Pearl GTL Project CEO SummitHSSE
Andy Brown
EVP Qatar & Managing Director Pearl GTL Project
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
2/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
3/30
3 June 2010
Pearl GTL Project CEO SummitHSSE:2) A Fatality in Ras Laffan
Ken Marnoch
COO QG4/Deputy COO QG3&4
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
4/30
Fatal IncidentLeadership Learning
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
5/30
5Month 2010
Situation The Work ActivityExternal Dry Out of Refractory - internal heating of vessel to dry/cure refractory cement on inner wall
Horizontal vessel that will contain catalyst
No burner fitted in vessel as standard
Refractory dry-out sub-contracted to HTPL
Active >10 years (working mainly inside India)
On QG3&4 since 20 Jan 10 one different activity for QG2 in 09 Completed 31 (of 36) similar dry-outs
Temporary burners fitted into two side-nozzles on vessel
Fueled by vaporised LPG provided remotely from tanker
Hot gases from vessel vented through top nozzles
Set-up work performed under Cold Work Permit; Dry-out work performed under Hot Work Permit
Additional supervision of HTPL by
CTJV supervisor; QG Operations; Refractory vendor rep
5
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
6/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
7/30
7Month 2010
Work place overview
7
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
8/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
9/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
10/30
10Month 2010
Explosion
10
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
11/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
12/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
13/30
13Month 2010
Explosion
13
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
14/30
14Month 2010
Explosion
14
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
15/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
16/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
17/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
18/30
18Month 2010
Investigation FindingsEquipment supplied was different to that in Method Statement
absence of pilot burner (as MS) forced ignition with full gas flow
HTPL unaware of the risks of burner ignition
no control on air purge prior to ignition
pressure reducing valve used as on-off valve (gas pressure too high)
burner valve suspected to be passing (based on testing)
delay (due to data logger) between air purge and ignition gas gave opportunity for
accumulation of explosive gas mixture in vessel
flame eye disconnected for ignition forced SOV override open
open SOV left only single valve isolation between gas supply and vessel
Position of operator
manual gas valve and air damper operation required operator to work close to temporary
burner at ignition18
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
19/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
20/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
21/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
22/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
23/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
24/30
24Month 2010
Temporary burner arrangement
24
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
25/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
26/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
27/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
28/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
29/30
-
8/6/2019 3 CEO Summit HSSE Andy Ken Steve Pres
30/30