Planned Planned Maintenance Maintenance System System References: References: (a) NAVSEAINST 4790.8 (series) (a) NAVSEAINST 4790.8 (series) (b) OPNAVINST 4790.4(series) (b) OPNAVINST 4790.4(series) (c) OPNAVINST 5100.19(series) (c) OPNAVINST 5100.19(series) (d) COMNAVSURFORINST 4790.1 (series) (d) COMNAVSURFORINST 4790.1 (series) (e) MOMSENINST 4790.1 (series) (e) MOMSENINST 4790.1 (series) (f) CINCLANT/CINCPACFLTINST 4790.3 (series) (f) CINCLANT/CINCPACFLTINST 4790.3 (series) (g) NAVEDTRA 43241-H 3M PQS (g) NAVEDTRA 43241-H 3M PQS (h) NAVSUP P-485 (h) NAVSUP P-485 3M 103 PQS Fundamentals

Upload: ngoc-dep

Post on 12-Jul-2015

299 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: 3 m 103

Planned Planned Maintenance Maintenance

SystemSystemReferences: References: (a) NAVSEAINST 4790.8 (series) (a) NAVSEAINST 4790.8 (series)

(b) OPNAVINST 4790.4(series)(b) OPNAVINST 4790.4(series)

(c) OPNAVINST 5100.19(series)(c) OPNAVINST 5100.19(series)

(d) COMNAVSURFORINST 4790.1 (series)(d) COMNAVSURFORINST 4790.1 (series)

(e) MOMSENINST 4790.1 (series)(e) MOMSENINST 4790.1 (series)

(f) CINCLANT/CINCPACFLTINST 4790.3 (series)(f) CINCLANT/CINCPACFLTINST 4790.3 (series)

(g) NAVEDTRA 43241-H 3M PQS(g) NAVEDTRA 43241-H 3M PQS

(h) NAVSUP P-485(h) NAVSUP P-485

3M 103 PQS Fundamentals

Page 2: 3 m 103

Providing maintenance and material managers the means to plan, acquire,

organize, direct, control and evaluate the manpower and resources used for the

support of maintenance.

3M is the nucleus for managing maintenance onboard ships.

103.1

Page 3: 3 m 103

a. Standardization - achieve uniform maintenance standards and criteria.b. Efficiency - effective use of available manpower and material resources in maintenance and maintenance support efforts.

c. Documentation - recording of maintenance and maintenance support actions to establish a material history.

d. Analysis - provision to be used in the improvement of maintainability and reliability of systems and equipment, and the reduction of cost of material ownership.

e. Configuration Status Accounting - a means of reporting and recording changes in what equipment is installed onboard, equipment configuration specifications, and shipboard location.

f. Scheduling - standardized method for scheduling, planning, managing, and tracking maintenance required and accomplished.

Information collected on completed maintenance and Information collected on completed maintenance and configuration changes provides the following benefits:configuration changes provides the following benefits:

103.1

Page 4: 3 m 103

Duties, Responsibilities and the 3M chain of

Command

103.2

Page 5: 3 m 103

TYCOMResponsibilities

Exercise primary responsibility for the

effective operation and support of their Ships' 3-M

Systems.

103.2 a

Page 6: 3 m 103

Maintains staff to administer the 3M system

Provides training teams for 3M assists & assessments

Reviews quality/quantity of ship’s 3M data (CASREP’s, Technical Feedback Reports, MDS documents, etc.)

Provides 3M system training for maintenance and/or maintenance management.

Reviews Safety Advisory & Mishap and Material Inspection reports (INSURV, Propulsion Examining Board

(PEB), etc.). When deficiencies are evident, corrective action is initiated

103.2 a

Page 7: 3 m 103

SHIPBOARD ORGANIZATIONDUTIES AND RESPONSIBILITIES

3 M S Y S T E M SC O O R D I N A T O R

D E P A R T M E N T A L 3 - MS Y S T E M S A S S I S T A N T

W O R K C E N T E RM A I N T . P E R S O N N E R

W O R K C E N T E RS U P E R V I S O R

G R O U P S U P E R V I S O R

D I V I S I O N O F F I C E R

D E P A R T M E N T H E A D

E X E C U T I V E O F F I C E R3 M S Y S T E M M A N A G E R

C O M M A N D I N G O F F I C E R

103.2

Page 8: 3 m 103

CO - overall responsible for ensuring ship maintenance is accomplished following 3-M System procedures and that the 3-M System functions effectively within the command.

