Universidad Central de Ecuador Alejandro Delgado UCE-FIQ Ecuador Quotation Transaction No.: 359801 Quotation No.: 1485 Project: 3598 Date: 04.04.2014 Your No.: Inquiry Date: 04.04.2014 Contact Person: Ulrich Ahlers E-mail: [email protected] Telephone: +49 (0) 2581 63601-159 Fax: +49 (0) 2581 63601-20 Debitor Tel.: Debitor Fax: E-mail: For any queries please indicate the transaction no. and the document no.! Order of Costs e&e Small Scale Extract Production Plant Table of contents 1.0 SPX/e&e CPP Pilot 2- effect extraction plant; 2 x 100 l 2.0 SPX/e&e CPP Pilot 1- effect evaporation plant; 200 kg/h 3.0 SPX/e&e CPP Pilot rectification plant; 150 kg/h 4.0 SPX/e&e CPP Pilot aroma recovery plant; 50 l/h 5.0 SPX/e&e CPP UHT sterilisation plant 6.0 SPX/e&e CPP Pilot drying cabinet; 3 m 2 7.0 SPX/e&e Installation supervision 8.0 SPX/e&e Commissioning and training 9.0 GMP Documentation (OPTION)

Upload: alejodany

Post on 25-Sep-2015

224 views

Category:

Documents


3 download

DESCRIPTION

35

TRANSCRIPT

  • Universidad Central de Ecuador Alejandro Delgado UCE-FIQ Ecuador

    Quotation Transaction No.: 359801 Quotation No.: 1485

    Project: 3598 Date: 04.04.2014 Your No.: Inquiry Date: 04.04.2014 Contact Person: Ulrich Ahlers E-mail: [email protected] Telephone: +49 (0) 2581 63601-159 Fax: +49 (0) 2581 63601-20 Debitor Tel.: Debitor Fax: E-mail: For any queries please indicate the transaction no. and the document no.!

    Order of Costs e&e Small Scale Extract Production Plant

    Table of contents

    1.0 SPX/e&e CPP Pilot 2- effect extraction plant; 2 x 100 l

    2.0 SPX/e&e CPP Pilot 1- effect evaporation plant; 200 kg/h

    3.0 SPX/e&e CPP Pilot rectification plant; 150 kg/h

    4.0 SPX/e&e CPP Pilot aroma recovery plant; 50 l/h

    5.0 SPX/e&e CPP UHT sterilisation plant

    6.0 SPX/e&e CPP Pilot drying cabinet; 3 m2

    7.0 SPX/e&e Installation supervision

    8.0 SPX/e&e Commissioning and training

    9.0 GMP Documentation (OPTION)

  • Transaction Nr.: 359801 page 2 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    1 SPX/e&e CPP Pilot 2- effect extraction plant; 2 x 100 l

    ...

    2 x 100 l Percolator Volume

    The extraction plant is used for the extraction of vegetable or animal raw materials. The plant consists of 2 extractors which can be operated in 1- or 2-effect operation. Due to the very flexible construction, varying operation modes with variable pressures, temperatures and solvents are possible. The direction of extraction can be chosen either from top to bottom or vice versa. Moreover, the extraction material can be damped and the extraction can take place under vacuum or pressure.

    e&e CPP System: Connect - Plug - Produce The plant is ready for operation, incl. switch cabinet, and mounted on a stainless steel frame. Before being delivered to the customer the plant is checked for functioning in e&es workshop.

