![Page 1: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/1.jpg)
SUMATRA COPPER & GOLD plc ABN 14 136 694 267 Level 2, 66 Hunter Street, Sydney NSW 2000 Australia
P +61 2 9300 3377 F +61 2 9221 6333 E [email protected] W www.sumatracoppergold.com Registered in England and Wales Registered Number 5777015
Registered address: 39 Parkside, Cambridge CB1 1PN United Kingdom
29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam
RE: PRESENTATION TO ANNUAL GENERAL MEETING I attach a PowerPoint presentation which is to be delivered to the shareholders present at today’s Annual General Meeting which is convened to be held at 11.00 am. Yours sincerely Richard Edwards Company Secretary pjn6714
For
per
sona
l use
onl
y
![Page 2: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/2.jpg)
ANNUAL GENERAL MEETING
29 May 2012
For
per
sona
l use
onl
y
![Page 3: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/3.jpg)
This document is prepared as a presenter’s aid and support. It is not a stand alone document. Best efforts have been taken to ensure theaccuracy of information contained at the time of presentation. In some instances forward targets and/or assumptions have been included. All such instances are indicative only and subject to alteration and/or cancellation as and when the management of Sumatra Copper & Gold plc (ABN 14 136 694 267) sees fit. All information contained herein is general in nature.
Potential investors are cautioned against using the content of this presentation in isolation for making investment decisions.
Research and the counsel of a qualified financial adviser or accountant are strongly recommended to anyone considering investing in listed company securities, including Sumatra Copper & Gold plc.
The information in this report that relates to Exploration Results is based on information compiled by Matthew Farmer, geologist, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr. Farmer is an employee of the Company who has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Farmer has consented to the inclusion in this document of the matters based on his information in the form and context in which they appear.
Disclaimer
The information in this report that relates to Tembang Ore Reserves is based on information compiled by Mr Shane McLeay of Entech Pty Ltd, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr McLeay has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr McLeay consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to Tembang Mineral Resources is based on information compiled by Mr David Stock MAusIMM who is an independent Geological Consultant to the Company and is a Competent Person as defined by the Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code 2004 Edition) and has consented to the inclusion in this report of the matters based on his information in the form and context in which they appear. In addition, the Mineral Resource Estimates were reviewed by Mr. Robert Spiers who is a member of AIG and a full time employee of Hellman & Schofield Pty Ltd. Mr. Spiers has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Spiers has consented to the inclusion in this report of the matters based on their information in the form and context in which it appears.
For
per
sona
l use
onl
y
![Page 4: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/4.jpg)
Atlas
Kingking
Gn.Pani
Wabu
Bulawan SianaPlacer
Tombulilato
TANDAI
MARTABE
SIHAYO1.4 Moz
6.49 Moz Au, 66.2 Moz Ag
PONGKOR3.6 Moz Au, 26.3 Moz Ag
MIWAH3.14 Moz Au, 8.9 Moz Ag
SONTANG
1.25 Moz Au, 34.6 Moz AgMT.MURO
3.56 Moz Au, 1.44 Moz AgKELIAN
Mamut
TOKA TINDUNG1.75 Moz Au
GOSOWONG2.8 Moz Au
GRASBERG38.5 Moz Au, 35.6 lb Cu
1.83 Moz AuMESEL
AWAK MAS1.92 Moz Au
TUJUH BUKIT14.0 Moz Au, 8.8 lb Cu BATU HIJAU
17.2 Moz Au, 14.1 lb Cu
25.0 Moz Au, 16.0 lb CuELANG
Wetar
Ojolali
Way Linggo
Cibaliung
1.0Moz Au 12.8 Moz AgTEMBANG
Au deposit Cu‐Au deposit
500 Kms
Sumatra projects
For Further Information – ASX:SUM
Note: The Tembang Resources shown on this page are historical resources that have been published. The detailed Tembang Resources are shown in Appendix 1
RIM Of Fire: Prolific Mineralisation
• World’s largest gold deposit – Grasberg
• Lowest costs producers – Gosowong, Co-O, Way Linggo
For
per
sona
l use
onl
y
![Page 5: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/5.jpg)
Our Projects in Sumatra
4
Tembang Project (100% SUM)• Brownfields gold and silver project • DFS completion scheduled for July 2012• Gold and silver production scheduled for 2nd half 2013
Tandai Project (30% SUM, 70% Newcrest)• Exploration JV project with Newcrest
Sontang Project (100% SUM)• High-grade exploration project
Other greenfield projects (100% SUM)• Exploration IUPs covering more than 1,370km2
For
per
sona
l use
onl
y
![Page 6: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/6.jpg)
Tembang and Surrounding Infrastructure
5
For
per
sona
l use
onl
y
![Page 7: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/7.jpg)
Tembang Project Management Team
6
Adi Sjoekri BSc ,MSc, MBA (Management) Director (Gov’t Liaison, Permitting, Forestry)
Mr Sjoekri has over 17 years corporate experience, working for major companies such as CSR and Newmont. More recently he was a consultant for the mining industry.
