Submittal/Approval LetterTo: Patrick Muench, P.E. Date: May 1, 2017 Turnpike Design Engineer
Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( )Federal Aid Number: Not ApplicableProject Name: Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM169.320State Road Number: 91 Co./Sec./Sub.: 94/470/000Begin Project MP: 153.230 End Project MP: 169.320 Full Federal Oversight: Yes ( ) No ( )Request for: Design Exception ( ), Design Variation ( )
Community Aesthetic Feature: Conceptual ( ), Final ( )Re-submittal: Yes ( ) No( ) Original Ref# - -
Requested for the following element(s):( ) Design Speed ( ) Lane Width ( ) Shoulder Width ( ) Cross Slope( ) Design Loading Structural Capacity ( ) Vertical Clearance ( ) Maximum Grade ( ) Stopping Sight Distance( ) Superelevation ( ) Horizontal Curve Radius ( ) Other
This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings.
SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions.
There are seven bridges within the project limits, four of which are a part of SR 91 Mainline. The SR 91 northbound and southbound travel ways have separate bridges at the Belcher canal and the L-20 canal crossings. Structure Nos. 940057 and 940073 cross Angle Road and Belcher Canal, and Structure Nos. 940058 and 940083 cross over the L-20 Canal. The remaining bridges on the project are the three overpasses across SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059).
The existing vertical clearances at the Picos Road crossing over SR 91 (Structure No. 940055) of 15’-8¼” on the northbound side, and 15’-10 1/8” on the southbound side, do not meet the governing AASHTO or FDOT criteria. In addition, the Minute Maid Road overpass (Structure No. 940059) across southbound SR 91 has an existing vertical clearance of 15’-10 5/8” which also is below the minimum AASHTO or FDOT vertical clearance requirements. As required by Table 25.5.1 of the Turnpike Plans Preparation and Practices Handbook (TPPPH), the vertical clearances were evaluated against the Plans Preparation Manual (PPM) Chapter 25 requirements for a final determination whether a design exception is needed, however, PPM Chapter 25 does not provide any additional criteria regarding vertical clearance. Therefore, in accordance with TPPPH Table 25.5.1, a Design Exception is required for these bridges to remain in place without any improvements.
The County Road 68 overpass (Structure No. 940056) has sufficient vertical clearance to meet AASHTO and FDOT minimum vertical clearance requirements of 16’-0”.
Three of the SR 91 mainline bridges (Structure Nos. 940057, 940083, and 940058) are compliant with FDOT vertical clearance requirement of 16’-0”, as well as the AASHTO requirement of 14’-0”, for local roads passing under bridges. With an existing vertical clearance of 15’-9 ¾”, the northbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940073) is compliant with the AASHTO requirement; however, it does not meet the FDOT minimum vertical clearance criterion. Therefore, a Design Variation, which has been applied for under a separate cover, will be required to maintain the bridge as is, without any improvements.
The reconstruction of the facilities at Picos Road and Minute Maid Road to achieve a vertical clearance meeting the FDOT new construction criteria will increase the construction cost significantly as well as impacting the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Increasing the vertical clearance will negatively impact the budget and the schedule, however, since there are no documented collisions with the referenced structures, the benefit/cost ratio for providing the improvements will be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing the improvements discussed in this report. Furthermore, maintaining the current vertical clearances will eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Exception is requested for the two bridge crossings over SR 91 at Picos Road and Minute Maid Road to remain in place without any improvements.
Recommended by:
Date 5/1/2017Houman Assari, P.E., Responsible Professional Engineer
Approvals:
Date Date Patrick Muench, P.E., Turnpike Design Engineer Russ Snyder, P.E., Turnpike Structures Design Engineer
N/A Date N/A Date Michael Shepard, P.E., State Roadway Design Engineer State Structures Design Engineer
N/A Date N/A Date State Chief Engineer FHWA Division Administrator
5/11/1705/22/17
Houman Assari Digitally signed by Houman Assari Date: 2017.05.01 14:56:50 -04'00'
Russell D SnyderDigitally signed by Russell D Snyder DN: c=US, o=IdenTrust ACES Business Representative, ou=FLORIDA DEPARTMENT OF TRANSPORTATION, cn=Russell D Snyder, 0.9.2342.19200300.100.1.1=A01097C00000144FEE2E1C900002D8F Date: 2017.05.11 08:09:25 -04'00'
Patrick Muench
Digitally signed by Patrick Muench DN: cn=Patrick Muench, o=Florida Department of Transportation, ou=Florida's Turnpike Enterprise, [email protected], c=US Date: 2017.05.22 10:07:58 -04'00'
Page | 1
Request for FTE Design Exceptions & Variations Checklist
Date:
BMP: EMP: EMP:
New Construction
District: Project Name: Project Section Exemption FPID: Requested Control Element(s):
Design Speed* Horizontal Curve Radius
Other __________
Lane Width Vertical Clearance** Superelevation
Shoulder Widths Maximum Grade Stopping Sight Distance
RRR
Design Loading Structural Capacity* Cross Slopes
*Requires supplementary review (i.e. Planning/Structures/etc)**Requires Utility Accommodation Manual (UAM) Exception Submittals
Page #/ NA
Submittal/Approval Letter (independent file from report) Short description of project, applicable criteria and reason for variation requestApplicable signature fields, names, and titles listed
Design Exception/Variation Report Report Cover
Project Title, FPID, digital sign, seal and date Project description
General project information, typical section, begin/end milepost, county section number Include Work Mix, To – From, Objectives, Obstacles and Schedule.
Description of the variation element and applicable criteria (AASHTO and Department value or standard)
Detailed explanation of why the criteria or standard cannot be complied with or is not applicable Description of any proposed value for project and why it is appropriate
Amount and character of traffic using the facility Description of the anticipated impact on Operations, Adjacent Sections, Level Of Service, Safety, Long and Short Term Effects
Is the variation temporary or permanent? Description of the anticipated Cumulative Effects
A plan view or aerial photo of the variation location Showing right of way lines, and property lines of adjacent property.
A photo of the area. Typical section or cross‐section of variation/exception location The milepost and station location of the variation/exception Any related work programmed or in future work plans
BMP:
Florida's Turnpike Enterprise
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.32015.078
05/01/2017
31.168
436517-1-52-01 & 436517-3-52-01 ✔
✔
N/A
S/A Letter
✔
✔
✔
✔ 1
Cover
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
1, 2, 3
4, E
A
D B
A w/ MM
4
✔
✔
Page | 2
The Project Schedule Management (PSM) Project Schedule Activities submitted
< Phase I Phase I – Phase II Phase II – Phase III Phase III – Phase IV > Phase IV
Letting: All mitigating efforts
An explanation of what if any associated existing or future Limitations as a result of public or legal commitments. Description and explanation of any practical alternatives, the selected treatment and why.
Comments on the most recent 5‐year crash history Including all pertinent crash reports Is the location of the variation on the High Crash List?
Description of the anticipated Cost (Social and to the Department – Benefit/Cost) Summary Conclusions
Summary description of included support documentation such as: Location map or description Typical section Aerial or Photo logs when they best illustrate the element issues Crash History and analysis Plan sheets in the area of the variation elements Profiles in the area of vertical alignment variation elements Tabulation of pole offsets for horizontal clearance variation Applicable Signed and Sealed Engineering Support Documents
For the specified conditions the following additional documentation is required: For design speed on FIHS/SIS
Provide typical sections at mid blocks and at intersections. For lane width
Provide locations of alternative routes that meet criteria Proposal for handling drainage Proposed signing and pavement markings
For shoulder width Proposal for handling stalled vehicles Proposal for handling drainage
For bridge width Plan view of the approaching roadways Existing bridge plans (these may be submitted electronically)
For a bridge with a design inventory load rating less than 1.0 Written evaluation and recommendation by the Office of Maintenance is required Load rating calculations for the affected structure
For vertical clearance Locations of alternative routes that meet criteria
Page #/ NA
✔ H
6
4, 5
5, 6
N/A
N/A
N/A
N/A
N/A
7
✔
✔
✔
✔
✔
✔
✔
✔
✔
7
✔
✔
A, B, D, F
✔
✔
✔
Page | 3
For cross‐slopeProposal for handling drainage
Details on how the cross slope impacts intersections
For conditions that may adversely affect the roadway’s capacity
Provide the comments on compatibility of the design and operation with the adjacent sections Effects on capacity (proposed criteria vs. AASHTO) using an acceptable capacity analysis procedure Calculate reduction for design year, level of service
For superelevation Provide the side friction factors for the curve for each lane of different cross‐slope at the PC of the curve, the point of maximum cross‐slope, and the PT of the curve using the following equation. f = (V2 – 15Re)/(V2e+15R)
For areas with crash histories or when a benefit to cost analysis is requested Provide a time value analysis between the benefit to society quantified in dollars and the costs to society quantified in dollars over the life of the Exception/Variation.
Roadside Safety Analysis Program (RSAP) Historical Crash Method (HCM)
Page #/ NA
N/A
N/A
N/A
N/A
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
St. Lucie County, Florida
FPID Numbers 436517-1-52-01 and 436517-3-52-01 Contract Number C9R86
VERTICAL CLEARANCE DESIGN EXCEPTION
Prepared For:
Florida Department of Transportation Florida’s Turnpike Enterprise
MAY 2017
Prepared By: Propel Engineering, Inc. 6685 Forest Hill Boulevard, Suite 205 Responsible Engineer: Greenacres, FL 33413 Houman Assari, PE Certification of Authorization No. 31050 State of Florida, Professional Engineer Vendor No. F463316950 License No. 49029
This item has been electronically signed and sealed by Houman Assari, PE on 05/01/2017 using a Digital Signature.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Houman Assari Digitally signed by Houman Assari Date: 2017.05.01 14:54:34 -04'00'
Table of Contents 1.0 Project Description ....................................................................................................................................................... 1
2.0 Description of the Design Exception ............................................................................................................................. 1 3.0 Design Criteria .............................................................................................................................................................. 3
3.1 American Association of State Highway and Transportation Officials (AASHTO) .................................................... 3
3.2 Florida Department of Transportation (FDOT) ....................................................................................................... 3 4.0 Proposed Criteria .......................................................................................................................................................... 3
5.0 Justification .................................................................................................................................................................. 4
5.1 Operational Conditions .......................................................................................................................................... 4
5.2 Crash History Analysis ............................................................................................................................................ 4 5.3 Costs ...................................................................................................................................................................... 5
5.4 Right-of-Way Impacts ............................................................................................................................................ 6
5.5 Community Impacts ............................................................................................................................................... 6 5.6 Environmental Impacts .......................................................................................................................................... 6
5.7 Mitigation .............................................................................................................................................................. 6
5.8 Alternative Route................................................................................................................................................... 7
6.0 Summary Conclusions ................................................................................................................................................... 7
APPENDICES
Appendix A: Location Map Appendix B: Typical Sections Appendix C: As-Built Plans Appendix D: Photo Log Appendix E: Traffic Data Appendix F: Crash History Appendix G: Cost Estimate Appendix H: Project Schedule
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 1
1.0 Project Description This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320, County Mile Post 15.078 County Mile Post 31.168, in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet governing criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings. SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions. The project is currently scheduled for letting on 01/09/2018, with a production date of 10/06/2017. There are currently no major obstacles to meeting this schedule. The project schedule is included in Appendix H of this document. 2.0 Description of the Design Exception There are seven bridges within the project limits, four of which are a part of SR 91 Mainline. The SR 91 northbound and southbound travel ways have separate bridges at the Belcher canal and the L-20 canal crossings. Structure Nos. 940057 and 940073 cross Angle Road and Belcher Canal, and Structure Nos. 940058 and 940083 cross over the L-20 Canal. The remaining bridges on the project are the three overpasses across SR 91 at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). Based on information gathered from field reviews, the design survey for the project, and review of the ERCAR and the as-built plans, the bridges were evaluated for compliance with American Association of State Highway and Transportation Officials (AASHTO), Florida Department of Transportation (FDOT) and Florida’s Turnpike Enterprise (FTE) criteria for Vertical Clearance. The results of the evaluation have been summarized in Table 2.1. The existing vertical clearances at the Picos Road crossing over SR 91 (Structure No. 940055) of 15’-8¼” on the northbound side, and 15’-10 1/8” on the southbound side, do not meet the governing AASHTO or FDOT criteria. In addition, the Minute Maid Road overpass (Structure No. 940059) across southbound SR 91 has an existing vertical clearance of 15’-10 5/8” which also is below the minimum AASHTO or FDOT vertical clearance requirements. As required by Table 25.5.1 of the Turnpike Plans Preparation and Practices Handbook (TPPPH), the vertical clearances were evaluated against the Plans Preparation Manual (PPM) Chapter 25 requirements for a final determination whether a design exception is needed, however, PPM Chapter 25 does not provide any additional criteria regarding vertical clearance. Therefore, in accordance with TPPPH Table 25.5.1, a Design Exception is required for these bridges to remain in place without any improvements. The Design Exception locations have been included in Appendix A of this document.
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 2
The County Road 68 overpass (Structure No. 940056) has sufficient vertical clearance to meet AASHTO and FDOT minimum vertical clearance requirements of 16’-0”. Three of the SR 91 mainline bridges (Structure Nos. 940057, 940083, and 940058) are compliant with FDOT vertical clearance requirement of 16’-0”, as well as the AASHTO requirement of 14’-0”, for local roads passing under bridges. With an existing vertical clearance of 15’-9 ¾”, the northbound SR 91 mainline bridge over Angle Road/Belcher Canal (Structure No. 940073) is compliant with the AASHTO requirement; however, it does not meet the FDOT minimum vertical clearance criterion. Therefore, a Design Variation, which has been applied for under a separate cover, will be required to maintain the bridge as is, without any improvements.
Table 2.1 – Summary of Bridge Vertical Clearances
Structure No.
Mile Marker Road Name
Minimum Required Vertical Clearance
Existing Vertical
Clearance Recommendation
AASHTO FDOT (4) FTE
940055 154.938 Picos Road over SR 91
16’-0” (1&2) 16’-0” 16’-0”
(4)
15’-8 ¼” (NB) Design Exception
15’-10 1/8” (SB)
940056 156.091 CR 68 over SR 91
16’-0” (1&2) 16’-0”
16’-2 ¾” (NB) (5) 16’-2 ¾” (NB) No Action
Required 16’-2 ¼” (SB) (5) 16’-2 ¼” (SB)
940073 157.975 SR 91 NB over Angle Road
14’-0” * (3) 16’-0” 16’-0”
(4) 15’-9 ¾” Design Variation
940057 157.975 SR 91 SB over Angle Road
14’-0” * (3) 16’-0” 16’-1 ¼”
(5) 16’-1 ¼” **Certified Survey Required
940083 158.657 SR 91 NB over Dirt Road
14’-0” * (3) 16’-0” 16’-6”
(5) 16’-6” No Action Required
940058 158.657 SR 91 SB over Dirt Road
14’-0” * (3) 16’-0” 16’-6”
(5) 16’-6” No Action Required
940059 165.420 Minute Maid Rd. over SR 91
16’-0” (1&2) 16’-0”
16’-5 ½” (5) 16’-5 ½” (NB)
Design Exception 16’-0” (4)
15’-10 5/8” (SB)
(1) AASHTO – A Policy on Design Standards – Interstate System (2005), Page 5 (2) AASHTO – A Policy on Geometric Design of Highways and Streets (2011), Section 8.2.9, Page 8-4 (3) AASHTO – A Policy on Geometric Design of Highways and Streets (2011), Section 5.2.3, Page 5-8 * Allowance for resurfacing required (4) FDOT – Plans Preparation Manual, Volume 1, Section 2.10
** Certified survey confirming the as-built minimum vertical clearance is equal to or greater than the existing vertical clearance is required
(5) FTE – Turnpike Plans Preparation and Practices Handbook, Volume 1, Chapter 2, Section 2.10
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 3
3.0 Design Criteria 3.1 American Association of State Highway and Transportation Officials (AASHTO)
A Policy on Design Standards – Interstate System – (2005) (AASHTO IS)
Bridges and Other Structures, Vertical Clearance, Page 5: “On all rural sections, the clear height of structures shall be not less than 16 ft. over the entire roadway width, including the width of paved shoulder.”
