- CONCERTO PLUS: What it does and latest developments
- Recent Developments in the CONCERTO communities
- The CONCERTO Vision!
CONCERTO communities are expected to work towards a completely integrated energy policy by using a combination of measures such as:
The main focus of the CONCERTO communities:
Renewable Energy
Research Monitoring Training
PolygenerationEnergy efficiency
INTEGRATIVE APPROACH
- To strengthen team working within the CONCERTO initiative
- To encourage associated communities and new ones to participate, or to create new projects
- To add value to the results of the CONCERTO projects
- To spread the knowledge about the CONCERTO initiative and its benefits amongst Europe by creating an umbrella image for all projects
- To coordinate analysis and monitoring
- To provide Policy Recommendations based on the results of the CONCERTO projects
- To enable networking to share the results with other European platforms such as the EPBD
…TO MAXIMISE THE IMPACT OF THE CONCERTO INITIATIVE !
The main focus of CONCERTO PLUS:
Dissemination
Technical and Non-Technical Analysis
Networking
Knowledge Sharing
Policy Recommendations
The main focus of CONCERTO PLUS:
Across all CONCERTO projects
On all levels:
Community / Regional / National / European
CONCERTO PLUS: Latest Developments
- Socio Economic Evaluation: Socio Economic Matrix
- Technical Evaluation: The Technical Monitoring Database
- Site Visits
- Networking
- Dissemination: The CONCERTO DVD
CONCERTO PLUS latest developments: Socio Economic Evaluation
- SOCIO ECONOMIC MATRIX:- Tool for clustering similar
approaches as the basis for individual project assessment
- Socio-economic matrix tool consists of criteria; detailed
definition indicators related with
criteria, definitions and examples
tools for data acquisition; definition
The matrix is made available on-line for comparison and evaluation!
CONCERTO PLUS latest developments: Technical Evaluation
OUR TASKS
To collect results (monitoring and calculated) of all projects of all communities of all countries
To make this results comparable: across different countries / systems / building types
To summarize the results in a meaningful manner
To be able to assess what has worked were / what hasn’t worked / why has it not worked? what can we learn from this?
To use this data for Policy Recommendations: What legal / fiscal / funding mechanisms should be altered / implemented to increase sustainability in European communities?
CONCERTO PLUS latest developments: Technical Evaluation
HOW DO WE DO THIS?
- By creating ‘Baselines’ for all CONCERTO communities to allow for comparison and impact assessmentto… Assess RES, EE and polygeneration systems and measures throughout all CONCERTO communities
Assess actual energy performance of communitiesAssess which systems and measures are most
economically viable - By visiting the communities and their technical experts to find the real barriers / challenges in their projects- By collecting all calculated and monitored data in a ‘Technical Monitoring Database’ for short and long term evaluation-Communities will be encouraged to contribute their data to the database after the end of the CONCERTO project- We will then have a ‘real’ database of monitoring data across many European countries
CONCERTO PLUS latest developments: Technical Evaluation
WHY?
The CONCERTO initiative is a unique project which combines for the first time a series of communities across Europe
This will provide invaluable ‘real’ monitoring data throughout the building sector in Europe!
The results of each individual project can thus shape our future energy policy
We will have a real ‘return’ on the results: e.g.: improved legislation, improved funding schemes, research that is focusing on the real needs of Europe’s communities
TO MAKE A REAL IMPACT!
CONCERTO PLUS latest developments: Technical Evaluation
The CONCERTO Technical Monitoring Database
Technical Monitoring Database (Screenshots)
Regional site visits:
- Once a year for all CONCERTO communities in one country
- To establish a strong CONCERTO network between the communities on a national level (Network coordination group)
- Agree on national standards, guidelines and baselines for technical monitoring
- Establish common guidelines for policy recommendations
- Establish a CONCERTO dissemination structure on national level
CONCERTO PLUS latest developments: Site visits
Project Site visits:
- Once a year for each CONCERTO project (organised ideally in conjunction with project meetings)
- Development of project specific methodological standards of Socio- economic issues
- Open questions of project management issues
- Visit of demonstration projects
CONCERTO PLUS latest developments: Site visits
Visit other experts on their site visits
- Make site visits available in the Concerto Monthly e-mail
- Invite other experts
Knowledge Management
- Expert Talks on database are not really used; Expert-e-mail groups as alternative for cross-sharing of information
CONCERTO PLUS latest developments: Networking
CONCERTO Communities: Demonstration Projects
- Overview of most recent developments in some other communities
- Highlights from Demonstration Projects
- Topics of common interest from other communities
CONCERTO Communities: act2 / Hanover
LISTER BAD
- 3200 m² Water Area
- Largest open-air swimming pool in Hanover
- Thermal Solar Collectors on the flat roof of the changing rooms
- 1890 m² of polypropylene solar absorbers
- Robust system adapted for low temperature heating required for a swimming pool
- The swimming pool has already been opened in May 2007
CONCERTO Communities: act2 / Hanover
60s APARTMENT BUILDINGS
- Replacement of single apartment gas heating systems through district heating
- Thermal improvement of the buildings’ envelope (walls, ceilings) and replacement of the windows by low-e glazing
- Cold bridges have been analysed and treated where necessary
- None of the apartments do have ventilation systems; the buildings will therefore continually be checked to assess the actual indoor air quality
CONCERTO Communities: ECO-City / Helsingborg - Helsingør
KVARTERET FRONTEN 3- 50 new ECO-dwellings over
14 storeys- Additional insulation (above
current Building Regulations)- Low-e windows- Heat recovery ventilation- District heating- Energy monitoring devices- Pre-fabrication of the façade - Expected to be finished in
January 2008
CONCERTO Communities: ECO-City / Helsingborg - Helsingør
TÜRKIET (PORTALEN)- 107 new ECO-dwellings in a 6
to 7 storey building - Pre-fabrication- Additional insulation- Energy monitoring- Low-e windows- Heat recovery ventilation- District heating - 80m2 of evacuated tube
collectors - Expected to be finished in
March 2008
CONCERTO Communities: ECO-City / Helsingborg - Helsingør
Other ongoing demonstration projects:
- New Prototype for Comfort Metering (see image)
- Rehabilitation of boiler station to use biomass (5MW)
- 2MW Wind Power Turbine (Planning stage)
CONCERTO Communities: sesac / Växjö
VÄLLE BROAR- 8-stories wood building- Large extent of Pre-
fabrication- Eco-Buildings (additional
insulation, high quality glazing)
- District Heating
- The challenge is the air-tightness and achieving Passive-House Standard for a Test-Building!
