3 Natural Gas Projects in the Muskwa-Kechika. Has Adaptive Management been used? Are we using best available practices?

Upload: kalkin

Post on 24-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

Has Adaptive Management been used? Are we using best available practices?. 3 Natural Gas Projects in the Muskwa-Kechika. Murphy Chicken-. Temporary Wellsite Ice road No Cut & Fill Environmentally Successful Project 2 Drilling Seasons. Marathon Sikanni. Damaging Cut & Fill Wellsite - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 3 Natural Gas Projects in the Muskwa-Kechika

3 Natural Gas Projects in the Muskwa-Kechika.

Has Adaptive Management been used?

Are we using best available practices?

Page 2: 3 Natural Gas Projects in the Muskwa-Kechika

Murphy Chicken-• Temporary Wellsite• Ice road• No Cut & Fill• Environmentally

Successful Project • 2 Drilling Seasons

Page 3: 3 Natural Gas Projects in the Muskwa-Kechika

Marathon Sikanni

• Damaging Cut & Fill Wellsite• Partial Ice Road• Much Cut & Fill• 2 Drilling Seasons

Page 4: 3 Natural Gas Projects in the Muskwa-Kechika

CNRL Sikanni• Important Wintering Area, and • Animal Travel Corridor• Signs of Moose, Elk, Caribou, Bear, Bison,

Deer, Marten, Ptarmigan, & smaller amimals• Damaging Cut & Fill Wellsite• Short Ice Road• 2 Drilling Seasons

Page 5: 3 Natural Gas Projects in the Muskwa-Kechika

Conclusion• Murphy Project was Environmentally successful, with limited long term impacts to veg. or

soils• Marathon Project used conventional cut and fill technology• CNRL also used damaging cut and fill technology.

• THEREFORE:

• Best Available Practices have not been used, &

• Adaptive Managementhas not been utilized.