Page 1: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

1

Page 2: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

2

Page 3: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

3

40 Donaldson Street, Greenslopes QLD

Proudly Developed by Mosaic Property Group

Page 4: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

4

Page 5: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

5

CONGRATULATIONS ON THE SETTLEMENT OF YOUR BEAUTIFUL NEW APARTMENT. ALTHOUGH THE BUILDING IS NOW COMPLETE, OUR COMMITMENT TO YOU IS FAR FROM OVER.

The completion of a Mosaic project is always an exciting time for everyone and you are now the proud owner of a high quality apartment in a stunning building. Every member of the Mosaic team has worked hard to have some involvement and impact on the project, eagerly monitoring the project’s evolution. But now it’s time for us to hand over the ownership of a building that we have loved since it was merely a set of concept plans and a vacant block of land.

For us, the commitment to our clients certainly doesn’t stop at settlement. We will continue to closely monitor and track the building and landscaping over the next 12 months, ensuring everything is settling as it should and rectifying any unforeseen issues that may arise, if required. As we maintain the management rights for all our developments, Mosaic will be there for the life of the building, ensuring it is well maintained, remains in the best possible condition and your investment is protected for many years to come.

And of course, should you have questions about anything at all, whether it is now, or in 1, 2 or 5 years’ time, we are always here to assist.

Thanks again for your support of Mosaic.

A THANK YOU MESSAGE FROM OUR MANAGING DIRECTOR

‘I would like to personally congratulate you.’

Page 6: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

6

‘THE EvOLUTION OF APEx’

Con

stru

ctio

n Up

date

Si

x –

July

201

6

Ori

gina

l Art

ists

Im

pres

sion

s

Page 7: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

7

Page 8: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

8

‘THE EvOLUTION OF APEx’

Con

stru

ctio

n Up

date

O

ne –

Feb

ruar

y 20

16

DEMOLITION WORKS WERE CONDUCTEDthen utilities connected and the new site of�ce set up, as well as establishing sediment and erosion control measures. The bulk earthworks were well underway with a large 32 tonne excavator making great progress with excavations works.

Page 9: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

9

Page 10: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

10

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

Tw

o –

Mar

ch 2

016

MOSAIC CONSTRUCTION MADE IMPRESSIVE PROGRESS ON SITE. The bulk earthworks, ground �oor blockwork and a large portion of the strip footings were completed.

Page 11: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

11

Page 12: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

12

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

T

hree

– A

pril

2016

TWO IMPORTTWO IMPORTTWO IMPOR ANTANT T PROJECT MILESTONES WERE REACHED, TONES WERE REACHED, Tthe �rst being the completion of the ground �oor slab which creates the Level 1 apartment and the carpark for the complex.

Page 13: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

13

Page 14: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

14

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

Fo

ur –

May

201

6

THE BUILDING WENT UP A LEVEL, AS THE LEVEL 3 SLAB WAS COMPLETED ALLOWINGthe internal and external walls to create six Level 3 apartments. Works continued to the lower apartments.Works continued to the lower apartments.W

Page 15: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

15

Page 16: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

16

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

Fi

ve –

Jun

e 20

16

THE LAST SUSPENDED CONCRETE SLAB WAS COMPLETED AFTER A MONTH OF OUTSTANDING PROGRESS. TANDING PROGRESS. TBlockwork was completed for Level 4, while a start was made on the internal framework for Level 2 apartments.

Page 17: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

17

Page 18: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

18

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

Si

x –

July

201

6

WITH APEX ON DONALDSON NOW “TOPPEW “TOPPEW D OUT”, the focus shifted to the apartment internals allowing framing, service rough-ins and sheeting to commence. Rendering of the external blockwork walls of the building and lobby area was also half completed.

Page 19: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

19

Page 20: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

20

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

Se

ven

– A

ugus

t 20

16

INTERNALS AND EXTERNALS OF THE BUILDING RECEIVED ATTENTION, with more painting and rendering inside and out, and the kitchen and bathroom cabinetry for the ground level and Level 1 apartments completed.

Page 21: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

21

Page 22: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

22

‘THE EvOLUTION OF APEx CONTINUES’

Con

stru

ctio

n Up

date

Ei

ght

– Se

ptem

ber

2016

IT WAS ANOTHER BUSY MONTH ON SITE WITH THE MOSAIC CONSTRUCTION TEAM PROGRESSING FURTHER THAN ANTICIPATED, allowing the completion date to be brought forward. Over the coming month, the construction team completed all externals and internals of the building ensuring all the apartments and building works were �nished to the expected Mosaic standard.

