2nd aip bs bri lcc 22-06-09reva
TRANSCRIPT
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
1/36
Contract No. SS P318 Programme No. 063KA
Design & Construction
of
Tamar Development Project, Hong Kong
for
The Government of the Hong Kong Special Administrative Region
2nd AIP Submission Broadcast Reception Installation for LegCo Complex
Revision No. Issue on
a 6 March 2008
b 9 July 2008
c 18 Dec 2008
c1 22 Jun 2009
Endorsed by
Company GHHJV
for and on behalf of
Signature
Name Edward Yeung
Position Project Director
Distribution List:
ArchSD - SO GHHJV MVAArchSD SOR/PTL RDL WMArchSD SOR/A MCS (RSE) ERMArchSD SOR/SE LAM (RGE) KAA
ArchSD SOR/BSE JRP (BSE) LDP
ArchSD SOR/QS HOK APLArchSD SOR/EME GMB TPSArchSD SOR/LA GTR RWDIArchSD SOR/IT ALT CWArchSD SOR/COW SMW VVArchSD SOR/BSI EDAW
ArchSD SOR/EM Date
Independent Design Checker (IDC)
2nd AIP Drawing
( ) in compliance with Contract No.SS P318
( ) in compliance with Contract No.SS P318 with conditions
( ) NOT in compliance with Contract No.SS P318
For and on behalf of Scott Wilson Limited
Building Services Design Checker
Date:
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
2/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
3/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
4/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
5/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) - 5 - Building Services Installation
The frequency plan for the BRI and IBCCDS as shown below:
Frequency Range System
Frequency Channels between BRI System
470 MHz to 862 MHz - SMATV System
- CCTV System
- FM Radio
- Pay TV
Block diagram showing the interconnection between various blocks as follow:
3.2 The terrestrial television antenna system will include the following:
(a) Aerials (both terrestrial TV and FM)
(b) Bandpass filter or preamplifier for terrestrial TV and FM
(c) Amplifiers (plus, if necessary channel translators, converters) and combining units
(d) Power supply units
(e) Equalisers
(f) Trunk, branch, spur feeders, feeders and tap-off units
(g) TV/FM duplex outlet units including isolator for safety
(h) Lead- in connection for the Cable TV services
(i) Channels for SMATV and STAR TV system
(j) Channels for meeting broadcasting system
(k) Interfacing work with the meeting broadcasting system in LegCo Complex so that the information and
data from the meeting broadcasting system can be broadcasted into the BRI system of LegCo Complexand BRI system of CGC office block(s) and low block
(l) Channels for other systems such as security CCTV systems, IT network, etc
3.3 The Satellite Master Antenna Television (SMATV) system will include the following:
(a) SMATV system including dish antenna for the satellites, feedhorn, low noise block converter, satellite
receiver, channel amplifier, filter, RF modulator/combiner, etc
(b) 6.2 metre diameter dish antennae for receiving programmes from following satellites.
Asiasat 2 (100.5E);
Asiasat 3s (105.5E);
BSAT 1A (110.0E); and
Palapa C2 (113.0E)
(c) Antenna support
(d) C-band/Ku-band feedhorns
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
6/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
7/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
8/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) - 8 - Building Services Installation
Fig. 1 Normal Condition
The switcher of the system shall then be manually turn ON to allow signals from CGC Office Block BRI
system to in-jet into the LegCo BRI system to support the TV services of LegCo Complex.
Fig. 2 Suspension of LegCo Complex Antenna and Head-end Equipment During Expansion
After the builders work of expansion phase has been completed, the antennas and head-end equipment
shall be re-installed at the new BRI equipment room and new roof of LegCo High Block.
The optical fiber and coaxial backbone shall be extended to re-connect the existing BRI system with the
head-end equipment.