    All components are ex-proof according to

    ATEX. Technical Data:

    Solvent: Watery and non-water-soluble, combustible and non-combustible solvents (Other solvents are only allowed to be used after consultation with e&e)

    Flow rate: 100 - 800 l/h Operating temp.: 10 - 100C Operating pressure: -1...+0,5 bar Extract concentration: depending on the basic material and the process

    conditions

    Utilities Requirements: Steam: 3,0 barg Steam demand: approx. 120 kg/h (preheating)

    approx. 100 kg/h (damping) Electrical power: 4,7 kW Electrical connection: 230/400 V, 50 Hz, PE/N Ex protection: EEx de II T3 Cooling water: approx. 3,8 m3/h (25 - 35C) Chilled water 6 - 12 C for vacuum pump Compresses air: 6 barg

  • Transaction Nr.: 359801 page 3 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    Size: Length x width x height: approx. 5.000 x 1.900 x 2.450 mm

    Materials: All product-contacting parts are made from AISI 316/316 L. Other parts are made from AISI 304, resp. grey cast iron or something similar. The frame is fabricated from AISI 304. Gaskets are made from EPDM, partially from PTFE.

    The plant is designed and fabricated according to the effective DIN, AD and VDE standards and directives as well as to all applicable EU Directives. The layout corresponds to the rules of the food and pharmaceutical industry.

  • Transaction Nr.: 359801 page 4 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    2 SPX/e&e CPP Pilot 1- effect evaporation plant; 200 kg/h

    ...

    1-effect, 200 kg/h Water evaporation

    The plant is used for the concentration of watery or organically dissolved extracts. The plant consists of a plate evaporator with a downstream centrifugal separator. The evaporated vapours are condensed in the plate condenser in the vacuum or at ambient pressure. The evaporation temperature can be adjusted according to the product-specific boiling curve through the applied vacuum. This way, even temperature-sensitive extracts can be concentrated.

    e&e CPP System: Connect - Plug - Produce The plant is ready for operation, incl. switch cabinet, and mounted on a stainless steel frame. Before being delivered to the customer the plant is checked for functioning in e&es workshop.

    All components are ex-proof according to

    ATEX. Technical Data:

    Solvent: Watery and not water-soluble, combustible and non-combustible solvents

    Evaporative power: 200 kg/h (water) Feeding quantity: 100 - 1000 l/h Feeding temperature: 20 - 60C Extract concentration: Depending on the feed material and the

    process conditions

    Utilities requirements: Steam: 3,0 barg Steam demand: approx. 220 kg/h Electrical power: 7,5 kW Electrical connection: 230/400 V, 50 Hz, PE/N Ex protection: EEx de II T3 Cooling water: approx. 15 m3/h (25C inlet, 35C outlet) Chilled water 6 - 12 C for vacuum pump Compressed air: 6 barg

    Size: Length x Width x Height: approx. 3,600 x 1,400 x 2,100 mm

  • Transaction Nr.: 359801 page 5 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    Materials: All product-contacting parts are made from AISI 316/316 L. Other parts made from AISI 304, resp. cast iron or something similar. The frame is made from AISI 304. Gaskets are made from EPDM, partly from PTFE.

    The plant is designed and built according to the effective DIN, AD and VDE standards and directives as well as to all applicable EU Directives. The layout corresponds to the rules of the food and pharmaceutical industry.

  • Transaction Nr.: 359801 page 6 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    3 SPX/e&e CPP Pilot rectification plant; 150 kg/h

    ...

    The plant is used for concentration of Ethanol / Water solution by rectification. The feed quantity is charged into the column by a pump and can be preheated by bottom product. After filling the bottom, the steam- heating of the bottom evaporator is started. The entering liquid is in contact with the rising vapours. At the head the enriched vapours are condensed. Part of the condensed liquid is pumped back to the column as reflux, the main part is cooled in a heat exchanger by cooling water and leaves the plant. The bottom is equipped with an overflow by level. The overflow is pumped through a heat exchanger for pre-heating the feed bevore leaving the plant. The plant operates under atmospheric conditions.

    e&e CPP System: Connect - Plug - Produce The plant is ready for operation, incl. switch cabinet, and mounted on a stainless steel frame. Before being delivered to the customer the plant is checked for functioning in e&es workshop. For transportation the column has to be dismounted and reassembled on site. Therefore the column will be delivered without insulation.

