20

082

0 647

760

5/31

/201

217

.058

155.

208

144

L1

25

21

10

142

77S

29

1S

20

082

0201

130

6/15

/201

222

.875

161.

025

2977

RS

25

21

10

292

1N

11

00

2012

Page 42: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8197

8454

06/

28/2

012

28.8

816

7.03

014

77R

11

11

11

09

077

N11

1N

30

082

0013

110

7/2/

2012

30.9

9616

9.14

61

77R

S1

12

11

01

191

N1

10

281

9784

560

7/4/

2012

28.8

816

7.03

014

1L

22

13

110

014

11

S10

81

S2

00

8198

6214

07/

13/2

012

23.9

3116

2.08

19

1L

11

11

177

09

96

S2

21

S2

02

8202

8751

07/

13/2

012

24.2

3116

2.38

128

77L

S1

11

11

028

74

N4

10

081

9840

800

7/15

/201

229

.058

167.

208

1377

R2

25

31

10

1318

1N

11

00

8198

4081

07/

16/2

012

16.0

5815

4.20

814

3R

22

52

11

014

16

N2

211

N2

00

8 200

1313

07/

20/2

012

16.9

3515

5.08

51

77R

S1

12

11

01

191

N1

10

481

9784

620

7/29

/201

225

.88

164.

030

1877

L1

15

11

10

182

1S

11

00

8197

8463

07/

29/2

012

27.0

5816

5.20

818

77L

21

51

11

018

11

S1

10

081

9753

030

8/7/

2012

22.9

7516

1.12

51

77M

M2

12

11

01

1914

N26

10

182

0647

840

8/7/

2012

29.3

2316

7.47

327

77L

S2

13

11

027

96

S1

10

282

0201

240

8/11

/201

216

.058

154.

208

2777

L2

22

31

100

2714

1S

11

00

8197

5304

08/

17/2

012

17.3

7115

5.52

19

77L

S1

12

11

09

077

S30

141

S2

00

8204

3205

08/

17/2

012

25.8

2316

3.97

327

77R

S1

12

11

027

11

N2

10

082

0432

060

8/21

/201

219

.901

158.

051

2777

R1

21

31

100

272

1N

11

00

8201

7225

08/

25/2

012

15.8

6315

4.01

327

77R

S2

13

11

027

141

N77

10

182

0019

720

9/1/

2012

15.5

5815

3.70

814

1L

21

51

11

31 4

141

S2

211

S2

01

8206

4792

09/

8/20

1216

.058

154.

208

977

L1

11

11

10

4013

1S

11

00

8206

4793

09/

13/2

012

31.3

2316

9.47

31

77R

S1

11

11

01

191

N1

10

281

9784

740

9/14

/201

221

.058

159.

208

2777

LS

11

21

10

2714

1S

291

00

8197

8475

09/

15/2

012

26.9

9616

5.14

61

77R

S1

12

11

01

191

N77

10

282

0019

760

9/29

/201

219

.319

157.

469

2777

MM

25

21

100

93

1S

771

00

8197

4861

09/

30/2

012

31.8

5417

0.00

427

77R

S2

13

11

027

11

N12

51

N2

00

8197

5310

010

/1/2

012

24.5

0516

2.65

534

77M

M1

12

11

034

177

N26

10

082

0201

310

10/4

/201

226

.854

165.

004

144

LS

11

11

10

152

1S

2621

8S

20

181

9753

110

10/8

/201

231

.756

169.

906

2777

MM

21

31

10

2714

1N

121

00

8202

2108

010

/11/

2012

31.8

5617

0.00

614

1R

21

11

11

014

211

N12

91

N2

00

820 1

7253

010

/12/

2012

24.3

2316

2.47

327

77L

S1

51

11

027

41

S1

10

081

9637

110

10/1

3/20

1215

.849

153.

999

1377

L1

14

11

10

132

1S

11

00

8197

4865

010

/21/

2012

18.9

3515

7.08

514

4L

21

11

11

014

21

S2

101

S2

03

8197

5314

010

/26/

2012

27.9

5316

6.10

327

77M

M2

12

11

027

11

N12

10

082

0019

920

12/7

/201

230

.323

168.

473

977

R1

11

11

10

90

6N

21

1N

30

182

2534

400

12/7

/201

231

.323

169.

473

2777

LS

15

41

10

2719

1S

261

02

8291

0968

012

/11/

2012

16.7

5515

4.90

527

77R

S2

52

11

027

11

N2

10

181

9748

680

12/2

2/20

1229

.323

167.

473

144

R2

11

11

10

1419

1N

214

1N

20

381

9753

180

12/2

2/20

1226

.954

165.

104

977

MM

11

11

10

00

0S

131

S2

00

8198

7884

012

/31/

2012

15.4

2715

3.57

727

77R

S1

11

11

027

141

N2

10

1

8196

3719

01/

2/20

1322

.85

161.

000

1477

R2

11

21

10

146

1N

11

00

8201

1604

01/

3/20

1323

.905

162.

055

977

RS

15

11

10

4014

1N

11

03

8200

1996

01/

17/2

013

17.0

5815

5.20

814

3R

11

22

11

014

141

N2

51

N2

00

8197

8461

01/

20/2

013

27.9

9616

6.14

627

77M

M1

11

11

027

141

S26

10

082

0965

720

1/21

/201

321

.852

160.

002

154

L2

15

11

10

152

1S

779

8S

20

081

9784

640

1/22

/201

320

.852

159.

002

1877

MM

11

11

110

181 4

15S

771

00

8200

1999

01/

25/2

013

28.8

5316

7.00

327

77M

M1

51

11

027

131

S30

10

182

0153

750

1/28

/201

327

.853

166.

003

2777

MM

15

11

11

2714

15N

11

00

8198

4444

02/

5/20

1318

.058

156.

208

141

RS

11

11

10

141

14N

108

14N

20

082

0172

700

2/23

/201

320

.852

159.

002

144

R2

11

11

10

1410

1N

14

1N

20

182

0172

710

2/23

/201

321

.935

160.

085

2777

RS

15

11

10

271

1N

11

00

2013

Page 43: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8209

3862

02/

23/2

013

18.0

5815

6.20

827

77R

11

11

11

027

141

N1

10

081

9753

260

2/24

/201

317

.948

156.

098

1377

L1

11

11

10

131

1N

11

00

8197

5327

02/

24/2

013

29.0

5316

7.20

314

4M

M1

12

11

014

196

S2

31

S2

04

8197

5328

03/

4/20

1320

.752

158.

902

141

L1

11

12

40

141

1S

28

1S

20

082

0200

860

3/8/

2013

21.8

5216

0.00

214

1L

21

11

11

014

11

S2

81

S2

02

8201

7294

03/

12/2

013

26.9

2316

5.07

317

77R

21

11

11

017

01

N1

1N

20

082

0354

160

3/18

/201

314

.915

153.

065

577

R2

15

11

10

4021

1N

11 4

1N

20

082

2532

470

3/18

/201

316

.058

154.

208

1977

MM

21

21

10

2818

77N

61

00

8202

0091

03/

22/2

013

28.8

5316

7.00

314

1R

11

12

11

09

06

N77

11

N3

00

8202

0093

03/

31/2

013

26.8

5416

5.00

428

77M

M1

11

11

028

141

N77

10

082

8257

460

4/4/

2013

14.9

2915

3.07

928

77L

S2

12

11

028

11

S12

10

182

0201

080

4/15

/201

329

.852

168.

002

2777

RS

21

21

10

272

1N

21

00

8204

3226

04/

16/2

013

24.3

2316

2.47

314

4R

11

51

11

114

1077

N25

36

N2

01

8225

4978

04/

16/2

013

27.2

2816

5.37

81

77L

S1

11

11

01

191

S29

10

182

9109

850

4/22

/201

325

.651

163.

801

2777

RS

21

31

10

271

1S

21

00

8199

9012

04/

27/2

013

20.0

5815

8.20

89

77L

S1

11

11

09

61

S1

10

082

0432

270

4/27

/201

325

.323

163.

473

2777

R2

15

11

10

2714

1N

221

1N

20

083

2476

760

4/28

/201

328

.996

167.

146

1377

L2

13

11

10

132

1S

11

00

8225

3254

05/

4/20

1318

.935

157.

085

1477

L2

11

11

10

141

1N

28

3S

20

283

1948

040

5/4/

2013

16.0

5815

4.20

830

77M

M2

52

11

130

141

S25

10

082

2549

820

5/9/

2013

25.3

2316

3.47

318

77R

21

11

112

09

211

N1

191

N2

01

8282

5747

05/

10/2

013

27.7

5316

5.90

314

1L

21

41

11

014

11

S2

81

S2

00

8225

3257

05/

18/2

013

24.3

2316

2.47

327

77L

S2

12

11

027

11

S12

10

081

9637

230

5/27

/201

318

.85

157.

000

144

R1

11

21

10

147

11N

122

1N

20

082

8257

480

5/27

/201

328

.053

166.

203

144

L2

11

21

10

140

1S

121

S2

00

8204

3234

05/

31/2

013

26.8

2316

4.97

329

77R

S1

11

11

029

21

N1

10

481

9637

250

6/3/

2013

19.8

8415

8.03

427

77R

S2

23

11

027

21

N12

10

082

0432

350

6/6/

2013

20.8

8415

9.03

427

77M

M2

12

11

027

11

N1

10

282

0432

360

6/11

/201

319

.984

158.

134

2777

MM

21

31

100

271

1N

121

00

8318

3054

06/

18/2

013

19.9

7915

8.12

927

77M

M1

21

11

027

121

S77

11

283

1830

550

6/20

/201

318

.935

157.

085

2777

MM

11

21

10

271

1S

11

01

8204

3238

06/

23/2

013

23.9

0516

2.05

527

77R

S1

12

11

027

11

N2

10

082

0432

390

6/23

/201

325

.851

164.

001

2777

LS

11

21

10

2714

14S

101

00

8324

7683

06/

25/2

013

19.0

5815

7.20

89

77L

S1

51

11

042

115

S77

10

083

1830

570

6/27

/201

320

.852

159.

002

143

L2

11

21

11

141

11S

2513

1S

20

182

0432

420

6/28

/201

319

.884

158.

034

143

L2

11

11

10

142

1S

112

1S

20

083

1830

590

6/29

/201

330

.996

169.

146

143

R1

11

21

10

1414

1N

24

1N

20

582

0354

220

7/3/

2013

18.0

5815

6.20

814

1R

11

11

11

014

93

N2

11

N3

05

8318

3060

07/

4/20

1324

.323

162.

473

2777

MM

21

21

10

271

1E

11

00

8203

5423

07/

9/20

1317

.058

155.

208

141

R1

21

31

100

147

14N

7714

1N

20

082

0354

240

7/15

/201

328

.323

166.

473

143

R2

11

21

10

143

1N

221

1N

20

082

8257

550

7/17

/201

327

.266

165.