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
9/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
10/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
11/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
12/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-A Building Services Installation
Appendix A
Drawing Schedule, Legend andSchematic Diagram
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
13/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-B Building Services Installation
Appendix B
Schedule of Major Materials and Equipment
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
14/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-B Building Services Installation
Appendix B Schedule of Major Materials and Equipment
1.0 Schedule of Major Equipment for Broadcast Reception Installation
Offered
Item Equipment/Material
Brand Model Origin
1st 2nd 3rd
1 UHF Aerial Fagor Di@na Plus Spain - - -
2 FM Aerial Fagor AN02 Spain - - -
3 Pre-amplifier Fagor AMB 800 Spain - - -
4 Channel amplifier Fagor Micro MATV
plus N
Spain - - -
5 Fibre transmitter unit Cabletech - H.K. - - -
6 Fibre receiver unit Cabletech - H.K - - -
7 Distribution amplifier Fagor DA 353 Spain - - -
8 Splitter & Tee unit Antek SFS Series H.K
9 Trunk coaxial cable Cabletech A-1160-LSZH H.K
10 Branch coaxial cable Cabletech A-660-LSZH H.K - - -
11 TV/FM outlet Antek SKK 04 H.K - - -
12 LNB C-Band Chaparral 11-5205-1 USA - - -
13 Digital receiver
modulator
Fagor SDM 6000+ Spain - - -
14 LNB Ku-Band Chaparral 11-5205-1 USA - - -
15 Feedhorn C-Band Chaparral 11-1427-1 USA
16 Rack Delta 42U PRC - - -
17 Satellite solid antenna
6.2m
JJ 6.2m Dia. P.R.C - - -
NOTE : Some specified model number of equipment / material will be provided in DDA submission
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
15/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-C Building Services Installation
Appendix C
Estimation of Maintenance Cost
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
16/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-C Building Services Installation
Appendix C Estimation of Maintenance Cost
1.0 Estimation of Maintenance Cost for Broadcast Reception Installation
Item Equipment / System Monthly cost
1BRI System
(comprehensive)
- Monthly Inspection 3,900.00
Total Amount (12 months) : 46,800.00
2.0 Description of the Maintenance Service Work for Broadcast Reception Installations
Broadcast Reception Installation
Monthly Inspection
(a) General cleaning of headend equipment
(b) To carry out function test for the BRI system at equipment room
- Connecting a TV at the test point in headend equipment room for channel reception inspection.
- Check reception and make fine-tuning, if necessary
(c) To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution
AMP) at the equipment room
(d) To check the record of complaints of the corresponding equipments with follow-up action. Detail of it
will be provided in DDA submission.
3.0 Detail Cost breakdown For monthly inspection of BRI system in LegCo Complex
Items Description Qty Unite rate (HK$) Sub-total (HK$)
1) General cleaning of headend equipment 1 lot 600 600
2) To carry to function test for the BRI system at
equipment room as follows :
1 lot 1800 1800
i) Connecting a TV at the test point in headend
equipment room for channel reception
inspection
ii) Check reception and make fine-tuning, if
necessary
c) To check the condition of the equipment, if
necessary, the BRI system (e.g. Pre-amp,
Distribution AMP)
1 lot 1500 1500
d) To check the record of complaints of the
corresponding equipments with follow-up action.
Detail of it will be provided in DDA submission
1 lot (included) 0
Total (HK$) : 3900
Remarks : The maintenance works listed above are offered as a single package of a
comprehensive maintenance contract
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
17/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
18/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
19/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-D Building Services Installation
Satellite Programme Video Standard
Maharishi
BTV World
* Fashion TV HK & Asia
* Aaj TV
Arirang
Pacific Century Matrix
Alijazeera
Bloomberg
NOW
* MTA Internat ional 1
* MTA Internat ional 2
DW-TV
Russia Today
Supreme Master
* Star Utsav
Wik Kid
* Phoenix Info News
* Phoenix Chinese
Sahara Samay
Alami Saharar
AsiaSat 3S
Orbital position: 105.5E
Azimuth: 204.5
Elevation: 62.6
* Sahara Samay Bihar
MPEG-2
* Sahara Samay NCR
* Sahara Samay National
* Sahara Samay Mumbai
* Sahara Samay Madhya Pradesh
* Sahara Samay Uttar Predesh
VOA
PTV
* PTV 1
PTV World
ATV
* ATV Khyber
Global
i -
Pakistani mux
National
Global
Z Music
Z Smile
NOTE : Programme channel names from internet / magazines are used.