    All components are ex-proof according to ATEX, temperature class T3.

    Technical Data: Feeding quantity: 150 - 200 kg/h Feed concentration: approx. 60 Vol-% Ethanol concentration: approx. 85 Vol-% Bottom concentration:

  • Transaction Nr.: 359801 page 7 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    Materials: All product-contacting parts are made from AISI 316/316 L. Other parts made from AISI 304, resp. cast iron or something similar. The frame is made from AISI 304. Gaskets are made from EPDM, partly from PTFE.

    The plant is designed and built according to the effective DIN, AD and VDE standards and directives as well as to all applicable EU Directives. The layout corresponds to the rules of the food and pharmaceutical industry.

  • Transaction Nr.: 359801 page 8 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    4 SPX/e&e CPP Pilot aroma recovery plant; 50 l/h

    ...

    The plant is used for enrichment of aromatic components from the extraction solvent by stripping / rectification. The feed quantity is charged into the column from a buffer vessel by means of vacuum or a pump. After filling the bottom, the steam- heating of the evaporator is started. The entering liquid is in contact with the rising vapours. At the head the enriched vapours are condensed. A share of the condensed liquid is discharged as aroma, the remaining main part is going back to the column (reflux). The final product can be cooled in a heat exchanger either with cooling or chilled water. It will be collected in a buffer vessel. The bottom is equipped with an overflow by level. Two bottoms product vessel can collect the liquid and discharge it vice versa. The plant can operate under atmospheric or vacuum conditions.

    e&e CPP System: Connect - Plug - Produce The plant is ready for operation, incl. switch cabinet, and mounted on a stainless steel frame. Before being delivered to the customer the plant is checked for functioning in e&es workshop. For transportation the column has to be dismounted and reassembled on site. Therefore the column will be delivered without insulation.

    All components are ex-proof according to ATEX, temperature class T3.

    Technical Data: Feeding quantity: 10 - 70 l/h

    Utilities requirements: Steam: 3,0 barg Steam demand: approx. 60 kg/h Electrical power: 7,5 kW Electrical connection: 230/400 V, 50 Hz, PE/N Ex protection: EEx de II T3 Cooling water: approx. 4 m3/h (25 - 35C) Chilled water 6 - 12 C for vacuum pump Compressed air: 6 barg

    Size: Length x Width x Height: approx. 3,700 x 1,400 x 6,000 mm

  • Transaction Nr.: 359801 page 9 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    Materials: All product-contacting parts are made from AISI 316/316 L. Other parts made from AISI 304, resp. cast iron or something similar. The frame is made from AISI 304. Gaskets are made from EPDM, partly from PTFE.

    The plant is designed and built according to the effective DIN, AD and VDE standards and directives as well as to all applicable EU Directives. The layout corresponds to the rules of the food and pharmaceutical industry.

  • Transaction Nr.: 359801 page 10 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    5 SPX/e&e CPP UHT sterilisation plant

    ...

    The plant is used for sterilisation of watery or organically dissolved extracts. This is done by heating the extracts up to 145 C by the means of sterilized steam at approx. 3.5 bar g, keeping the extracts hot during approx. 2 - 4 seconds (variable), cooling down by flashing under vacuum and condensation of the vapours. The plant consists of a clean steam generation, a deep sterilisation head with injection nozzle and holding tube, a flash separator with plate condensor and vacuum pump, a feeding tank and several pumps.

    e&e CPP System: Connect - Plug - Produce The plant is ready for operation, incl. switch cabinet, and mounted on a stainless steel frame. Before being delivered to the customer the plant is checked for functioning in e&es workshop.

