4 Data Center Project Management Problems You
Can Avoid
![Page 2: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/2.jpg)
Here are four data center project management challenges you can
avoid:
![Page 3: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/3.jpg)
1. Exceeding Project Budget
With the myriad numbers of data center construction costs, it is challenging to
account for every expense and price overage.
Sponsored by http://www.DataCenterLeadGen.com
![Page 4: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/4.jpg)
Using tools like:
Sponsored by http://www.DataCenterLeadGen.com
•Construction cost calculators•Hiring experienced planners•Adding some contingency to your cost estimates to mitigate budget overrun
![Page 5: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/5.jpg)
2. Keep Project Scheduling on Track
Sponsored by http://www.DataCenterLeadGen.com
Holding to a timeframe when building a colocation
facility or other server facility is as equally challenging as cost.
![Page 6: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/6.jpg)
Consider contracting temporary services within a modular data center:
•Hiring the right general contractor or project manager•Find contractors that are willing to assume the responsibility of milestone attainment
Sponsored by http://www.DataCenterLeadGen.com
![Page 7: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/7.jpg)
3. Securing Resource AvailabilityContracting the service providers that can deliver on data center construction phases like:•Raised floor assembly• Server rack installation•Air flow ventilationCan mean you are competing for expertise which is in high demand.
Sponsored by http://www.DataCenterLeadGen.com
![Page 8: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/8.jpg)
Sponsored by http://www.DataCenterLeadGen.com
Building relationships with these companies well in advance of your build is
critical.
![Page 9: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/9.jpg)
Sponsored by http://www.DataCenterLeadGen.com
Instead of hiring a bunch of independent contractors to deliver a narrow band of the
spectrum of services you require, work with firms which
can deliver a wide scope of responsibilities.
![Page 10: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/10.jpg)
Shift the responsibility of delegation of tasks to the contractor to dovetail services together, such as:•Server room cabling•Cooling system installation•Server installation and configuration•Software implementation, testing, and deployment
Sponsored by http://www.DataCenterLeadGen.com
![Page 11: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/11.jpg)
4. Lack of Change Management Readiness
Sponsored by http://www.DataCenterLeadGen.com
If there’s an industry which should be prepared for change, it would have to
be managed technology services. Expecting the unexpected and having a
Plan B to fall back on along the way separates the innovators from the
imitators.
![Page 12: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/12.jpg)
Sponsored by http://www.DataCenterLeadGen.com
Be prepared to swap out equipment you had in mind for more scalability, elevated
security, or faster performance. If demand spikes in advance of your go-
live, consider hardware consolidation or virtualization to increase server density and delivery capacity.
![Page 13: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/13.jpg)
Three key data center project management strategies:
•Establishing relationships with service providers•Keeping thorough and detailed reports•Being prepared for change
Sponsored by http://www.DataCenterLeadGen.com
![Page 14: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/14.jpg)
Sponsored by http://www.DataCenterLeadGen.com
Should you be planning to expand your roster of managed hosting or colocation facilities, keep these tips in mind to:• Mitigate risk• Get your build completed with minimal delays• Manageable cost overage
![Page 15: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/15.jpg)
Sponsored by http://www.DataCenterLeadGen.com
Have you completed a data center project where project
management either accelerated, stalled, or derailed the initiative
completely?
![Page 16: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/16.jpg)
Sponsored by http://www.DataCenterLeadGen.com
Tell us about it in the comments section!
![Page 17: 4 Data Center Project Management Problems You Can Avoid (SlideShare)](https://reader036.vdocuments.us/reader036/viewer/2022070600/58cf08b51a28ab5f2b8b522d/html5/thumbnails/17.jpg)
Copyright © SP Home Run Inc. SP Home Run is a Registered Trademark of SP Home Run Inc. All Worldwide Rights Reserved.
Recommended Reading
Learn How Colocation Data Centers Can Create a Scalable, Data-Driven, Marketing and Sales Funnel That Powers Growth
Download Your Free Copy Now at http://www.DataCenterLeadGen.com