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
20/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-D Building Services Installation
Satellite Programme Video Standard
TVRI Nasional
RCTI
Bali TV
SCTV
Antv
Indosiar
Satelindo
Metro TV
Global TV
Spacetoon
Palapa C2
Orbital position: 113.0E
Azimuth: 185.4
Elevation: 64.7
TPI
MPEG-2
Wowow
NHK BS 1
BSAT 1A
NHK BS 2
NTSC
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
21/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-D Building Services Installation
Proposed famous SMATV channels
BloombergBreaking financial, business and economic news worldwide from major provider of information
services
Phoenix Chinese Offers a diverse variety of Chinese programming with productions from China and abroad.
Phoenix Info
Chinese
The Phoenix InfoNews Channel is the first Chinese language channel that covered news among
Greater China regions, including mainland China, Taiwan and Hong Kong. There is 24-hour
broadcasting on financial news, stock market information as well as news hea
DW
Deutsche Welles television studios are concentrated in Berlin. Germanys international
broadcaster, DW-TV, provides news, background information and cultural highlights around the
clock.
VOA
The Voice of America is a multimedia international broadcasting service funded by the U.S.
government through the Broadcasting Board of Governors. VOA broadcasts more than 1,000
hours of news, information, educational, and cultural programming every week
CETV
-
Horizon
/ Horizon - A general entertainment satellite channel programmed by the
i-CABLE group to serve Mainland China as well as Chinese communities in the region. With
own-produced entertainment news programmes during primetime as backbone, the channel a
NHK BS1
Japanese TV showing programs of a more educational, cultural or intellectual nature,
periodically also showing anime. A similar counterpart would be the Public Broadcasting Service
of the United States
NHK BS2
Japanese TV which is a generalist channel similar to BBC One and it's European counterparts,
showing News, Drama, Quiz/Variety Shows, Music, Sports, Anime and Specials which directly
compete with it's commercial counterparts.
NOW TV
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
22/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-E Building Services Installation
Appendix E
Proposed BRI System Channel List
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
23/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-E Building Services Installation
UHF Frequency Channels list in IBCCDS (470-862 MHz)
Channel Number Frequncy Range Allocation to be avoided Remark OFTA specified
E21 470 - 478 MHz TVB (Analogue) (Temple Hill) Existing analogue TV Y
E22 478 - 486MHz Digital TV Existing digital TV Y
E23 486 - 494MHz ATV ( Analogue) (Temple Hill) Existing analogue TV Y
E24 494 - 502MHz SMATV 01 ER requirement
E25 502 - 510MHz Pearl (Analogue) (Temple Hill) Existing analogue TV Y
E26 510 - 518MHz SMATV 02 ER requirement
E27 518 - 526MHz ATV World (Analogue) (Temple Hill) Existing analogue TV Y
E28 526 - 534MHz SMATV 03 ER requirement
E29 534 - 542MHz SMATV 04 ER requirement
E30 542 - 550MHz SMATV 05 ER requirement
E31 550 - 558MHz SMATV 06 ER requirement
E32 558 - 566MHz SMATV 07 ER requirement
E33 566 - 574MHz SMATV 08 ER requirement
E34 574 - 582MHz SMATV 09 ER requirement
E35 582 - 590MHz Digital TV HDTV ( TVB ) Y
E36 590 - 598MHz SMATV 10 ER requirement
E37 598 - 606MHz Digital TV HDTV ( ATV ) Y
E38 606 - 614MHz SMATV 11 ER requirement
E39 614 - 622MHz SMATV 12 ER requirement
E40 622 - 630MHz SMATV 13 ER requirement
E41 630 - 638MHz SMATV 14 ER requirement
E42 638 - 646MHz SMATV 15 ER requirement
E43 646 - 654MHz SMATV 16 ER requirement
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
24/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
25/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-E Building Services Installation
Channel Summary:
Required Channels:
Analogue TV signal 4
HD TV signal 3
CCTV 1
IT network 1
Public broadcasting system (Provision future connection) 3SMATV 20
32
Vacant Channels 17
Total Channels 49
Remarks:1 ) Cable TV channels are allocated in VHF frequency band and will not occupy any BRI channel.. See clause 3.13
2 ) ER requires 1 channel for LegCo meeting broadcast system ( MBS ) ( ERIV / BS 3.7.1 L), whereas 9 locations were specified. The channel can be one of vacant frequency channels.