    All components are ex-proof according to ATEX, temperature class

    T3. Technical Data:

    Feeding quantity: 50 - 400 l/h Product: various extracts Solvent: water / ethanol Product viscosity: max. 1000 cp at feeding temperature Feeding temperature: 20 - 60C Sterilisation temperature: approx. 143 C Keeping the extract hot: 2 - 4 seconds (variable, keeping the extracts hot

    by modifying the sterilisation section) Utilities requirements: Steam: 3,0 barg Steam demand: approx. 10 - 100 kg/h Electrical power: 7,5 kW Electrical connection: 230/400 V, 50 Hz, PE/N Ex protection: EEx de II T3 Cooling water: approx. 11 m3/h (25 - 35C) Chilled water 6 - 12 C for vacuum pump Compressed air: 6 barg

    Size: Length x Width x Height: approx. 3,400 x 1,400 x 1,900 mm

  • Transaction Nr.: 359801 page 11 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    Materials: All product-contacting parts are made from AISI 316/316 L. Other parts made from AISI 304, resp. cast iron or something similar. The frame is made from AISI 304. Gaskets are made from EPDM, partly from PTFE.

    The plant is designed and built according to the effective DIN, AD and VDE standards and directives as well as to all applicable EU Directives. The layout corresponds to the rules of the food and pharmaceutical industry.

    6 SPX/e&e CPP Pilot drying cabinet; 3 m2

    9-0004015 e&e Pilot Drying Cabinet Plant, 3 m2 Heating surface

    The plant is used for batchwise drying of liquid or viscous products, especially of thickened extracts. The plant mainly consist of the drying cabinet, a tempering device, a vacuum and condensation system as well as a control cabinet.

    The product is poured into drying trays and then shifted onto the heating plates of the drying cabinet. A vacuum is created for drying and the trays will be heated from the bottom by direct-contact heat and from above by radiant heat. The

  • Transaction Nr.: 359801 page 12 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    evaporating temperature can be adjusted according to the product-specific boiling curve through the applied vacuum so that temperature-sensitive extracts can be dried as well.

    The vapours will be extracted and liquefied in the condenser.

    The plant will be delivered ready for operation and is mounted on a stainless steel frame, incl. a control cabinet. The drying cabinet has a mounting frame with which it can be attached to a wall. Thereby, the anterior part reside in a clean room whereas the posterior part with the auxiliary equipment can be stored in an engineering room.

    The cabinet can be cleaned by wiping it clean or washing it out. For this, the heating plates can be removed separately if required.

    Technical Data: Heating surface: 6 plates 0.5 m2 (750 x 750 mm) Front door: attached to the right or to the left (changeable) Sight opening: 2 sight glasses DN 100 with sight glass lamp Operating pressure: 10 mbar (abs.) Operating temperature: 120C Operating pressure Heating plates: 3 bar g Heating capacity: 6/12 kW (switchable) Cooling capacity: 20.000 kcal/h at 120C

    Utility requirements: Fresh water: for filling the tempering device Cooling water: 3,5 m3/h (4C - 10C) Electrical power: approx. 18 kW Electrical connection: 230/400 V, 50 Hz, PE/N Protection category: IP 54

    Size: Overall size 2.900 x 1.200 x 2.090 mm (L x W x H) Wall opening: 1.100 x 1.205 mm (W x H) Swing range door: 1.200 mm (max. radius) Materials: Drying Cabinet: 1.4301, dead surface Piping: 1.4301, dead surface Sealing: O-ring-seal in the door frame, EPDM

    other sealings EPDM Insulation: 50 mm rock wool with stainless steel casing all around,

    screwed together with the corpus. The insulation of the door is hermetically welded.

    The scope of delivery includes 48 pc. stainless steel trays made of 1.4301, type

  • Transaction Nr.: 359801 page 13 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    Gastro-Norm, 325 x 345 x 65 mm, deep-drawn and stackable.

    The control is carried out via On/Off Switches and feelers with signal lamps which are installed in a stainless steel control cabinet for wall fastening. The control cabinet is installed in the clean room near the cabinet door.

    The plant is built ready for operation on a stainless steel frame with height adjustable base. The control cabinet is connected to the plant with 5 m cable harness and has to be installed on the wall next to the dryer door after assembly.

