408020-00406-ci-wrp-0001_rev 0.pdf
TRANSCRIPT
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 1/21
Micro-Project Work Release Package (WRP)
(for scopes of work < 1,000 workshare hours)
Document No: 408020-00406-CI-WRP-0001 Rev No: 0 Date: 3/27/2015
Prepared By: Ben Wardell
Approved By: Nathan Schafer
Project Name: SWRC Central Amine Facility (Detail)
Project Number: 408020-00406
Home Office: WorleyParsons Billings, MT USA
Support Office: WorleyParsons Mumbai, India (Chennai)
IEWO No: 239668
Charge Code: Charge time to the SWRC project account code 408020-00406
• WBS 0000-24200OT is approved for this project
Scope of Work: Originate and check drilled pier supported, reinforced concrete foundation calculations forthe following pieces of equipment (per preliminary design drawings, designbasis/criteria/codes and equipment info attached):
1. Storage Sphere (mk # 39PV-100)2. Surge Tank (mk # 39TK-101)3. Carbon Filters (mk # 39PV-103 A/B)
Man-hour 65 hours, (principal civil engineer)
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 2/21
H o m e O f f i c e
Responsibilities
of
Home Office:
• Design and overall responsible charge of project civil engineering.
Inputs
fromHome Office:
• Provide preliminary foundation drawings, project General Civil Notes andequipment vendor drawing(s) – these constitute the basis for foundationcalculations. MathCad calc for vertical capacity of drilled piers included – SOmay use at their preference. If SO requires any additional information, they areto contact Ben Wardell or Ross Schwend.
Example
Deliverables/Go-bys:
S u p p o r t O f f i c e
Responsibilities
ofSupport Office:
• Confirm schedule is achievable.
• Confirm that man-hour estimate is in line with work scope or advise otherwise.
• Originate and check foundation calculations – redline preliminary foundationdrawings and schedules for engineering content, i.e. primarily reinforcingcontent.
DeliverablesfromSupport Office:
• Checked calculations as described above in pdf format. (Lateral analysis ofdrilled piers is not expected to be necessary for these foundations.)
• Red-lined drawings / schedules as described above in pdf format. • Native software files, i.e. Excel, MathCad, RISA, STAAD, etc.
Issuance and Approval o f
Deliverables:
• HO will overview deliverables and be responsible for final drawing checks anddeliverables to client.
Coordination &C i ti
• Primary method of communication will be by email.
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 3/21
Project
Assign ment
Au thor izat ionForm (PAAF)
Required?:
• No PAAF required.
•
RiskManagement:
Not applicable as there is no substantial risk in performing the work in this worksharearrangement
Engineering &
Design System
Appl ications:
SO preference acceptable as approved for use by WorleyParsons
Specifications &
Standards:Basis provided by HO in the project General Civil Notes (includes US code references,materials specifications, geotechnical design criteria, etc.)
Document & DataManagement:
Will be completed by the home office.
CloseoutRequirements:
Will be completed by the home office.
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 4/21
C : \ A u t o C A D V a u l t \ S i n c l a i r R a w l i n s \ ! C l i e n t I n f o \ S D 0 0 0 0 S W R C S t a n d a r d s \ B_
C i v i l \ S D 0 0 0 0 - F B - 0 0 0 4 - 1 . d w g ,
1 0 / 2 2 / 2 0 1 3 9 : 3 8 : 1 5 A M
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 5/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 6/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 7/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 8/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 9/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 10/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 11/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 12/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 13/21
TAGNUMBER
SWRCCompany
Number
EQUIPM
S
39PV-100 Rich Amine
T
39TK-101 Lean Am
39TK-102 Ac ti v ated
39TK-103 Ac ti v ated
P
39P-100Rich Stora
39P-101Rich Stora
39P-102 HP Settler
39P-103 HP Settler
39P-104 HPS ettler
39P-105 HPS ettler
39P-110 Lean
39P-111 Lean
V
3 9 PV -1 0 2 R ic h Am
39PV-103A Activate
39PV-103B Ac ti v ate
3 9P V- 10 4A L ea n
3 9P V- 10 4B L ea n
39PV-105A Lean Am
39PV-105B Lean Am
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 14/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 15/21
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 16/21
No comment BDW
1/20/2015
REVIEW STAMP
PROJECT NO. _________________
1. REVIEWED & ACCEPTED.MANUFACTURE MAY PROCEED
2. REVIEWED & ACCEPTED AS MARKED.REVISE & RE-SUBMIT.MANUFACTURE MAY PROCEED
3. REVISE AS MARKED & RE-SUBMIT.MANUFACTURE SHALL NOT PROCEED
4. REVIEW NOT REQUIRED.FOR INFORMATION ONLY.MANUFACTURE MAY PROCEED
Acceptance in any of these categories in no way relievesthe Contractor/Supplier of its responsibility for the due andproper performance of the Works in accordance with theContract/Purchase Order.