XO - Ships' 3-M System manager and responsible to CO for overall management of the Ship’s 3-M program.

3-M System Coordinator (3MC) - functional manager of 3-M System and responsible to the XO for coordination and direct supervision of all administrative facets of the Ship’s 3-M System program.

103.2 b-d

Page 9: 3 m 103

DEPARTMENT HEAD

103.2e

Responsible for effective operation of the 3-M System within the department. Supervises scheduling all Maintenance Requirements (MR’s) and is responsible for all budgetary expenses to support the 3M systems.

Page 10: 3 m 103

DIVISION OFFICER

103.2 f

Trained in the 3-M System and responsible to the Department Head.

Assists in managing the maintenance required for the division’s equipment, and is responsible for documentation accuracy.

Conducts and manages divisional 3M training.

Page 11: 3 m 103

DEPARTMENTAL 3M

103.2 g

Responsible to 3MC and Department Head for preparation and submission of all departmental 3M reports (spot-checks, PMS, Equipment Validations, etc.).

Maintains the EGL master copies for each MRC in the Department.

Assists Division Officers in achieving required 3M Systems training.

Page 12: 3 m 103

Division CPO’s who are responsible for two or Division CPO’s who are responsible for two or more work centers shall be referred to as “Group more work centers shall be referred to as “Group

Supervisors" Supervisors"

Group Supervisors shall be responsible for the Group Supervisors shall be responsible for the proper performance of the 3-M System functions proper performance of the 3-M System functions

within their work centers.within their work centers.

The Work Center Supervisor is responsible for The Work Center Supervisor is responsible for the effective operation of the 3-M System the effective operation of the 3-M System

within the work center within the work center

This responsibility shall not be delegatedThis responsibility shall not be delegated

Work Center Supervisors receive additional 3-M Work Center Supervisors receive additional 3-M System trainingSystem training

Group and Work Center SupervisorsGroup and Work Center Supervisors

103.2h & i

Page 13: 3 m 103

REPAIR PARTS PETTY OFFICER

RPPO – Interfaces with Supply for ordering parts and supplies required for all associated workcenters.

Conducts monthly Material Obligation Validations (MOV’s) with the Department Head to validate the continued need for parts ordered.

103.2 j

Page 14: 3 m 103

You: the Maintenance Personnel

Responsible to Work Center Supervisor (WCS). Your 3-M duties include, but are not limited to:

a. Perform assigned sheduled maintenance requirements using MRC’s and Equipment Guide Lists (EGLs) as indicated by the 13 week accomplishment log and the weekly schedule.

103.2k

Page 15: 3 m 103

You: the Maintenance Personnelb. Performing PMS, promptly notify the WCS

when:(1) Anything on an MRC is not fully understood,

appears to be incorrect or cannot be accomplished as written.

(2) Tools, materials, etc., prescribed by the MRC are not available.

(3) Any doubt exists about capability, training, or experience to properly perform the MR as prescribed.

(4) Factors exist which would make performance of the MR unwise or dangerous (e.g., disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc.).

103.2k

Page 16: 3 m 103

3-M is a management tool designed to provide efficient, uniform methods of conducting and recording preventive and corrective maintenance.

Preventive maintenance: actions intended to prevent or discover functional failures. Preventive maintenance includes actions taken to prevent equipment from failing, such as changing the oil, cleaning filters, calibrating, etc.

Corrective maintenance: actions taken to fix equipment that has failed or is not working to design specifications.

Included in the phrase "corrective maintenance" are authorized changes or modifications to installed equipment.

Corrective and PreventiveCorrective and PreventiveMaintenanceMaintenance

103.3

Page 17: 3 m 103

Maintenance Requirement Card (MRC) – step-by-step procedures with safety precautions noted describing who, what, how, and with what resources an MR will be accomplished.

Equipment Guide List (EGL) - used when an MRC applies to a number of identical items (i.e., valves, small arms, etc.). Each item will be uniquely identified. Each ship prepares its own EGLs.

Purpose of the 3M elements

Maintenance Index Page (MIP) – Index of MRC’s prepared and issued for each system/equipment onboard for which PMS exists.

MRC’s, EGL’s, & MIP’s are basic PMS documents. 103.4 a-c

Page 18: 3 m 103

List of Effective Pages (LOEP) - lists MIP’s and system equipment not requiring PMS assigned to each work center.

Change Page – Historical Listing of all authorized changes made to the Work Center Manual (43P1) citing specific references authorizing each change.

