30.5 2001 Summary DCS Workshop - L.Jirdén 1
Summary of DCS Summary of DCS Workshop 28/29 May 01Workshop 28/29 May 01
Aim of workshop Program Summary of presentations Conclusion
![Page 2: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/2.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 2
Aim of Workshop (1)Aim of Workshop (1)
ALICE DCS project is running since several years been pending ~ one year now being re-launched
Take a step backwards…… and review the basic issues project definition and organization status of Joint Controls Project (JCOP) status of Detector Controls
![Page 3: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/3.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 3
Aim of Workshop (2)Aim of Workshop (2)
But also to re-establish contacts across ALICE controls community re-launch discussions and exchange of information learn to know each other and start a fruitful
collaboration...
![Page 4: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/4.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 4
ALICE DCS Workshop May 28th pm and 29th am 2001
Monday, May 28th at 14h00 in 304-1-001B14:00 Wellcome and Introduction C.Fabjan + L.Jirdén14:15 Proposed DCS Project Organization L.Jirdén14:45 Joint Controls Project (JCOP) Overview W.Salter15:30 CoffeeDetector Controls Overview and Status Reports (c:a 20 min each)15:50 ITS Pixel V.Manzari16:10 ITS Strips D.Bonnet16:30 ITS Drift G.Mazza16:50 TPC H.R.Schmidt17:10 TRD V.Petracek
Tuesday, May 29th at 09h00 in 160-1-009Detector Controls Reports continued.09:00 TOF F.Cindolo09:20 HMPID G.De Cataldo/E.Carrone09:40 PHOS S.Sadovsky10:00 FMD J-J.Gaardhoje10:20 coffee10:40 PMD Y.Viyogi11:00 CASTOR A.Angelis11:20 MUON ARM F.Staley11:40 Conclusion and Discussion all
![Page 5: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/5.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 5
Proposed DCS project Proposed DCS project organization:organization:
GOALSGOALS Ultimate goal
“A working DCS ready for exploitation end 2005 allowing to control and operate the experiment during all modes of operation and according to defined requirements”.
Final assembly and commissioning“Individual DCS’s ready to be used during final assembly
and commissioning end 2004”.
Intermediate goals Milestones to be established in ALICE Controls Board.
![Page 6: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/6.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 6
ALICEControls
Coord. team(ACC)
Joint Controls Project (JCOP)
ALICE Controls Board (ACB)
ALICETechn. Coord.Techn. Board
DAQTriggerOfflineLHC M.
Detectors Ext.Services
IT-CO groupEP Management
ATLAS Controls Coord.
CMS Controls Coord.
LHCb Controls Coord.
![Page 7: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/7.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 7
GLOBAL LAYOUTGLOBAL LAYOUT
ITS
hv hv hvhv
hv
lvlv lvlv
lvpT Tpixel driftstrip
TPC MUON
safety
access
DAQ
Trigger
Offline
LHCECS
DCS
electricity
magnet
gas
cooling
Detectors
Services
![Page 8: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/8.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 8
Project organization (1)Project organization (1)
Responsibilities ACC: co-ordinate the project execution Detector groups Groups: design & implement their DCS ACB: steering group, some executive power Service groups: similar to detector groups DAQ,Trigger, Offline, LHC machine: to be defined in
common projects IT Controls group: co-ordinate JCOP, support common
tools JCOP: provide common framework of tools and
components
![Page 9: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/9.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 9
Project organization (2)Project organization (2)
Deliverables Prototype development
various ‘standard’ solutions, end-to-end slices test cases with some detector groups
Manpower ACC: 2.5 today 5-6 end 2001?
Initial steps
![Page 10: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/10.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 10
JCOP Presentation:JCOP Presentation:Sub-Projects - ISub-Projects - I
SCADA Acquisition Development of Supervisory Framework Communications with CERN infrastructure
services Applications to Interface to CERN
Infrastructure Control of Gas Systems Gamma Irradiation Facility (GIF) Front-End Communications
![Page 11: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/11.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 11
Sub-Projects - IISub-Projects - II
Rack Control Crate Control Sub-detector Cooling and Ventilation Control of High and Low Voltage Vertical Slice TTC (?)
