350-1738 equipment manufacturer - playworld350-1738 ref. no. quantity thursday, april 30, 2020 page...
TRANSCRIPT
![Page 1: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/1.jpg)
Equipment Manufacturer350-1738
![Page 2: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/2.jpg)
Equipment Manufacturer350-1738
![Page 3: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/3.jpg)
36"
0,92M
48"
1,22M
TRANSFER
STATION
W/ STEP
0.5 1.0
05'
Meters2.0 3.0
10'
ADA
STAIR
GLIDE
SLIDE
GLIDE
SLIDE
ACCESS
GATE
6'-1"
[1.86M]
6'-1"
[1.86M]
6'-3"
[1.91M]
6'-2"
[1.88M]
6'-2"
[1.87M]
6'-2"
[1.87M]
NUVO
TWIST
CLIMBER
NUVO
CURVY
LADDER
POST
MOUNT
BELL
25'-7"
[7.81M]
26'
[7.93M]
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 4
2
4
1
1
1
1
1
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
350-
1738
SA
LE
S
TR
UC
TU
RE
350-1738A 1/4"=1'-0"
M. MERTZ
20-DEC-17
13'3" x 13'9" x 9'6"4,04M x 4,19M x 2,9M
25'7" x 26'0"7,81M x 7,93M
532 SqFt.49,42 SqM.
84 Ft.25,6M
4 Ft.1,22M
18 5-12
17
![Page 4: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/4.jpg)
36"
0,92M
48"
1,22M
0.5 1.0
05'
Meters2.0 3.0
10'
6'-1"
[1.86M]
6'-1"
[1.86M]
6'-3"
[1.91M]
6'-2"
[1.88M]
6'-2"
[1.87M]
6'-2"
[1.87M]
25'-7"
[7.81M]
26'
[7.93M]
6
7
8
9
10
10
11
12
13
14
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 4
2
4
1
1
1
1
1
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
350-
1738
SA
LE
S
TR
UC
TU
RE
350-1738A 1/4"=1'-0"
M. MERTZ
20-DEC-17
13'3" x 13'9" x 9'6"4,04M x 4,19M x 2,9M
25'7" x 26'0"7,81M x 7,93M
532 SqFt.49,42 SqM.
84 Ft.25,6M
4 Ft.1,22M
18 5-12
17
![Page 5: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/5.jpg)
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
![Page 6: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/6.jpg)
36"
36"
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
1
2
4
"
1
2
4
"
1
3
6
"
36" 15"36"
18"
54"
18"
19"
41"
16"
32"
64"
18"
16"
31"
18"
1
3
6
"
1
3
6
"
1
4
8
"
1
4
8
"
18"
32"
27"
18"
9"
135"
140"
117"
158"
108"
TRANSFER
STATION
W/ STEP
ADA
STAIR
GLIDE
SLIDE
GLIDE
SLIDE
NUVO
TWIST
CLIMBER
NUVO
CURVY
LADDER
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
350-
1738
SA
LE
S
TR
UC
TU
RE
350-1738A 1/4"=1'-0"
M. MERTZ
20-DEC-17
![Page 7: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/7.jpg)
Posts
ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP
ZZCH0028 32 3.5in OD x 136in STEEL POST W/ RIVETED CAP
ZZCH0038 23 3.5in OD x 148in STEEL POST W/ RIVETED CAP
Decks & Kick Plates
ZZCH0616 14 SQUARE COATED DECK ASSEMBLY
ZZCH0617 15 TRIANGULAR COATED DECK ASSEMBLY
ADA Items
ZZCH2007 16 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 17 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH3126 18 GLIDE SLIDE (48in DECK)
ZZCH3127 19 GLIDE SLIDE (36in DECK)
Activity Panels
ZZCH4838 210 NUVO- ACCESS GATE HANDLE FOR CSA
Climbers
ZZCH7046 111 36in TWIST CLIMBER
ZZCH7057 112 48in CURVY CLIMBER
Audible Activities
ZZCH4558 113 9in BELL (POST MOUNT)
Stairs and Ladders
ZZCH9168 114 12in ACCESS STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZUN1471 115 INSTALLER HARDWARE KIT
ZZUN9910 116 SURFACING WARNING LABEL KIT
ZZUN9930 117 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 118 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 119 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 350-1738A - Bill Of Material
350-1738
Ref.No. Quantity
Thursday, April 30, 2020 Page of1 1 Playworld.com
![Page 8: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/8.jpg)
CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP
2 77.82 108 0 2.00 0.25 0
CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP
3 130.53 176 0 3.00 0.38 0
CertifiedZZCH00383 3.5in OD x 148in STEEL POST W/ RIVETED CAP
2 94.22 127 0 2.00 0.25 0
CertifiedZZCH06164 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0
CertifiedZZCH06175 TRIANGULAR COATED DECK ASSEMBLY1 29.90 120 2 1.00 0.00 0
CertifiedZZCH20076 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 148.40 310 2 2.00 0.09 0
CertifiedZZUN20197 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH31268 GLIDE SLIDE (48in DECK)1 119.73 492 2 1.50 0.03 1
CertifiedZZCH31279 GLIDE SLIDE (36in DECK)1 99.73 374 2 1.50 0.03 1
CertifiedZZCH483810 NUVO- ACCESS GATE HANDLE FOR CSA2 10.16 128 0 1.00 0.00 0
CertifiedZZCH704611 36in TWIST CLIMBER 1 82.51 540 1 1.50 0.03 1
CertifiedZZCH705712 48in CURVY CLIMBER 1 73.10 464 1 2.00 0.06 1
CertifiedZZCH455813 9in BELL (POST MOUNT) 1 6.21 45 1 0.25 0.00 1
CertifiedZZCH916814 12in ACCESS STEPPED PLATFORM (DECK TO DECK)
1 70.28 277 1 2.00 0.00 0
N/AZZUN147115 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991016 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993017 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXX067818 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID19 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1738A - Compliance and Technical Data
350-1738
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
146 297 3,554 16 22.08 1.151,033.37 5Totals:
4 Metric Tons134 Kg66 Kg465.02 Kg 0.87 m3
Thursday, April 30, 2020 Page of1 2 Playworld.com
![Page 9: 350-1738 Equipment Manufacturer - Playworld350-1738 Ref. No. Quantity Thursday, April 30, 2020 Page 1 of 1 Playworld.com. 1 ZZCH0018 3.5in OD x 124in STEEL POST W/RIVETED Certified](https://reader034.vdocuments.us/reader034/viewer/2022042711/5f8351a9c0d1ff66ef5ea8a1/html5/thumbnails/9.jpg)
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1738A - Compliance and Technical Data
350-1738
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1738A, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Thursday, April 30, 2020 Page of2 2 Playworld.com