A Policy on Geometric Design of Highways and Streets (2011)
Chapter 8 – Freeways, Section 8.2.9, Vertical Clearance:
“The vertical clearance to structures passing over freeways should be at least 16 ft. over the entire roadway width, including auxiliary lanes and the usable width of shoulders with consideration for future resurfacing.”
Chapter 5 – Local Roads and Streets, Section 5.2.3, Vertical Clearance: “Vertical clearance at underpasses should be at least 14 ft. over the entire roadway width, with an allowance for future resurfacing.”
3.2 Florida Department of Transportation (FDOT) Plans Preparation Manual (PPM) (January 2017)
Volume 1, Section 2.10 – Vertical Clearance:
For any construction affecting existing roadway or railroad over roadway bridge clearances (e.g., bridge widenings or resurfacing), FDOT minimum vertical clearance is 16'-0".
Turnpike Plans Preparation and Practices Handbook (TPPPH) (March 3, 2017)
Volume 1, Section 2.10 – Vertical Clearance:
“Existing vertical clearances between 16’-0” and 16’-6” must be maintained or increased, unless otherwise approved by the Turnpike Structures Design Engineer.”
4.0 Proposed Criteria The proposed design is to allow the existing vertical clearances at Picos Road and Minute Maid Road overpasses, as identified in Table 2.1 of this document, to remain as existing.
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 4
5.0 Justification The main objective of the project is to extend the service life of the existing asphalt pavement and improve safety related features along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public.
5.1 Operational Conditions A project Traffic Data Report was provided by FTE. The Traffic Data results were as follows:
Table 5.1.1 – SR 91 Traffic Data
Two-Way AADT Trucks (DDHV) Traffic Factors
2016 2018 2038 2016 2018 2028 KSTD (%) D (%) T24 (%) DHT (%)
32,500 33,900 45,200 145 151 202 10.5 60.7 14.0 7.0 The design and posted speed within the project limits is 70 mph. The Traffic Data is included in Appendix E of this document.
The substandard vertical clearance referenced in this Design Exception is limited to two locations where Picos Road and Minute Maid Road cross over SR 91. A collision with these bridges may potentially cause delays as a result of lanes being closed and debris on the roadway. However, the substandard vertical clearances are an existing condition, therefore no increase in potential adverse impacts on the existing capacity and operation of the facility are anticipated if the vertical clearances are maintained. There are additional design elements that are not in compliance with AASHTO and FDOT criteria, namely shoulder width and cross slope/superelevation, that occur in the vicinity of the areas established for this Design Exception. However, no cumulative effects impacting the operation of the facility are expected. The capacity of the roadway is dependent on the number of lanes and the posted speed limit along the corridor, which will not change after the completion of the proposed improvements. The scope of this project is limited to milling and resurfacing, with the milling depth and resurfacing thickness being the same. There will be no increase in the elevation of the resurfaced pavement, therefore the existing vertical clearances will be maintained. Based on the analysis performed, no long or short term adverse impacts are anticipated on operations, Level of Service, or adjacent roadway sections for the areas identified in this Design Exception, which is expected to be in place through the design life of the project. SR 91 from MM 152 to MM 193 is to be evaluated for widening to by year 2035 which may ultimately impact the bridges at Picos and Minute Maid Roads. A Project Development and Environment (PD&E) study would be required, which will address the vertical clearance deficiency, prior to design and construction. 5.2 Crash History Analysis Safety considerations associated with substandard vertical clearance at the referenced locations are collisions with the bridges, and potential subsequent rear-end crashes. The most recent 5-year crash history from the years 2011 through 2015 was reviewed. The crash data is included in Appendix F of this document. This report covers crash data, field investigations, and assessments of the existing conditions along the corridor. The data provided includes the location of each crash, the type of crash, the date, and the existing conditions.
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 5
The analysis of the crash history revealed a total of 376 crashes within the project limits. A review of the crash data revealed that there were no collisions with overhead fixed objects. The maintenance and bridge inspection reports were also reviewed to determine whether any collisions and the possible cost associated with bridge repairs could be found. However, no reported repairs as a result of collisions were found. The analysis further revealed the deficient vertical clearance locations, as identified in this Design Exception, are not on the Turnpike’s Top 30 Crash List.
5.3 Costs Cost estimates have been prepared for three alternatives that can eliminate the substandard vertical clearance at the Picos Road and the Minute Maid Bridges. These three options are: reconstruction of the bridges over SR 91, jacking the bridges over SR 91, and reconstructing SR 91 at a lower elevation to achieve the minimum required vertical clearance. The cost estimate for each alternative is included in Appendix G of this document.
5.3.1 Bridge Reconstruction The reconstruction of the overpass bridges would require an increase in elevation at the critical locations of 9¾” for the Picos Road Bridge, and 7 3/8” for the Minute Maid Road Bridge to meet the FDOT new construction minimum vertical clearance of 16’-6”. The approaches to the bridges would have to be improved to accommodate this increase in elevation. The total length of roadway improvements required for both roadways will be 2,385 feet. Additional improvements would also include drainage modifications, embankment, and guardrail replacement. The placement of the required embankment may have impacts on the environmentally sensitive areas adjacent to the roadway. Furthermore, the additional work will impact the maintenance of traffic by increasing the cost and extending the construction duration and disturbance to the FTE consumers. The estimated cost to construct this alternative will be $7,221,494.81. 5.3.2 Bridge Jacking The Jacking of the overpass bridges would also require an increase in elevation at the critical locations of 9¾” for the Picos Road Bridge, and 7 3/8” for the Minute Maid Road Bridge to meet the FDOT new construction minimum vertical clearance of 16’-6”. The approaches to the bridges would have to be improved to accommodate this increase in elevation. The total length of roadway improvements required would be 2,385 feet. Additional improvements would also include drainage modifications, embankment, and guardrail replacement. The placement of the required embankment may have impacts on the environmentally sensitive areas adjacent to the roadway. Furthermore, the additional work will impact the maintenance of traffic by increasing the cost and extending the construction duration and disturbance to the FTE consumers. The estimated cost to construct this alternative will be $2,423,350.56. The bridge jacking alternative is not the preferred option given the age of the structures, which were constructed in 1960s, and the significant distance that the bridges would need to be raised. Furthermore, whether jacking equipment can be placed under the beams or temporary towers will be needed, would have to be determined. 5.3.3 Lowering of SR 91 Northbound SR 91 must be lowered by 9¾” at Picos Road to meet the FDOT new construction minimum vertical clearance of 16’-6”. Southbound SR 91 would have to be lowered by 7 3/8” at the Picos Road Bridge, and by 7 7/8” at the Minute Maid Road Bridge. In order to transition the sections of SR 91 to lower elevations at the bridge, 2400 feet mainline roadway would require reconstruction. The additional work will impact the maintenance of traffic by increasing the cost and extending the construction duration and disturbance to the local communities. The estimated cost to construct this alternative will be $869,024.88.
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 6
A Benefit/Cost analysis would result in a B/C ratio of zero regardless of which alternative is constructed since there were no crashes found to be attributed to the deficient vertical clearance in the analysis of the most recent 5-year crash history. There are no anticipated social costs associated with the deficient vertical clearance. 5.4 Right-of-Way Impacts Whether any of the Alternative Improvements to correct the vertical clearance deficiencies are implemented or the existing vertical clearances are allowed to remain in place, no right-of-way impacts are anticipated. Picos Road and Minute Maid Road are low volume facilities for which the cost of maintaining traffic at the same location during construction may not be justifiable. For ease of construction and expediting construction time, as well as cost savings, diversion of traffic to other crossings is the most viable option. Even if the traffic is to be maintained at the bridge locations, only temporary construction easements would most likely be required with no permanent right of way acquisition required. 5.5 Community Impacts Since the substandard vertical clearances are an existing condition, no adverse community impacts are expected if the existing vertical clearances are maintained. However, if any of the Alternative Improvements to correct the vertical clearance deficiencies are implemented, the additional work will impact the maintenance of traffic on SR 91, thereby increasing the cost and extending the construction duration of the project. This will ultimately result in additional disturbance to the FTE consumers and the local community using the existing bridges. 5.6 Environmental Impacts With the implementation of any of the Alternative Improvements to correct the vertical clearance deficiencies, there may be impacts on the roadside slopes in the vicinity of the Picos Road and the Minute Maid Road Bridges. Belcher Canal requiring extensive permitting through South Florida Water Management District (SFWMD). Gopher tortoise burrows were observed which require coordination with Florida Fish and Wildlife Conservation Commission (FWC). The appropriate habitats must be surveyed during design to confirm whether the burrows are active. If the burrows are impacted, a relocation permit will be required prior to moving the tortoise. Relocation permitting does not typically occur until approximately 90 days prior to the start of construction in the area. Since the substandard vertical clearances are an existing condition, no adverse environmental impacts are expected if the existing vertical clearances are maintained.
5.7 Mitigation To enhance the safety of the current conditions regarding the deficient vertical clearance, advance warning signage was considered for installation to alert the traveling public of the vertical clearance limitation. However, the MUTCD guidelines require the placement of low clearance signs when vertical clearances are less than 12 inches above the statutory maximum vehicle height, which does not apply to the vertical clearance deficiencies identified in this exception. Additional mitigation strategies as outlined in the Federal Highway Administration (FHWA) publication Mitigation Strategies for Design Exceptions, dated July 2007, include detours and prohibiting of large vehicles from using the project segment of SR 91 which are infeasible or impractical for application on an interstate facility. There are no associated existing or future limitations as a result of legal or public commitments known for this project.
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 7
5.8 Alternative Route SR 91 is a Limited Access Expressway on the National Highway System (NHS) and the State Highway System (SHS). The project segment lies between the interchange for SR 70, immediately south of the project, and the SR 60 interchange which is approximately 40 miles to the north of SR 70. The only comparable facility to SR 91 is Interstate 95 which may be accessed at the SR 70 interchange. Interstate 95 diverges from SR 91 going north which does not provide for an ideal alternative route, adding approximately 10 additional miles to the route, but is the only facility that may be used to avoid the low structures. The separation between the interchanges hinders the opportunity to guarantee a viable alternative route that will be effective and potentially utilized by oversized vehicles.
6.0 Summary Conclusions The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders and the paved median openings. Additional safety related improvements would also be provided along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public. The reconstruction of the facilities at Picos Road and Minute Maid Road to achieve a vertical clearance meeting the FDOT new construction criteria would increase the construction cost significantly as well as impacting the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Increasing the vertical clearance would negatively impact the budget and the schedule, however, since there are no documented collisions with the referenced structures, the benefit/cost ratio for providing the improvements would be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing the improvements discussed in this report. Furthermore, maintaining the current vertical clearances would eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Exception is requested for the two bridge crossings over SR 91 at Picos Road and Minute Maid Road to remain in place without any improvements.
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix A Location Map
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix B Typical Sections
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix C As-Built Plans
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix D Photo Log
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from 153.230 to 169.320
Figure 1 – Picos Road Over NB SR 91
Figure 3 - Picos Road Over NB SR 91
Figure 2 - Picos Road Over NB SR 91
Figure 4 - Picos Road Over NB SR 91
Vertical Clearance Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from 153.230 to 169.320
Figure 5 – Picos Road Over SB SR 91
Figure 7 – Minute Maid Road Over SB SR 91
Figure 6 - Picos Road Over SB SR 91
Figure 8 - Minute Maid Road Over SB SR 91
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix E Traffic Data
Traffic and Revenue Consultant Florida’s Turnpike Enterprise
Florida Department of Transportation
AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com
MEMORANDUM Date:
To:
From:
Copies:
Subject: Typical Section Traffic Data and Equivalent Single Axle Loading (ESAL) Calculations_Update
FPN:
State Road:
Counties:
FY 2016 Turnpike Annual Traffic Trends Report
Lane Closure Traffic Data Page 2
AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com
U.S. DOT Mitigation Strategies for Design Expectations
Typical Section Traffic Data and Trucks Directional Design Hour Volume
2016 2018 2038 KSTD D T24 (%) DHT (%) 2016 2018 2038
South of Fort Drum Service Plaza (MP 184)
32,500 33,900 45,200 10.5% 60.7% 14.0 7.0 145 151 202
Trucks (DDHV)Segment
Two-Way AADT Traffic Factors
Year AADT Lane Factor ESAL (1000S)
CUM-ESAL(1000S)
2018 33,900 0.763 694 6942019 34,600 0.761 706 1,4002020 35,400 0.759 721 2,1212021 35,900 0.758 730 2,8512022 36,600 0.756 743 3,5942023 37,300 0.755 755 4,3492024 37,900 0.753 766 5,1152025 38,500 0.752 777 5,8922026 39,000 0.751 786 6,6782027 39,600 0.750 797 7,4752028 40,100 0.749 806 8,2812029 40,700 0.748 816 9,0972030 41,200 0.747 825 9,9222031 41,700 0.746 834 10,7562032 42,200 0.745 843 11,5992033 42,700 0.744 852 12,4512034 43,200 0.743 861 13,3122035 43,700 0.742 869 14,1812036 44,200 0.741 878 15,0592037 44,700 0.740 887 15,9462038 45,200 0.739 896 16,842
14.0%
0.5
(1.567 - 0.0826 x Ln(One-Way AADT)-0.12368 x LV)
1.050 *Freeway - Urban - Flexible Pavement
LV = 0.000
ESAL = AADT x T24 x DF x LF x EF x 365
Opening to Mid-Design Year (2025) ESAL Accumulation: 5,198
Opening to Design Year (2032) ESAL Accumulation: 10,905
Opening to Mid-Design Year (2028) ESAL Accumulation: 7,587
Opening to Design Year (2038) ESAL Accumulation: 16,14820-year design
(Years 2018-2038)
14-year design (Years 2018-2032)
Florida's Turnpike - Ticket System
FPN 436517-1 Mainline Resurfacing from MP 153.2 to MP 169.3
Mainline - South of Fort Drum Service Plaza
Two (2) Lanes
(Daily Truck Factor) T24 =
(Directional Distribution Factor) DF =
(Lane Factor) LF =
(Load Equivalency Factor) EF* =
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix F Crash History
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
2011
8198
4049
01/
2/20
1118
.869
157.
019
141
L1
11
21
10
1414
1S
18
14S
40
081
9861
510
1/2/
2011
18.8
6915
7.01
99
77R
21
51
11
09
21
N1
10
281
9784
110
1/5/
2011
30.8
8416
9.03
427
1R
S1
12
11
027
11
N77
10
081
9636
970
1/6/
2011
20.8
7115
9.02
127
77R
S1
51
11
027
1415
N17
10
081
9748
190
1/6/
2011
20.8
7115
9.02
127
77L
S2
51
11
027
715
S12
10
081
9748
200
1/6/
2011
20.8
7115
9.02
115
3L
22
51
11
014
148
E2
1S
20
081
9636
990
1/13
/201
121
.876
160.
026
777
R2
11
11
10
90
1N
115
1N
20
081
9829
250
1/20
/201
124
.878
163.
028
274
RS
15
41
10
2714
1N
771
00
8197
5263
01/
30/2
011
26.8
8116
5.03
113
77L
11
51
11
013
141
S1
10
081
9973
390
2/13
/201
118
.876
157.
026
274
RS
11
11
10
273
1N
171
00
8200
1260
02/
18/2
011
19.9
0115
8.05
114
4L
11
51
11
014
211
S21
6S
20
081
9752
650
2/21
/201
115
.863
154.
013
144
L2
15
11
10
142
11S
2521
1S
20
082
0431
780
2/27
/201
122
.875
161.
025
293
RS
15
21
10
2914
6N
11
00
8199
9008
03/
5/20
1127
.88
166.
030
144
L1
11
21
10
1412
14S
773
14S
20
081
9861
570
3/9/
2011
16.5
5815
4.70
827
3L
S1
51
11
027
101
S2
10
182
0431
790
3/9/
2011
21.8
7616
0.02
627
3L
S1
51
11
027
141
S26
10
281
9829
280
3/14
/201
116
.058
154.
208
141
R1
11
11
10
147
14N
214
1N
30
082
0172
360
3/16
/201
129
.323
167.
473
188
RS
11
11
10
119
1N
251
01
8201
7237
03/
17/2
011
19.9
0115
8.05
127
4M
M1
11
11
027
141
S26
211
S2
03
8202
2051
03/
17/2
011
21.8
7616
0.02
614
1R
21
51
11
018
11
N12
81
N2
03
8206
4726
03/
22/2
011
27.8
816
6.03
027
4M
M1
54
11
027
141
S25
10
081
9752
710
4/10
/201
128
.88
167.