416

2777

MM

11

21

10

00

60

11

S2

00

8324

7687

07/

18/2

013

30.4

9616

8.64

614

4L

21

51

11

014

21

S77

91

S2

00

8206

8079

07/

25/2

013

20.4

5315

8.60

322

77M

M2

13

110

022

11

S12

10

083

3274

320

8/1/

2013

24.8

5216

3.00

29

77M

M1

11

11

040

131

N1

10

183

1830

640

8/2/

2013

16.6

5715

4.80

714

77M

M1

51

11

327

113

S77

141

S2

03

8204

3247

08/

4/20

1328

.323

166.

473

3677

LS

21

21

100

368

1S

11

12

8282

5761

08/

8/20

1314

.947

153.

097

1477

R1

14

21

10

021

00

31

N2

02

8366

4737

08/

15/2

013

16.9

3515

5.08

51

77R

S2

12

11

043

1915

N2

10

183

1830

650

8/19

/201

326

.854

165.

004

977

MM

11

11

10

431

1N

261

01

Page 44: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8366

4738

08/

24/2

013

18.0

5815

6.20

814

4L

11

11

11

014

106

S15

31

S2

00

8334

0326

09/

1/20

1320

.852

159.

002

2777

MM

15

11

10

2714

1S

771

01

8208

4673

09/

3/20

1326

.823

164.

973

1877

L2

15

11

10

921

77O

211

S3

00

8208

4674

09/

3/20

1326

.823

164.

973

141

L2

15

11

10

141

1S

28

1S

20

183

2476

920

9/18

/201

319

.884

158.

034

977

MM

15

11

10

93

1S

11

03

8209

5495

09/

23/2

013

16.0

5815

4.20

814

1L

22

53

110

014

211

S2

41

S2

00

8332

7436

09/

23/2

013

16.0

5815

4.20

814

4L

S2

53

11

014

46

S2

121

S2

00

8 206

7822

010

/5/2

013

18.9

3515

7.08

59

77R

11

12

11

040

91

N1

10

083

1830

750

10/6

/201

330

.996

169.

146

2777

RS

11

21

10

271

1N

11

00

8364

4192

010

/6/2

013

26.8

5416

5.00

434

77L

S1

12

11

036

44

S4

10

083

6646

660

10/7

/201

330

.296

168.

446

2977

LS

21

31

100

4214

1S

301

00

8366

4667

010

/7/2

013

27.8

0316

5.95

310

4R

S2

52

11

215

26

N25

108

N2

20

8318

3076

010

/14/

2013

27.8

2316

5.97

31

77L

21

11

11

01

191

N1

151

S5

02

8366

4671

010

/18/

2013

15.0

7715

3.22

730

77M

M1

32

11

030

11

S29

10

083

6728

840

11/2

4/20

1319

.352

157.

502

977

MM

11

11

10

914

1S

11

02

8332

7448

012

/1/2

013

22.8

516

1.00

014

1R

22

52

11

014

141

N2

714

N2

00

8366

4601

012

/1/2

013

20.8

5215

9.00

214

1L

12

53

110

014

11

S2

81

S2

00

8367

2887

012

/1/2

013

23.3

516

1.50

014

1R

12

13

11 0

014

214

N10

91

N2

00

8368

8042

012

/1/2

013

23.0

516

1.20

029

77R

S2

52

11

042

21

N1

10

183

6646

050

12/2

0/20

1318

.058

156.

208

94

MM

11

11

10

4014

1S

212

1S

20

183

6646

070

12/2

6/20

1326

.854

165.

004

2777

MM

11

11

120

4314

1N

11

01

8324

7709

012

/29/

2013

21.3

5215

9.50

29

77M

M2

12

110

027

136

S77

10

0

8202

2103

01/

1/20

1417

.848

155.

998

141

L1

24

21

10

141

1S

18

14S

30

083

1830

810

1/1/

2014

21.9

3516

0.08

527

77M

M1

12

11

027

131

N1

10

083

1830

820

1/1/

2014

18.0

315

6.18

014

1L

12

52

11

014

81

S12

11

S2

02

8366

4608

01/

1/20

1414

.996

153.

146

3377

LS

21

31

770

4210

15S

11

00

8366

4609

01/

1/20

1422

.058

160.

208

1477

R1

21

21

100

141

1N

28

1N

30

083

6646

140

1/9/

2014

23.0

5816

1.20

814

3L

22

53

110

014

21 1

S2

91

N2

00

8366

4756

01/

9/20

1430

.856

169.

006

977

MM

21

31

100

437

1N

121

00

8206

7827

01/

25/2

014

24.3

2316

2.47

36

77L

11

11

11

06

01

S1

10

183

2477

150

1/25

/201

430

.323

168.

473

181

L2

11

11

10

181

1S

29

13S

40

481

9861

890

2/14

/201

428

.384

166.

534

2777

MM

11

11

10

4014

1N

21

01

8198

6199

02/

14/2

014

28.6

5316

6.80

314

77L

11

21

11

014

111

S2

11

S2

00

836 8

8048

02/

16/2

014

25.8

5316

4.00

318

77R

11

31

112

018

11

N1

10

083

3274

570

2/23

/201

415

.158

153.

308

144

R2

11

11

10

1411

6N

33

1N

20

483

3274

580

2/28

/201

416

.055

154.

205

144

R1

12

11

10

1411

6N

26

1N

20

082

0431

900

3/2/

2014

27.4

2316

5.57

314

3R

21

11

11

014

615

N2

1415

N2

00

8319

0337

03/

3/20

1428

.853

167.

003

2777

MM

11

11

10

273

1N

261

02

8324

7721

03/

6/20

1430

.996

169.

146

977

L1

25

21

120

93

1S

11

00

8324

7722

03/

6/20

1430

.996

169.

146

977

L2

25

21

120

914

1S

11

00

8200

1990

03/

10/2

014

16.8

5715

5.00

710

77R

21

11

11

010

158

N4

1N

20

183

3006

920

3/22

/201

418

.235

156.

385

144

R2

13

11

11

143

1N

2512

1N

20

083

6880

530

3/25

/201

427

.384

165.

534

141

L2

21

21

10

141

1S

778

1S

20

082

0431

930

3/29

/201

417

.835

155.

985

141

L1

25

21

100

141

1 4S

28

14S

20

183

6646

240

3/30

/201

429

.852

168.

002

977

MM

15

11

10

4314

14S

301

00

8204

3195

04/

6/20

1419

.884

158.

034

2777

MM

15

11

10

271

16S

21

00

8209

5496

04/

17/2

014

14.9

0115

3.05

130

77M

M1

22

11

030

181

S77

10

182

9035

350

4/21

/201

418

.058

156.

208

2777

MM

11

11

10

2714

1N

21

01

8332

7466

05/

2/20

1424

.852

163.

002

141

L1

15

11

10

141

1S

221

1S

20

2

2014

Page 45: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8368

8057

05/

2/20

1431

.756

169.

906

1877

L2

25

21

120

181

1S

11

00

8379

7346

05/

2/20

1420

.852

159.

002

2777

MM

25

21

10

271

15S

771

01

8206

7828

05/

14/2

014

21.8

5216

0.00

210

77L

S1

12

11

010

2114

S2

128

S2

01

8323

9798

05/

14/2

014

20.5

5215

8.70

227

77L

S1

12

11

027

21

S1

10

083

2477

250

5/16

/201

430

.323

168.

473

2777

MM

11

11

10

2714

1S

11

00

8224

7851

05/

26/2

014

22.0

5816

0.20

827

77L

S1

51

11

027

141

S2

10

283

6646

300

5/30

/201

417

.058

155.

208

141

R1

21

31

100

141

1N

28

1 4N

20

182

2478

520

6/8/

2014

28.8

5916

7.00

927

77R

S2

53

110

028

121

N29

10

283

7720

240

6/11

/201

421

.352

159.

502

2777

LS

25

31

10

273

1S

771

00

8366

4694

06/

12/2

014

14.9

7715

3.12

727

77R

S2

13

110

027

21

N30

10

083

6646

330

6/23

/201

420

.058

158.

208

977

LS

21

31

100

409

1S

11

00

8366

4772

06/

24/2

014

21.9

3516

0.08

527

77M

M1

51

11

027

141

S1

10

083

6647

730

6/29

/201

430

.996

169.

146

2777

L2

15

11

10

402

77S

261

1S

20

483

7539

240

6/30

/201

418

.85

157.

000

2777

MM

15

11

10

2719

1S

121

00

8366

4634

07/

8/20

1416

.058

154.

208

3077

MM

21

31

100

432

1S

11

00

8290

3544

07/

10/2

014

18.0

5815

6.20

839

77L

S2

13

11

039

131

S2

10

082

9035

450

7/18

/201

429

.058

167.

208

1477

LS

11

11

10

1421

1S

11

00

8379

7361

07/

19/2

014

17.9

6215

6.11

214

1R

11

11

11

01 4

11

N10

81

N2

06

8379

7365

07/

26/2

014

24.7

7616

2.92

627

77R

S2

23

110

042

11

S2

10

383

2477

300

7/27

/201

426

.323

164.

473

977

RS

15

11

10

421

1N

11

04

8379

7277

07/

27/2

014

30.0

5816

8.20

814

1L

21

11

11

014

141

S10

71

N2

00

8381

8692

07/

28/2

014

16.2

8115

4.43

127

77L

11

11

177

027

191

S77

10

182

2478

530

8/3/

2014

18.8

5615

7.00

627

77M

M2

12

110

09

11

S2

10

083

7720

310

8/16

/201

423

.35

161.

500

1477

LS

21

31

10

426

1S

1214

1S

20

183

7973

720

8/26

/201

424

.851

163.

001

977

MM

11

11

10

4313

1S

21

00

8379

7373

08/

26/2

014

29.3

7116

7.52

17

77R

21

11

11

07

01

S15

1S

20

083

6728

960

9/5/

2014

26.3

5116

4.50

114

1R

22

13

110

014

21

N10

91

N2

00

8199

9023

09/

13/2

014

17.5

9815

5.74

827

77M

M2

12

11

027

110

N6

10

183

1882

020

9/18

/201

419

.884

158.

034

977

LS

11

41

10

4014

1S

21

00

8366

4699

09/

24/2

014

23.3

2316

1.47

329

77R

S2

13

11

09

141

N1

10

083

8187

020

9/27

/201

429

.996

168.

146

2777

RS

13

11

10

271

1N

21

02

8367

4953

010

/9/2

014

20.8

3315

8.98

328

77R

S1

11

11

028

377

N30

10

083

7972

860

10/9

/201

419

.058

157.

208

2777

MM

15

11

10

271

1N

11

00

8366

4642

010

/12/

2014

26.8

5416

5.00

427

77M

M1

11

112

043

141

S1

10

083

7972

870

10/1

5/20

1431

.339

169.

489

141

R1

15

11

10

141

1N

28

1N

20

083

7045

530

10/1

8/20

1425

.058

163.

208

141

L2

15

11

10

142

1S

29

1S

20

882

9035

520

10/1

9/20

1424

.058

162.

208

144

R2

11

11

10

1410

6N

153

1N

20

083

7720

340

10/2

0/20

1423

.655

161.