3M ELEMENTS (con’t)

103.4 d-e

The LOEP, Change Page, & MIP’s are key elements of the 43P1

Page 19: 3 m 103

FBR notifies TYCOM & FTSC’s of PMS issues.

Two versions: SKED and Hardcopy

TWO types: Category A (for changes to LEOP)

Category B (Technical)

Some Category B FBR’s are Urgent.

Must be approved and transmitted within 4 days of creation with a response time goal of 1 day.

NOTE: FBR’s will provide initial PMS coverage but Configuration Data needs to be updated to initiate logistic support. This is also referred to as submitting a 4790/CK Configuration Change

FEEDBACK REPORTS (FBR)

103.4 f

Page 20: 3 m 103

The 43P1 reflects that portion of the PMS Master File that contains only the planned maintenance

requirements applicable that work center.

It consists of the following Major Elements:

Change Page, LOEP, MIP’s, & FBR file

It is designed to provide a ready reference of planned maintenance requirements for the work center supervisor and all Maintenance personnel.

WORKCENTER PMS MANUAL(43P1)

103.4 g

Page 21: 3 m 103

Weekly displays MRC’s and personnel assigned to them for the week in a given

work center. Maintenance Personnel have access to view this in SKED.

Quarterly displays maintenance to be performed during a specific 3-month period.

Updated weekly by WCS, provides ready reference to the current status of PMS.

Represents departmental directive and once finalized may only be changed with department

head approval.

PMS SCHEDULES

103.4 h-i

Page 22: 3 m 103

Flip Page cites justifiable reasons for all unaccomplished or deleted maintenance.

NOTE: Lack of Man-hours is not justifiable. Examples of justifiable reasons are:

part on order with JSN’s and REQ #’s

CASREP with Numbers

HAZMAT unavailable WITH JSN and REQ #

The Flip page entry always starts with one of four pro-words: LOST -; RESCHEDULED -; DELETED -; or COMPLETED – (with additional information required).

PMS SCHEDULES QUARTERLY FLIP PAGE

103.4 i

Page 23: 3 m 103

Cycle displays PMS to be performed during the period between docking

availabilities and/or three interdeployment training cycles.

Any checks that have not been accomplished prior to restarting a cycle

will be scheduled during the first quarter of the new cycle schedule.

An example of such an availability is Docking Phased Maintenance Availability

(DPMA).

PMS SCHEDULES CYCLE

103.4j

Page 24: 3 m 103

Signature documentation of personal accomplishment of assigned MR’s after

WCS notification and authorization.

Documents associated Tag-outs and is reviewed weekly by the WCS & DivO

Maintained in the 43P1 for not less than 13 weeks.

13 Week Accountability Log

103.4 k

Page 25: 3 m 103

Contains the information necessary for equipment tag-out maintenance.

Regulated by the Tag Out Users Manual (TUMS)

Created when existing technical documentation (EOSS, CSOSS, etc.) is

insufficient to support tag-outs

Signature Verified by WCS, DivO, and DH and re-verified when any one transfers

Isolation Guide List (IGL)

103.4 l

Page 26: 3 m 103

Sub-category (SCAT) - Portable Electric/Electronic Test Equipment listed in the Test Equipment Index are assigned a SCAT code

which groups models having the same test capability and tolerances.

Standard PMS Material Identification Guide (SPMIG) - Database providing part numbers

and ordering information for MRC materials in the Test Equipment, Materials, Parts and Tools

Block. This data accessible in SKED

SPMIG & SCAT

103.4 m-n

Page 27: 3 m 103

This is a 3-part four segment code used in cataloging MRCs which is located at the lower right side of the MRC

Birthdate: first 2 digits

SYSCOM MRC Control Number

103.4 o

Page 28: 3 m 103

SYSCOM MIP Control Number

Three SYSCOM MIP control numbering systems have been developed based on

changing PMS philosophy and are

currently in use. (Conventional, Surface

Missile System, and Reliability Centered

Maintenance)

Birthdate: last 2 digits.

103.4 p

Page 29: 3 m 103

Objective: reduce PMS to the minimum during a prolonged inactive period without degrading material condition, or jeopardizing future operational reliability.

Inactive Equipment Maintenance (IEM)

A modified maintenance program to prevent equipment deterioration during inactive periods, when complete PMS support is neither desirable nor practical.