030
141
L2
11
11
10
140
1S
71
S2
02
8198
2933
04/
15/2
011
18.8
6915
7.01
927
77L
11
12
177
027
141
S77
10
081
9748
290
4/27
/201
118
.869
157.
019
2977
LS
11
11
10
292
1S
21
00
8197
4830
05/
1/20
1123
.931
162.
081
2777
RS
11
11
10
2710
1N
11
01
8198
2937
05/
7/20
1117
.864
156.
014
2777
RS
11
11
10
273
1N
11
00
8198
2938
05/
13/2
011
19.9
0115
8.05
114
1R
21
11
11
014
11
N77
81
N2
00
819 9
7349
05/
22/2
011
30.8
8416
9.03
41
77R
11
11
11
042
191
N17
10
482
0650
250
5/24
/201
120
.852
159.
002
2788
LS
11
11
12
272
1S
21
01
8197
4804
05/
30/2
011
28.8
5316
7.00
327
77L
S1
11
11
027
21
S2
10
181
9748
050
6/3/
2011
23.9
3116
2.08
127
77L
S1
31
11
027
21
S1
10
082
0012
750
6/5/
2011
20.8
7115
9.02
127
77M
M1
12
11
027
121
S25
131
N2
00
8197
4806
06/
12/2
011
26.8
8116
5.03
128
77R
S1
11
11
028
415
N2
10
181
9829
220
6/23
/201
127
.88
166.
030
2777
MM
21
31
770
2714
1S
771
00
8197
5275
06/
26/2
011
21.8
7616
0.02
614
4L
21
12
111
014
131
S12
413
S2
01
8204
3181
06/
26/2
011
20.8
7115
9.02
127
77L
S1
12
11
027
141
S1
10
181
9829
350
6/30
/201
117
.864
156.
014
2977
LS
11
11
10
299
1S
771
00
8197
4825
07/
21/2
011
16.8
3815
4.98
814
1R
21
11
11
014
11
N2
211
N2
00
8 199
7341
07/
22/2
011
31.8
8617
0.03
614
4L
21
11
11
014
31
S1
101
S2
00
8198
4048
07/
24/2
011
15.0
1515
3.16
514
4L
11
11
11
014
41
S1
101
S2
00
8206
5031
08/
4/20
1121
.876
160.
026
2777
LS
11
11
10
4314
1S
301
00
8198
2944
08/
7/20
1129
.881
168.
031
2977
LS
25
31
10
292
1S
291
00
Exem
ptio
n fro
m F
lorid
a Pu
blic
Rec
ords
Sec
tion
119,
Flo
rida
Stat
utes
: Th
e in
form
atio
n co
ntai
ned
in th
e C
rash
Ana
lysi
s R
epor
ting
(C.A
.R.)
syst
em h
as b
een
com
pile
d fro
m in
form
atio
n co
llect
ed fo
r the
pur
pose
of i
dent
ifyin
g, e
valu
atin
g, o
r pla
nnin
g sa
fety
en
hanc
emen
ts.
This
sys
tem
and
its
prod
ucts
iden
tify
info
rmat
ion
used
for t
he p
urpo
se o
f dev
elop
ing
high
way
saf
ety
cons
truct
ion
impr
ovem
ent p
roje
cts
whi
ch m
ay b
e im
plem
ente
d ut
ilizi
ng F
eder
al-a
id h
ighw
ay fu
nds.
Sin
ce th
is in
form
atio
n is
col
lect
ed fo
r the
ab
ove-
men
tione
d pu
rpos
e it
is e
xem
pt fr
om d
iscl
osur
e as
a p
ublic
reco
rd p
ursu
ant t
o Fe
dera
l law
. Any
doc
umen
t dis
play
ing
this
ex
empt
ion
from
pub
lic re
cord
s sh
all b
e us
ed o
nly
for t
hose
pur
pose
s de
emed
app
ropr
iate
by
the
Dep
artm
ent.
See
Title
23
Uni
ted
Stat
es C
ode
Sect
ion
409.
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8200
1282
08/
13/2
011
29.3
2316
7.47
318
77R
11
21
11
040
01
N1
11
N6
00
8197
5279
08/
25/2
011
28.0
816
6.23
01
77M
M2
12
11
01
41
N12
10
182
0172
510
9/2/
2011
27.8
816
6.03
027
77M
M1
11
11
027
41
N26
10
082
0012
850
9/16
/201
128
.88
167.
030
141
L2
15
11
10
141
6N
221
1S
20
081
9840
620
9/22
/201
114
.862
153.
012
141
R2
15
11
10
141
1N
221
1N
30
281
9829
490
9/26
/201
128
.88
167.
030
2777
LS
11
11
10
2714
11S
11
00
8204
3188
010
/1/2
011
26.8
8116
5.03
127
77M
M1
12
11
027
11
N1
10
281
9844
310
10/6
/201
119
.058
157.
208
1477
R1
11
21
10
148
4N
41
8N
20
081
9748
370
10/8
/201
131
.807
169.
957
2777
R1
21
31
10
271
1N
121
00
8198
4066
010
/13/
2011
17.1
2115
5.27
123
77L
S1
11
11
023
161
S2
10
081
9829
530
10/1
5/20
1126
.881
165.
031
2777
LS
12
11
10
2714
1S
291
00
8198
6174
010
/18/
2011
18.8
6915
7.01
929
77L
S2
13
110
09
21
S30
10
081
9861
750
10/2
2/20
1119
.901
158.
051
977
RS
11
11
10
403
1N
21
01
8204
3191
010
/31/
2011
26.8
8116
5.03
127
77M
M2
53
11
027
131
S12
10
081
9840
670
11/3
/201
120
.871
159.
021
2777
LS
11
21
10
277
15S
21
00
8198
6177
011
/16/
2011
24.8
7816
3.02
89
3L
S1
11
11
042
1477
S2
121
S2
01
8201
7263
011
/16/
2011
27.8
816
6.03
018
77R
21
51
11
040
61
N1
11
N2
00
8200
1290
011
/27/
2011
17.3
6715
5.51
727
7 7L
S1
11
11
027
141
S25
10
081
9829
610
12/5
/201
124
.878
163.
028
2777
RS
25
21
10
271
1N
11
00
8201
7267
012
/10/
2011
14.8
6215
3.01
215
2R
22
12
11
014
13
N2
81
N2
00
8198
6185
012
/15/
2011
29.3
2316
7.47
39
77L
X1
52
11
040
141
S2
10
082
0012
910
12/1
6/20
1129
.996
168.
146
153
L1
15
21
10
1413
77S
2914
1S
20
181
9861
860
12/2
2/20
1120
.871
159.
021
1877
RS
15
11
10
1818
1N
11
00
8206
4754
012
/24/
2011
21.8
7116
0.02
11
77R
S1
51
11
027
11
N2
10
282
0650
410
12/2
7/20
1116
.871
155.
021
3477
LS
21
31
10
421
5S
11
00
8197
5289
01/
1/20
1219
.901
158.
051
2788
LS
14
11
10
271
1S
311
00
8201
7274
01/
2/20
1229
.881
168.
031
141
R1
11
11
10
141
1N
28
1N
30
181
9861
880
1/8/
2012
17.0
1515
5.16
59
3M
M1
11
11
09
010
N6
11
N2
00
8206
4760
01/
14/2
012
17.0
5815
5.20
81
88L
S1
51
11
02
191
S1
10
181
9752
900
1/15
/201
225
.68
163.
830
1377
R2
15
11
10
131
1N
11
00
8197
8432
02/
11/2
012
14.9
1515
3.06
514
4L
11
21
11
018
577
S13
1S
30
182
0647
630
2/15
/201
216
.058
154.
208
977
RS
13
11
110
119
77N
301
01
8204
3196
02/
17/2
012
15.1
5815
3.30
814
4R
21
42
11
014
106
N3
1N
20
081
9973
680
3/1/
2012
28.8
816
7.03
09
77L
22
12
11
040
31
S1
10
081
9829
670
3/2/
2012
17.8
6415
6.01
417
77R
21
11
11
05
01
N77
21
N2
00
8198
2968
03/
6/20
1214
.935
153.
085
2777
RS
11
21
10
271
6N
777
1N
20
082
0 201
060
3/29
/201
226
.058
164.
208
2777
LS
11
11
10
2719
1S
771
11
8204
3198
03/
29/2
012
25.2
2316
3.37
327
77L
S1
11
11
027
141
S77
10
381
9555
620
4/16
/201
219
.901
158.
051
274
RS
11
21
10
90
1N
41
N2
00
8197
8446
04/
22/2
012
28.8
816
7.03
018
77L
11
12
11
040
131
S77
31
S2
01
8200
1305
04/
27/2
012
30.3
2316
8.47
327
77M
M1
21
11
027
21
S1
10
282
0432
020
4/27
/201
216
.681
154.
831
2777
RS
11
11
770
273
1N
771
01
8201
7285
05/
9/20
1217
.878
156.
028
273
L1
11
21
10
271
1N
11
1S
20
081
9973
720
5/14
/201
227
.996
166.
146
141
R1
21
31
100
1413
1N
127
1N
20
081
9748
480
5/15
/201
216
.058
154.
208
2777
MM
11
11
10
2714
1N
291
00
8197
5295
05/
26/2
012
27.1
8116
5.33
129
77L
S1
12
11
029
21
S17
10
381
9748
500
5/29
/201
226
.323
164.
473
1777
R2
11
11
10
50
1N
11
1N
20
082
0 647
760
5/31
/201
217
.058
155.
208
144
L1
25
21
10
142
77S
29
1S
20
082
0201
130
6/15
/201
222
.875
161.
025
2977
RS
25
21
10
292
1N
11
00
2012
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8197
8454
06/
28/2
012
28.8
816
7.03
014
77R
11
11
11
09
077
N11
1N
30
082
0013
110
7/2/
2012
30.9
9616
9.14
61
77R
S1
12
11
01
191
N1
10
281
9784
560
7/4/
2012
28.8
816
7.03
014
1L
22
13
110
014
11
S10
81
S2
00
8198
6214
07/
13/2
012
23.9
3116
2.08
19
1L
11
11
177
09
96
S2
21
S2
02
8202
8751
07/
13/2
012
24.2
3116
2.38
128
77L
S1
11
11
028
74
N4
10
081
9840
800
7/15
/201
229
.058
167.
208
1377
R2
25
31
10
1318
1N
11
00
8198
4081
07/
16/2
012
16.0
5815
4.20
814
3R
22
52
11
014
16
N2
211
N2
00
8 200
1313
07/
20/2
012
16.9
3515
5.08
51
77R
S1
12
11
01
191
N1
10
481
9784
620
7/29
/201
225
.88
164.
030
1877
L1
15
11
10
182
1S
11
00
8197
8463
07/
29/2
012
27.0
5816
5.20
818
77L
21
51
11
018
11
S1
10
081
9753
030
8/7/
2012
22.9
7516
1.12
51
77M
M2
12
11
01
1914
N26
10
182
0647
840
8/7/
2012
29.3
2316
7.47
327
77L
S2
13
11
027
96
S1
10
282
0201
240
8/11
/201
216
.058
154.
208
2777
L2
22
31
100
2714
1S
11
00
8197
5304
08/
17/2
012
17.3
7115
5.52
19
77L
S1
12
11
09
077
S30
141
S2
00
8204
3205
08/
17/2
012
25.8
2316
3.97
327
77R
S1
12
11
027
11
N2
10
082
0432
060
8/21
/201
219
.901
158.
051
2777
R1
21
31
100
272
1N
11
00
8201
7225
08/
25/2
012
15.8
6315
4.01
327
77R
S2
13
11
027
141
N77
10
182
0019
720
9/1/
2012
15.5
5815
3.70
814
1L
21
51
11
31 4
141
S2
211
S2
01
8206
4792
09/
8/20
1216
.058
154.
208
977
L1
11
11
10
4013
1S
11
00
8206
4793
09/
13/2
012
31.3
2316
9.47
31
77R
S1
11
11
01
191
N1
10
281
9784
740
9/14
/201
221
.058
159.
208
2777
LS
11
21
10
2714
1S
291
00
8197
8475
09/
15/2
012
26.9
9616
5.14
61
77R
S1
12
11
01
191
N77
10
282
0019
760
9/29
/201
219
.319
157.
469
2777
MM
25
21
100
93
1S
771
00
8197
4861
09/
30/2
012
31.8
5417
0.00
427
77R
S2
13
11
027
11
N12
51
N2
00
8197
5310
010
/1/2
012
24.5
0516
2.65
534
77M
M1
12
11
034
177
N26
10
082
0201
310
10/4
/201
226
.854
165.
004
144
LS
11
11
10
152
1S
2621
8S
20
181
9753
110
10/8
/201
231
.756
169.
906
2777
MM
21
31
10
2714
1N
121
00
8202
2108
010
/11/
2012
31.8
5617
0.00
614
1R
21
11
11
014
211
N12
91
N2
00
820 1
7253
010
/12/
2012
24.3
2316
2.47
327
77L
S1
51
11
027
41
S1
10
081
9637
110
10/1
3/20
1215
.849
153.
999
1377
L1
14
11
10
132
1S
11
00
8197
4865
010
/21/
2012
18.9
3515
7.08
514
4L
21
11
11
014
21
S2
101
S2
03
8197
5314
010
/26/
2012
27.9
5316
6.10
327
77M
M2
12
11
027
11
N12
10
082
0019
920
12/7
/201
230
.323
168.
473
977
R1
11
11
10
90
6N
21
1N
30
182
2534
400
12/7
/201
231
.323
169.
473
2777
LS
15
41
10
2719
1S
261
02
8291
0968
012
/11/
2012
16.7
5515
4.90
527
77R
S2
52
11
027
11
N2
10
181
9748
680
12/2
2/20
1229
.323
167.
473
144
R2
11
11
10
1419
1N
214
1N
20
381
9753
180
12/2
2/20
1226
.954
165.
104
977
MM
11
11
10
00
0S
131
S2
00
8198
7884
012
/31/
2012
15.4
2715
3.57
727
77R
S1
11
11
027
141
N2
10
1
8196
3719
01/
2/20
1322
.85
161.
000
1477
R2
11
21
10
146
1N
11
00
8201
1604
01/
3/20
1323
.905
162.
055
977
RS
15
11
10
4014
1N
11
03
8200
1996
01/
17/2
013
17.0
5815
5.20
814
3R
11
22
11
014
141
N2
51
N2
00
8197
8461
01/
20/2
013
27.9
9616
6.14
627
77M
M1
11
11
027
141
S26
10
082
0965
720
1/21
/201
321
.852
160.
002
154
L2
15
11
10
152
1S
779
8S
20
081
9784
640
1/22
/201
320
.852
159.
002
1877
MM
11
11
110
181 4
15S
771
00
8200
1999
01/
25/2
013
28.8
5316
7.00
327
77M
M1
51
11
027
131
S30
10
182
0153
750
1/28
/201
327
.853
166.
003
2777
MM
15
11
11
2714
15N
11
00
8198
4444
02/
5/20
1318
.058
156.
208
141
RS
11
11
10
141
14N
108
14N
20
082
0172
700
2/23
/201
320
.852
159.
002
144
R2
11
11
10
1410
1N
14
1N
20
182
0172
710
2/23
/201
321
.935
160.
085
2777
RS
15
11
10
271
1N
11
00
2013
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8209
3862
02/
23/2
013
18.0
5815
6.20
827
77R
11
11
11
027
141
N1
10
081
9753
260
2/24
/201
317
.948
156.
098
1377
L1
11
11
10
131
1N
11
00
8197
5327
02/
24/2
013
29.0
5316
7.20
314
4M
M1
12
11
014
196
S2
31
S2
04
8197
5328
03/
4/20
1320
.752
158.
902
141
L1
11
12
40
141
1S
28
1S
20
082
0200
860
3/8/
2013
21.8
5216
0.00
214
1L
21
11
11
014
11
S2
81
S2
02
8201
7294
03/
12/2
013
26.9
2316
5.07
317
77R
21
11
11
017
01
N1
1N
20
082
0354
160
3/18
/201
314
.915
153.
065
577
R2
15
11
10
4021
1N
11 4
1N
20
082
2532
470
3/18
/201
316
.058
154.