805

1877

R1

11

11

10

90

1N

7715

1N

20

082

9035

530

10/2

2/20

1426

.323

164.

473

2977

MM

11

21

10

294

8O

10

083

7720

360

10/2

7/20

1416

.099

154.

249

144

R2

11

11

10

144

1N

212

1N

20

083

6647

010

10/3

1/20

1422

.323

160.

473

2777

R2

12

21

10

93

1N

1021

1N

20

083

1882

030

11/5

/201

429

.852

168.

002

577

LS

11

11

10

402

1S

21

00

8330

0704

011

/9/2

014

18.9

3515

7.08

527

77M

M2

13

14

027

11

S1

10

083

2398

080

11/1

8/20

1419

.31

157.

460

141

L2

15

21

11

142

1S

29

1S

20

383

7 972

910

11/2

1/20

1428

.058

166.

208

2777

MM

15

11

10

271

1N

11

01

8206

7835

011

/23/

2014

22.8

516

1.00

028

77L

S1

12

11

028

26

S2

10

083

6646

450

11/3

0/20

1420

.058

158.

208

3777

RS

11

11

10

421

1N

11

00

8370

4559

012

/2/2

014

30.8

5416

9.00

414

1R

22

13

110

014

11

N77

81

N2

02

8330

0711

012

/5/2

014

18.0

1115

6.16

114

1L

21

51

11

014

211

S2

211

S2

00

8377

4969

012

/5/2

014

30.0

5816

8.20

827

77M

M2

12

110

027

141

S29

10

1

Page 46: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8332

7481

012

/11/

2014

28.8

5316

7.00

31

77R

S1

11

11

042

191

N1

10

183

7466

250

12/1

5/20

1423

.323

161.

473

1377

R2

15

11

10

131

1N

11

00

8367

4955

012

/16/

2014

17.8

8615

6.03

628

77R

S1

51

11

028

74

S4

10

0

8317

7434

01/

1/20

1516

.058

154.

208

141

R2

21

31

10

142

1N

21

1N

20

083

1774

350

1/2/

2015

19.0

5815

7.20

814

1R

11

12

11

014

1414

N77

713

N2

00

8379

7300

01/

2/20

1516

.058

154.

208

3477

LS

21

31

10

3411

15W

121

00

8366

4704

01/

13/2

015

16.0

5815

4.20

89

77L

21

12

11

040

21

S77

10

1983

6646

500

1/18

/201

517

.058

155.

208

177

MM

11

11

10

4313

1N

11

01

8366

4651

01/

21/2

015

16.0

5815

4.20

830

77M

M1

41

11

043

141

N1

10

083

3274

890

1/31

/201

528

.853

167.

003

1777

L1

15

11

10

50

1S

772

1S

20

083

6646

520

2/13

/201

521

.852

160.

002

141

R2

15

11

10

00

00

914

N3

00

8366

4653

02/

14/2

015

21.8

5216

0.00

214

1L

21

51

11

014

11

S2

91

S2

00

8323

5638

02/

22/2

015

15.1

5815

3.30

814

3R

11

11

11

014

1317

N3

31

N3

00

8379

7395

02/

23/2

015

19.9

615

8.11

018

77L

11

11

11

018

181

S1

10

083

7466

290

2/28

/201

515

.115

153.

265

144

R2

21

21

10

141

6N

7710

1N

20

083

8146

190

3/7/

2015

31.0

5816

9.20

827

77L

21

12

11

09

06

S1

1S

20

083

7720

490

3/13

/201

527

.354

165.

504

2777

LS

25

21

10

273

1S

771

00

8323

5641

03/

16/2

015

20.8

3315

8.98

317

77L

21

11

112

017

151

S1

10

083

7466

330

3/23

/201

529

.323

167.

473

141

R2

15

21

10

141

1N

28

1N

20

383

7466

340

3/24

/201

514

.92

153.

070

3077

L1

21

21

10

301

17S

778

1S

30

283

6646

550

3/26

/201

526

.055

164.

205

977

RS

11

21

10

277

1N

771

00

8323

9821

03/

29/2

015

21.8

6716

0.01

727

77R

S1

12

11

027

141

S2

10

083

6646

580

3/29

/201

517

.055

155.

205

154

R1

11

11

10

155

0N

210

13N

20

083

7743

340

3/29

/201

521

.852

160.

002

1477

R1

15

11

10

1414

10N

772

1N

20

083

2002

940

4/1/

2015

15.0

6115

3.21

114

4R

11

51

11

014

121

N4

1N

20

282

0678

450

4/3/

2015

19.8

8415

8.03

414

1R

11

11

11

014

214

N2

914

N2

00

8332

7492

04/

3/20

1531

.856

170.

006

144

L1

11

11

10

1413

1S

293

1S

20

382

0938

770

4/14

/201

524

.323

162.

473

2777

LS

23

11

10

271

1S

21

00

8199

9033

04/

15/2

015

17.3

5715

5.50

732

77R

S1

11

11

042

81

N1

10

083

7720

540

4/19

/201

519

.384

157.

534

1477

R2

11

11

10

2713

1S

7714

1N

20

183

8 146

210

4/19

/201

518

.058

156.

208

2777

MM

25

21

10

2714

1S

21

00

8327

4832

05/

14/2

015

20.8

615

9.01

05

77R

21

11

11

040

181

S77

111

S2

00

8381

4622

05/

23/2

015

15.0

8615

3.23

627

77R

S1

51

11

027

11

N1

01

8367

2917

05/

24/2

015

28.3

5316

6.50

314

4R

21

12

11

09

477

S31

131

S2

01

8367

2918

05/

27/2

015

29.3

5216

7.50

215

1L

21

11

177

015

277

S2

913

S2

03

8370

1000

05/

27/2

015

28.3

5316

6.50

328

77M

M1

11

11

028

84

S4

10

083

2398

240

5/28

/201

523

.55

161.

700

141

L2

11

21

12

1421

1S

771

1S

21

484

5159

480

5/28

/201

518

.058

156.

208

273

MM

15

11

10

450

1N

211

N2

00

8451

5949

05/

31/2

015

15.0

8615

3.23

613

77L

21

51

11

013

11

S1

10

083

7720

570

6/2/

2015

18.7

5515

6.90

529

77L

S1

21

11

042

81

S77

10

083

6729

190

6/3/

2015

23.4

0516

1.55

528

88M

M1

51

11

028

010

U1

00

8206

7832

06/

13/2

015

20.3

8415

8.53

427

77M

M1

11

11

027

141

S2

10

083

6729

260

7/13

/201

524

.405

162.

555

1377

L2

15

11

110

131

1S

11

00

8206

7837

07/

18/2

015

21.8

5216

0.00

227

77L

11

12

11

027

91

S1

10

083

7466

410

7/18

/201

518

.03

156.

180

1877

RS

15

11

10

1821

1N

771

1N

20

083

6647

210

7/19

/201

515

.071

153.

221

1877

R2

15

21

120

1818

1N

11

01

8379

7314

07/

19/2

015

16.0

5815

4.20

818

77R

11

51

11

018

11

N1

10

083

7973

150

7/19

/201

517

.058

155.

208

1877

R1

15

11

10

1818

1N

11

00

8377

2062

07/

24/2

015

24.1

5516

2.30

514

4L

11

51

11

00

00

S3

1S

20

0

2015

Page 47: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Impa

ct

Type

Cod

e

Acci

dent

Si

de O

f Ro

ad

Lane

Of

Acci

dent

Co

de

Road

Su

rfac

e Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8377

2064

07/

28/2

015

26.6

0416

4.75

414

4L

11

51

11

014

211

S3

1S

20

082

0678

460

7/29

/201

517

.735

155.

885

2977

LS

21

31

100

2914

1S

11

00

8377

2068

08/

9/20

1524

.602

162.

752

2777

LS

15

11

10

271

1S

771

00

8374

6645

08/

16/2

015

25.3

2316

3.47

328

77M

M1

12

11

027

141

N25

10

083

7539

560

8/20

/201

517

.849

155.

999

141

L1

15

11

10

142

1S

298

1S

20

083

2852

210

8/21

/201

518

.35

156.

500

2977

R1

11

11

10

4018

1N

14

1N

20

283

2852

230

9/5/

2015

20.8

5215

9.00

227

77M

M2

13

110

027

16

N1 2

201

S2

01

8333

9221

09/

5/20

1520

.358

158.

508

2777

MM

21

21

100

271

1S

301

00

8367

2933

09/

5/20

1520

.352

158.

502

93

L2

21

31

100

91

11S

214

1S

20

183

7466

470

9/5/

2015

18.9

3515

7.08

527

77M

M2

13

11

027

81

N10

10

083

7539

580

9/9/

2015

31.8

5617

0.00

614

1R

11

51

11

214

106

N25

277

N2

00

8381

2091

09/

9/20

1520

.058

158.

208

1477

LS

188

771

10

144

1S

118

S2

00

8456

7548

09/

12/2

015

20.8

5215

9.00

218

77R

11

12

11

018

151

N1

10

083

8120

940

9/26

/201

519

.058

157.

208

1377

R2

12

11

10

131

1N

11

00

8367

2935

010

/7/2

015

20.8

5215

9.00

29

77M

M1

51

11

145

16

N2

10

183

3392

270

10/1

2/20

1531

.799

169.

949

143

R1

11

11

10

010

00

31

N2

00

8374

6650

010

/15/

2015

16.9

3515

5.08

59

77R

S1

11

11

040

31

N1

10

083

2852

270

10/1

7/20

1523

.323

161.

473

141

L1

15

11

10

1 41

1S

221

1S

20

083

3392

300

10/2

2/20

1527

.423

165.

573

1377

LS

11

11

10

132

1S

11

01

8367

2937

010

/25/

2015

17.3

5715

5.50

79

77M

M1

51

11

09

141

S2

10

084

8706

170

10/2

5/20

1522

.935

161.

085

141

L1

11

11

10

141

1S

28

1S

40

083

7466

540

10/3

0/20

1521

.935

160.

085

1877

L1

15

21

10

181

1S

11

00

8365

6739

011

/6/2

015

20.3

7715

8.52

79

77M

M1

11

11

040

141

N1

10

383

6567

420

11/1

3/20

1527

.223

165.

373

2977

LS

21

31

100

422

1S

261

00

8367

2942

011

/17/

2015

21.3

5215

9.50

214

4L

22

53

188

014

088

U13

1S

20

383

6729

430

11/1

9/20

1515

.347

153.

497

477

R2

25

31

100

46

15N

121

01

8328

5230

011

/27/

2015

16.9

8115

5.13

136

77M

M1

12

11

027

114

N2

10

083

2852

310

11/2

8/20

1515

.158

153.

308

144

R1

11

11

10

1413

6N

34

1N

30

083

7 466

650

11/3

0/20

1529

.323

167.

473

2777

LS

21

21

10

2714

1S

771

00

8370

6455

012

/3/2

015

14.9

1515

3.06

59

77M

M2

43

110

030

11

S29

10

083

7545

290

12/3

/201

518

.935

157.