103.4 q

Page 30: 3 m 103

•• Technical bulletins containing Technical bulletins containing information about the hazardous information about the hazardous materialMaterial (HAZMAT)•• Shall be in English and contain at Shall be in English and contain at

least the following information:least the following information:–– Identity of materialIdentity of material–– Hazardous ingredientsHazardous ingredients–– Physical and chemical characteristicsPhysical and chemical characteristics

MSDS

103.4 r

Page 31: 3 m 103

–– Physical hazards (fire, explosion, Physical hazards (fire, explosion, reactivity)reactivity)–– Health hazards (routes of entry, Health hazards (routes of entry,

exposure limits, and cancer potential)exposure limits, and cancer potential)–– Precautions for safe handling & usePrecautions for safe handling & use–– Emergency first aid proceduresEmergency first aid procedures–– MSDS preparation dateMSDS preparation date–– Name, address & phone number of Name, address & phone number of

chemical manufacturer, importer, chemical manufacturer, importer, employer who can provide additional employer who can provide additional informationinformation

MSDS (Con’t)

103.4 r

Page 32: 3 m 103

-

(HMUG)Divided into 22 groups

Each section contains information on

Control measures

Precautions

Health hazards

Spill controls

Disposal guidelines

Hazardous Material Users Guide

103.4 s

Page 33: 3 m 103

* Common sense, thorough indoctrination, and documented training of all personnel maintaining and operating shipboard equipment is required.

* Accidents do not respect persons or rights. Statistics show that a high percentage of accidents or casualties could have been prevented if specific precautionary measures had been taken.* Every effort has been made to indicate hazards to personnel in the "Safety Precautions" block and in the appropriate steps of the procedure block of MRCs.

WARNINGS WILL BE INSERTED IMMEDIATELY PRIOR TO THE

APPROPRIATE PROCEDURAL STEP.

* Inadequacies in the MRC which might affect the safety of personnel or equipment shall be reported by an Urgent PMS FBR.

Unsafe condition in the performance of PMS

103.5

Page 34: 3 m 103

Provides detailed step-by-step procedures for performing maintenance and describes who, what, how, and with what resources a specific requirements will be accomplished.

3 types exist:

Technically Validated (white)

Maintenance Requirement Card (MRC):

103.6

Preliminary (Yellow)Classified (Pink)

Most MRC’s are Technically validated

Page 35: 3 m 103

Preliminary (Yellow)

1. Provided via FTSC’s to provide ships with advance coverage while MIPs/MRCs are undergoing final review.

2. Identified by a "P" code and number following the slash of the SYSCOM MIP control number reflecting the revision.

3. Preliminary MIPs/MRCs are technically reviewed/approved by the cognizant SYSCOMs/BUMED.

103.6 b

Page 36: 3 m 103

Unclassified locator card duplicates information in all MRC blocks but procedures, and includes one of the following statements:

Classified (pink)

"Maintenance procedure with the requirement is CONFIDENTIAL. Maintenance Requirement Card is stowed in_________ .“

OR

"Maintenance procedure with the require-ment is SECRET. Maintenance Requirement Card is stowed in __________________ ."

103.6 c

Page 37: 3 m 103

And the intervals of accomplishment

Periodicity codes

103.7

Page 38: 3 m 103

Calendar Periodicities

The only authorized periodicities are as follows:

Q - Quarterly4M - Every 4th monthS - Semiannually8M - Every 8th monthA - Annually#M - Every # months

D – Every day2D - Every 2nd day3D - Every 3rd dayW - Weekly2W - Every 2nd week3W - Every 3rd week2M - Every 2nd month

103.7 a

Page 39: 3 m 103

Non-Calendar Periodicities

R - Situation Requirement

U - Unscheduled Maintenance

LU - Lay-Up

PM - Periodic Maintenance

SU - Start-Up

OT - Operational Test

Inactive Equipment Maintenance (IEM)

Page 40: 3 m 103

No system starts perfect – feedback can get it there

Three systems exist for process improvement:

Feedback Reports (FBR)

Technical Manual Deficiency/Evaluation Report (TMDER)

Configuration Item or

4790/ck Configuration Change

REPORTING DISCREPANCIES

103.8

Page 41: 3 m 103

Procedures for discrepancies/ deficiencies-Technical Feedback Reports

(TFBR)

The PMS FBR or TFBR is used to notify Fleet Technical Support

Centers (FTSC) and/or the TYCOM of matters related to PMS.

103.8

Page 42: 3 m 103

FBR FORMTwo versions: SKED and Hardcopy

SKED – Instructions are available in the help file, with some specific Do’s and Don’ts

Hardcopy - composed of an original and four copies. Instructions for preparation and submission of the form are printed on the back of the last copy.