208
1977
MM
21
21
10
2818
77N
61
00
8202
0091
03/
22/2
013
28.8
5316
7.00
314
1R
11
12
11
09
06
N77
11
N3
00
8202
0093
03/
31/2
013
26.8
5416
5.00
428
77M
M1
11
11
028
141
N77
10
082
8257
460
4/4/
2013
14.9
2915
3.07
928
77L
S2
12
11
028
11
S12
10
182
0201
080
4/15
/201
329
.852
168.
002
2777
RS
21
21
10
272
1N
21
00
8204
3226
04/
16/2
013
24.3
2316
2.47
314
4R
11
51
11
114
1077
N25
36
N2
01
8225
4978
04/
16/2
013
27.2
2816
5.37
81
77L
S1
11
11
01
191
S29
10
182
9109
850
4/22
/201
325
.651
163.
801
2777
RS
21
31
10
271
1S
21
00
8199
9012
04/
27/2
013
20.0
5815
8.20
89
77L
S1
11
11
09
61
S1
10
082
0432
270
4/27
/201
325
.323
163.
473
2777
R2
15
11
10
2714
1N
221
1N
20
083
2476
760
4/28
/201
328
.996
167.
146
1377
L2
13
11
10
132
1S
11
00
8225
3254
05/
4/20
1318
.935
157.
085
1477
L2
11
11
10
141
1N
28
3S
20
283
1948
040
5/4/
2013
16.0
5815
4.20
830
77M
M2
52
11
130
141
S25
10
082
2549
820
5/9/
2013
25.3
2316
3.47
318
77R
21
11
112
09
211
N1
191
N2
01
8282
5747
05/
10/2
013
27.7
5316
5.90
314
1L
21
41
11
014
11
S2
81
S2
00
8225
3257
05/
18/2
013
24.3
2316
2.47
327
77L
S2
12
11
027
11
S12
10
081
9637
230
5/27
/201
318
.85
157.
000
144
R1
11
21
10
147
11N
122
1N
20
082
8257
480
5/27
/201
328
.053
166.
203
144
L2
11
21
10
140
1S
121
S2
00
8204
3234
05/
31/2
013
26.8
2316
4.97
329
77R
S1
11
11
029
21
N1
10
481
9637
250
6/3/
2013
19.8
8415
8.03
427
77R
S2
23
11
027
21
N12
10
082
0432
350
6/6/
2013
20.8
8415
9.03
427
77M
M2
12
11
027
11
N1
10
282
0432
360
6/11
/201
319
.984
158.
134
2777
MM
21
31
100
271
1N
121
00
8318
3054
06/
18/2
013
19.9
7915
8.12
927
77M
M1
21
11
027
121
S77
11
283
1830
550
6/20
/201
318
.935
157.
085
2777
MM
11
21
10
271
1S
11
01
8204
3238
06/
23/2
013
23.9
0516
2.05
527
77R
S1
12
11
027
11
N2
10
082
0432
390
6/23
/201
325
.851
164.
001
2777
LS
11
21
10
2714
14S
101
00
8324
7683
06/
25/2
013
19.0
5815
7.20
89
77L
S1
51
11
042
115
S77
10
083
1830
570
6/27
/201
320
.852
159.
002
143
L2
11
21
11
141
11S
2513
1S
20
182
0432
420
6/28
/201
319
.884
158.
034
143
L2
11
11
10
142
1S
112
1S
20
083
1830
590
6/29
/201
330
.996
169.
146
143
R1
11
21
10
1414
1N
24
1N
20
582
0354
220
7/3/
2013
18.0
5815
6.20
814
1R
11
11
11
014
93
N2
11
N3
05
8318
3060
07/
4/20
1324
.323
162.
473
2777
MM
21
21
10
271
1E
11
00
8203
5423
07/
9/20
1317
.058
155.
208
141
R1
21
31
100
147
14N
7714
1N
20
082
0354
240
7/15
/201
328
.323
166.
473
143
R2
11
21
10
143
1N
221
1N
20
082
8257
550
7/17
/201
327
.266
165.
416
2777
MM
11
21
10
00
60
11
S2
00
8324
7687
07/
18/2
013
30.4
9616
8.64
614
4L
21
51
11
014
21
S77
91
S2
00
8206
8079
07/
25/2
013
20.4
5315
8.60
322
77M
M2
13
110
022
11
S12
10
083
3274
320
8/1/
2013
24.8
5216
3.00
29
77M
M1
11
11
040
131
N1
10
183
1830
640
8/2/
2013
16.6
5715
4.80
714
77M
M1
51
11
327
113
S77
141
S2
03
8204
3247
08/
4/20
1328
.323
166.
473
3677
LS
21
21
100
368
1S
11
12
8282
5761
08/
8/20
1314
.947
153.
097
1477
R1
14
21
10
021
00
31
N2
02
8366
4737
08/
15/2
013
16.9
3515
5.08
51
77R
S2
12
11
043
1915
N2
10
183
1830
650
8/19
/201
326
.854
165.
004
977
MM
11
11
10
431
1N
261
01
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8366
4738
08/
24/2
013
18.0
5815
6.20
814
4L
11
11
11
014
106
S15
31
S2
00
8334
0326
09/
1/20
1320
.852
159.
002
2777
MM
15
11
10
2714
1S
771
01
8208
4673
09/
3/20
1326
.823
164.
973
1877
L2
15
11
10
921
77O
211
S3
00
8208
4674
09/
3/20
1326
.823
164.
973
141
L2
15
11
10
141
1S
28
1S
20
183
2476
920
9/18
/201
319
.884
158.
034
977
MM
15
11
10
93
1S
11
03
8209
5495
09/
23/2
013
16.0
5815
4.20
814
1L
22
53
110
014
211
S2
41
S2
00
8332
7436
09/
23/2
013
16.0
5815
4.20
814
4L
S2
53
11
014
46
S2
121
S2
00
8 206
7822
010
/5/2
013
18.9
3515
7.08
59
77R
11
12
11
040
91
N1
10
083
1830
750
10/6
/201
330
.996
169.
146
2777
RS
11
21
10
271
1N
11
00
8364
4192
010
/6/2
013
26.8
5416
5.00
434
77L
S1
12
11
036
44
S4
10
083
6646
660
10/7
/201
330
.296
168.
446
2977
LS
21
31
100
4214
1S
301
00
8366
4667
010
/7/2
013
27.8
0316
5.95
310
4R
S2
52
11
215
26
N25
108
N2
20
8318
3076
010
/14/
2013
27.8
2316
5.97
31
77L
21
11
11
01
191
N1
151
S5
02
8366
4671
010
/18/
2013
15.0
7715
3.22
730
77M
M1
32
11
030
11
S29
10
083
6728
840
11/2
4/20
1319
.352
157.
502
977
MM
11
11
10
914
1S
11
02
8332
7448
012
/1/2
013
22.8
516
1.00
014
1R
22
52
11
014
141
N2
714
N2
00
8366
4601
012
/1/2
013
20.8
5215
9.00
214
1L
12
53
110
014
11
S2
81
S2
00
8367
2887
012
/1/2
013
23.3
516
1.50
014
1R
12
13
11 0
014
214
N10
91
N2
00
8368
8042
012
/1/2
013
23.0
516
1.20
029
77R
S2
52
11
042
21
N1
10
183
6646
050
12/2
0/20
1318
.058
156.
208
94
MM
11
11
10
4014
1S
212
1S
20
183
6646
070
12/2
6/20
1326
.854
165.
004
2777
MM
11
11
120
4314
1N
11
01
8324
7709
012
/29/
2013
21.3
5215
9.50
29
77M
M2
12
110
027
136
S77
10
0
8202
2103
01/
1/20
1417
.848
155.
998
141
L1
24
21
10
141
1S
18
14S
30
083
1830
810
1/1/
2014
21.9
3516
0.08
527
77M
M1
12
11
027
131
N1
10
083
1830
820
1/1/
2014
18.0
315
6.18
014
1L
12
52
11
014
81
S12
11
S2
02
8366
4608
01/
1/20
1414
.996
153.
146
3377
LS
21
31
770
4210
15S
11
00
8366
4609
01/
1/20
1422
.058
160.
208
1477
R1
21
21
100
141
1N
28
1N
30
083
6646
140
1/9/
2014
23.0
5816
1.20
814
3L
22
53
110
014
21 1
S2
91
N2
00
8366
4756
01/
9/20
1430
.856
169.
006
977
MM
21
31
100
437
1N
121
00
8206
7827
01/
25/2
014
24.3
2316
2.47
36
77L
11
11
11
06
01
S1
10
183
2477
150
1/25
/201
430
.323
168.
473
181
L2
11
11
10
181
1S
29
13S
40
481
9861
890
2/14
/201
428
.384
166.
534
2777
MM
11
11
10
4014
1N
21
01
8198
6199
02/
14/2
014
28.6
5316
6.80
314
77L
11
21
11
014
111
S2
11
S2
00
836 8
8048
02/
16/2
014
25.8
5316
4.00
318
77R
11
31
112
018
11
N1
10
083
3274
570
2/23
/201
415
.158
153.
308
144
R2
11
11
10
1411
6N
33
1N
20
483
3274
580
2/28
/201
416
.055
154.
205
144
R1
12
11
10
1411
6N
26
1N
20
082
0431
900
3/2/
2014
27.4
2316
5.57
314
3R
21
11
11
014
615
N2
1415
N2
00
8319
0337
03/
3/20
1428
.853
167.
003
2777
MM
11
11
10
273
1N
261
02
8324
7721
03/
6/20
1430
.996
169.
146
977
L1
25
21
120
93
1S
11
00
8324
7722
03/
6/20
1430
.996
169.
146
977
L2
25
21
120
914
1S
11
00
8200
1990
03/
10/2
014
16.8
5715
5.00
710
77R
21
11
11
010
158
N4
1N
20
183
3006
920
3/22
/201
418
.235
156.
385
144
R2
13
11
11
143
1N
2512
1N
20
083
6880
530
3/25
/201
427
.384
165.
534
141
L2
21
21
10
141
1S
778
1S
20
082
0431
930
3/29
/201
417
.835
155.
985
141
L1
25
21
100
141
1 4S
28
14S
20
183
6646
240
3/30
/201
429
.852
168.
002
977
MM
15
11
10
4314
14S
301
00
8204
3195
04/
6/20
1419
.884
158.
034
2777
MM
15
11
10
271
16S
21
00
8209
5496
04/
17/2
014
14.9
0115
3.05
130
77M
M1
22
11
030
181
S77
10
182
9035
350
4/21
/201
418
.058
156.
208
2777
MM
11
11
10
2714
1N
21
01
8332
7466
05/
2/20
1424
.852
163.
002
141
L1
15
11
10
141
1S
221
1S
20
2
2014
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8368
8057
05/
2/20
1431
.756
169.
906
1877
L2
25
21
120
181
1S
11
00
8379
7346
05/
2/20
1420
.852
159.
002
2777
MM
25
21
10
271
15S
771
01
8206
7828
05/
14/2
014
21.8
5216
0.00
210
77L
S1
12
11
010
2114
S2
128
S2
01
8323
9798
05/
14/2
014
20.5
5215
8.70
227
77L
S1
12
11
027
21
S1
10
083
2477
250
5/16
/201
430
.323
168.
473
2777
MM
11
11
10
2714
1S
11
00
8224
7851
05/
26/2
014
22.0
5816
0.20
827
77L
S1
51
11
027
141
S2
10
283
6646
300
5/30
/201
417
.058
155.
208
141
R1
21
31
100
141
1N
28
1 4N
20
182
2478
520
6/8/
2014
28.8
5916
7.00
927
77R
S2
53
110
028
121
N29
10
283
7720
240
6/11
/201
421
.352
159.
502
2777
LS
25
31
10
273
1S
771
00
8366
4694
06/
12/2
014
14.9
7715
3.12
727
77R
S2
13
110
027
21
N30
10
083
6646
330
6/23
/201
420
.058
158.
208
977
LS
21
31
100
409
1S
11
00
8366
4772
06/
24/2
014
21.9
3516
0.08
527
77M
M1
51
11
027
141
S1
10
083
6647
730
6/29
/201
430
.996
169.
146
2777
L2
15
11
10
402
77S
261
1S
20
483
7539
240
6/30
/201
418
.85
157.
000
2777
MM
15
11
10
2719
1S
121
00
8366
4634
07/
8/20
1416
.058
154.
208
3077
MM
21
31
100
432
1S
11
00
8290
3544
07/
10/2
014
18.0
5815
6.20
839
77L
S2
13
11
039
131
S2
10
082
9035
450
7/18
/201
429
.058
167.
208
1477
LS
11
11
10
1421
1S
11
00
8379
7361
07/
19/2
014
17.9
6215
6.11
214
1R
11
11
11
01 4
11
N10
81
N2
06
8379
7365
07/
26/2
014
24.7
7616
2.92
627
77R
S2
23
110
042
11
S2
10
383
2477
300
7/27
/201
426
.323
164.
473
977
RS
15
11
10
421
1N
11
04
8379
7277
07/
27/2
014
30.0
5816
8.20
814
1L
21
11
11
014
141
S10
71
N2
00
8381
8692
07/
28/2
014
16.2
8115
4.43
127
77L
11
11
177
027
191
S77
10
182
2478
530
8/3/
2014
18.8
5615
7.00
627
77M
M2
12
110
09
11
S2
10
083
7720
310
8/16
/201
423
.35
161.
500
1477
LS
21
31
10
426
1S
1214
1S
20
183
7973
720
8/26
/201
424
.851
163.
001
977
MM
11
11
10
4313
1S
21
00
8379
7373
08/
26/2
014
29.3
7116
7.52
17
77R
21
11
11
07
01
S15
1S
20
083
6728
960
9/5/
2014
26.3
5116
4.50
114
1R
22
13
110
014
21
N10
91
N2
00
8199
9023
09/
13/2
014
17.5
9815
5.74
827
77M
M2
12
11
027
110
N6
10
183
1882
020
9/18
/201
419
.884
158.
034
977
LS
11
41
10
4014
1S
21
00
8366
4699
09/
24/2
014
23.3
2316
1.47
329
77R
S2
13
11
09
141
N1
10
083
8187
020
9/27
/201
429
.996
168.
146
2777
RS
13
11
10
271
1N
21
02
8367
4953
010
/9/2
014
20.8
3315
8.98
328
77R
S1
11
11
028
377
N30
10
083
7972
860
10/9
/201
419
.058
157.
208
2777
MM
15
11
10
271
1N
11
00
8366
4642
010
/12/
2014
26.8
5416
5.00
427
77M
M1
11
112
043
141
S1
10
083
7972
870
10/1
5/20
1431
.339
169.
489
141
R1
15
11
10
141
1N
28
1N
20
083
7045
530
10/1
8/20
1425
.058
163.
208
141
L2
15
11
10
142
1S
29
1S
20
882
9035
520
10/1
9/20
1424
.058
162.
208
144
R2
11
11
10
1410
6N
153
1N
20
083
7720
340
10/2
0/20
1423
.655
161.
805
1877
R1
11
11
10
90
1N
7715
1N
20
082
9035
530
10/2
2/20
1426
.323
164.
473
2977
MM
11
21
10
294
8O
10
083
7720
360
10/2
7/20
1416
.099
154.
249
144
R2
11
11
10
144
1N
212
1N
20
083
6647
010
10/3
1/20
1422
.323
160.
473
2777
R2
12
21
10
93
1N
1021
1N
20
083
1882
030
11/5
/201
429
.852
168.
002
577
LS
11
11
10
402
1S
21
00
8330
0704
011
/9/2
014
18.9
3515
7.08
527
77M
M2
13
14
027
11
S1
10
083
2398
080
11/1
8/20
1419
.31
157.
460
141
L2
15
21
11
142
1S
29
1S
20
383
7 972
910
11/2
1/20
1428
.058
166.
208
2777
MM
15
11
10
271
1N
11
01
8206
7835
011
/23/
2014
22.8
516
1.00
028
77L
S1
12
11
028
26
S2
10
083
6646
450
11/3
0/20
1420
.058
158.