085

2977

LS

21

21

100

422

5S

301

00

8370

6456

012

/4/2

015

31.2

8216

9.43

214

4R

12

52

11

014

1277

N25

411

N2

00

8374

6666

012

/7/2

015

26.3

2316

4.47

327

77R

S1

12

11

027

177

S1

10

083

7545

310

12/1

0/20

1531

.496

169.

646

977

RS

11

11

10

4010

1N

291

01

8375

4536

012

/18/

2015

29.8

5216

8.00

29

77R

S2

52

110

09

31

N2

10

285

1373

610

12/2

2/20

1517

.963

156.

113

2777

MM

11

11

10

431

1S

261

01

8524

7997

012

/24/

2015

28.8

5316

7.00

314

88R

11

31

11

014

11

N1

10

083

8180

360

12/2

5/20

1527

.228

165.

378

2777

MM

11

11

10

279

15S

7710

15S

20

1

Page 48: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix G Cost Estimate

Page 49: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

PAY

ITEM

NUM

BER

ITEM

DES

CRIP

TIO

NUN

ITUN

IT P

RICE

QUA

NTIT

YCO

ST11

0-1-

1CL

EARI

NG A

ND G

RUBB

ING

AC5,

250.

00$

4.60

24

,150

.00

$

11

0-3

REM

OVA

L OF

EXIS

ITNG

BRI

DGES

SF35

.00

$

21

,315

.00

746,

025.

00$

110-

4-10

REM

OVA

L OF

EXIS

ITNG

CO

NCRE

TESY

20.0

0$

910

18,2

00.0

0$

120-

6EM

BANK

MEN

TCY

6.25

$

3,08

5

19,2

81.2

5$

160-

4TY

PE B

STA

BILI

ZATI

ON

SY3.

25$

10

,600

34,4

50.0

0$

285-

701

OPT

IONA

L BAS

E GR

OUP

1SY

7.50

$

4,24

0

31,8

00.0

0$

285-

706

OPT

IONA

L BAS

E GR

OUP

6SY

15.0

0$

6,36

0

95,4

00.0

0$

334-

1SU

PERP

AVE

ASPH

ALTI

C CO

NCRE

TETN

95.0

0$

465.

0

44,1

75.0

0$

339-

1M

ISCE

LLAE

OUS

ASP

HALT

PAV

EMEN

TTN

210.

00$

14

6.0

30

,660

.00

$

42

5-11

MO

DIFY

EXI

STIN

G DR

AINA

GE S

TRUC

TURE

EA2,

500.

00$

4

10,0

00.0

0$

520-

6SH

OUL

DER

GUTT

ER -

CONC

RETE

LF20

.00

$

4,

770

95

,400

.00

$

53

6-1-

1GU

ARDR

AIL

LF18

.00

$

4,

770

85

,860

.00

$

57

0-1-

2PE

RFO

RMAN

CE T

URF,

SO

DSY

2.

50$

6,

360

15

,900

.00

$

BR

IDGE

REP

LACE

MEN

TSF

150.

00$

24

,860

3,72

9,04

0.00

$

101-

1M

OBI

LIZA

TIO

N10

2-1

MAI

NTEN

ANCE

OF

TRAF

FIC

CONT

INGE

NCY

Cons

truc

tion

Cost

Est

imat

e fo

r Brid

ge R

econ

stru

ctio

nTu

rnpi

ke M

ainl

ine

(SR

91) R

esur

faci

ng a

nd S

afet

y Im

prov

emen

ts

from

MM

153

.230

to M

M 1

69.3

20St

. Luc

ie C

ount

y, F

lorid

a FP

ID N

umbe

rs 4

3651

7-1-

52-0

1 an

d 43

6517

-3-5

2-01

Cont

ract

Num

ber C

9R86 To

tal C

ost

7,22

1,49

4.81

$

Subt

otal

4,98

0,34

1.25

$

10

%

UTIL

ITY

IMPA

CTS

498,

034.

13$

10%

10%

10%

498,

034.

13$

-$

49

8,03

4.13

$

P.

E.C.

E.I.

15%

747,

051.

19$

Page 50: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

PAY

ITEM

NUM

BER

ITEM

DES

CRIP

TIO

NUN

ITUN

IT P

RICE

QUA

NTIT

YCO

ST11

0-1-

1CL

EARI

NG A

ND G

RUBB

ING

AC5,

250.

00$

4.60

24

,150

.00

$

11

0-4-

10RE

MO

VAL O

F EX

ISIT

NG C

ONC

RETE

SY20

.00

$

91

0

18

,200

.00

$

12

0-6

EMBA

NKM

ENT

CY6.

25$

3,

085

19

,281

.25

$

16

0-4

TYPE

B S

TABI

LIZA

TIO

NSY

3.25

$

10,6

00

34

,450

.00

$

28

5-70

1O

PTIO

NAL B

ASE

GRO

UP 1

SY7.

50$

4,

240

31

,800

.00

$

28

5-70

6O

PTIO

NAL B

ASE

GRO

UP 6

SY15

.00

$

6,

360

95

,400

.00

$

33

4-1

SUPE

RPAV

E AS

PHAL

TIC

CONC

RETE

TN95

.00

$

46

5.0

44

,175

.00

$

33

9-1

MIS

CELL

AEO

US A

SPHA

LT P

AVEM

ENT

TN21

0.00

$

146.

0

30,6

60.0

0$

425-

11M

ODI

FY E

XIST

ING

DRAI

NAGE

STR

UCTU

REEA

2,50

0.00

$

4

10

,000

.00

$

52

0-6

SHO

ULDE

R GU

TTER

- CO

NCRE

TELF

20.0

0$

4,77

0

95,4

00.0

0$

536-

1-1

GUAR

DRAI

LLF

18.0

0$

4,77

0

85,8

60.0

0$

570-

1-2

PERF

ORM

ANCE

TUR

F, S

OD

SY

2.50

$

6,36

0

15,9

00.0

0$

*BR

IDGE

JACK

ING

1,16

6,00

0.00

$

101-

1M

OBI

LIZA

TIO

N10

2-1

MAI

NTEN

ANCE

OF

TRAF

FIC

250,

691.

44$

Tota

l Cos

t2,

423,

350.

56$

* Th

e ap

proa

ch to

det

erm

ine

the

cost

was

bas

ed o

n a

proj

ect w

here

jack

ing

oper

atio

n w

as n

eede

d fo

r a fo

ur sp

an b

ridge

with

3 n

ight

s of

oper

atio

n to

jack

2" r

angi

ng fr

om $

250k

to $

500k

. Cos

ts a

lso in

clude

subs

truc

ture

reha

bilit

atio

n (i.

e. p

edes

tal r

etro

fits)

.

10%

167,

127.

63$

Cons

truc

tion

Cost

Est

imat

e fo

r Brid

ge Ja

ckin

gTu

rnpi

ke M

ainl

ine

(SR

91) R

esur

faci

ng a

nd S

afet

y Im

prov

emen

ts

from

MM

153

.230

to M

M 1

69.3

20St

. Luc

ie C

ount

y, F

lorid

a FP

ID N

umbe

rs 4

3651

7-1-

52-0

1 an

d 43

6517

-3-5

2-01

Cont

ract

Num

ber C

9R86 Su

btot

al1,

671,

276.

25$

10%

167,

127.

63$

UTIL

ITY

IMPA

CTS

10%

-$

CO

NTIN

GENC

Y10

%16

7,12

7.63

$

P.

E.C.

E.I.

15%

Page 51: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

PAY

ITEM

NUM

BER

ITEM

DES

CRIP

TIO

NUN

ITUN

IT P

RICE

QUA

NTIT

YCO

ST11

0-1-

1CL

EARI

NG

AND

GRUB

BIN

GAC

5,25

0.00

$

5.

30

27,8

25.0

0$

120-

6EX

CAVA

TIO

NCY

6.25

$

9,28

0

58,0

00.0

0$

160-

4TY

PE B

STA

BILI

ZATI

ON

SY3.

25$

11

,750

38,1

87.5

0$

285-

701

OPT

ION

AL B

ASE

GRO

UP 1

SY7.

50$

5,

340

40

,050

.00

$

28

5-70

9O

PTIO

NAL

BAS

E GR

OUP

9SY

18.0

0$

6,41

0

115,

380.

00$

334-

1SU

PERP

AVE

ASPH

ALTI

C CO

NCR

ETE

TN95

.00

$

2,

600.

0

247,

000.

00$

339-

1M

ISCE

LLAE

OUS

ASP

HALT

PAV

EMEN

TTN

210.

00$

14

6.0

30

,660

.00

$

53

6-1-

1GU

ARDR

AIL

LF18

.00

$

90

0

16

,200

.00

$

57

0-1-

2PE

RFO

RMAN

CE T

URF,

SO

DSY

2.

50$

10

,410

26,0

25.0

0$

101-

1M

OBI

LIZA

TIO

N10

2-1

MAI

NTE

NAN

CE O

F TR

AFFI

C

P.E.

C.E.

I.15

%89

,899

.13

$

Tota

l Cos

t86

9,02

4.88

$

UTIL

ITY

IMPA

CTS

10%

-$

CO

NTI

NGE

NCY

10%

59,9

32.7

5$

10%

59,9

32.7

5$

Cons

truc

tion

Cost

Est

imat

e fo

r Low

erin

g SR

91

Turn

pike

Mai

nlin

e (S

R 91

) Res

urfa

cing

and

Saf

ety

Impr

ovem

ents

fr

om M

M 1

53.2

30 to

MM

169

.320

St. L

ucie

Cou

nty,

Flo

rida

FPID

Num

bers

436

517-

1-52

-01

and

4365

17-3

-52-

01Co

ntra

ct N

umbe

r C9R

86 Subt

otal

599,

327.

50$

10

%59

,932

.75

$

Page 52: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix H Project Schedule

Page 53: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Activ

ity ID

PSM

Activ

ity N

ame

Orig Dur

Rem Dur

Star

tFi

nish

Dur

atio

n %

Com

plet

eC

alen

dar

Tota

lFl

oat

Free

Floa

t

4365

17-1

RES

4365

17-1

RES

UR

FAC

4365

17-1

RES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST

LUC

IE C

OU

NTY

, (M

P 15

3.23

- 16

9.32

)71

933

605

-Sep

-15

A01

-Jul

-18

53.2

7%0

0

RESU

RFAC

E TP

RESU

RFAC

E TP

K M

AIRE

SURF

ACE

TPK

MAI

NLIN

E IN

ST.