Name ……………………………………………………….
Signed …………………………….. Date ………………..
408020-00406
Thane Reukauf - WP
Thane Reukauf 2/5/15
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 17/21
No comment BDW
1/20/2015
REVIEW STAMP
PROJECT NO. _________________
1. REVIEWED & ACCEPTED.MANUFACTURE MAY PROCEED
2. REVIEWED & ACCEPTED AS MARKED.REVISE & RE-SUBMIT.MANUFACTURE MAY PROCEED
3. REVISE AS MARKED & RE-SUBMIT.MANUFACTURE SHALL NOT PROCEED
4. REVIEW NOT REQUIRED.
FOR INFORMATION ONLY.MANUFACTURE MAY PROCEED
Acceptance in any of these categories in no way relievesthe Contractor/Supplier of its responsibility for the due andproper performance of the Works in accordance with theContract/Purchase Order.
Name ……………………………………………………….
Signed …………………………….. Date ………………..
408020-00406
Thane Reukauf - WP
Thane Reukauf 2/5/15
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 18/21
BASE SHEAR
3. FOUNDATION LOADS DO NOT INCLUDE WEIGHT OF LINING OR CUSTOMER EQUIP.
FOUNDATION:
5. THE FOLLOWING OVERTURNING MOMENTS SHOULD BE USED FOR CHECKING OVERALL
FOUNDATION STABILITY AND SOIL BEARING PRESSURES.
4. THE MAXIMUM COMBINATION OF FOUNDATION LOADS SHOULD BE USED FOR DESIGN OF
6. DESIGN DATA FOR FOUNDATION LOADS :
FOR API 650, PAR F.7 TANKS FOUNDATION SHALL
BE DESIGNED FOR LOAD COMBINATION GIVEN PARAGRAPH F.7.5.
FOUNDATION LOADS
CL
MAX. PRESSURE DISTRIBUTION FROM HYDRODYNAMIC
SEISMIC LOADS ACTING ON TANK BOTTOM
N/A = NOT APPLICABLE
ft-kips
ft-kips
ft-kips
AND FOR DESIGN OF PIPE VAULTS, IF ANY, BENEATH THE TANK SHELL.
FOUNDATION , TANK ANCHORAGE, CHECKING BEARING STRESSES ON THE FOUNDATION
1. MAX UPLIFT PER BOLT :
ANCHOR BOLT LOADS PER API 650 APP F PARAGRAPH F.7.4
ANCHOR BOLTS:
mph
ps f
psi
NORMAL OPERATION =
NORMAL OPERATION WITH WIND =
NORMAL OPERATION WITH SEISMIC =
TEST =
1.5 X FAILURE PRESSURE =
kips
kips
kips
kips
kips
11.5
14.1
14.9
45.1
NOMINAL METAL LOAD =
CORRODED METAL LOAD =
ROOF LIVE LOAD =
DESIGN PRESSURE =
TEST PRESSURE =
EXTERNAL DESIGN PRESSURE (VACUUM) =
DESIGN PRESSURE =
TEST PRESSURE =
2973
3716
2179
2096
lbs/ft
lbs/ft
lbs/ft
lbs/ft
lbs/ft
lbs/ft
ps f
ps f
ps f
ps f
ps f
WIND =
SEISMIC =
kips
kips
16 -6
INTERNAL DESIGN PRESSURE =
INTERNAL TEST PRESSURE =
EXTERNAL DESIGN PRESSURE (VACUUM) =
FAILURE PRESSURE =
PRODUCT DESIGN SP. GR. =
WIND =
SEISMIC DATA =
ROOF LIVE LOAD =
2.5
3.13
3.5
5.95
1.04
120
ROOF SNOW LOAD = ps f
2. WORK THIS WITH DRAWING F2.
R =
ROOF SNOW LOAD =
lbs/ft
ps f
ps f
3.7
3.7
SHELL INSULATION =
ROOF INSULATION =
SHELL INSULATION =
ROOF INSULATION =
lbs/ft
lbs/ft
PRODUCT STATIC PRESSURE =
TEST WATER STATIC PRESSURE =
BOTTOM PLATE STATIC PRESSURE =
NOTES:
TANK BOTTOM SLOPE =
SEISMIC LOAD = 2367
WIND LOAD (OVERTURNING) =
WIND LOAD (UPLIFT) =
lbs/ft
lbs/ft
lbs/ft
lbs/ft
lbs/ft
SEISMIC SLAB MOMENT =
SEISMIC RINGWALL FOUNDATION MOMENT =
WIND RINGWALL FOUNDATION MOMENT =
2707
2029
198
MEASURED FROM THE AVERAGE ELEVATION.
THE CIRCUMFERENCE AND WITHIN ‚ INCH IN THE TOTAL CIRCUMFERENCE
1. THE TOP OF RINGWALL SHALL BE LEVEL WITHIN „ INCH IN ANY 30'-0 OF
NOMINAL METAL LOAD FOR PRESSURE OR WIND UPLIFT CASE =
CORRODED METAL LOAD FOR PRESSURE OR WIND UPLIFT CASE =
1. THE FOUNDATION LOADS SHOWN ARE ALLOW ABLE STRESS LEVEL LOADS (UNFACTORED).
2. FOR USE IN STRENGTH/ULTIMATE LIMIT LOAD COMBINATIONS, MULTIPLY THE GIVEN
SEISMIC LOADS BY A FACTOR OF 1.4.
(TYPE - RINGWALL)
Mapped ASCE 7 Method, Ss : 0.28, S1: 0.08, Av: 0.1383, SDC: B
25
5.2
192 ps f
23 1
61 1
38 2
20 6
15 0
1 5
36 0
45 0
1 1
14 3
25
20 6
12 7
3 5
CROWN UP TO CENTER AT 1
psi
psi
in-H2O
15 1
N/ A
N/ A
CRW
HOUSTON FAIRBANKS/M.K. BAUMAN
F1
96851-000-SP-01-00F101
FOUNDATION LOAD
TANK #39-TK-101
(1) 33'-0 I .D. x 34' -7 HIGH
WORLEY PARSONS/SINCLAIR REFININ
SINCLAIR, WYOMING
C
R
RAJ
15JAN15
IFC
S
S
U
E
D
O
R
O
N
S
T
R
U
T
O
N
R
5
N
5
INDICATES CHANGE FROM PREVIOUS ISSUE
Y
C
H
K
D
D
T
E
Y
C
H
K
D
D
T
E
Y
C
H
K
D
D
T
E
R
E
V
S
O
N
S
R
E
R
K
S
Y
CHKD DATE
ENGINEERING ASSIGNED
CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK PERFORMED BY CB&
SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ( CB&I ). IT MAY CONTAIN INFORMATION DESCRIBING
OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN PERMIS
C
DWG NO
DOC NO.
(ASCE 7-10)
Why? Stringent Conc Tolerance:Provide grout allowance to setbase pl elev +/- 1/16"
REVIEW STAMP
PROJECT NO. _________________
1. REVIEWED & ACCEPTED.MANUFACTURE MAY PROCEED
2. REVIEWED & ACCEPTED AS MARKED.REVISE & RE-SUBMIT.MANUFACTURE MAY PROCEED
3. REVISE AS MARKED & RE-SUBMIT.MANUFACTURE SHALL NOT PROCEED
4. REVIEW NOT REQUIRED.FOR INFORMATION ONLY.MANUFACTURE MAY PROCEED
Acceptance in any of these categories in no way relievesthe Contractor/Supplier of its responsibility for the due andproper performance of the Works in accordance with theContract/Purchase Order.
Name ……………………………………………………….
Signed …………………………….. Date ………………..