Page 43: 3 m 103

Category A -- This type of FBR is non-technical in nature and is

intended to meet PMS needs which do not require technical review. Category A FBRs are

submitted to request classified or other PMS documentation

which cannot be obtained locally.

There are three types of FBRs: Category A, Category B, and Urgent.

103.8

Page 44: 3 m 103

This type of FBR is technical in nature, and is used to report:

Technical discrepancies inhibiting PMS performance.

Shift of maintenance responsibilities.

Requests for TYCOM assistance.

Category B --

103.8

Page 45: 3 m 103

When the reason for submission of a PMS FBR involves safety of personnel, ship, or equipment

and relates to the technical requirements of PMS, the FBR will be considered URGENT.

The message shall describe the unsafe procedures or conditions, and shall identify the MIP/MRC

involved.

URGENT Feedback Reports.

103.8

Page 46: 3 m 103

TMDER

Used to correct Technical Manuals and Used to correct Technical Manuals and Publications used in the maintenance of Publications used in the maintenance of shipboard equipment.shipboard equipment.

Accomplished either on-line via Distance Accomplished either on-line via Distance Support or via Snail Mail using a form from Support or via Snail Mail using a form from the back of the Manual.the back of the Manual.

Page 47: 3 m 103

CONFIGURATION Known as:Known as: 4790/CK, Configuration Change, & Configuration 4790/CK, Configuration Change, & Configuration

ItemsItems

Used to get support for newly installed equipment. Used to get support for newly installed equipment. Will initiate all logistics:Will initiate all logistics:

PMS, Parts, & Technical DocumentationPMS, Parts, & Technical Documentation

NOTE: FBR’s can be used to start and change PMS, but will NOTE: FBR’s can be used to start and change PMS, but will do nothing for the other elements of logistic support.do nothing for the other elements of logistic support.

Page 48: 3 m 103

Definitions and Relationships of the

following:

103.9

Page 49: 3 m 103

Report No. PMS 5 (the LOEP) – lists all MIP’s and system equipment not requiring PMS assigned to each work center.

The LOEP is a part of the PMS Master file and contains:

LOEP’s And MIP’s

(1) Report Date (Date LOEP produced).

(2) Force Revision (FR) Number.

(3) Type Commander (TYCOM).

(4) Unit (Ship's hull number, Unit Identification Code (UIC), and name).

(5) Work Center.

(6) MIP Numbers and Nomenclature (brief description of the system/equipment).

103.9 a

Page 50: 3 m 103

EGL’s and MRC’sEGL’s and MRC’s

Specific EGL’s are created for Specific EGL’s are created for each MRC when it applies to a each MRC when it applies to a number of identical items number of identical items (i.e. valves, small arms, etc.)(i.e. valves, small arms, etc.)

Each item on the EGL will have Each item on the EGL will have a unique identifier/serial a unique identifier/serial number assigned. number assigned. Each ship prepares its own EGLs.Each ship prepares its own EGLs.

103.9 b

Page 51: 3 m 103

IGL’s and MRC’sIGL’s and MRC’s

Contains specific equipment tag-out information necessary for that MRC

Contains number, locations, and positions of the tagged items and permission/notification

requirements

Each ship prepares its own TGLs

103.9 c

Page 52: 3 m 103

MIPs are issued for each installed system/equipment for which PMS support has been established.

MIPs are basic PMS reference documents.

MIP’s and MRC’s

Each is an index of a complete set of MRC’s applicable to a ship system, subsystem, or equipment.

103.9 d

Page 53: 3 m 103

Change Page and LOEP

Change Page indicates all changesChange Page indicates all changes

(FR’s/CAN’s/DIT’s)(FR’s/CAN’s/DIT’s)

to the WC referencing authorizing to the WC referencing authorizing document.document.

list’s approved TFBR’s submitted for list’s approved TFBR’s submitted for LOEP Corrections.LOEP Corrections.

It must reflect the current FRIt must reflect the current FR

(Force Revisions/Advance Change Notices/Document Input Transmittals)

103.9 e

Page 54: 3 m 103

SAFETY PRECAUTIONS

Warning: Death or injury may result if the operating/handling procedures and practices are not correctly followed. Warning text may be listed in the safety precautions‘ block and will be repeated preceding the procedure involved.

Caution: Damage to equipment may result if the operating procedures and practices, etc. are not correctly followed. Cautions are not listed in safety precautions block but will precede the instruction for the procedure involved.

103.10

listed prior to applicable step on the MRC

Specific categories are:

Page 55: 3 m 103