LUC

IE C

OUN

TY, M

P 15

3.23

- 16

9.32

719

336

05-S

ep-1

5 A

01-J

ul-1

853

.27%

00

PE -

DES

IGN

PE -

DES

IGN

PE -

DES

IGN

534

151

05-S

ep-1

5 A

09-O

ct-1

771

.72%

185

0

PUB

LIC

INVO

LVPU

BLI

C IN

VOLV

EMEN

PUB

LIC

INVO

LVEM

ENT

66

24-A

pr-1

701

-May

-17

0%5-

Day

293

0R

3610

020

610

CO

OR

DIN

ATE

W/ E

MO

REG

ARD

ING

PU

BLIC

INVO

LVEM

ENT

55

24-A

pr-1

7*28

-Apr

-17

0%5-

Day

293

0R

3610

030

610

DO

CU

MEN

T PR

OPO

SED

PU

BLIC

INVO

LVEM

ENT

ACTI

VITI

ES1

101

-May

-17

01-M

ay-1

70%

5-D

ay29

329

3

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

SCO

PFI

NAL

DES

IGN

- SC

OPE

OF

SER

VIC

ES &

MH

EST

IMAT

E67

005

-Sep

-15

A10

-Dec

-15

A10

0%0

R31

6400

016

4PR

EPAR

E D

RAF

T SC

OPE

OF

SER

VIC

ES -

Obt

ain

Scop

e Te

mpl

, dev

el d

raft

SOS

160

05-S

ep-1

5 A

20-S

ep-1

5 A

100%

7 D

ayR

3724

420

724

DIS

CIP

LIN

E R

EVIE

W D

RAF

T SO

S - D

EVEL

OP

MH

EST

IMAT

ES6

006

-Oct

-15

A12

-Oct

-15

A10

0%5-

Day

R39

9002

072

4R

EQU

EST

CR

ASH

DAT

A FR

OM

TR

AFFI

C O

PS1

015

-Oct

-15

A15

-Oct

-15

A10

0%5-

Day

R37

2443

072

4R

EVIS

E D

RAF

T SC

OPE

OF

SER

VIC

ES5

018

-Nov

-15

A22

-Nov

-15

A10

0%7

Day

R37

2444

072

4D

ISC

IPLI

NES

REV

IEW

PR

E-FI

NAL

SO

S6

020

-Nov

-15

A01

-Dec

-15

A10

0%5-

Day

R31

6410

016

4FI

NAL

IZE

SCO

PE O

F SE

RVI

CES

/MAN

HO

UR

EST

IMAT

E5

004

-Dec

-15

A10

-Dec

-15

A10

0%5-

Day

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

CO

NS

FIN

AL D

ESIG

N -

CO

NSU

LTAN

T C

ON

TRAC

T AC

QUIS

ITIO

N21

40

04-J

an-1

6 A

01-N

ov-1

6 A

100%

0R

3724

101

724

CO

NFI

RM

AD

INFO

RM

ATIO

N (M

ajor

& M

inor

Wor

k Ty

pes

Verif

ied)

50

04-J

an-1

6 A

08-J

an-1

6 A

100%

5-D

ayR

3724

105

724

MEE

T W

ITH

TR

C/T

RC

KIC

KOFF

MEE

TIN

G1

009

-Jan

-16

A09

-Jan

-16

A10

0%7

Day

R37

2408

072

4TP

K R

EVIE

W F

INAL

DR

AFT

SOS

(Kat

hy/B

riann

a)5

011

-Jan

-16

A15

-Jan

-16

A10

0%7

Day

R37

2409

072

4SU

BMIT

FIN

AL D

RAF

T SO

S TO

PSU

10

18-J

an-1

6 A

18-J

an-1

6 A

100%

7 D

ayR

3724

100

724

POST

PLA

NN

ED A

D O

N F

DO

T W

EB S

ITE

*1

025

-Jan

-16

A25

-Jan

-16

A10

0%M

onR

3990

000

990

DES

IGN

CO

NSU

LTAN

T C

ON

TRAC

T AC

QU

ISIT

ION

(H

amm

ock)

198

025

-Jan

-16

A01

-Nov

-16

A10

0%5-

Day

R37

2420

572

4H

OLD

TEC

H P

ANEL

MEE

TIN

GS

*2

004

-Feb

-16

A05

-Feb

-16

A10

0%5-

Day

R32

3210

023

2FO

RM

AL A

D A

PPEA

RS

ON

FD

OT

WEB

PAG

E (C

one

of S

ilenc

e)*

10

22-F

eb-1

6 A

22-F

eb-1

6 A

100%

Mon

R39

9005

072

4LE

TTER

S O

F R

ESPO

NSE

LO

Rs

DU

E D

ATE

*1

007

-Mar

-16

A07

-Mar

-16

A10

0%M

onR

3724

130

724

PREP

ARE

LON

G L

IST

PAC

KAG

E *

50

08-M

ar-1

6 A

14-M

ar-1

6 A

100%

5-D

ayR

3724

140

724

TEC

H. R

EV. C

OM

MIT

TEE

EVAL

UAT

E LO

NG

LIS

T PK

G. *

50

15-M

ar-1

6 A

21-M

ar-1

6 A

100%

5-D

ayR

3990

040

724

LON

GLI

ST T

RC

MEE

TIN

G *

10

28-M

ar-1

6 A

28-M

ar-1

6 A

100%

Mon

R34

0110

040

1SE

LEC

TIO

N C

OM

MIT

TEE

SHO

RT

LIST

CO

NSU

LTAN

TS *

10

08-A

pr-1

6 A

08-A

pr-1

6 A

100%

Fri

R37

2418

072

4SE

ND

RFP

*1

018

-Apr

-16

A18

-Apr

-16

A10

0%M

onR

3230

000

230

SCO

PE O

F SE

RVI

CES

MEE

TIN

G (

Shor

tlist F

irms)

*1

025

-Apr

-16

A25

-Apr

-16

A10

0%M

onR

3990

060

230

DEA

DLI

NE

FOR

TEC

HIN

ICAL

QU

ESTI

ON

S *

10

02-M

ay-1

6 A

02-M

ay-1

6 A

100%

Mon

R39

9007

023

0C

ON

SULT

ANT

PAC

KETS

DU

E *

10

09-M

ay-1

6 A

09-M

ay-1

6 A

100%

Mon

R32

4900

024

9R

ECV.

WR

ITTE

N P

RO

POSA

LS/C

ON

DU

CT

OR

AL T

ECH

NIC

ALS

*1

027

-May

-16

A27

-May

-16

A10

0%Fr

iR

3724

220

724

TEC

HN

ICAL

EVA

LUAT

ION

*2

027

-May

-16

A31

-May

-16

A10

0%5-

Day

R39

9008

072

4TR

C S

CO

RES

DU

E *

10

03-J

un-1

6 A

03-J

un-1

6 A

100%

Fri

R34

0210

040

2FI

NAL

SEL

ECTI

ON

CO

MM

ITTE

E M

EETI

NG

S *

10

13-J

un-1

6 A

13-J

un-1

6 A

100%

Mon

R37

2433

072

4PR

EPAR

E C

ON

TRAC

T50

022

-Jun

-16

A31

-Aug

-16

A10

0%5-

Day

R37

2429

572

4SC

OPE

CLA

RIF

ICAT

ION

MEE

TIN

G1

029

-Jun

-16

A29

-Jun

-16

A10

0%5-

Day

R37

2402

072

4U

NIT

S M

EETI

NG

10

14-J

ul-1

6 A

14-J

ul-1

6 A

100%

5-D

ayR

3724

300

724

STAF

FHO

UR

NEG

OTI

ATIO

NS

MEE

TIN

GS

10

15-A

ug-1

6 A

15-A

ug-1

6 A

100%

5-D

ayR

3724

310

724

CO

NSU

LTAN

T SU

BMIT

FIN

AL P

RIC

E PR

OPO

SAL/

AUD

IT P

KG5

025

-Aug

-16

A31

-Aug

-16

A10

0%5-

Day

R37

2432

072

4PR

E-AW

ARD

AU

DIT

EVA

LUAT

ION

30

01-S

ep-1

6 A

06-S

ep-1

6 A

100%

5-D

ayR

3990

100

990

AWAR

D C

ON

TRAC

T

(Ham

moc

k)43

001

-Sep

-16

A01

-Nov

-16

A10

0%5-

Day

R37

2433

572

4TU

RN

PIKE

LEG

AL R

EVIE

W C

ON

TRAC

T1

014

-Oct

-16

A14

-Oct

-16

A10

0%5-

Day

R37

2434

072

4SE

ND

CO

NTR

ACT

TO C

ON

SULT

ANT

50

24-O

ct-1

6 A

28-O

ct-1

6 A

100%

5-D

ayR

3299

000

299

REQ

UES

T FU

ND

S1

027

-Oct

-16

A27

-Oct

-16

A10

0%5-

Day

R37

2436

072

4R

ECEI

VED

SIG

NED

CO

NTR

ACT

10

31-O

ct-1

6 A

31-O

ct-1

6 A

100%

5-D

ayR

3233

000

233

EXEC

UTE

CO

NTR

ACT

(DES

IGN

)1

001

-Nov

-16

A01

-Nov

-16

A10

0%5-

Day

PAVE

MEN

T D

EPA

VEM

ENT

DES

IGN

PK

PAVE

MEN

T D

ESIG

N P

KG

& T

YPIC

AL S

ECTI

ON

149

3421

-Sep

-16

A24

-Apr

-17

77.1

8%5-

Day

200

R31

9710

019

7R

EQU

EST

ESAL

(18

KIP)