Page 23: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

23

Page 24: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

24

‘THE EvOLUTION OF APEx FINAL PRODUCT’

THE FINAL PRODUCT IS CLEANED AND POLISHED AND THE FINISHING TOUCHES APPLIED, TOUCHES APPLIED, Tready for settlement and handing over to the new owners.

Nov

embe

r 20

16

Page 25: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

25

Page 26: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

26

Apex on Donaldson had a specific design intent to both protect the streetscape of a highly desirable and affluent Greenslopes street and comply with the Local Council Area Plan.

/ CLASSIC DESIGN

Page 27: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

27

The building is set on a huge 1,400m² site. With low impact design in mind, Apex is sympathetic to the neighbourhood with only 15 apartments set across 3 levels.

/ UNIQUE

Page 28: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

28

Apex, located in the dress circle of Greenslopes, is only 6km south-east from the Brisbane CBD.

Page 29: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

29

The classically designed Apex demonstrates that it’s possible to build luxurious and modern apartments in an established suburb and still maintain street integrity.

/ TIMELESS APPEAL

Page 30: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

30

Solar shading was implemented to the western elevation openings to reduce cooling costs and improve privacy for both residents and neighbours.

/ PRIvATE

Page 31: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

31

Cutting-edge contemporary design will stand the test of time.

Page 32: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

32

Car park and lobby with secure intercom entry.

Page 33: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

33

Water storage tanks were installed beneath the driveway in reinforced concrete tanks to ensure the front façade of the building remained open and aesthetically pleasing to the streetscape.

Hot water costs reduced through installation of high rated Water Efficiency Labelling Scheme (WELS) fixtures.

Low voltage, energy efficient LED lighting used throughout entire building.

/ EFFICIENT AND SUSTAINABLE

Page 34: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

34

/ MODERN

Page 35: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

35

Luxurious and thoughtful lobbies cleverly take design elements from outside and bring them within.

Page 36: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

36

Situated in a wide, leafy street in one of Brisbane’s most established suburbs.

/ OUTLOOK

Page 37: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

37

Page 38: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

38

Stylish, contemporary apartments perfectly located for enjoying vibrant city fringe living.

/ LIFESTYLE

Page 39: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

39

Page 40: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

40

/ vIBRANT

Page 41: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

41

A large block ensures plenty of room for private and green spaces.

Page 42: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

42

very spacious and thoughtful open plan layout with ample living dining. and outdoor entertaining areas.

Page 43: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

43

Higher than average ceiling heights and large opening windows and doors for a more spacious feel.

/ SPACIOUS

Page 44: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

44

Beautiful polished timber floors flow throughout, connecting living areas.

/ ELEGANT

Page 45: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

45

Page 46: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

46

Gourmet kitchens feature stone waterfall benchtops, European appliances and tapware with integrated dishwasher and microwave.

/ LUxURY

Page 47: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

47

Large furnishable balconies create additional living spaces.

/ OUTDOOR LIvING

Page 48: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

48

/ ENJOYMENT

Page 49: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

49

Page 50: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

50

Stunning fully tiled bathrooms with semi-frameless shower screens and quality fixtures.

Page 51: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

51

Spacious air-conditioned bedrooms with generous walk-in or built-in wardrobes.

/ GENEROUS

Page 52: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

52

/ FEATURES

Page 53: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

53

High attention paid to every finer detail for both a stunning finish and functional design.

Page 54: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

54

Page 55: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

55

/ PREMIUM

Page 56: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

56

Ample natural light and air flow through open apartments means energy efficient living.

/ OPEN AND LIGHT

Page 57: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

57

Page 58: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

58

/ QUALITY

Page 59: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

59

PROUDLY DEVELOPED AND CONSTRUCTED BY:

p 1300 336 989 or 07 3171 2270 f 07 3171 2217 e [email protected] 84 Latrobe Terrace, Paddington Q 4064

postal PO Box 526, Paddington Q 4064 w mosaicproperty.com.au

Page 60: 40 Donaldson Street, Greenslopes QLD · Construction Update Six – July 2016 WITH APEX ON DONALDSON NOW “TOPPE D OUT”, the focus shifted to the apartment internals allowing framing,

60