208
3777
RS
11
11
10
421
1N
11
00
8370
4559
012
/2/2
014
30.8
5416
9.00
414
1R
22
13
110
014
11
N77
81
N2
02
8330
0711
012
/5/2
014
18.0
1115
6.16
114
1L
21
51
11
014
211
S2
211
S2
00
8377
4969
012
/5/2
014
30.0
5816
8.20
827
77M
M2
12
110
027
141
S29
10
1
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8332
7481
012
/11/
2014
28.8
5316
7.00
31
77R
S1
11
11
042
191
N1
10
183
7466
250
12/1
5/20
1423
.323
161.
473
1377
R2
15
11
10
131
1N
11
00
8367
4955
012
/16/
2014
17.8
8615
6.03
628
77R
S1
51
11
028
74
S4
10
0
8317
7434
01/
1/20
1516
.058
154.
208
141
R2
21
31
10
142
1N
21
1N
20
083
1774
350
1/2/
2015
19.0
5815
7.20
814
1R
11
12
11
014
1414
N77
713
N2
00
8379
7300
01/
2/20
1516
.058
154.
208
3477
LS
21
31
10
3411
15W
121
00
8366
4704
01/
13/2
015
16.0
5815
4.20
89
77L
21
12
11
040
21
S77
10
1983
6646
500
1/18
/201
517
.058
155.
208
177
MM
11
11
10
4313
1N
11
01
8366
4651
01/
21/2
015
16.0
5815
4.20
830
77M
M1
41
11
043
141
N1
10
083
3274
890
1/31
/201
528
.853
167.
003
1777
L1
15
11
10
50
1S
772
1S
20
083
6646
520
2/13
/201
521
.852
160.
002
141
R2
15
11
10
00
00
914
N3
00
8366
4653
02/
14/2
015
21.8
5216
0.00
214
1L
21
51
11
014
11
S2
91
S2
00
8323
5638
02/
22/2
015
15.1
5815
3.30
814
3R
11
11
11
014
1317
N3
31
N3
00
8379
7395
02/
23/2
015
19.9
615
8.11
018
77L
11
11
11
018
181
S1
10
083
7466
290
2/28
/201
515
.115
153.
265
144
R2
21
21
10
141
6N
7710
1N
20
083
8146
190
3/7/
2015
31.0
5816
9.20
827
77L
21
12
11
09
06
S1
1S
20
083
7720
490
3/13
/201
527
.354
165.
504
2777
LS
25
21
10
273
1S
771
00
8323
5641
03/
16/2
015
20.8
3315
8.98
317
77L
21
11
112
017
151
S1
10
083
7466
330
3/23
/201
529
.323
167.
473
141
R2
15
21
10
141
1N
28
1N
20
383
7466
340
3/24
/201
514
.92
153.
070
3077
L1
21
21
10
301
17S
778
1S
30
283
6646
550
3/26
/201
526
.055
164.
205
977
RS
11
21
10
277
1N
771
00
8323
9821
03/
29/2
015
21.8
6716
0.01
727
77R
S1
12
11
027
141
S2
10
083
6646
580
3/29
/201
517
.055
155.
205
154
R1
11
11
10
155
0N
210
13N
20
083
7743
340
3/29
/201
521
.852
160.
002
1477
R1
15
11
10
1414
10N
772
1N
20
083
2002
940
4/1/
2015
15.0
6115
3.21
114
4R
11
51
11
014
121
N4
1N
20
282
0678
450
4/3/
2015
19.8
8415
8.03
414
1R
11
11
11
014
214
N2
914
N2
00
8332
7492
04/
3/20
1531
.856
170.
006
144
L1
11
11
10
1413
1S
293
1S
20
382
0938
770
4/14
/201
524
.323
162.
473
2777
LS
23
11
10
271
1S
21
00
8199
9033
04/
15/2
015
17.3
5715
5.50
732
77R
S1
11
11
042
81
N1
10
083
7720
540
4/19
/201
519
.384
157.
534
1477
R2
11
11
10
2713
1S
7714
1N
20
183
8 146
210
4/19
/201
518
.058
156.
208
2777
MM
25
21
10
2714
1S
21
00
8327
4832
05/
14/2
015
20.8
615
9.01
05
77R
21
11
11
040
181
S77
111
S2
00
8381
4622
05/
23/2
015
15.0
8615
3.23
627
77R
S1
51
11
027
11
N1
01
8367
2917
05/
24/2
015
28.3
5316
6.50
314
4R
21
12
11
09
477
S31
131
S2
01
8367
2918
05/
27/2
015
29.3
5216
7.50
215
1L
21
11
177
015
277
S2
913
S2
03
8370
1000
05/
27/2
015
28.3
5316
6.50
328
77M
M1
11
11
028
84
S4
10
083
2398
240
5/28
/201
523
.55
161.
700
141
L2
11
21
12
1421
1S
771
1S
21
484
5159
480
5/28
/201
518
.058
156.
208
273
MM
15
11
10
450
1N
211
N2
00
8451
5949
05/
31/2
015
15.0
8615
3.23
613
77L
21
51
11
013
11
S1
10
083
7720
570
6/2/
2015
18.7
5515
6.90
529
77L
S1
21
11
042
81
S77
10
083
6729
190
6/3/
2015
23.4
0516
1.55
528
88M
M1
51
11
028
010
U1
00
8206
7832
06/
13/2
015
20.3
8415
8.53
427
77M
M1
11
11
027
141
S2
10
083
6729
260
7/13
/201
524
.405
162.
555
1377
L2
15
11
110
131
1S
11
00
8206
7837
07/
18/2
015
21.8
5216
0.00
227
77L
11
12
11
027
91
S1
10
083
7466
410
7/18
/201
518
.03
156.
180
1877
RS
15
11
10
1821
1N
771
1N
20
083
6647
210
7/19
/201
515
.071
153.
221
1877
R2
15
21
120
1818
1N
11
01
8379
7314
07/
19/2
015
16.0
5815
4.20
818
77R
11
51
11
018
11
N1
10
083
7973
150
7/19
/201
517
.058
155.
208
1877
R1
15
11
10
1818
1N
11
00
8377
2062
07/
24/2
015
24.1
5516
2.30
514
4L
11
51
11
00
00
S3
1S
20
0
2015
Cras
h Nu
mbe
rEv
ent C
rash
Da
te
Crsh
Loc
Fina
l MP
On
Road
way
Turn
pike
M
M
Firs
t Ha
rmfu
l Ev
ent
Code
Impa
ct
Type
Cod
e
Acci
dent
Si
de O
f Ro
ad
Lane
Of
Acci
dent
Co
de
Road
Su
rfac
e Co
nditi
on
Code
Light
ing
Cond
ition
Co
de
Even
t W
eath
er
Cond
ition
Co
de
Wor
k Zo
ne
Rela
ted
Code
Firs
t Roa
d Co
nditi
on
Code
Alco
hol
Invo
lved
In
Acc
. Co
de
Veh
#1
Harm
ful
Even
t Seq
01
Cd
Veh
#1
Poin
t Of
Impa
ct
Veh
#1
Mov
emen
t Co
de
Veh
#1
Dire
ctio
n O
f Tra
vel
Veh
#1
Firs
t Dr
iver
Ac
tion
Cd
Veh
#2
Poin
t Of
Impa
ct
Veh
#2
Mov
emen
t Co
de
Veh
#2
Dire
ctio
n O
f Tra
vel
Tota
l Nu
mbe
r O
f Veh
icle
Tota
l Nu
mbe
r O
f Fat
ality
Tota
l of
Inju
ries
Num
ber
8377
2064
07/
28/2
015
26.6
0416
4.75
414
4L
11
51
11
014
211
S3
1S
20
082
0678
460
7/29
/201
517
.735
155.
885
2977
LS
21
31
100
2914
1S
11
00
8377
2068
08/
9/20
1524
.602
162.
752
2777
LS
15
11
10
271
1S
771
00
8374
6645
08/
16/2
015
25.3
2316
3.47
328
77M
M1
12
11
027
141
N25
10
083
7539
560
8/20
/201
517
.849
155.
999
141
L1
15
11
10
142
1S
298
1S
20
083
2852
210
8/21
/201
518
.35
156.
500
2977
R1
11
11
10
4018
1N
14
1N
20
283
2852
230
9/5/
2015
20.8
5215
9.00
227
77M
M2
13
110
027
16
N1 2
201
S2
01
8333
9221
09/
5/20
1520
.358
158.
508
2777
MM
21
21
100
271
1S
301
00
8367
2933
09/
5/20
1520
.352
158.
502
93
L2
21
31
100
91
11S
214
1S
20
183
7466
470
9/5/
2015
18.9
3515
7.08
527
77M
M2
13
11
027
81
N10
10
083
7539
580
9/9/
2015
31.8
5617
0.00
614
1R
11
51
11
214
106
N25
277
N2
00
8381
2091
09/
9/20
1520
.058
158.
208
1477
LS
188
771
10
144
1S
118
S2
00
8456
7548
09/
12/2
015
20.8
5215
9.00
218
77R
11
12
11
018
151
N1
10
083
8120
940
9/26
/201
519
.058
157.
208
1377
R2
12
11
10
131
1N
11
00
8367
2935
010
/7/2
015
20.8
5215
9.00
29
77M
M1
51
11
145
16
N2
10
183
3392
270
10/1
2/20
1531
.799
169.
949
143
R1
11
11
10
010
00
31
N2
00
8374
6650
010
/15/
2015
16.9
3515
5.08
59
77R
S1
11
11
040
31
N1
10
083
2852
270
10/1
7/20
1523
.323
161.
473
141
L1
15
11
10
1 41
1S
221
1S
20
083
3392
300
10/2
2/20
1527
.423
165.
573
1377
LS
11
11
10
132
1S
11
01
8367
2937
010
/25/
2015
17.3
5715
5.50
79
77M
M1
51
11
09
141
S2
10
084
8706
170
10/2
5/20
1522
.935
161.
085
141
L1
11
11
10
141
1S
28
1S
40
083
7466
540
10/3
0/20
1521
.935
160.
085
1877
L1
15
21
10
181
1S
11
00
8365
6739
011
/6/2
015
20.3
7715
8.52
79
77M
M1
11
11
040
141
N1
10
383
6567
420
11/1
3/20
1527
.223
165.
373
2977
LS
21
31
100
422
1S
261
00
8367
2942
011
/17/
2015
21.3
5215
9.50
214
4L
22
53
188
014
088
U13
1S
20
383
6729
430
11/1
9/20
1515
.347
153.
497
477
R2
25
31
100
46
15N
121
01
8328
5230
011
/27/
2015
16.9
8115
5.13
136
77M
M1
12
11
027
114
N2
10
083
2852
310
11/2
8/20
1515
.158
153.
308
144
R1
11
11
10
1413
6N
34
1N
30
083
7 466
650
11/3
0/20
1529
.323
167.
473
2777
LS
21
21
10
2714
1S
771
00
8370
6455
012
/3/2
015
14.9
1515
3.06
59
77M
M2
43
110
030
11
S29
10
083
7545
290
12/3
/201
518
.935
157.
085
2977
LS
21
21
100
422
5S
301
00
8370
6456
012
/4/2
015
31.2
8216
9.43
214
4R
12
52
11
014
1277
N25
411
N2
00
8374
6666
012
/7/2
015
26.3
2316
4.47
327
77R
S1
12
11
027
177
S1
10
083
7545
310
12/1
0/20
1531
.496
169.
646
977
RS
11
11
10
4010
1N
291
01
8375
4536
012
/18/
2015
29.8
5216
8.00
29
77R
S2
52
110
09
31
N2
10
285
1373
610
12/2
2/20
1517
.963
156.
113
2777
MM
11
11
10
431
1S
261
01
8524
7997
012
/24/
2015
28.8
5316
7.00
314
88R
11
31
11
014
11
N1
10
083
8180
360
12/2
5/20
1527
.228
165.
378
2777
MM
11
11
10
279
15S
7710
15S
20
1
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix G Cost Estimate
PAY
ITEM
NUM
BER
ITEM
DES
CRIP
TIO
NUN
ITUN
IT P
RICE
QUA
NTIT
YCO
ST11
0-1-
1CL
EARI
NG A
ND G
RUBB
ING
AC5,
250.
00$
4.60
24
,150
.00
$
11
0-3
REM
OVA
L OF
EXIS
ITNG
BRI
DGES
SF35
.00
$
21
,315
.00
746,
025.
00$
110-
4-10
REM
OVA
L OF
EXIS
ITNG
CO
NCRE
TESY
20.0
0$
910
18,2
00.0
0$
120-
6EM
BANK
MEN
TCY
6.25
$
3,08
5
19,2
81.2
5$
160-
4TY
PE B
STA
BILI
ZATI
ON
SY3.
25$
10
,600
34,4
50.0
0$
285-
701
OPT
IONA
L BAS
E GR
OUP
1SY
7.50
$
4,24
0
31,8
00.0
0$
285-
706
OPT
IONA
L BAS
E GR
OUP
6SY
15.0
0$
6,36
0
95,4
00.0
0$
334-
1SU
PERP
AVE
ASPH
ALTI
C CO
NCRE
TETN
95.0
0$
465.
0
44,1
75.0
0$
339-
1M
ISCE
LLAE
OUS
ASP
HALT
PAV
EMEN
TTN
210.
00$
14
6.0
30
,660
.00
$
42
5-11
MO
DIFY
EXI
STIN
G DR
AINA
GE S
TRUC
TURE
EA2,
500.
00$
4
10,0
00.0
0$
520-
6SH
OUL
DER
GUTT
ER -
CONC
RETE
LF20
.00
$
4,
770
95
,400
.00
$
53
6-1-
1GU
ARDR
AIL
LF18
.00
$
4,
770
85
,860
.00
$
57
0-1-
2PE
RFO
RMAN
CE T
URF,
SO
DSY
2.
50$
6,
360
15
,900
.00
$
BR
IDGE
REP
LACE
MEN
TSF
150.
00$
24
,860
3,72
9,04
0.00
$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTEN
ANCE
OF
TRAF
FIC
CONT
INGE
NCY
Cons
truc
tion
Cost
Est
imat
e fo
r Brid
ge R
econ
stru
ctio
nTu
rnpi
ke M
ainl
ine
(SR
91) R
esur
faci
ng a
nd S
afet
y Im
prov
emen
ts
from
MM
153
.230
to M
M 1
69.3
20St
. Luc
ie C
ount
y, F
lorid
a FP
ID N
umbe
rs 4
3651
7-1-
52-0
1 an
d 43
6517
-3-5
2-01
Cont
ract
Num
ber C
9R86 To
tal C
ost
7,22
1,49
4.81
$
Subt
otal
4,98
0,34
1.25
$
10
%
UTIL
ITY
IMPA
CTS
498,
034.
13$
10%
10%
10%
498,
034.
13$
-$
49
8,03
4.13
$
P.
E.C.
E.I.
15%
747,
051.
19$
PAY
ITEM
NUM
BER
ITEM
DES
CRIP
TIO
NUN
ITUN
IT P
RICE
QUA
NTIT
YCO
ST11
0-1-
1CL
EARI
NG A
ND G
RUBB
ING
AC5,
250.
00$
4.60
24
,150
.00
$
11
0-4-
10RE
MO
VAL O
F EX
ISIT
NG C
ONC
RETE
SY20
.00
$
91
0
18
,200
.00
$
12
0-6
EMBA
NKM
ENT
CY6.
25$
3,
085
19
,281
.25
$
16
0-4
TYPE
B S
TABI
LIZA
TIO
NSY
3.25
$
10,6
00
34
,450
.00
$
28
5-70
1O
PTIO
NAL B
ASE
GRO
UP 1
SY7.
50$
4,
240
31
,800
.00
$
28
5-70
6O
PTIO
NAL B
ASE
GRO
UP 6
SY15
.00
$
6,
360
95
,400
.00
$
33
4-1
SUPE
RPAV
E AS
PHAL
TIC
CONC
RETE
TN95
.00
$
46
5.0
44
,175
.00
$
33
9-1
MIS
CELL
AEO
US A
SPHA
LT P
AVEM
ENT
TN21
0.00
$
146.
0
30,6
60.0
0$
425-
11M
ODI
FY E
XIST
ING
DRAI
NAGE
STR
UCTU
REEA
2,50
0.00
$
4
10
,000
.00
$
52
0-6
SHO
ULDE
R GU
TTER
- CO
NCRE
TELF
20.0
0$
4,77
0
95,4
00.0
0$
536-
1-1
GUAR
DRAI
LLF
18.0
0$
4,77
0
85,8
60.0
0$
570-
1-2
PERF
ORM
ANCE
TUR
F, S
OD
SY
2.50
$
6,36
0
15,9
00.0
0$
*BR
IDGE
JACK
ING
1,16
6,00
0.00
$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTEN
ANCE
OF
TRAF
FIC
250,
691.