CAL

CU

LATI

ON

S &

TRAF

FIC

DAT

AFR

OM

PLA

NN

ING

10

21-S

ep-1

6 A

21-S

ep-1

6 A

100%

5-D

ayR

3257

000

257

REC

EIPT

OF

ESAL

& T

RAF

FIC

DAT

A FR

OM

PLA

NN

ING

10

27-O

ct-1

6 A

27-O

ct-1

6 A

100%

5-D

ayR

3106

100

106

DES

IGN

SU

RVE

Y22

002

-Nov

-16

A05

-Dec

-16

A10

0%5-

Day

R31

0203

010

2LA

NE

CLO

SUR

E AN

ALYS

IS/4

5% T

CP

MEE

TIN

G1

007

-Mar

-17

A07

-Mar

-17

A10

0%5-

Day

EXC

EPTI

ON

S EX

CEP

TIO

NS

& V

ARIA

EXC

EPTI

ON

S &

VAR

IATI

ON

S11

134

14-N

ov-1

6 A

24-A

pr-1

769

.37%

5-D

ay20

0

R32

9401

029

4PR

EPAR

E D

RAF

T D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

200

14-N

ov-1

6 A

13-D

ec-1

6 A

100%

5-D

ayR

3294

030

294

REV

IEW

DR

AFT

DES

IGN

EXC

EPTI

ON

S, V

ARIA

TIO

NS

& TE

CH

MEM

O15

014

-Dec

-16

A06

-Jan

-17

A10

0%5-

Day

R32

9404

029

4PR

EPAR

E FI

NAL

DES

IGN

EXC

EPTI

ON

S, V

ARIA

TIO

NS

& TE

CH

MEM

O60

1809

-Jan

-17

A31

-Mar

-17

70%

5-D

ay20

0R

3294

050

294

REV

IEW

FIN

AL D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

1515

03-A

pr-1

721

-Apr

-17

0%5-

Day

200

R31

9721

019

7SU

BMIT

SIG

N &

SEA

LED

EXC

EPTI

ON

S, V

ARIA

TIO

NS,

& T

ECH

MEM

O &

APP

RO

VE1

124

-Apr

-17

24-A

pr-1

70%

5-D

ay20

0

PAVE

MEN

T D

EPA

VEM

ENT

DES

IGN

PAVE

MEN

T D

ESIG

N87

606

-Dec

-16

A10

-Apr

-17

93.1

%5-

Day

300

R31

9700

019

7PR

EPAR

E D

RAF

T PA

VEM

ENT

DES

IGN

200

06-D

ec-1

6 A

05-J

an-1

7 A

100%

5-D

ayR

3197

060

260

REV

IEW

DR

AFT

PAVE

MEN

T D

ESIG

N15

006

-Jan

-17

A26

-Jan

-17

A10

0%5-

Day

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JFM

2016

2017

2018

2019

2020

2021

CO

OR

DIN

ATE

W/ E

MO

REG

ARD

ING

PU

BLIC

INVO

LVEM

ENT

DO

CU

MEN

T PR

OPO

SED

PU

BLIC

INVO

LVEM

ENT

ACTI

VITI

ES

PREP

ARE

DR

AFT

SCO

PE O

F SE

RVI

CES

- O

btai

n Sc

ope

Tem

pl, d

evel

dra

ft SO

SD

ISC

IPLI

NE

REV

IEW

DR

AFT

SOS

- DEV

ELO

P M

H E

STIM

ATES

REQ

UES

T C

RAS

H D

ATA

FRO

M T

RAF

FIC

OPS

REV

ISE

DR

AFT

SCO

PE O

F SE

RVI

CES

DIS

CIP

LIN

ES R

EVIE

W P

RE-

FIN

AL S

OS

FIN

ALIZ

E SC

OPE

OF

SER

VIC

ES/M

ANH

OU

R E

STIM

ATE

CO

NFI

RM

AD

INFO

RM

ATIO

N (M

ajor

& M

inor

Wor

k Ty

pes

Verif

ied)

MEE

T W

ITH

TR

C/T

RC

KIC

KOFF

MEE

TIN

GTP

K R

EVIE

W F

INAL

DR

AFT

SOS

(Kat

hy/B

riann

a)SU

BMIT

FIN

AL D

RAF

T SO

S TO

PSU

POST

PLA

NN

ED A

D O

N F

DO

T W

EB S

ITE

*D

ESIG

N C

ON

SULT

ANT

CO

NTR

ACT

ACQ

UIS

ITIO

N

(Ham

moc

k)H

OLD

TEC

H P

ANEL

MEE

TIN

GS

*FO

RM

AL A

D A

PPEA

RS

ON

FD

OT

WEB

PAG

E (C

one

of S

ilenc

e)*

LETT

ERS

OF

RES

PON

SE L

OR

s D

UE

DAT

E *

PREP

ARE

LON

G L

IST

PAC

KAG

E *

TEC

H. R

EV. C

OM

MIT

TEE

EVAL

UAT

E LO

NG

LIS

T PK

G. *

LON

GLI

ST T

RC

MEE

TIN

G *

SELE

CTI

ON

CO

MM

ITTE

E SH

OR

T LI

ST C

ON

SULT

ANTS

*SE

ND

RFP

*SC

OPE

OF

SER

VIC

ES M

EETI

NG

(Sh

ortlis

t Firm

s) *

DEA

DLI

NE

FOR

TEC

HIN

ICAL

QU

ESTI

ON

S *

CO

NSU

LTAN

T PA

CKE

TS D

UE

*R

ECV.

WR

ITTE

N P

RO

POSA

LS/C

ON

DU

CT

OR

AL T

ECH

NIC

ALS

*TE

CH

NIC

AL E

VALU

ATIO

N *

TRC

SC

OR

ES D

UE

*FI

NAL

SEL

ECTI

ON

CO

MM

ITTE

E M

EETI

NG

S *

PREP

ARE

CO

NTR

ACT

SCO

PE C

LAR

IFIC

ATIO

N M

EETI

NG

UN

ITS

MEE

TIN

GST

AFFH

OU

R N

EGO

TIAT

ION

S M

EETI

NG

SC

ON

SULT

ANT

SUBM

IT F

INAL

PR

ICE

PRO

POSA

L/AU

DIT

PKG

PRE-

AWAR

D A

UD

IT E

VALU

ATIO

NAW

ARD

CO

NTR

ACT

(H

amm

ock)

TUR

NPI

KE L

EGAL

REV

IEW

CO

NTR

ACT

SEN

D C

ON

TRAC

T TO

CO

NSU

LTAN

TR

EQU

EST

FUN

DS

REC

EIVE

D S

IGN

ED C

ON

TRAC

TEX

ECU

TE C

ON

TRAC

T (D

ESIG

N)

REQ

UES

T ES

AL (1

8 KI

P) C

ALC

ULA

TIO

NS

& TR

AFFI

C D

ATAF

RO

M P

LAN

NIN

GR

ECEI

PT O

F ES

AL &

TR

AFFI

C D

ATA

FRO

M P

LAN

NIN

GD

ESIG

N S

UR

VEY

LAN

E C

LOSU

RE

ANAL

YSIS

/45%

TC

P M

EETI

NG

PREP

ARE

DR

AFT

DES

IGN

EXC

EPTI

ON

S, V

ARIA

TIO

NS

& TE

CH

MEM

OR

EVIE

W D

RAF

T D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

PREP

ARE

FIN

AL D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

REV

IEW

FIN

AL D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

SUBM

IT S

IGN

& S

EALE

D E

XCEP

TIO

NS,

VAR

IATI

ON

S, &

TEC

H M

EMO

& A

PPR

OVE

PREP

ARE

DR

AFT

PAVE

MEN

T D

ESIG

NR

EVIE

W D

RAF

T PA

VEM

ENT

DES

IGN

4365

17-1

ReD

oRES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST.

LU

CIE

CO

UN

TY, M

P 15

3.23

- 16

9.32

Dat

a D

ate:

07-

Mar

-17

P

age

1 of

3

R

un D

ate:

29-

Mar

-17

Rem

aini

ng L

evel

of E

ffort

Actu

al L

evel

of E

ffort

Rem

aini

ng W

ork

Actu

al W

ork

Crit

ical

Rem

aini

ng W

ork

Layo

ut: ~

Proj

ect S

ched

ule_

1 F

ilter

s: T

ASK

filte

r: Al

l Act

iviti

es©

Prim

aver

a S

yste

ms,

Inc.

Page 54: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Activ

ity ID

PSM

Activ

ity N

ame

Orig Dur

Rem Dur

Star

tFi

nish

Dur

atio

n %

Com

plet

eC

alen

dar

Tota

lFl

oat

Free

Floa

t

R31

9703

019

7PR

EPAR

E FI

NAL

PAV

EMEN

T D

ESIG

N9

027

-Jan

-17

A08

-Feb

-17

A10

0%5-

Day

R31

9707

026

0R

EVIE

W F

INAL

PAV

EMEN

T D

ESIG

N5

503

-Apr

-17

07-A

pr-1

70%

5-D

ay30

0R

3197

200

197

SUBM

IT F

INAL

SIG

N &

SEA

LED

PAV

EMEN

T D

ESIG

N &

APPR

OVE

11

10-A

pr-1

710

-Apr

-17

0%5-

Day

300

TYPI

CAL

SEC

TTY

PIC

AL S

ECTI

ON

TYPI

CAL

SEC

TIO

N87

2406

-Dec

-16

A10

-Apr

-17

72.4

1%5-

Day

300

R32

6001

026

0PR

EPAR

E D

RAF

T TY

PIC

AL S

ECTI

ON

S19

006

-Dec

-16

A04

-Jan

-17

A10

0%5-

Day

R32

6000

026

0R

EVIE

W D

RAF

T TY

PIC

AL S

ECTI

ON

S15

005

-Jan

-17

A25

-Jan

-17

A10

0%5-

Day

R32

6003

026

0PR

EPAR

E FI

NAL

TYP

ICAL

SEC

TIO

NS

60

26-J

an-1

7 A

02-F

eb-1

7 A

100%

5-D

ayR

3260

040

260

REV

IEW

FIN

AL T

YPIC

AL S

ECTI

ON

S40

1703

-Feb

-17

A30

-Mar

-17

57.5

%5-

Day

366

R32

6005

026

0SU

BMIT

FIN

AL S

IGN

& S

EALE

D T

YPIC

AL S

ECTI

ON

S &

APPR

OVE

11

10-A

pr-1

710

-Apr

-17

0%5-

Day

3010

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

RO

ADFI

NAL

DES

IGN

- R

OAD

WAY

230

145

02-N

ov-1

6 A

29-S

ep-1

736

.96%

5-D

ay18

70

R32

3410

023

4IS

SUE

NTP

AN

D S

CH

EDU

LE K

ICKO

FF M

TG (D

ESIG

N)

