INDIA INFRASTRUCTURE REPORT http://www.indiainframonitor.com/projects/report/53c3998897725281...
1 of 2 31-07-2014 PM 02:40
Project Name 380 MW Vijaipur Power Project
Sector Electricity
Sub Sector Thermal Power Generation
Location Village/Town/City District State
Vijaipur Guna Madhya Pradesh
Project Promoters andShareholders
Name Contact Details Equity Stake (%)
Gail (India) Limited GAIL Bhawan, 16 BhikajiCama Place, R K PuramNew DelhiDelhiIndia+91 11 26172580www.gail.nic.in
100
Project Background andScope
Gail (India) Limited plans to set up a 380 MW combined cycle power plant at Vijaypur,Guna distrcit in Madhya Pradesh. The proposed project is combined cycle power plantcomprising of gas turbine, heat recovery steam generator (HRSG) steam turbine andgenerator and entails an initial investment of Rs 12.09 billion.
The proposed project will be located within the existing premises of Gail (India)Limited's liquified petroleum gas (LPG) manufacturing facility cum compressor station.Total water requirement for the plant will be 455 cubic metres per hour (m3/hr). Waterwill be sourced from the Gopi Krishna Sagar dam and will be transported by undergroundpipeline channel. Water Resource Department (WRD), Government of Madhya Pradeshhas allotted 10 million cubic metre (mcm) of water to the project.
Blend of natural gas (NG) and re-gasified LNG (RLNG) in the ratio of 60:40 will be used asfuel for the plant. Gas requirement will be 1.452 mmscmd (million metric standard cubicmeter per day) at 85 per cent plant load factor (PLF). The fuel will be transportedthrough pipelines from the compressor station located within the premises. Thecompany has already signed a long term gas contract with Sabine Pass Liquefaction, LLC(limited liability company) for supply of 3.5 million metric tonnes per annum (mmtpa) ofLNG and with Gazprom Marketing and Trading Singapore Private Limited for supply of 2.5mmtpa of LNG. The LNG supplies from Sabine Pass Liquefaction, LLC (limited liabilitycompany) are expected to start by the end of 2017. The total levelised tariff for poweris estimated to be Rs 6.37 per kwh (kilo watt hour).
The power will be evacuated to 220 kV substation of Madhya Pradesh State ElectricityBoard (MPSEB) in Guna which is 25 kms from the proposed site.
The proposal for consideration of environmental clearance was deferred by the expertappraisal committee in October 2012 as some of the provisions of Tems of Reference(ToR) were not complied. Revised proposal was therefore re-considered in January 2014and environmental clearance was received from the Ministry of Environment and Forests(MoEF), Government of India in June 2014.
Construction is yet to begin. The project is expected to commission 22 months after theconstruction start date.
Ownership Public Sector Undertaking (PSU)
Current Status Announced
Project Type Greenfield
Key Consultants Name Contact Details Scope of Work
EMTRC Consultants PrivateLimited
Ansal Plaza, UpperMezzanine UM113 - 113A,Near Metro Station, VaishaliGhaziabadUttar PradeshIndia+91 120 22306760http://www.emtrc.com
Preparation of environmentimpact assessment (EIA)report
Cost Rs 12.09 billion
Capacity 380 MW
Cost Per Unit Rs 31.81 million/MW
Land Acquisition Completed
Cost
Rs 12.09 billion
Capacity
380 MW
Ownership
Public Sector Undertaking (PSU)
Current Status
Announced