44$
Tota
l Cos
t2,
423,
350.
56$
* Th
e ap
proa
ch to
det
erm
ine
the
cost
was
bas
ed o
n a
proj
ect w
here
jack
ing
oper
atio
n w
as n
eede
d fo
r a fo
ur sp
an b
ridge
with
3 n
ight
s of
oper
atio
n to
jack
2" r
angi
ng fr
om $
250k
to $
500k
. Cos
ts a
lso in
clude
subs
truc
ture
reha
bilit
atio
n (i.
e. p
edes
tal r
etro
fits)
.
10%
167,
127.
63$
Cons
truc
tion
Cost
Est
imat
e fo
r Brid
ge Ja
ckin
gTu
rnpi
ke M
ainl
ine
(SR
91) R
esur
faci
ng a
nd S
afet
y Im
prov
emen
ts
from
MM
153
.230
to M
M 1
69.3
20St
. Luc
ie C
ount
y, F
lorid
a FP
ID N
umbe
rs 4
3651
7-1-
52-0
1 an
d 43
6517
-3-5
2-01
Cont
ract
Num
ber C
9R86 Su
btot
al1,
671,
276.
25$
10%
167,
127.
63$
UTIL
ITY
IMPA
CTS
10%
-$
CO
NTIN
GENC
Y10
%16
7,12
7.63
$
P.
E.C.
E.I.
15%
PAY
ITEM
NUM
BER
ITEM
DES
CRIP
TIO
NUN
ITUN
IT P
RICE
QUA
NTIT
YCO
ST11
0-1-
1CL
EARI
NG
AND
GRUB
BIN
GAC
5,25
0.00
$
5.
30
27,8
25.0
0$
120-
6EX
CAVA
TIO
NCY
6.25
$
9,28
0
58,0
00.0
0$
160-
4TY
PE B
STA
BILI
ZATI
ON
SY3.
25$
11
,750
38,1
87.5
0$
285-
701
OPT
ION
AL B
ASE
GRO
UP 1
SY7.
50$
5,
340
40
,050
.00
$
28
5-70
9O
PTIO
NAL
BAS
E GR
OUP
9SY
18.0
0$
6,41
0
115,
380.
00$
334-
1SU
PERP
AVE
ASPH
ALTI
C CO
NCR
ETE
TN95
.00
$
2,
600.
0
247,
000.
00$
339-
1M
ISCE
LLAE
OUS
ASP
HALT
PAV
EMEN
TTN
210.
00$
14
6.0
30
,660
.00
$
53
6-1-
1GU
ARDR
AIL
LF18
.00
$
90
0
16
,200
.00
$
57
0-1-
2PE
RFO
RMAN
CE T
URF,
SO
DSY
2.
50$
10
,410
26,0
25.0
0$
101-
1M
OBI
LIZA
TIO
N10
2-1
MAI
NTE
NAN
CE O
F TR
AFFI
C
P.E.
C.E.
I.15
%89
,899
.13
$
Tota
l Cos
t86
9,02
4.88
$
UTIL
ITY
IMPA
CTS
10%
-$
CO
NTI
NGE
NCY
10%
59,9
32.7
5$
10%
59,9
32.7
5$
Cons
truc
tion
Cost
Est
imat
e fo
r Low
erin
g SR
91
Turn
pike
Mai
nlin
e (S
R 91
) Res
urfa
cing
and
Saf
ety
Impr
ovem
ents
fr
om M
M 1
53.2
30 to
MM
169
.320
St. L
ucie
Cou
nty,
Flo
rida
FPID
Num
bers
436
517-
1-52
-01
and
4365
17-3
-52-
01Co
ntra
ct N
umbe
r C9R
86 Subt
otal
599,
327.
50$
10
%59
,932
.75
$
Vertical Clearance Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01
Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320
Appendix H Project Schedule
Activ
ity ID
PSM
Activ
ity N
ame
Orig Dur
Rem Dur
Star
tFi
nish
Dur
atio
n %
Com
plet
eC
alen
dar
Tota
lFl
oat
Free
Floa
t
4365
17-1
RES
4365
17-1
RES
UR
FAC
4365
17-1
RES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST
LUC
IE C
OU
NTY
, (M
P 15
3.23
- 16
9.32
)71
933
605
-Sep
-15
A01
-Jul
-18
53.2
7%0
0
RESU
RFAC
E TP
RESU
RFAC
E TP
K M
AIRE
SURF
ACE
TPK
MAI
NLIN
E IN
ST.
LUC
IE C
OUN
TY, M
P 15
3.23
- 16
9.32
719
336
05-S
ep-1
5 A
01-J
ul-1
853
.27%
00
PE -
DES
IGN
PE -
DES
IGN
PE -
DES
IGN
534
151
05-S
ep-1
5 A
09-O
ct-1
771
.72%
185
0
PUB
LIC
INVO
LVPU
BLI
C IN
VOLV
EMEN
PUB
LIC
INVO
LVEM
ENT
66
24-A
pr-1
701
-May
-17
0%5-
Day
293
0R
3610
020
610
CO
OR
DIN
ATE
W/ E
MO
REG
ARD
ING
PU
BLIC
INVO
LVEM
ENT
55
24-A
pr-1
7*28
-Apr
-17
0%5-
Day
293
0R
3610
030
610
DO
CU
MEN
T PR
OPO
SED
PU
BLIC
INVO
LVEM
ENT
ACTI
VITI
ES1
101
-May
-17
01-M
ay-1
70%
5-D
ay29
329
3
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
SCO
PFI
NAL
DES
IGN
- SC
OPE
OF
SER
VIC
ES &
MH
EST
IMAT
E67
005
-Sep
-15
A10
-Dec
-15
A10
0%0
R31
6400
016
4PR
EPAR
E D
RAF
T SC
OPE
OF
SER
VIC
ES -
Obt
ain
Scop
e Te
mpl
, dev
el d
raft
SOS
160
05-S
ep-1
5 A
20-S
ep-1
5 A
100%
7 D
ayR
3724
420
724
DIS
CIP
LIN
E R
EVIE
W D
RAF
T SO
S - D
EVEL
OP
MH
EST
IMAT
ES6
006
-Oct
-15
A12
-Oct
-15
A10
0%5-
Day
R39
9002
072
4R
EQU
EST
CR
ASH
DAT
A FR
OM
TR
AFFI
C O
PS1
015
-Oct
-15
A15
-Oct
-15
A10
0%5-
Day
R37
2443
072
4R
EVIS
E D
RAF
T SC
OPE
OF
SER
VIC
ES5
018
-Nov
-15
A22
-Nov
-15
A10
0%7
Day
R37
2444
072
4D
ISC
IPLI
NES
REV
IEW
PR
E-FI
NAL
SO
S6
020
-Nov
-15
A01
-Dec
-15
A10
0%5-
Day
R31
6410
016
4FI
NAL
IZE
SCO
PE O
F SE
RVI
CES
/MAN
HO
UR
EST
IMAT
E5
004
-Dec
-15
A10
-Dec
-15
A10
0%5-
Day
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
CO
NS
FIN
AL D
ESIG
N -
CO
NSU
LTAN
T C
ON
TRAC
T AC
QUIS
ITIO
N21
40
04-J
an-1
6 A
01-N
ov-1
6 A
100%
0R
3724
101
724
CO
NFI
RM
AD
INFO
RM
ATIO
N (M
ajor
& M
inor
Wor
k Ty
pes
Verif
ied)
50
04-J
an-1
6 A
08-J
an-1
6 A
100%
5-D
ayR
3724
105
724
MEE
T W
ITH
TR
C/T
RC
KIC
KOFF
MEE
TIN
G1
009
-Jan
-16
A09
-Jan
-16
A10
0%7
Day
R37
2408
072
4TP
K R
EVIE
W F
INAL
DR
AFT
SOS
(Kat
hy/B
riann
a)5
011
-Jan
-16
A15
-Jan
-16
A10
0%7
Day
R37
2409
072
4SU
BMIT
FIN
AL D
RAF
T SO
S TO
PSU
10
18-J
an-1
6 A
18-J
an-1
6 A
100%
7 D
ayR
3724
100
724
POST
PLA
NN
ED A
D O
N F
DO
T W
EB S
ITE
*1
025
-Jan
-16
A25
-Jan
-16
A10
0%M
onR
3990
000
990
DES
IGN
CO
NSU
LTAN
T C
ON
TRAC
T AC
QU
ISIT
ION
(H
amm
ock)
198
025
-Jan
-16
A01
-Nov
-16
A10
0%5-
Day
R37
2420
572
4H
OLD
TEC
H P
ANEL
MEE
TIN
GS
*2
004
-Feb
-16
A05
-Feb
-16
A10
0%5-
Day
R32
3210
023
2FO
RM
AL A
D A
PPEA
RS
ON
FD
OT
WEB
PAG
E (C
one
of S
ilenc
e)*
10
22-F
eb-1
6 A
22-F
eb-1
6 A
100%
Mon
R39
9005
072
4LE
TTER
S O
F R
ESPO
NSE
LO
Rs
DU
E D
ATE
*1
007
-Mar
-16
A07
-Mar
-16
A10
0%M
onR
3724
130
724
PREP
ARE
LON
G L
IST
PAC
KAG
E *
50
08-M
ar-1
6 A
14-M
ar-1
6 A
100%
5-D
ayR
3724
140
724
TEC
H. R
EV. C
OM
MIT
TEE
EVAL
UAT
E LO
NG
LIS
T PK
G. *
50
15-M
ar-1
6 A
21-M
ar-1
6 A
100%
5-D
ayR
3990
040
724
LON
GLI
ST T
RC
MEE
TIN
G *
10
28-M
ar-1
6 A
28-M
ar-1
6 A
100%
Mon
R34
0110
040
1SE
LEC
TIO
N C
OM
MIT
TEE
SHO
RT
LIST
CO
NSU
LTAN
TS *
10
08-A
pr-1
6 A
08-A
pr-1
6 A
100%
Fri
R37
2418
072
4SE
ND
RFP
*1
018
-Apr
-16
A18
-Apr
-16
A10
0%M
onR
3230
000
230
SCO
PE O
F SE
RVI
CES
MEE
TIN
G (
Shor
tlist F
irms)
*1
025
-Apr
-16
A25
-Apr
-16
A10
0%M
onR
3990
060
230
DEA
DLI
NE
FOR
TEC
HIN
ICAL
QU
ESTI
ON
S *
10
02-M
ay-1
6 A
02-M
ay-1
6 A
100%
Mon
R39
9007
023
0C
ON
SULT
ANT
PAC
KETS
DU
E *
10
09-M
ay-1
6 A
09-M
ay-1
6 A
100%
Mon
R32
4900
024
9R
ECV.
WR
ITTE
N P
RO
POSA
LS/C
ON
DU
CT
OR
AL T
ECH
NIC
ALS
*1
027
-May
-16
A27
-May
-16
A10
0%Fr
iR
3724
220
724
TEC
HN
ICAL
EVA
LUAT
ION
*2
027
-May
-16
A31
-May
-16
A10
0%5-
Day
R39
9008
072
4TR
C S
CO
RES
DU
E *
10
03-J
un-1
6 A
03-J
un-1
6 A
100%
Fri
R34
0210
040
2FI
NAL
SEL
ECTI
ON
CO
MM
ITTE
E M
EETI
NG
S *
10
13-J
un-1
6 A
13-J
un-1
6 A
100%
Mon
R37
2433
072
4PR
EPAR
E C
ON
TRAC
T50
022
-Jun
-16
A31
-Aug
-16
A10
0%5-
Day
R37
2429
572
4SC
OPE
CLA
RIF
ICAT
ION
MEE
TIN
G1
029
-Jun
-16
A29
-Jun
-16
A10
0%5-
Day
R37
2402
072
4U
NIT
S M
EETI
NG
10
14-J
ul-1
6 A
14-J
ul-1
6 A
100%
5-D
ayR
3724
300
724
STAF
FHO
UR
NEG
OTI
ATIO
NS
MEE
TIN
GS
10
15-A
ug-1
6 A
15-A
ug-1
6 A
100%
5-D
ayR
3724
310
724
CO
NSU
LTAN
T SU
BMIT
FIN
AL P
RIC
E PR
OPO
SAL/
AUD
IT P
KG5
025
-Aug
-16
A31
-Aug
-16
A10
0%5-
Day
R37
2432
072
4PR
E-AW
ARD
AU
DIT
EVA
LUAT
ION
30
01-S
ep-1
6 A
06-S
ep-1
6 A
100%
5-D
ayR
3990
100
990
AWAR
D C
ON
TRAC
T
(Ham
moc
k)43
001
-Sep
-16
A01
-Nov
-16
A10
0%5-
Day
R37
2433
572
4TU
RN
PIKE
LEG
AL R
EVIE
W C
ON
TRAC
T1
014
-Oct
-16
A14
-Oct
-16
A10
0%5-
Day
R37
2434
072
4SE
ND
CO
NTR
ACT
TO C
ON
SULT
ANT
50
24-O
ct-1
6 A
28-O
ct-1
6 A
100%
5-D
ayR
3299
000
299
REQ
UES
T FU
ND
S1
027
-Oct
-16
A27
-Oct
-16
A10
0%5-
Day
R37
2436
072
4R
ECEI
VED
SIG
NED
CO
NTR
ACT
10
31-O
ct-1
6 A
31-O
ct-1
6 A
100%
5-D
ayR
3233
000
233
EXEC
UTE
CO
NTR
ACT
(DES
IGN
)1
001
-Nov
-16
A01
-Nov
-16
A10
0%5-
Day
PAVE
MEN
T D
EPA
VEM
ENT
DES
IGN
PK
PAVE
MEN
T D
ESIG
N P
KG
& T
YPIC
AL S
ECTI
ON
149
3421
-Sep
-16
A24
-Apr
-17
77.1
8%5-
Day
200
R31
9710
019
7R
EQU
EST
ESAL
(18
KIP)
CAL
CU
LATI
ON
S &
TRAF
FIC
DAT
AFR
OM
PLA
NN
ING
10
21-S
ep-1
6 A
21-S
ep-1
6 A
100%
5-D
ayR
3257
000
257
REC
EIPT
OF
ESAL
& T
RAF
FIC
DAT
A FR
OM
PLA
NN
ING
10
27-O
ct-1
6 A
27-O
ct-1
6 A
100%
5-D
ayR
3106
100
106
DES
IGN
SU
RVE
Y22
002
-Nov
-16
A05
-Dec
-16
A10
0%5-
Day
R31
0203
010
2LA
NE
CLO
SUR
E AN
ALYS
IS/4
5% T
CP
MEE
TIN
G1
007
-Mar
-17
A07
-Mar
-17
A10
0%5-
Day
EXC
EPTI
ON
S EX
CEP
TIO
NS
& V
ARIA
EXC
EPTI
ON
S &
VAR
IATI
ON
S11
134
14-N
ov-1
6 A
24-A
pr-1
769
.37%
5-D
ay20
0
R32
9401
029
4PR
EPAR
E D
RAF
T D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
200
14-N
ov-1
6 A
13-D
ec-1
6 A
100%
5-D
ayR
3294
030
294
REV
IEW
DR
AFT
DES
IGN
EXC
EPTI
ON
S, V
ARIA
TIO
NS
& TE
CH
MEM
O15
014
-Dec
-16
A06
-Jan
-17
A10
0%5-
Day
R32
9404
029
4PR
EPAR
E FI
NAL
DES
IGN
EXC
EPTI
ON
S, V
ARIA
TIO
NS
& TE
CH
MEM
O60
1809
-Jan
-17
A31
-Mar
-17
70%
5-D
ay20
0R
3294
050
294
REV
IEW
FIN
AL D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
1515
03-A
pr-1
721
-Apr
-17
0%5-
Day
200
R31
9721
019
7SU
BMIT
SIG
N &
SEA
LED
EXC
EPTI
ON
S, V
ARIA
TIO
NS,
& T
ECH
MEM
O &
APP
RO
VE1
124
-Apr
-17
24-A
pr-1
70%
5-D
ay20
0
PAVE
MEN
T D
EPA
VEM
ENT
DES
IGN
PAVE
MEN
T D
ESIG
N87
606
-Dec
-16
A10
-Apr
-17
93.1
%5-
Day
300
R31
9700
019
7PR
EPAR
E D
RAF
T PA
VEM
ENT
DES
IGN
200
06-D
ec-1
6 A
05-J
an-1
7 A
100%
5-D
ayR
3197
060
260
REV
IEW
DR
AFT
PAVE
MEN
T D
ESIG
N15
006
-Jan
-17
A26
-Jan
-17
A10
0%5-
Day
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JFM
2016
2017
2018
2019
2020
2021
CO
OR
DIN
ATE
W/ E
MO
REG
ARD
ING
PU
BLIC
INVO
LVEM
ENT
DO
CU
MEN
T PR
OPO
SED
PU
BLIC
INVO
LVEM
ENT
ACTI
VITI
ES
PREP
ARE
DR
AFT
SCO
PE O
F SE
RVI
CES
- O
btai
n Sc
ope
Tem
pl, d
evel
dra
ft SO
SD
ISC
IPLI
NE
REV
IEW
DR
AFT
SOS
- DEV
ELO
P M
H E
STIM
ATES
REQ
UES
T C
RAS
H D
ATA
FRO
M T
RAF
FIC
OPS
REV
ISE
DR
AFT
SCO
PE O
F SE
RVI
CES
DIS
CIP
LIN
ES R
EVIE
W P
RE-
FIN
AL S
OS
FIN
ALIZ
E SC
OPE
OF
SER
VIC
ES/M
ANH
OU
R E
STIM
ATE
CO
NFI
RM
AD
INFO
RM
ATIO
N (M
ajor
& M
inor
Wor
k Ty
pes
Verif
ied)
MEE
T W
ITH
TR
C/T
RC
KIC
KOFF
MEE
TIN
GTP
K R
EVIE
W F
INAL
DR
AFT
SOS
(Kat
hy/B
riann
a)SU
BMIT
FIN
AL D
RAF
T SO
S TO
PSU
POST
PLA
NN
ED A
D O
N F
DO
T W
EB S
ITE
*D
ESIG
N C
ON
SULT
ANT
CO
NTR
ACT
ACQ
UIS
ITIO
N
(Ham
moc
k)H
OLD
TEC
H P
ANEL
MEE
TIN
GS
*FO
RM
AL A
D A
PPEA
RS
ON
FD
OT
WEB
PAG
E (C
one
of S
ilenc
e)*
LETT
ERS
OF
RES
PON
SE L
OR
s D
UE
DAT
E *
PREP
ARE
LON
G L
IST
PAC
KAG
E *
TEC
H. R
EV. C
OM
MIT
TEE
EVAL
UAT
E LO
NG
LIS
T PK
G. *
LON
GLI
ST T
RC
MEE
TIN
G *
SELE
CTI
ON
CO
MM
ITTE
E SH
OR
T LI
ST C
ON
SULT
ANTS
*SE
ND
RFP
*SC
OPE
OF
SER
VIC
ES M
EETI
NG
(Sh
ortlis
t Firm
s) *
DEA
DLI
NE
FOR
TEC
HIN
ICAL
QU
ESTI
ON
S *
CO
NSU
LTAN
T PA
CKE
TS D
UE
*R
ECV.