10

02-N

ov-1

6 A

02-N

ov-1

6 A

100%

5-D

ayR

3990

090

168

CO

NSU

LTAN

T SU

BMIT

QC

PLA

N1

011

-Nov

-16

A11

-Nov

-16

A10

0%5-

Day

R36

1005

029

0PM

LET

TER

TO

PIO

w/L

ETTI

NG

DAT

E &

CO

NST

. DU

R.10

1019

-Jul

-17

01-A

ug-1

70%

5-D

ay65

45R

3380

000

380

PRO

DU

CTI

ON

REA

DY

55

25-S

ep-1

729

-Sep

-17

0%5-

Day

200

60%

DES

IGN

60%

DES

IGN

60%

DES

IGN

7857

07-F

eb-1

7 A

25-M

ay-1

726

.92%

5-D

ay27

50

R31

1310

011

3PR

EPAR

E 60

% P

LAN

S54

3307

-Feb

-17

A21

-Apr

-17

38.8

9%5-

Day

200

R31

6810

016

8Q

A/Q

C A

UD

IT (6

0% P

LAN

S)1

124

-Apr

-17

24-A

pr-1

70%

5-D

ay20

0R

3235

200

235

CO

NSU

LTAN

T SU

BMIT

60%

PLA

NS

FOR

REV

IEW

11

25-A

pr-1

725

-Apr

-17

0%5-

Day

200

R33

0296

030

2C

ENTR

AL O

FFIC

E R

EVIE

W T

TMS

1010

26-A

pr-1

709

-May

-17

0%5-

Day

255

R34

6525

046

5Q

UAN

TITI

ES A

ND

REQ

UES

T FO

R IN

FO T

O C

ON

STR

UC

TIO

N1

126

-Apr

-17

26-A

pr-1

70%

5-D

ay25

0R

3302

002

302

REV

IEW

60%

PAY

ITEM

LIS

T10

1026

-Apr

-17

09-M

ay-1

70%

5-D

ay31

11R

3302

900

302

REV

IEW

60%

PLA

NS

1515

26-A

pr-1

716

-May

-17

0%5-

Day

200

R35

0719

150

7PR

EPAR

E C

ON

STR

UC

TIO

N D

UR

SC

HED

ULE

(CO

NST

RU

CTI

ON

)15

1527

-Apr

-17

17-M

ay-1

70%

5-D

ay25

5R

3302

100

302

SUBM

IT 6

0% C

OM

MEN

TS T

O C

ON

SULT

ANT

11

17-M

ay-1

717

-May

-17

0%5-

Day

200

R35

2200

552

2R

EVIS

E 60

% P

LAN

SH

EETS

FO

R U

TILI

TIES

55

18-M

ay-1

724

-May

-17

0%5-

Day

276

276

R31

6910

016

9FI

ELD

REV

IEW

11

18-M

ay-1

718

-May

-17

0%5-

Day

200

R31

6915

016

9IN

CO

RPO

RAT

E C

OM

MEN

TS F

RO

M F

IELD

REV

IEW

55

19-M

ay-1

725

-May

-17

0%5-

Day

200

100%

DES

IGN

100%

DES

IGN

100%

DES

IGN

3838

25-M

ay-1

718

-Jul

-17

0%5-

Day

340

R31

1330

011

3PR

EPAR

E 10

0% P

LAN

S20

2025

-May

-17

22-J

un-1

70%

5-D

ay20

0R

3235

400

235

CO

NSU

LTAN

T SU

BMIT

100

% P

LAN

S FO

R R

EVIE

W1

126

-Jun

-17

26-J

un-1

70%

5-D

ay34

0R

3310

910

310

CEN

TRAL

OFF

ICE

REV

IEW

TTM

S15

1527

-Jun

-17

17-J

ul-1

70%

5-D

ay34

0R

3310

002

310

REV

IEW

100

% P

LAN

SU

MM

ARY

BOXE

S15

1527

-Jun

-17

17-J

ul-1

70%

5-D

ay34

0R

3310

900

310

REV

IEW

100

% P

LAN

S15

1527

-Jun

-17

17-J

ul-1

70%

5-D

ay34

0R

3310

100

310

SUBM

IT 1

00%

CO

MM

ENTS

TO

CO

NSU

LTAN

T1

118

-Jul

-17

18-J

ul-1

70%

5-D

ay34

0

FIN

AL -

SIG

NE

FIN

AL -

SIG

NED

& S

EFI

NAL

- SI

GN

ED &

SEA

LED

3232

19-J

ul-1

731

-Aug

-17

0%5-

Day

340

R31

1340

011

3PR

EPAR

E FI

NAL

PLA

NS

1515

19-J

ul-1

708

-Aug

-17

0%5-

Day

340

R31

9004

011

3C

ON

SULT

ANT

SUBM

IT F

INAL

PLA

NS

11

09-A

ug-1

709

-Aug

-17

0%5-

Day

340

R32

4500

024

5FI

NAL

PLA

NS

REV

IEW

55

10-A

ug-1

716

-Aug

-17

0%5-

Day

340

R32

4510

024

5IN

CO

RPO

RAT

E FI

NAL

CO

MM

ENTS

& R

ESPO

NC

ES10

1017

-Aug

-17

30-A

ug-1

70%

5-D

ay34

0R

3235

500

235

CO

NSU

LTAN

T SU

BMIT

FIN

AL S

IGN

ED &

SEA

LED

PLA

NS1

131

-Aug

-17

31-A

ug-1

70%

5-D

ay34

0

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

UTI

LIT

FIN

AL D

ESIG

N -

UTI

LITI

ES11

054

07-F

eb-1

7 A

11-J

ul-1

750

.91%

5-D

ay80

0R

3990

110

522

UTI

LITY

CO

OR

DIN

ATIO

N K

ICK

OFF

MEE

TIN

G1

007

-Feb

-17

A07

-Feb

-17

A10

0%5-

Day

R35

2221

052

2D

IST.

60%

PLA

N S

HEE

TS to

UTI

LITI

ES1

126

-Apr

-17

26-A

pr-1

70%

5-D

ay56

0R

3522

220

522

ALL

UTI

LITY

MAR

KUPS

RET

UR

NED

11

25-M

ay-1

725

-May

-17

0%5-

Day

560

R32

2800

022

8D

ISTR

IB. R

EVIS

ED P

LAN

SH

EETS

TO

UTI

LITI

ES1

123

-Jun

-17

23-J

un-1

70%

5-D

ay56

0R

3523

300

523

REC

EIVE

MAR

KUP

CO

RR

ECTI

ON

S FR

OM

UTI

LITI

ES1

110

-Jul

-17

10-J

ul-1

70%

5-D

ay56

0R

3266

000

266

UTI

LITI

ES C

ERTI

FIED

11

11-J

ul-1

711

-Jul

-17

0%5-

Day

840

CO

NSU

LTAN

T E

CO

NSU

LTAN

T EV

ALU

AC

ON

SULT

ANT

EVAL

UAT

ION

S11

611

626

-Apr

-17

09-O

ct-1

70%

5-D

ay59

0R

3238

110

238

PHAS

E II

CO

NSU

LTAN

T G

RAD

ES5

526

-Apr

-17

02-M

ay-1

70%

5-D

ay36

16R

3236

000

236

FIN

AL C

ON

SULT

ANT

GR

ADES

11

09-O

ct-1

709

-Oct

-17

0%5-

Day

5959

ENVI

RO

NM

ENT

ENVI

RO

NM

ENTA

L C

EREN

VIR

ON

MEN

TAL

CER

TIFI

CAT

ION

S18

096

03-N

ov-1

6 A

20-J

ul-1

746

.67%

5-D

ay64

0R

3990

030

328

NM

SA C

HEC

KLIS

T1

003

-Nov

-16

A03

-Nov

-16

A10

0%5-

Day

R33

3300

033

3C

ULT

UR

AL R

ESO

UR

CE

& AR

CH

AEO

LOG

ICAL

SU

RVE

Y61

3320

-Jan

-17

A21

-Apr

-17

45.9

%5-

Day

940

R36

1010

061

0N

OIS

E IN

VEST

IGAT

ION

2020

24-A

pr-1

719

-May

-17

0%5-

Day

105

41R

3174

000

174

CO

NTA

MIN

ATIO

N IN

VEST

IGAT

ION

2020

24-A

pr-1

719

-May

-17

0%5-

Day

105

41R

3328

000

328

FCC

CER

TIFI

CAI

TON

REQ

UIR

ED

Y/N

11

08-J

un-1

708

-Jun

-17

0%5-

Day

9474

R33

3310

033

3C

ERTI

FY C

ULT

UR

AL R

ESO

UR

CES

& A

RC

HAE

OLO

GIC

AL1

119

-Jul

-17

19-J

ul-1

70%

5-D

ay64

0R

3610

200

610

CER

TIFY

PU

BLIC

INVO

LVEM

ENT

11

19-J

ul-1

719

-Jul

-17

0%5-

Day

640

R36

1030

061

0C

ERTI

FY N

OIS

E1

119

-Jul

-17

19-J

ul-1

70%

5-D

ay64

0R

3174

100

174

CER

TIFY

CO

NTA

MIN

ATIO

N1

119

-Jul

-17

19-J

ul-1

70%

5-D

ay64

0R

3610

900

610

INC

LUD

E EN

VIR

ON

. CER

TIFI

CAT

ION

IN P

RO

JEC

T FI

LE1

120

-Jul

-17

20-J

ul-1

70%

5-D

ay64

0

* * R

IGH

T O

F W

A* *

RIG

HT

OF

WAY

* * R

IGH

T O

F W

AY1

123

-Jun

-17

23-J

un-1

70%

5-D

ay83

0

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JFM

2016

2017

2018

2019

2020

2021

PREP

ARE

FIN

AL P

AVEM

ENT

DES

IGN

REV

IEW

FIN

AL P

AVEM

ENT

DES

IGN

SUBM

IT F

INAL

SIG

N &

SEA

LED

PAV

EMEN

T D

ESIG

N &

APPR

OVE

PREP

ARE

DR

AFT

TYPI

CAL

SEC

TIO

NS

REV

IEW

DR

AFT

TYPI

CAL

SEC

TIO

NS

PREP

ARE

FIN

AL T

YPIC

AL S

ECTI

ON

SR

EVIE

W F

INAL

TYP

ICAL

SEC

TIO

NS

SUBM

IT F

INAL

SIG

N &

SEA

LED

TYP

ICAL

SEC

TIO

NS

& AP

PRO

VE

ISSU

E N

TP A

ND

SC

HED

ULE

KIC

KOFF

MTG

(DES

IGN

)C

ON

SULT

ANT

SUBM

IT Q

C P

LAN

PM L

ETTE

R T

O P

IO w

/LET

TIN

G D

ATE

& C

ON

ST. D

UR.

PRO

DU

CTI

ON

REA

DY

PREP

ARE

60%

PLA

NS

QA/

QC

AU

DIT

(60%

PLA

NS)

CO

NSU

LTAN

T SU

BMIT

60%

PLA

NS

FOR

REV

IEW

CEN

TRAL

OFF

ICE

REV

IEW

TTM

SQ

UAN

TITI

ES A

ND

REQ

UES

T FO

R IN

FO T

O C

ON

STR

UC

TIO

NR

EVIE

W 6

0% P

AY IT

EM L

IST

REV

IEW

60%

PLA

NS

PREP

ARE

CO

NST

RU

CTI

ON

DU

R S

CH

EDU

LE (C

ON

STR

UC

TIO

N)

SUBM

IT 6

0% C

OM

MEN

TS T

O C

ON

SULT

ANT

REV

ISE

60%

PLA

N S

HEE

TS F

OR

UTI

LITI

ESFI

ELD

REV

IEW

INC

OR

POR

ATE

CO

MM

ENTS

FR

OM

FIE

LD R

EVIE

W

PREP

ARE

100%

PLA

NS

CO

NSU

LTAN

T SU

BMIT

100

% P

LAN

S FO

R R

EVIE

WC

ENTR

AL O

FFIC

E R

EVIE

W T

TMS

REV

IEW

100

% P

LAN

SU

MM

ARY

BOXE

SR

EVIE

W 1

00%

PLA

NS

SUBM

IT 1

00%

CO

MM

ENTS

TO

CO

NSU

LTAN

T

PREP

ARE

FIN

AL P

LAN

SC

ON

SULT

ANT

SUBM

IT F

INAL

PLA

NS

FIN

AL P

LAN

S R

EVIE

WIN

CO

RPO

RAT

E FI

NAL

CO

MM

ENTS

& R

ESPO

NC

ESC

ON

SULT

ANT

SUBM

IT F

INAL

SIG

NED

& S

EALE

D P

LANS

UTI

LITY

CO

OR

DIN

ATIO

N K

ICK

OFF

MEE

TIN

GD

IST.