    The plant must be assembled in the explosion-proof area.

    The plant is designed and built according to the effective DIN, AD and VDE standards and directives as well as to all applicable EU Directives. The layout corresponds to the rules of the food and pharmaceutical industry.

  • Transaction Nr.: 359801 page 14 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    7 SPX/e&e Installation supervision

    ...

    Since the Pilot plants are constructed acc. to the e&e system CPP: connect-plug-produce (plant completely assembled, wired and function-tested in the e&e workshop), the only works remaining on site to be carried out by the buyer are:

    - Allocation and connection of utilities: - steam - cooling water - chilled water - compressed air - electricity

    - Reassembling, duct work and insulation of the columns (Position 4 and 5). SPX/e&e makes one senior supervisor available, who supervises and controls the connection works and tightness tests on site and conducts a first test operation of the plant with water.

    We assume that the period for the SPX/e&e supervision will take 24 days (incl. travel). 24 days SPX/e&e installation supervision incl. travel / flight costs and incurred expenses / allowance.

    Hotel costs (min. 4 star hotel), transfer between airport and hotel, transfer between hotel and construction site as well as an allowance fee (meals) are to be paid by the buyer.

    The estimated 24 days for the SPX/e&e installation supervision shall be conducted without interruption.

    The mechanical and electrical installation of the supply lines (incl. installation material such as pipes, flanges, fittings, etc. in stainless steel AISI 316/316 L) as well as the connection of the plant incl. pressure and tightness tests are to be conducted by the staff of the buyer.

    In case the SPX/e&e supervisor needs more than 24 days and his support is demanded by the buyer, the additional costs will be invoiced at a daily rate of 1.250.- acc. to actual expenditures.

  • Transaction Nr.: 359801 page 15 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    8 SPX/e&e Commissioning and training

    ...

    The SPX/e&e commissioning engineer commissions the completely installed e&e CPP Pilot plants and tests all mechanical and electrical functions. After completion of the functional tests the SPX/e&e commissioning engineer will conduct miscellaneous test runs with water and product that is to be provided by the buyer. - Test production (extraction) with one or more raw materials / products (to be provided by the buyer). - Introduction and training for the operating personnel of the buyer. - Final acceptance.

    Please note: - that the raw material / products for the commissioning provided by the buyer shall demonstrably not be toxic - that the extraction cut of the raw material / products shall have a particle size of 3-5 mm - that the dust content in the product / raw material shall not exceed 20 % - that as solvent solely water or a mixture of water and ethanol will be used

    We assume that the period for the SPX/e&e commissioning und training will take approx. 36 days (incl. travel). 36 days SPX/e&e commissioning and training incl. travel / flight costs and incurred expenses / allowance.

    The buyer ensures the proper supply of steam, cooling water, chilled water, pressed air and electricity during the entire period of the commissioning and training, furthermore the buyer provides sufficient and qualified personnel for the entire period of the commissioning and training. The buyer guarantees that the product / raw material / solvent will be provided in a sufficient amount and quality during the entire period of the commissioning and training.

    The estimated 36 days for the SPX/e&e commissioning and training shall be conducted without interruption.

    Hotel costs (min. 4 star hotel), transfer between airport and hotel, transfer between hotel and construction site as well as an allowance fee (meals) are to be paid by the buyer.

    In case the SPX/e&e commissioning engineer needs more than 36 days and his support is demanded by the buyer, the additional costs will be invoiced at a daily rate of 1,250.- acc. to actual expenditures.