CONCERTO Communities: sesac / Växjö
BISKOPSHAGEN (Garden City)- A series of 2-storey buildings
each- consisting of 4-6 apartments- Bearing structure is concrete and
the façade wooden panels (which are pre-fabricated in a tent on site)
- All aspects of Eco-Buildings (additional insulation, heat recovery ventilation etc.)
- Quality insurance on the construction site: trainings and close cooperation with site workers are supported!
CONCERTO Communities: sesac / Delft
POPTAHOF Development- Refurbishment of a series of
high rise apartments buildings
- New external insulation- replacement of windows- Connection to district
heating systems- Socio-economic aspects also
included: new playgrounds, vegetable gardens, tenants democratically ‘vote’ for any changes
CONCERTO Communities: sesac / Delft
POPTAHOF Development- First apartment blocks
have already been evacuated
- Construction is currently under way
- Tenants can return to their old flats once the refurbishment is completed
CONCERTO Community: Ecostiler / Amsterdam (NL)
COMPLEX 40- Refurbishment of social
housing buildings - New windows and window
panels- Insulation to the attic and the
ground floors - Photovoltaic panels- Heat recovery through sewage
water- Completion by the end of 2007- Refurbishment was undertaken
while occupied (logistical and socio-economical challenge!)
CONCERTO Community: Ecostiler / Amsterdam (NL)
DE LEEUW VAN VLAANDEREN- Complete Refurbishment:
only structure remained - High efficient façade - Energy and acoustic buffer
zone to the noisy highway
CONCERTO Community: Polycity / Ostfildern (DE)
SCHARNHAUSER PARK- All new buildings comply with
the ‘Polycity’ Standard- High performance windows
and façade systems- Mechanical ventilation
(however without heat recovery)
- All buildings are connected to the local district heating network
- Biomass ORC (organic ranking cycle) plant is providing heat and electricity to all buildings
CONCERTO Community: Polycity / Ostfildern (DE)
YOUTH CENTRE- Buried in the earth and
covered by a ‘green roof’- ‘Almost’ a passive house
save for the double galzed windows (triple glazed windows were not chosen due to potential vandalism)
CONCERTO Community: Polycity / Cerdanyola (ES)
LA CLOTA RESIDENTIAL BUILDING- Under construction; finished
2008- Natural ventilation (cross
ventilation of all flats)- High performance windows
and increased insulation in the façade
- Shading concept (open / closed balconies with external shading)
- Monitoring through a communal energy management system
CONCERTO Community: Polycity / Cerdanyola (ES)
NEW URBAN DEVELOPMENT- 50,000 inhabitants and
industrial + educational area- 33% renewable energy supply- 30% demand reduction in
buildings- Synchrotron building (office
area is part of CONCERTO)- 1 -2 MWe Biomass gasification- 2000m2 thermal solar
collectors- 2MW thermal cooling
CONCERTO Communities: Knowledge Management
- Please inform us about the current status of your demonstration projects!
- Especially about barriers / lessons learnt / solutions
- This will help other communities (current ones as well as CONCERTO II communities) with similar tasks
- Encourage the cross-sharing of knowledge and experience!
- This ‘cross-sharing’ of information can happen through:
The monthly e-mails
E-mail groups on specific topics (i.e. Bio-Gas Plants)
Invitations to other CONCERTO experts to visit your sites
‘Regional’ site visits i.e. meeting with other experts
What we really want: The CONCERTO Vision
- CONCERTO enables all relevant stakeholders to change their attitude and social habits
- CONCERTO encourages the industry to reap the benefits of sustainable solutions
- CONCERTO sets higher performance standards in energy efficiency and integration of renewables
- CONCERTO acts as a motivator and driving force in the field of renewable energy
- CONCERTO highlights the demand in particular fields of research
- CONCERTO fosters integrated solutions
- CONCERTO gives new impulses to the regional development
To influence…
- The energy policy of the future on local as well as European level
- The relevant stakeholders on the construction and energy industry
- The direction and funding of research activities in this field