60%

PLA

N S

HEE

TS to

UTI

LITI

ESAL

L U

TILI

TY M

ARKU

PS R

ETU

RN

EDD

ISTR

IB. R

EVIS

ED P

LAN

SH

EETS

TO

UTI

LITI

ESR

ECEI

VE M

ARKU

P C

OR

REC

TIO

NS

FRO

M U

TILI

TIES

UTI

LITI

ES C

ERTI

FIED

PHAS

E II

CO

NSU

LTAN

T G

RAD

ESFI

NAL

CO

NSU

LTAN

T G

RAD

ES

NM

SA C

HEC

KLIS

TC

ULT

UR

AL R

ESO

UR

CE

& AR

CH

AEO

LOG

ICAL

SU

RVE

YN

OIS

E IN

VEST

IGAT

ION

CO

NTA

MIN

ATIO

N IN

VEST

IGAT

ION

FCC

CER

TIFI

CAI

TON

REQ

UIR

ED

Y/N

CER

TIFY

CU

LTU

RAL

RES

OU

RC

ES &

AR

CH

AEO

LOG

ICAL

CER

TIFY

PU

BLIC

INVO

LVEM

ENT

CER

TIFY

NO

ISE

CER

TIFY

CO

NTA

MIN

ATIO

NIN

CLU

DE

ENVI

RO

N. C

ERTI

FIC

ATIO

N IN

PR

OJE

CT

FILE

4365

17-1

ReD

oRES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST.

LU

CIE

CO

UN

TY, M

P 15

3.23

- 16

9.32

Dat

a D

ate:

07-

Mar

-17

P

age

2 of

3

R

un D

ate:

29-

Mar

-17

Rem

aini

ng L

evel

of E

ffort

Actu

al L

evel

of E

ffort

Rem

aini

ng W

ork

Actu

al W

ork

Crit

ical

Rem

aini

ng W

ork

Layo

ut: ~

Proj

ect S

ched

ule_

1 F

ilter

s: T

ASK

filte

r: Al

l Act

iviti

es©

Prim

aver

a S

yste

ms,

Inc.

Page 55: 436517-1 S+S Design Exception - Vertical Clearance 2017-05-01 · 2017-08-22 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline

Activ

ity ID

PSM

Activ

ity N

ame

Orig Dur

Rem Dur

Star

tFi

nish

Dur

atio

n %

Com

plet

eC

alen

dar

Tota

lFl

oat

Free

Floa

t

R/W

RIG

HT

OF

R/W

RIG

HT

OF

WAY

AC

R/W

RIG

HT

OF

WAY

AC

QU

ISIT

ION

11

23-J

un-1

723

-Jun

-17

0%5-

Day

830

R31

8700

018

7**

*** N

O R

/W R

EQU

IRED

CER

TIFI

CAT

ION

****

*1

123

-Jun

-17

23-J

un-1

70%

5-D

ay83

63

* * C

ON

STR

UC

T* *

CO

NST

RU

CTI

ON

* * C

ON

STR

UC

TIO

N30

230

225

-Apr

-17

01-J

ul-1

80%

00

CC

-7 F

INAL

PLA

CC

-7 F

INAL

PLA

NS

PRC

C-7

FIN

AL P

LAN

S PR

OC

ESSI

NG

101

101

05-J

un-1

725

-Oct

-17

0%5-

Day

200

R30

5004

024

2C

OM

PILE

CO

NTR

ACT

IND

EX F

ILE

7878

05-J

un-1

722

-Sep

-17

0%5-

Day

200

R32

0400

020

4PR

OD

UC

TIO

N D

ATE

11

06-O

ct-1

7*06

-Oct

-17

0%5-

Day

200

R33

0511

530

5TU

RN

PIKE

OFF

ICE

FIN

AL R

EVIE

W &

PR

OC

ESSI

NG

66

09-O

ct-1

716

-Oct

-17

0%5-

Day

200

R32

4240

024

2R

EVIE

W F

INAL

SPE

C P

ACKA

GE

55

09-O

ct-1

713

-Oct

-17

0%5-

Day

200

R32

4250

024

2LE

GAL

REV

IEW

OF

SPEC

PKG

55

09-O

ct-1

713

-Oct

-17

0%5-

Day

200

R33

7012

037

0TU

RN

PIKE

OFF

ICE

SIG

N &

TR

ANSM

IT P

LAN

S PA

CKA

GE

33

17-O

ct-1

719

-Oct

-17

0%5-

Day

200

R33

7000

037

0PL

ANS

TO T

UR

NPI

KE C

ON

TRAC

TS1

125

-Oct

-17

25-O

ct-1

70%

5-D

ay20

0

CC

-7 D

ISTR

ICT

CC

-7 D

ISTR

ICT

CO

NTR

CC

-7 D

ISTR

ICT

CO

NTR

ACT

248

248

12-J

ul-1

729

-Jun

-18

0%0

0R

3524

100

524

* * P

OST

UTI

LITY

AG

REE

MEN

TS O

N W

EB S

ITE

11

12-J

ul-1

712

-Jul

-17

0%5-

Day

9237

R32

1900

121

9**

****

PO

ST P

ERM

ITS

ON

WEB

SIT

E1

121

-Jul

-17

21-J

ul-1

70%

5-D

ay85

65R

3580

100

580

BUIL

D W

P50

SCR

EEN

11

01-S

ep-1

701

-Sep

-17

0%5-

Day

5636

R33

0511

030

5TU

RN

PIKE

CO

NTR

ACTS

PR

OC

ESSI

NG

99

26-O

ct-1

707

-Nov

-17

0%5-

Day

202

R32

2900

022

9AD

VER

TISE

FO

R T

UR

NPI

KE C

ON

TRAC

T (

30 D

AYS)

(FR

IDAY

)5

510

-Nov

-17

08-D

ec-1

70%

Fri

44

R32

8000

028

0TU

RN

PIKE

CO

NTR

ACT

LETT

ING

(TU

ESD

AY)

11

09-J

an-1

8*09

-Jan

-18

0%Tu

e0

0R

3585

150

585

POST

BID

S (T

UES

DAY

)1

116

-Jan

-18

16-J

an-1

80%

Tue

1717

R35

2420

052

4* *

REM

OVE

UTI

LITY

AG

REE

MEN

TS fr

om W

EB S

ITE

11

03-M

ay-1

803

-May

-18

0%Th

u0

0R

3219

002

219

****

**

REM

OVE

PER

MIT

S FR

OM

WEB

SIT

E1

107

-May

-18

07-M

ay-1

80%

Mon

00

R35

8518

058

5AW

ARD

CO

NTR

ACT

11

22-M

ay-1

822

-May

-18

0%5-

Day

00

R35

8519

058

5EX

ECU

TE T

UR

NPI

KE C

ON

TRAC

T BY

CO

NTR

ACTO

R1

114

-Jun

-18

14-J

un-1

80%

5-D

ay0

0R

3585

400

585

EXEC

UTE

TU

RN

PIKE

CO

NTR

ACT

BY D

.O.T

.1

129

-Jun

-18

29-J

un-1

80%

5-D

ay0

0

CO

NST

RU

CTI

OC

ON

STR

UC

TIO

NC

ON

STR

UC

TIO

N43

343

325

-Apr

-17

01-J

ul-1

80%

7 D

ay0

0R

3202

001

202

SCO

PE &

NEG

OTI

ATE

POST

DES

IGN

SER

VIC

ES1

125

-Apr

-17

25-A

pr-1

70%

7 D

ay13

384

R33

1200

031

2C

ON

STR

UC

TIO

N N

OTI

CE

TO P

RO

CEE

D1

130

-Jun

-18

30-J

un-1

80%

7 D

ay0

0R

3202

000

202

POST

DES

IGN

EFF

OR

TS1

101

-Jul

-18

01-J

ul-1

80%

7 D

ay0

0

* * C

Ei* *

CEi

* * C

Ei10

210

209

-Oct

-17

08-M

ar-1

80%

5-D

ay60

0

CEI

- C

ON

SULT

CEI

- C

ON

SULT

ANT

ACC

EI -

CO

NSU

LTAN

T AC

QU

ISIT

ION

102

102

09-O

ct-1

708

-Mar

-18

0%5-

Day

600

R34

0500

040

5AD

VER

TISE

FO

R C

EI1

109

-Oct

-17

09-O

ct-1

70%

5-D

ay59

0R

3203

000

203

CEI

CO

NSU

L C

ON

T EX

EC1

108

-Mar

-18

08-M

ar-1

80%

5-D

ay60

60

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JFM

2016

2017

2018

2019

2020

2021

****

* NO

R/W

REQ

UIR

ED C

ERTI

FIC

ATIO

N **

***

CO

MPI

LE C

ON

TRAC

T IN

DEX

FIL

EPR

OD

UC

TIO

N D

ATE

TUR

NPI

KE O

FFIC

E FI

NAL

REV

IEW

& P

RO

CES

SIN

GR

EVIE

W F

INAL

SPE

C P

ACKA

GE

LEG

AL R

EVIE

W O

F SP

EC P

KGTU

RN

PIKE

OFF

ICE

SIG

N &

TR

ANSM

IT P

LAN

S PA

CKA

GE

PLAN

S TO

TU

RN

PIKE

CO

NTR

ACTS

* * P

OST

UTI

LITY

AG

REE

MEN

TS O

N W

EB S

ITE

****

**

POST

PER

MIT

S O

N W

EB S

ITE

BUIL

D W

P50

SCR

EEN

TUR

NPI

KE C

ON

TRAC

TS P

RO

CES

SIN

GAD

VER

TISE

FO

R T

UR

NPI

KE C

ON

TRAC

T (

30 D

AYS)

(FR

IDAY

)TU

RN

PIKE

CO

NTR

ACT

LETT

ING

(TU

ESD

AY)

POST

BID

S (T

UES

DAY

)* *

REM

OVE

UTI

LITY

AG

REE

MEN

TS fr

om W

EB S

ITE

****

**

REM

OVE

PER

MIT

S FR

OM

WEB

SIT

EAW

ARD

CO

NTR

ACT

EXEC

UTE

TU

RN

PIKE

CO

NTR

ACT

BY C

ON

TRAC

TOR

EXEC

UTE

TU

RN

PIKE

CO

NTR

ACT

BY D

.O.T

.

SCO

PE &

NEG

OTI

ATE

POST

DES

IGN

SER

VIC

ESC

ON

STR

UC

TIO

N N

OTI

CE

TO P

RO

CEE

DPO

ST D

ESIG

N E

FFO

RTS

ADVE

RTI

SE F

OR

CEI

CEI

CO

NSU

L C

ON

T EX

EC

4365

17-1

ReD

oRES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST.

LU

CIE

CO

UN

TY, M

P 15

3.23

- 16

9.32

Dat

a D

ate:

07-

Mar

-17

P

age

3 of

3

R

un D

ate:

29-

Mar

-17

Rem

aini

ng L

evel

of E

ffort

Actu

al L

evel

of E

ffort

Rem

aini

ng W

ork

Actu

al W

ork

Crit

ical

Rem

aini

ng W

ork

Layo

ut: ~

Proj

ect S

ched

ule_

1 F

ilter

s: T

ASK

filte

r: Al

l Act

iviti

es©

Prim

aver

a S

yste

ms,

Inc.