4. andritz va tech hydro gfse-presentation harald schmid
TRANSCRIPT
www.vatech-hydro.com1
Jebel AuliaAn innovative concept of renewable
energy generation
www.hydromatrix.com
www.vatech-hydro.com2
What is HYDROMATRIX ®
� A solution for low head sites with existing dam and weir
structures
� Many small units instead of conventional sized turbines
� Not a typical ‚small hydro‘ application
� A very feasible hydropower system, investment cost approx .
900 – 1,800 USD / kW
� Innovative application of proven technologies
www.vatech-hydro.com3
HYDROMATRIX® Benefits
� Clean & environmentally friendly energy (KYOTO-protocol)
� Use of existing weir structures
� no civil construction
� no geological risk
� no additional land usage
� Standardized modular concept
� Compressed project schedule
� HYDROMATRIX® modules removeable at flood conditions
� Keep existing river flow pattern
� High availability
www.vatech-hydro.com4
HYDROMATRIX® Application criteria
� Available plant discharge from ~ 60 m³/s
� Available head from 3 m up to 10 m
� Minimum submergence 1.5 m below tailwater
� Unit output from 200 kW up to ~ 700 kW
� Close grid connection
� Structure available & suitable for HYDROMATRIX ®
www.vatech-hydro.com5
HYDROMATRIX® Application range
Flow> 60 m³/sFlow
> 60 m³/s
Head3 - 10 mHead
3 - 10 m
Submergence> 1.5 m
Submergence> 1.5 m
www.vatech-hydro.com6
HYDROMATRIX® Potential Applications
Navigation dams
Irrigation dams
Shiplocks
Intake towers
www.vatech-hydro.com7
Irrigation Dams - Jebel Aulia, Sudan
Client: National Electricity Corp.
D = 1,120 mm
n = 375 rpm
H = 5.5 m
Ptu = 380 kW
80 units in 40 modules
Ptotal = 30.4 MW
Existing barrage on the White Nile
Contract award: 2000
Commissioning: 2004
HYDROMATRIX® Experience
www.vatech-hydro.com8
Client: National ElectricityCorp.
D = 1,120 mm
n = 375 rpm
H = 5.5 m
Ptu = 380 kW
80 units in 40 modules
Ptotal = 30.4 MW
Existing barrage on the
White Nile
Contract award: 2000
Commissioning: 2004
Irrigation Dams - Jebel Aulia, Sudan
HYDROMATRIX® Experience
www.vatech-hydro.com9
Client: National Electricity Corp.
D = 1,120 mm
n = 375 rpm
H = 5.5 m
Ptu = 380 kW
80 units in 40 modules
Ptotal = 30.4 MW
Existing barrage on the White Nile
Contract award: 2000
Commissioning: 2004
Irrigation Dams - Jebel Aulia, Sudan
HYDROMATRIX® Experience
www.vatech-hydro.com10
Jebel Aulia, Sudan
Status: October 2003
HYDROMATRIX® Experience
www.vatech-hydro.com11
Status November 2003
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com12
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com13
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com14
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com15
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com16
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com17
HYDROMATRIX® Experience Jebel Aulia, Sudan
www.vatech-hydro.com18
HYDROMATRIX® Contact worldwide
For more information about HYDROMATRIX ® please contact:
Harald SCHMIDHYDROMATRIX® Coordination
VA TECH HYDROA - 4031 Linz, AustriaLunzerstrasse 78
Phone: +43 (732) 6987 3343Fax: +43 (732) 6980 2554E-mail: [email protected]
Websites:http://www.hydromatrix.comhttp://www.vatech-hydro.com
http://www.hydromatrix.com