WR
ITTE
N P
RO
POSA
LS/C
ON
DU
CT
OR
AL T
ECH
NIC
ALS
*TE
CH
NIC
AL E
VALU
ATIO
N *
TRC
SC
OR
ES D
UE
*FI
NAL
SEL
ECTI
ON
CO
MM
ITTE
E M
EETI
NG
S *
PREP
ARE
CO
NTR
ACT
SCO
PE C
LAR
IFIC
ATIO
N M
EETI
NG
UN
ITS
MEE
TIN
GST
AFFH
OU
R N
EGO
TIAT
ION
S M
EETI
NG
SC
ON
SULT
ANT
SUBM
IT F
INAL
PR
ICE
PRO
POSA
L/AU
DIT
PKG
PRE-
AWAR
D A
UD
IT E
VALU
ATIO
NAW
ARD
CO
NTR
ACT
(H
amm
ock)
TUR
NPI
KE L
EGAL
REV
IEW
CO
NTR
ACT
SEN
D C
ON
TRAC
T TO
CO
NSU
LTAN
TR
EQU
EST
FUN
DS
REC
EIVE
D S
IGN
ED C
ON
TRAC
TEX
ECU
TE C
ON
TRAC
T (D
ESIG
N)
REQ
UES
T ES
AL (1
8 KI
P) C
ALC
ULA
TIO
NS
& TR
AFFI
C D
ATAF
RO
M P
LAN
NIN
GR
ECEI
PT O
F ES
AL &
TR
AFFI
C D
ATA
FRO
M P
LAN
NIN
GD
ESIG
N S
UR
VEY
LAN
E C
LOSU
RE
ANAL
YSIS
/45%
TC
P M
EETI
NG
PREP
ARE
DR
AFT
DES
IGN
EXC
EPTI
ON
S, V
ARIA
TIO
NS
& TE
CH
MEM
OR
EVIE
W D
RAF
T D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
PREP
ARE
FIN
AL D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
REV
IEW
FIN
AL D
ESIG
N E
XCEP
TIO
NS,
VAR
IATI
ON
S &
TEC
H M
EMO
SUBM
IT S
IGN
& S
EALE
D E
XCEP
TIO
NS,
VAR
IATI
ON
S, &
TEC
H M
EMO
& A
PPR
OVE
PREP
ARE
DR
AFT
PAVE
MEN
T D
ESIG
NR
EVIE
W D
RAF
T PA
VEM
ENT
DES
IGN
4365
17-1
ReD
oRES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST.
LU
CIE
CO
UN
TY, M
P 15
3.23
- 16
9.32
Dat
a D
ate:
07-
Mar
-17
P
age
1 of
3
R
un D
ate:
29-
Mar
-17
Rem
aini
ng L
evel
of E
ffort
Actu
al L
evel
of E
ffort
Rem
aini
ng W
ork
Actu
al W
ork
Crit
ical
Rem
aini
ng W
ork
Layo
ut: ~
Proj
ect S
ched
ule_
1 F
ilter
s: T
ASK
filte
r: Al
l Act
iviti
es©
Prim
aver
a S
yste
ms,
Inc.
Activ
ity ID
PSM
Activ
ity N
ame
Orig Dur
Rem Dur
Star
tFi
nish
Dur
atio
n %
Com
plet
eC
alen
dar
Tota
lFl
oat
Free
Floa
t
R31
9703
019
7PR
EPAR
E FI
NAL
PAV
EMEN
T D
ESIG
N9
027
-Jan
-17
A08
-Feb
-17
A10
0%5-
Day
R31
9707
026
0R
EVIE
W F
INAL
PAV
EMEN
T D
ESIG
N5
503
-Apr
-17
07-A
pr-1
70%
5-D
ay30
0R
3197
200
197
SUBM
IT F
INAL
SIG
N &
SEA
LED
PAV
EMEN
T D
ESIG
N &
APPR
OVE
11
10-A
pr-1
710
-Apr
-17
0%5-
Day
300
TYPI
CAL
SEC
TTY
PIC
AL S
ECTI
ON
TYPI
CAL
SEC
TIO
N87
2406
-Dec
-16
A10
-Apr
-17
72.4
1%5-
Day
300
R32
6001
026
0PR
EPAR
E D
RAF
T TY
PIC
AL S
ECTI
ON
S19
006
-Dec
-16
A04
-Jan
-17
A10
0%5-
Day
R32
6000
026
0R
EVIE
W D
RAF
T TY
PIC
AL S
ECTI
ON
S15
005
-Jan
-17
A25
-Jan
-17
A10
0%5-
Day
R32
6003
026
0PR
EPAR
E FI
NAL
TYP
ICAL
SEC
TIO
NS
60
26-J
an-1
7 A
02-F
eb-1
7 A
100%
5-D
ayR
3260
040
260
REV
IEW
FIN
AL T
YPIC
AL S
ECTI
ON
S40
1703
-Feb
-17
A30
-Mar
-17
57.5
%5-
Day
366
R32
6005
026
0SU
BMIT
FIN
AL S
IGN
& S
EALE
D T
YPIC
AL S
ECTI
ON
S &
APPR
OVE
11
10-A
pr-1
710
-Apr
-17
0%5-
Day
3010
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
RO
ADFI
NAL
DES
IGN
- R
OAD
WAY
230
145
02-N
ov-1
6 A
29-S
ep-1
736
.96%
5-D
ay18
70
R32
3410
023
4IS
SUE
NTP
AN
D S
CH
EDU
LE K
ICKO
FF M
TG (D
ESIG
N)
10
02-N
ov-1
6 A
02-N
ov-1
6 A
100%
5-D
ayR
3990
090
168
CO
NSU
LTAN
T SU
BMIT
QC
PLA
N1
011
-Nov
-16
A11
-Nov
-16
A10
0%5-
Day
R36
1005
029
0PM
LET
TER
TO
PIO
w/L
ETTI
NG
DAT
E &
CO
NST
. DU
R.10
1019
-Jul
-17
01-A
ug-1
70%
5-D
ay65
45R
3380
000
380
PRO
DU
CTI
ON
REA
DY
55
25-S
ep-1
729
-Sep
-17
0%5-
Day
200
60%
DES
IGN
60%
DES
IGN
60%
DES
IGN
7857
07-F
eb-1
7 A
25-M
ay-1
726
.92%
5-D
ay27
50
R31
1310
011
3PR
EPAR
E 60
% P
LAN
S54
3307
-Feb
-17
A21
-Apr
-17
38.8
9%5-
Day
200
R31
6810
016
8Q
A/Q
C A
UD
IT (6
0% P
LAN
S)1
124
-Apr
-17
24-A
pr-1
70%
5-D
ay20
0R
3235
200
235
CO
NSU
LTAN
T SU
BMIT
60%
PLA
NS
FOR
REV
IEW
11
25-A
pr-1
725
-Apr
-17
0%5-
Day
200
R33
0296
030
2C
ENTR
AL O
FFIC
E R
EVIE
W T
TMS
1010
26-A
pr-1
709
-May
-17
0%5-
Day
255
R34
6525
046
5Q
UAN
TITI
ES A
ND
REQ
UES
T FO
R IN
FO T
O C
ON
STR
UC
TIO
N1
126
-Apr
-17
26-A
pr-1
70%
5-D
ay25
0R
3302
002
302
REV
IEW
60%
PAY
ITEM
LIS
T10
1026
-Apr
-17
09-M
ay-1
70%
5-D
ay31
11R
3302
900
302
REV
IEW
60%
PLA
NS
1515
26-A
pr-1
716
-May
-17
0%5-
Day
200
R35
0719
150
7PR
EPAR
E C
ON
STR
UC
TIO
N D
UR
SC
HED
ULE
(CO
NST
RU
CTI
ON
)15
1527
-Apr
-17
17-M
ay-1
70%
5-D
ay25
5R
3302
100
302
SUBM
IT 6
0% C
OM
MEN
TS T
O C
ON
SULT
ANT
11
17-M
ay-1
717
-May
-17
0%5-
Day
200
R35
2200
552
2R
EVIS
E 60
% P
LAN
SH
EETS
FO
R U
TILI
TIES
55
18-M
ay-1
724
-May
-17
0%5-
Day
276
276
R31
6910
016
9FI
ELD
REV
IEW
11
18-M
ay-1
718
-May
-17
0%5-
Day
200
R31
6915
016
9IN
CO
RPO
RAT
E C
OM
MEN
TS F
RO
M F
IELD
REV
IEW
55
19-M
ay-1
725
-May
-17
0%5-
Day
200
100%
DES
IGN
100%
DES
IGN
100%
DES
IGN
3838
25-M
ay-1
718
-Jul
-17
0%5-
Day
340
R31
1330
011
3PR
EPAR
E 10
0% P
LAN
S20
2025
-May
-17
22-J
un-1
70%
5-D
ay20
0R
3235
400
235
CO
NSU
LTAN
T SU
BMIT
100
% P
LAN
S FO
R R
EVIE
W1
126
-Jun
-17
26-J
un-1
70%
5-D
ay34
0R
3310
910
310
CEN
TRAL
OFF
ICE
REV
IEW
TTM
S15
1527
-Jun
-17
17-J
ul-1
70%
5-D
ay34
0R
3310
002
310
REV
IEW
100
% P
LAN
SU
MM
ARY
BOXE
S15
1527
-Jun
-17
17-J
ul-1
70%
5-D
ay34
0R
3310
900
310
REV
IEW
100
% P
LAN
S15
1527
-Jun
-17
17-J
ul-1
70%
5-D
ay34
0R
3310
100
310
SUBM
IT 1
00%
CO
MM
ENTS
TO
CO
NSU
LTAN
T1
118
-Jul
-17
18-J
ul-1
70%
5-D
ay34
0
FIN
AL -
SIG
NE
FIN
AL -
SIG
NED
& S
EFI
NAL
- SI
GN
ED &
SEA
LED
3232
19-J
ul-1
731
-Aug
-17
0%5-
Day
340
R31
1340
011
3PR
EPAR
E FI
NAL
PLA
NS
1515
19-J
ul-1
708
-Aug
-17
0%5-
Day
340
R31
9004
011
3C
ON
SULT
ANT
SUBM
IT F
INAL
PLA
NS
11
09-A
ug-1
709
-Aug
-17
0%5-
Day
340
R32
4500
024
5FI
NAL
PLA
NS
REV
IEW
55
10-A
ug-1
716
-Aug
-17
0%5-
Day
340
R32
4510
024
5IN
CO
RPO
RAT
E FI
NAL
CO
MM
ENTS
& R
ESPO
NC
ES10
1017
-Aug
-17
30-A
ug-1
70%
5-D
ay34
0R
3235
500
235
CO
NSU
LTAN
T SU
BMIT
FIN
AL S
IGN
ED &
SEA
LED
PLA
NS1
131
-Aug
-17
31-A
ug-1
70%
5-D
ay34
0
FIN
AL D
ESIG
N
FIN
AL D
ESIG
N -
UTI
LIT
FIN
AL D
ESIG
N -
UTI
LITI
ES11
054
07-F
eb-1
7 A
11-J
ul-1
750
.91%
5-D
ay80
0R
3990
110
522
UTI
LITY
CO
OR
DIN
ATIO
N K
ICK
OFF
MEE
TIN
G1
007
-Feb
-17
A07
-Feb
-17
A10
0%5-
Day
R35
2221
052
2D
IST.