![Page 12: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/12.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 12
Controls Technologies (LHC Era )Controls Technologies (LHC Era )
Supervision
ProcessManagement
FieldManagement
Sensors/devices
Field buses & Nodes
PLC/UNICOS
OPC
Communication Protocols
SCADA
Technologies
Experimental equipment
LAN
WAN
Storage
Oth
er
syst
em
s(L
HC
, S
afe
ty,
...)
Configuration DB,Archives,Log files, etc.
Controller/PLC VME
Field Bus
LAN
Node Node
VME/SLiC
DIM
FSM
Commercial Custom
Based on an original idea from LHCb
Layer Structure
![Page 13: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/13.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 13
Detector presentationsDetector presentations
points asked to be covered Brief description of detectors Review of control needs, systems, devices, etc. Status today Next steps What do you expect from ACC team
![Page 14: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/14.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 14
Summary of answers (1)Summary of answers (1)
Description of detector Many detectors, different in size and complexity Detector R&D not finished yet in several cases…
Review of control needs inventory done in the past global overview was presented - many ‘similar’ needs systematic registration now to be done
![Page 15: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/15.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 15
Status todayStatus todayDETECTORS: PRESENTING CO strategy
on paperProposedComponents usedelsewhere
Tests andevaluationsstarted
Prototypingstarted
PVSSused
1 ITS Pixel V.Manzari YES NA57 V-reg2 ITS Strip D.Bonnet YES STAR3 ITS Drift G.Mazza YES4 TPC H.R.Schmidt YES HV PS Cooling starting5 TRD V.Petracek YES6 TOF F.Cindolo YES ZEUS7 HMPID G.De Cataldo/E.Carrone YES STAR HV,LV, HV,LV started8 PHOS S.Sadovsky YES Cool. box9 FMD none ?10 PMD Y.Viyogi YES (Muon Track)11 ZDC email YES12 Castor A.Angelis YES13 T0 T. Karavicheva YES WA9814 Muon Arm none ?
![Page 16: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/16.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 16
Next stepsNext steps
Start evaluation of devices LV and HV supplies, etc
Start prototyping use of PVSS
Controls people to be found Finish Detector R&D
![Page 17: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/17.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 17
What do you expect What do you expect from ACC team (1)from ACC team (1)
Some comments: To harmonize and make various detectors parts work
together To organize common ways to:
collect and record DCS data what data; environmental data records, etc
Look at implications due to limited access to equipment, redundancy needs
Cover security issues, handling of alarms
![Page 18: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/18.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 18
What do you expect What do you expect from ACC team (2)from ACC team (2)
Test-lab; when and what available PVSS support, software drivers Connections with external services what to be handled via DAQ and via DCS Beam-test systems etc.
Proposed DCS organization generally accepted
![Page 19: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/19.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 19
Workshop Conclusion (1)Workshop Conclusion (1)
Proposed Project organization Basic project outline accepted Controls Coordination and Controls Board mandate has
been defined - members nominated – after ok from TB ready to start working
JCOP progressing according to program plan PVSS II selection - major achievement framework tools advancing well - 1st release May 2001 feedback from the experiments important
![Page 20: 30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion](https://reader035.vdocuments.us/reader035/viewer/2022080916/56649e725503460f94b71014/html5/thumbnails/20.jpg)
30.5 2001 Summary DCS Workshop - L.Jirdén 20
Conclusion (2)Conclusion (2)
Detector groups very good response ~ 35 participants widespread progress only a few have started evaluation and prototype work devices in general not yet fixed but becoming urgent general wish to use common ‘standards’ welcomed the re-activation of ALICE controls
Aim of workshop contacts established, discussions re-launched and we
have learnt to know each other. 1st milestone has been achieved