3 ) AV signal of electonic voting and announciator system shall be proposed to combine together with all meeting broadcasting system for more BRI channels reservation for future.
4) Conventional vacant frequency band can provide 17 channels available for meeting broadcasting system. They are not enough to service 40 frequency channels (36LegCo+4CGC) for meeting
broadcasting system. The technical method for meeting broadcasting system has been reported to user for their further decision and kind consideration.
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
26/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
27/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-F Building Services Installation
Estimation of Running Cost
Running Cost of BRI System for LegCo Complex
ITEM Description Estimated Loading (kW)Assumed Operation Hour
per day
Sub-Total Energy Consumption
per day (kWh)
1 Lighting (14.63 sq m) 0.293 1 0.293
2 BRI Equipment in Head-end room 1.67 24 40.08
3 BRI from G/F to 3/F 0.32 24 7.68
4 Air-conditioning for BRI Room 0.672 24 16.13
Total 64.18
Notes:
Electricity charge rate of Year 2008 is used for the estimation of electricity cost.The life cycle of BRI system equipment is around ten Years.
2. Total Running Cost for BRI system
Total power consumption for BRI system per month: 1925.49 kWh
(Assumed 30 days for each month)
Block Rate Tariff
Unit charge for the first 1,500 units (Basic Charge) $ 1.177 / kW h
Unit charge from 1,501 units and above (Basic Charge) $ 1.270 / kW h
Unit charge for the first 1,500 units (Fuel Clause Adjustment) $ 0.105 / kWh
Unit charge for the f irst 1,501 units and above (Fuel Clause Adjustment) $ 0.105 / kWh
Running cost for each month : $ 2507.38
Annual running cost : $ 30,088.56
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
28/36
D i d C t ti f T D l t P j t H K B ildi S i J R P t Li it d
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
29/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-F Building Services Installation
Signal loss estimation of BRI system
General signal level is estimated on each floors for different individual BRI equipment
Building LegCo
Floor Description Signal level Floor Description Signal level
R/F Channel Amp. 90 100dB 3/F Fibre Rx (elect room) 70 80 dB
Main splitter 75 85 dB Amp. & Splitter 80 89 dB
9/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB
Amp. & Splitter 80 89 dB 2/F Fibre Rx (elect room) 70 80 dB
End User outlets 60 80 dB Amp. & Splitter 80 89 dB
8/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB
Amp. & Splitter 80 89 dB 1M/F Fibre Rx (elect room) 70 80 dB
End User outlets 60 80 dB Amp. & Splitter 80 89 dB
7/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB
Amp. & Splitter 80 89 dB 1/F Fibre Rx (elect room) 70 80 dB
End User outlets 60 80 dB Amp. & Splitter 80 89 dB
6/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB
Amp. & Splitter 80 89 dB GM/F Fibre Rx (elect room) 70 80 dB
End User outlets 60 80 dB Amp. & Splitter 80 89 dB
5/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB
Amp. & Splitter 80 89 dB G/F Fibre Rx (elect room) 70 80 dB
End User outlets 60 80 dB Amp. & Splitter 80 89 dB
4/F Fibre Rx (elect room) 70 80 dB End User outlets 60 80 dB
Amp. & Splitter 80 89 dB
End User outlets 60 80 dB
Notes:Detail signal loss calculation for each location on floors will be submitted in DDA.
Design and Construction of Tamar Development Project Hong Kong Building Services J Roger Preston Limited
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
30/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-H Building Services Installation
Appendix H
Corresponding Letters
Design and Construction of Tamar Development Project Hong Kong Building Services J Roger Preston Limited
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
31/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev. c1
Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-H Building Services Installation
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
32/36
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
33/36
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedF Th G t f th H K S i l Ad i i t ti R i 2
ndAIP S b i i 1
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
34/36
For The Government of the Hong Kong Special Administrative Region 2nd
AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-I Building Services Installation
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2
ndAIP Submission rev c1
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
35/36
For The Government of the Hong Kong Special Administrative Region 2 AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 22 Jun 2009
BRI System (LegCo Complex) APP-J Building Services Installation
Appendix J
Reply to ASD Comments on 1st Submission of 2nd AIP
-
7/27/2019 2nd Aip Bs Bri Lcc 22-06-09reva
36/36