408020-00406
Thane Reukauf - WP
Thane Reukauf 2/5/15
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 19/21
ANCHOR BOLT TOLERANCES:
C
H
O
R
D
T
(23 AROUND)
ANCHOR BOLT LOCATION
FIELD NOTES:
1. CHORDS ARE FOR CHECKING PURPOSE ONLY.
2. WORK THIS WITH DWG F1.
#1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
CL BOLT TO CL BOLT CHORD
#1 TO #2 OR #23
#1 TO #3 OR #22
#1 TO #4 OR #21
#1 TO #5 OR #20
#1 TO #6 OR #19
#1 TO #7 OR #18
#1 TO #8 OR #17
#1 TO #9 OR #16
#1 TO #10 OR #15
#1 TO #11 OR #14
#1 TO #12 OR #13
1. ANCHOR BOLT PROJECTION ABOVE THE CONCRETE SHALL BE WITHIN • OF THE SPECIFIED HEIGHT.
2. LOCATION OF THE ANCHOR BOLTS SHALL BE WITHIN ‚ FROM THEIR THEORETICAL POSITION.
3. ANCHOR BOLTS SHALL BE PLUMB WITHIN „ IN 12 .
H
=
‚
D
O
T
C
R
C
1• DIA ANCHOR BOLTS
4 -6
9'-0Ž
13'-4†
17 -5•
21 -2•
24 -6
27 -5‹
29 ' -10ˆ
31 -7
32'-10Ž
33'-6Š
0°
90°
180°
270°
6
9
CRW
HOUSTON FAIRBANKS/M.K. BAUMAN
F2
96851-000-SP-01-00F201
ANCHOR BOLT SETTING
TANK #39-TK-101
(1) 33'-0 I .D. x 34'-7 HIGH
WORLEY PARSONS/SINCLAIR REFININ
SINCLAIR, WYOMING
C
R
IP
S
S
U
E
D
R
E
L
N
R
Y
ANCHOR BOLT SETTING PLAN
INSIDE OF SHELL
ANCHOR BOLT CHAIR
CONCRETE BY OTHERS
MIN.
MIN.
BUILD SAND CUSHION T
TOP OF GROUT AT LEA
INSTALLED BY OTHERS
FURNISHED BY
2
2
2
6
SAND BY
GROUT BY
OTHERS
OTHERS
OTHERS
1•
4
6
ABOVE TOP OF RINGWA
16'-9†
16 -6
‚
(23 AROUND)
DIA ANCHOR BOLTS
A36 HOT DIP GALVANIZED
ANCHOR BOLTS PER ASCE 7-10 SECTION 15.7.5.
MUST BE DESIGNED TO DEVELOP THE TENSILE CAPACITY OF THE
ANCHOR BOLT EMBEDMENT LENGTH OR ANCHOR BOLT REINFORCEM
SECTION THRU FOUNDATION
TANK BOTTOM
TOP OF
DED
1/15/15
D
D
/
5
5
RAD. =
RAD. =
R
R
Y
NORTH
INDICATES CHANGE FROM PREVIOUS ISSUE
Y
C
H
K
D
D
T
E
Y
C
H
K
D
D
T
E
Y
C
H
K
D
D
T
E
R
E
V
S
O
N
S
R
E
R
K
S
Y
CHKD DATE
ENGINEERING ASSIGNED
CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK PERFORMED BY CB&I.
SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ( CB&I ). IT MAY CONTAIN INFORMATION DESCRIBING
OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCE PT BY EXPRESS WRITTEN PERMI
C
DWG NO
DOC NO.
?
REVIEWSTAMP
PROJECTNO. _________________
1. REVIEWED&ACCEPTED.MANUFACTUREMAY PROCEED
2. REVIEWED&ACCEPTEDASMARKED.REVISE& RE-SUBMIT.MANUFACTUREMAY PROCEED
3. REVISEASMARKED& RE-SUBMIT.MANUFACTURESHALL NOTPROCEED
4. REVIEW NOTREQUIRED.FORINFORMATION ONLY.MANUFACTUREMAY PROCEED
Acceptancein anyof these categories in noway relievesthe Contractor/Supplier of its responsibilityfor thedue andproperperformance ofthe Works in accordance with theContract/PurchaseOrder.
Name……………………………………………………….
Signed……………………………..Date ………………..
408020-00406
Thane Reukauf - WP
T ha ne R eu ka uf 2 /5 /1 5
7/21/2019 408020-00406-CI-WRP-0001_Rev 0.pdf
http://slidepdf.com/reader/full/408020-00406-ci-wrp-0001rev-0pdf 20/21
103A (North Vessel)