  • -optional-

    Transaction Nr.: 359801 page 16 of 18 Document No.: 1485

    Pos.: Art.Nr. Menge Einheit Einzelpreis Gesamtpreis Text Quantity Unit Unit price Total

    9 GMP Documentation (OPTION) . . .

    According the EU GMP Guideline SPX qualifies to ensure the required product quality. SPX is not responsible for the GMP relevant room concept, ventilation system or provision of according utilities! The Qualification is prospective (parallel) to the planning, installation and commissioning of the plant and consists of the following steps/documents:

    - URS (User Requirement Specification) - RA (Risk Analysis from plants point of view) - FDS (Functional Design Specification) - HDS (Hardware Design Specification) and SDS (Software Design

    Specification) - DQ (Design Qualification) - IQ (Installation Qualification), Leak Test, I/O-Check, etc. - OQ (Operational Qualification), Alarm Check, Performance Test (with

    water), etc. SPX provides Qualification Plans for the DQ, IQ and OQ which need to be approved by the customer before the corresponding Qualification Steps activities can start. In these steps the Plans are filled out and become reports together with the corresponding annexes. Deviations are documented and rated in deviation reports. If they do not affect the next Qualification Step, that one can start and the deviation reports can be closed later. If they affect the next Qualification Step, they need to be closed before starting it. The following documents are provided for GMP qualification:

    - Tube marking according DIN 2403 with labels - Component marking with Tag-No. with labels - For product contacted components additionally

    - 2.2 test reports according DIN EN 10204-2.2 for material and surfaces

    - Declaration of FDA conformity for gaskets - Welding documentation (manual isometrics, welders

    qualification) - Calibration Certificates for quality-relevant measuring devices

  • Transaction Nr.: 359801 page 17 of 18 Document No.: 1485

    Commercial Conditions 1 SPX/e&e CPP Pilot 2- effect extraction plant; 2 x 100 l 198.800,00 2 SPX/e&e CPP Pilot 1- effect evaporation plant; 200 kg/h 177.900,00 3 SPX/e&e CPP Pilot rectification plant; 150 kg/h 189.100,00 4 SPX/e&e CPP Pilot aroma recovery plant; 50 l/h 174.600,00 5 SPX/e&e CPP UHT sterilisation plant 219.800,00 6 SPX/e&e CPP Pilot drying cabinet; 3 m2 198.700,00 7 SPX/e&e Installation supervision 32.500,00 8 SPX/e&e Commissioning and training 46.500,00 9 GMP Documentation (OPTION)

    Total EUR without VAT 1.237.900,00

    Option GMP Documentation 91.700,00

    Prices are only valid upon purchase of all items 1 - 6.

    Delivery: EXW (Incotherms 2010): Delivery ex works, excl. transport, insurance, not loaded.

    Delivery time: Approx. 8 12 month

    Price:

    All prices are net and to be understand plus the legal VAT. The prices of this budget quotation are estimated budget prices. They were calculated on the basis of the commercial conditions, this scope and other references or documents of this budget quotation. However, in this phase, the prices do not represent a binding quotation that could be accepted.

  • Transaction Nr.: 359801 page 18 of 18

    Document No.: 1485

    Documentation

    The documentation will be delivered in one hard copy and one soft copy in English language consisting of: - P & I diagrams - Equipment list - Technical documentation with description of the components and units - Operating manuals of process components - Maintenance guidelines - Spare part lists (consolidated list form) - Manufacturer certificates

    Exclusions:

    The following services and supplies are not part of the Sellers proposal: - Intermediate storage tanks, raw material and product storage tanks, unless specified - Exhaust gas and waste water handling - Mechanical and electrical installation on site - Supports, platforms, stairs and railing, unless specified - Buildings, foundations, breaking into and adaptation of existing works, ventilation and draining systems, earthing and potential equalization - Insulation and insulation material, unless specified - Main electrical power supply - Low voltage distribution - Connections for the utilities as well as the utilities - CIP cleaning detergents - Ex- Zone planning - Unloading and storage of the equipment according to the Sellers instructions and marking - Access for communications by telephone, Internet, fax etc.

    Sincerely yours,

    SPX Flow Technology Warendorf GmbH

    Ulrich Ahlers Sales Manager