60%
PLA
N S
HEE
TS to
UTI
LITI
ES1
126
-Apr
-17
26-A
pr-1
70%
5-D
ay56
0R
3522
220
522
ALL
UTI
LITY
MAR
KUPS
RET
UR
NED
11
25-M
ay-1
725
-May
-17
0%5-
Day
560
R32
2800
022
8D
ISTR
IB. R
EVIS
ED P
LAN
SH
EETS
TO
UTI
LITI
ES1
123
-Jun
-17
23-J
un-1
70%
5-D
ay56
0R
3523
300
523
REC
EIVE
MAR
KUP
CO
RR
ECTI
ON
S FR
OM
UTI
LITI
ES1
110
-Jul
-17
10-J
ul-1
70%
5-D
ay56
0R
3266
000
266
UTI
LITI
ES C
ERTI
FIED
11
11-J
ul-1
711
-Jul
-17
0%5-
Day
840
CO
NSU
LTAN
T E
CO
NSU
LTAN
T EV
ALU
AC
ON
SULT
ANT
EVAL
UAT
ION
S11
611
626
-Apr
-17
09-O
ct-1
70%
5-D
ay59
0R
3238
110
238
PHAS
E II
CO
NSU
LTAN
T G
RAD
ES5
526
-Apr
-17
02-M
ay-1
70%
5-D
ay36
16R
3236
000
236
FIN
AL C
ON
SULT
ANT
GR
ADES
11
09-O
ct-1
709
-Oct
-17
0%5-
Day
5959
ENVI
RO
NM
ENT
ENVI
RO
NM
ENTA
L C
EREN
VIR
ON
MEN
TAL
CER
TIFI
CAT
ION
S18
096
03-N
ov-1
6 A
20-J
ul-1
746
.67%
5-D
ay64
0R
3990
030
328
NM
SA C
HEC
KLIS
T1
003
-Nov
-16
A03
-Nov
-16
A10
0%5-
Day
R33
3300
033
3C
ULT
UR
AL R
ESO
UR
CE
& AR
CH
AEO
LOG
ICAL
SU
RVE
Y61
3320
-Jan
-17
A21
-Apr
-17
45.9
%5-
Day
940
R36
1010
061
0N
OIS
E IN
VEST
IGAT
ION
2020
24-A
pr-1
719
-May
-17
0%5-
Day
105
41R
3174
000
174
CO
NTA
MIN
ATIO
N IN
VEST
IGAT
ION
2020
24-A
pr-1
719
-May
-17
0%5-
Day
105
41R
3328
000
328
FCC
CER
TIFI
CAI
TON
REQ
UIR
ED
Y/N
11
08-J
un-1
708
-Jun
-17
0%5-
Day
9474
R33
3310
033
3C
ERTI
FY C
ULT
UR
AL R
ESO
UR
CES
& A
RC
HAE
OLO
GIC
AL1
119
-Jul
-17
19-J
ul-1
70%
5-D
ay64
0R
3610
200
610
CER
TIFY
PU
BLIC
INVO
LVEM
ENT
11
19-J
ul-1
719
-Jul
-17
0%5-
Day
640
R36
1030
061
0C
ERTI
FY N
OIS
E1
119
-Jul
-17
19-J
ul-1
70%
5-D
ay64
0R
3174
100
174
CER
TIFY
CO
NTA
MIN
ATIO
N1
119
-Jul
-17
19-J
ul-1
70%
5-D
ay64
0R
3610
900
610
INC
LUD
E EN
VIR
ON
. CER
TIFI
CAT
ION
IN P
RO
JEC
T FI
LE1
120
-Jul
-17
20-J
ul-1
70%
5-D
ay64
0
* * R
IGH
T O
F W
A* *
RIG
HT
OF
WAY
* * R
IGH
T O
F W
AY1
123
-Jun
-17
23-J
un-1
70%
5-D
ay83
0
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JFM
2016
2017
2018
2019
2020
2021
PREP
ARE
FIN
AL P
AVEM
ENT
DES
IGN
REV
IEW
FIN
AL P
AVEM
ENT
DES
IGN
SUBM
IT F
INAL
SIG
N &
SEA
LED
PAV
EMEN
T D
ESIG
N &
APPR
OVE
PREP
ARE
DR
AFT
TYPI
CAL
SEC
TIO
NS
REV
IEW
DR
AFT
TYPI
CAL
SEC
TIO
NS
PREP
ARE
FIN
AL T
YPIC
AL S
ECTI
ON
SR
EVIE
W F
INAL
TYP
ICAL
SEC
TIO
NS
SUBM
IT F
INAL
SIG
N &
SEA
LED
TYP
ICAL
SEC
TIO
NS
& AP
PRO
VE
ISSU
E N
TP A
ND
SC
HED
ULE
KIC
KOFF
MTG
(DES
IGN
)C
ON
SULT
ANT
SUBM
IT Q
C P
LAN
PM L
ETTE
R T
O P
IO w
/LET
TIN
G D
ATE
& C
ON
ST. D
UR.
PRO
DU
CTI
ON
REA
DY
PREP
ARE
60%
PLA
NS
QA/
QC
AU
DIT
(60%
PLA
NS)
CO
NSU
LTAN
T SU
BMIT
60%
PLA
NS
FOR
REV
IEW
CEN
TRAL
OFF
ICE
REV
IEW
TTM
SQ
UAN
TITI
ES A
ND
REQ
UES
T FO
R IN
FO T
O C
ON
STR
UC
TIO
NR
EVIE
W 6
0% P
AY IT
EM L
IST
REV
IEW
60%
PLA
NS
PREP
ARE
CO
NST
RU
CTI
ON
DU
R S
CH
EDU
LE (C
ON
STR
UC
TIO
N)
SUBM
IT 6
0% C
OM
MEN
TS T
O C
ON
SULT
ANT
REV
ISE
60%
PLA
N S
HEE
TS F
OR
UTI
LITI
ESFI
ELD
REV
IEW
INC
OR
POR
ATE
CO
MM
ENTS
FR
OM
FIE
LD R
EVIE
W
PREP
ARE
100%
PLA
NS
CO
NSU
LTAN
T SU
BMIT
100
% P
LAN
S FO
R R
EVIE
WC
ENTR
AL O
FFIC
E R
EVIE
W T
TMS
REV
IEW
100
% P
LAN
SU
MM
ARY
BOXE
SR
EVIE
W 1
00%
PLA
NS
SUBM
IT 1
00%
CO
MM
ENTS
TO
CO
NSU
LTAN
T
PREP
ARE
FIN
AL P
LAN
SC
ON
SULT
ANT
SUBM
IT F
INAL
PLA
NS
FIN
AL P
LAN
S R
EVIE
WIN
CO
RPO
RAT
E FI
NAL
CO
MM
ENTS
& R
ESPO
NC
ESC
ON
SULT
ANT
SUBM
IT F
INAL
SIG
NED
& S
EALE
D P
LANS
UTI
LITY
CO
OR
DIN
ATIO
N K
ICK
OFF
MEE
TIN
GD
IST.
60%
PLA
N S
HEE
TS to
UTI
LITI
ESAL
L U
TILI
TY M
ARKU
PS R
ETU
RN
EDD
ISTR
IB. R
EVIS
ED P
LAN
SH
EETS
TO
UTI
LITI
ESR
ECEI
VE M
ARKU
P C
OR
REC
TIO
NS
FRO
M U
TILI
TIES
UTI
LITI
ES C
ERTI
FIED
PHAS
E II
CO
NSU
LTAN
T G
RAD
ESFI
NAL
CO
NSU
LTAN
T G
RAD
ES
NM
SA C
HEC
KLIS
TC
ULT
UR
AL R
ESO
UR
CE
& AR
CH
AEO
LOG
ICAL
SU
RVE
YN
OIS
E IN
VEST
IGAT
ION
CO
NTA
MIN
ATIO
N IN
VEST
IGAT
ION
FCC
CER
TIFI
CAI
TON
REQ
UIR
ED
Y/N
CER
TIFY
CU
LTU
RAL
RES
OU
RC
ES &
AR
CH
AEO
LOG
ICAL
CER
TIFY
PU
BLIC
INVO
LVEM
ENT
CER
TIFY
NO
ISE
CER
TIFY
CO
NTA
MIN
ATIO
NIN
CLU
DE
ENVI
RO
N. C
ERTI
FIC
ATIO
N IN
PR
OJE
CT
FILE
4365
17-1
ReD
oRES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST.
LU
CIE
CO
UN
TY, M
P 15
3.23
- 16
9.32
Dat
a D
ate:
07-
Mar
-17
P
age
2 of
3
R
un D
ate:
29-
Mar
-17
Rem
aini
ng L
evel
of E
ffort
Actu
al L
evel
of E
ffort
Rem
aini
ng W
ork
Actu
al W
ork
Crit
ical
Rem
aini
ng W
ork
Layo
ut: ~
Proj
ect S
ched
ule_
1 F
ilter
s: T
ASK
filte
r: Al
l Act
iviti
es©
Prim
aver
a S
yste
ms,
Inc.
Activ
ity ID
PSM
Activ
ity N
ame
Orig Dur
Rem Dur
Star
tFi
nish
Dur
atio
n %
Com
plet
eC
alen
dar
Tota
lFl
oat
Free
Floa
t
R/W
RIG
HT
OF
R/W
RIG
HT
OF
WAY
AC
R/W
RIG
HT
OF
WAY
AC
QU
ISIT
ION
11
23-J
un-1
723
-Jun
-17
0%5-
Day
830
R31
8700
018
7**
*** N
O R
/W R
EQU
IRED
CER
TIFI
CAT
ION
****
*1
123
-Jun
-17
23-J
un-1
70%
5-D
ay83
63
* * C
ON
STR
UC
T* *
CO
NST
RU
CTI
ON
* * C
ON
STR
UC
TIO
N30
230
225
-Apr
-17
01-J
ul-1
80%
00
CC
-7 F
INAL
PLA
CC
-7 F
INAL
PLA
NS
PRC
C-7
FIN
AL P
LAN
S PR
OC
ESSI
NG
101
101
05-J
un-1
725
-Oct
-17
0%5-
Day
200
R30
5004
024
2C
OM
PILE
CO
NTR
ACT
IND
EX F
ILE
7878
05-J
un-1
722
-Sep
-17
0%5-
Day
200
R32
0400
020
4PR
OD
UC
TIO
N D
ATE
11
06-O
ct-1
7*06
-Oct
-17
0%5-
Day
200
R33
0511
530
5TU
RN
PIKE
OFF
ICE
FIN
AL R
EVIE
W &
PR
OC
ESSI
NG
66
09-O
ct-1
716
-Oct
-17
0%5-
Day
200
R32
4240
024
2R
EVIE
W F
INAL
SPE
C P
ACKA
GE
55
09-O
ct-1
713
-Oct
-17
0%5-
Day
200
R32
4250
024
2LE
GAL
REV
IEW
OF
SPEC
PKG
55
09-O
ct-1
713
-Oct
-17
0%5-
Day
200
R33
7012
037
0TU
RN
PIKE
OFF
ICE
SIG
N &
TR
ANSM
IT P
LAN
S PA
CKA
GE
33
17-O
ct-1
719
-Oct
-17
0%5-
Day
200
R33
7000
037
0PL
ANS
TO T
UR
NPI
KE C
ON
TRAC
TS1
125
-Oct
-17
25-O
ct-1
70%
5-D
ay20
0
CC
-7 D
ISTR
ICT
CC
-7 D
ISTR
ICT
CO
NTR
CC
-7 D
ISTR
ICT
CO
NTR
ACT
248
248
12-J
ul-1
729
-Jun
-18
0%0
0R
3524
100
524
* * P
OST
UTI
LITY
AG
REE
MEN
TS O
N W
EB S
ITE
11
12-J
ul-1
712
-Jul
-17
0%5-
Day
9237
R32
1900
121
9**
****
PO
ST P
ERM
ITS
ON
WEB
SIT
E1
121
-Jul
-17
21-J
ul-1
70%
5-D
ay85
65R
3580
100
580
BUIL
D W
P50
SCR
EEN
11
01-S
ep-1
701
-Sep
-17
0%5-
Day
5636
R33
0511
030
5TU
RN
PIKE
CO
NTR
ACTS
PR
OC
ESSI
NG
99
26-O
ct-1
707
-Nov
-17
0%5-
Day
202
R32
2900
022
9AD
VER
TISE
FO
R T
UR
NPI
KE C
ON
TRAC
T (
30 D
AYS)
(FR
IDAY
)5
510
-Nov
-17
08-D
ec-1
70%
Fri
44
R32
8000
028
0TU
RN
PIKE
CO
NTR
ACT
LETT
ING
(TU
ESD
AY)
11
09-J
an-1
8*09
-Jan
-18
0%Tu
e0
0R
3585
150
585
POST
BID
S (T
UES
DAY
)1
116
-Jan
-18
16-J
an-1
80%
Tue
1717
R35
2420
052
4* *
REM
OVE
UTI
LITY
AG
REE
MEN
TS fr
om W
EB S
ITE
11
03-M
ay-1
803
-May
-18
0%Th
u0
0R
3219
002
219
****
**
REM
OVE
PER
MIT
S FR
OM
WEB
SIT
E1
107
-May
-18
07-M
ay-1
80%
Mon
00
R35
8518
058
5AW
ARD
CO
NTR
ACT
11
22-M
ay-1
822
-May
-18
0%5-
Day
00
R35
8519
058
5EX
ECU
TE T
UR
NPI
KE C
ON
TRAC
T BY
CO
NTR
ACTO
R1
114
-Jun
-18
14-J
un-1
80%
5-D
ay0
0R
3585
400
585
EXEC
UTE
TU
RN
PIKE
CO
NTR
ACT
BY D
.O.T
.1
129
-Jun
-18
29-J
un-1
80%
5-D
ay0
0
CO
NST
RU
CTI
OC
ON
STR
UC
TIO
NC
ON
STR
UC
TIO
N43
343
325
-Apr
-17
01-J
ul-1
80%
7 D
ay0
0R
3202
001
202
SCO
PE &
NEG
OTI
ATE
POST
DES
IGN
SER
VIC
ES1
125
-Apr
-17
25-A
pr-1
70%
7 D
ay13
384
R33
1200
031
2C
ON
STR
UC
TIO
N N
OTI
CE
TO P
RO
CEE
D1
130
-Jun
-18
30-J
un-1
80%
7 D
ay0
0R
3202
000
202
POST
DES
IGN
EFF
OR
TS1
101
-Jul
-18
01-J
ul-1
80%
7 D
ay0
0
* * C
Ei* *
CEi
* * C
Ei10
210
209
-Oct
-17
08-M
ar-1
80%
5-D
ay60
0
CEI
- C
ON
SULT
CEI
- C
ON
SULT
ANT
ACC
EI -
CO
NSU
LTAN
T AC
QU
ISIT
ION
102
102
09-O
ct-1
708
-Mar
-18
0%5-
Day
600
R34
0500
040
5AD
VER
TISE
FO
R C
EI1
109
-Oct
-17
09-O
ct-1
70%
5-D
ay59
0R
3203
000
203
CEI
CO
NSU
L C
ON
T EX
EC1
108
-Mar
-18
08-M
ar-1
80%
5-D
ay60
60
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JFM
2016
2017
2018
2019
2020
2021
****
* NO
R/W
REQ
UIR
ED C
ERTI
FIC
ATIO
N **
***
CO
MPI
LE C
ON
TRAC
T IN
DEX
FIL
EPR
OD
UC
TIO
N D
ATE
TUR
NPI
KE O
FFIC
E FI
NAL
REV
IEW
& P
RO
CES
SIN
GR
EVIE
W F
INAL
SPE
C P
ACKA
GE
LEG
AL R
EVIE
W O
F SP
EC P
KGTU
RN
PIKE
OFF
ICE
SIG
N &
TR
ANSM
IT P
LAN
S PA
CKA
GE
PLAN
S TO
TU
RN
PIKE
CO
NTR
ACTS
* * P
OST
UTI
LITY
AG
REE
MEN
TS O
N W
EB S
ITE
****
**
POST
PER
MIT
S O
N W
EB S
ITE
BUIL
D W
P50
SCR
EEN
TUR
NPI
KE C
ON
TRAC
TS P
RO
CES
SIN
GAD
VER
TISE
FO
R T
UR
NPI
KE C
ON
TRAC
T (
30 D
AYS)
(FR
IDAY
)TU
RN
PIKE
CO
NTR
ACT
LETT
ING
(TU
ESD
AY)
POST
BID
S (T
UES
DAY
)* *
REM
OVE
UTI
LITY
AG
REE
MEN
TS fr
om W
EB S
ITE
****
**
REM
OVE
PER
MIT
S FR
OM
WEB
SIT
EAW
ARD
CO
NTR
ACT
EXEC
UTE
TU
RN
PIKE
CO
NTR
ACT
BY C
ON
TRAC
TOR
EXEC
UTE
TU
RN
PIKE
CO
NTR
ACT
BY D
.O.T
.
SCO
PE &
NEG
OTI
ATE
POST
DES
IGN
SER
VIC
ESC
ON
STR
UC
TIO
N N
OTI
CE
TO P
RO
CEE
DPO
ST D
ESIG
N E
FFO
RTS
ADVE
RTI
SE F
OR
CEI
CEI
CO
NSU
L C
ON
T EX
EC
4365
17-1
ReD
oRES
UR
FAC
E TP
K M
AIN
LIN
E IN
ST.
LU
CIE
CO
UN
TY, M
P 15
3.23
- 16
9.32
Dat
a D
ate:
07-
Mar
-17
P
age
3 of
3
R
un D
ate:
29-
Mar
-17
Rem
aini
ng L
evel
of E
ffort
Actu
al L
evel
of E
ffort
Rem
aini
ng W
ork
Actu
al W
ork
Crit
ical
Rem
aini
ng W
ork
Layo
ut: ~
Proj
ect S
ched
ule_
1 F
ilter
s: T
ASK
filte
r: Al
l Act
iviti
es©
Prim
aver
a S
yste
ms,
Inc.