O Mon TPP No.2 Construction Project Contractor-Furnished data Mechanical Work Package A Subcontract No. OMON-ME-002

CONTRACTOR-FURHISHED DATA

Subcontract for

Mechanical Work Package A

O Mon TPP No.2 Construction Project

in

Cantho, Vietnam

(Subcontract No. OMON-ME-002)

Page 2: 3.3 Contractor-Furnished Data

O Mon TPP No.2 Construction Project Contractor-Furnished data Mechanical Work Package A Subcontract No. OMON-ME-002

CONTRACTOR-FURNISHED DATA

As stated in Sub-Clause 5.7 of the Specification, the Contractor provides drawings, procedures and any related documents for information and reference purpose. However, unit rate and Subcontract cost/amount shall be deemed to include and reflect them. In case there are any conflicts between Subcontract and Contractor-Furnished data appended hereto, Subcontract shall prevail. List of Contractor-Furnished data Ser. No Document No. Document Title Rev. 3.3.1 OMON-2-G-TG-0044 General inspection requirement with inspection

and test plan 0

3.3.2 Turbine generator and Boiler vendor piping delivery condition

3.3.3 Steam turbine delivery condition 3.3.4 Condenser delivery condition 3.3.5 FDF and GRF delivery condition 3.3.6 GAH delivery condition 3.3.7 Deaerator delivery condition 3.3.8 Turbine generator and Boiler area vendor piping

information

3.3.9 Preliminary Heavy Bulk Cargo List for Turbine generator and Boiler

5

< Procedure and/or Plan for Unit No.1> 3.3.10 Boiler air & GR duct division instruction 3.3.11 Boiler erection procedure 3.3.12 Boiler gas duct & structure division instruction 3.3.13 Boiler leaving out steel structure division

instruction

3.3.14 Boiler pressure parts division instruction 3.3.15 Boiler steel structure before pressure parts

division instruction

3.3.16 Condenser supply division instruction 3.3.17 Erection procedure for boiler steel structure 3.3.18 Installation procedure for condenser 3.3.19 Opening plan for power house & CCB 3.3.20 Turbine erection procedure 3.3.21 Installation plan for generator, steam drum,

heater and etc.