Don Harper B.Eng (Mining Engineering), B.Surv (Surveying)Mine Manager
Mr Harper is qualified mining engineer with more than 21 years’ industry experience. Don has a strong track-record of project management and taking resources projects from pre-feasibility stage into production.
Grant HardingB.AppSc, FAusIMM Project Manager
Mr Harding is a qualified extractive metallurgist with more than 25 years experience in the mining industry. He has extensive senior operational, engineering and project management experience, principally in Indonesia.
Matthew FarmerBSc (Hons) Geology, MAusIMM, FGSExploration Manager
Mr Farmer has over 27 years experience in exploration and mining mostly focused in South East Asia. His experience spans a mix of major and junior companies including BP Minerals and Newmont.
For
per
sona
l use
onl
y
![Page 8: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/8.jpg)
Tembang – 403,000 oz Gold and 5.5M oz Silver JORC Reserve
7
For
per
sona
l use
onl
y
![Page 9: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/9.jpg)
Tembang Project – Overview
8
Aerial view of the Tembang Project
Production timeline
Gold and silver production 2nd half 2013
Total Reserves (1) 403,000 oz gold 5.5M oz silver
Total mine life 10 years
Infrastructure De-risked by previous mining in 1996-2000
Mine type Open pit and underground
Upside 201,000 oz Au in PSV and three deposits open at depth
Note 1: Refer to Appendix 1 for full Statement of Reserves and Resources
For
per
sona
l use
onl
y
![Page 10: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/10.jpg)
Tembang – 2 Stage Development Strategy
9
STAGE 1
STAGE 2
For
per
sona
l use
onl
y
![Page 11: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/11.jpg)
Stage 1 – Belinau and Asmar
Berenai/Central Area
ProposedTailings damStage 2
Stage 2
74
3
61
2
5
10
8
Belinau UndergroundDeposit Stage 1
Haulage Road
Camp Site
Magazine
Stage 1Processing Plant
Belinau Open PitStage 1
Asmar Open Pit Stage 1
11 Workshop
For
per
sona
l use
onl
y
![Page 12: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/12.jpg)
Stage 1 – PFS and Optimisation Update
11
PFS Optimisation Belinau & Asmar(April 2012)
Target LOM Production Plan 186,000 oz AuEq(1)
C1- Target Cash Operating Costs(incl. silver credits)
US$350 to US$450/ oz Au
Mining Pre-Production Capital US$10m
Mine life 5 years (stage 1)
Production rate 400,000 tpa
Target Gold RecoveryTarget Silver Recovery
90%80%
Reserve in Stage 1 Production Plan 18% of Resource
Note 1: Refer to Appendix 1 for gold equivalent calculation
PFS – Belinau Deposit(March 2012)
LOM Production Plan 134,000 oz AuEq(1)
C1- Cash Operating Costs(incl. silver credits)
US$551/oz Au
Mining Pre-Production Capital US$22m
Mine life 3 years (stage 1)
Production rate 200,000 tpa
Gold RecoverySilver Recovery
90%80%
Reserve in Stage 1 Production Plan 13% of Resource
For
per
sona
l use
onl
y
![Page 13: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/13.jpg)
Stage 1 – Development Strategy
12
DFS• Complete DFS in July 2012• Hydrological and geotechnical drilling currently underway• Mining and processing studies nearing completion• Permitting underway
Mining• Start with open pit mining at Belinau and Asmar – de-risk and reduce pre-production capital • Hire all open pit equipment but owner operate – reduce upfront capital • Develop portal access from within Belinau pit – early access to high grade ore (in-pit adits)• Sublevel-stoping with benching and backfill – maximum gold recovery ... keep it simple• Owner operator with majority local workforce ... follow other successful operator’s methods
Processing• Build a conventional CIL 400,000tpa gold plant ... keep the process simple and costs down• Secured design for previous plant enabling use of existing concrete foundations – significant savings• Historical production confirmed gold recoveries greater than 90%• Test work using oxygen to improve silver recoveries to greater than 85% underway• Option to upgrade existing tails dam to be confirmed in the DFS ... reduce upfront capex
and regulatory issues
For
per
sona
l use
onl
y
![Page 14: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/14.jpg)
Belinau Open Pit – Cutback
New Pit
Existing Pit
Optimised Belinau Pit Design
The two stage Belinau open pit cutback provides for up to 12 month’s ore supply before underground high grade feed is required for the mill.F
or p
erso
nal u
se o
nly
![Page 15: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/15.jpg)
Belinau Underground Mine
14
For
per
sona
l use
onl
y
![Page 16: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/16.jpg)
15
Asmar and Belinau – Further Potential
15.15m @ 4.94 g/t Au, 5.0 g/t AgBERENAI DEEP
1.95m @ 81.92 g/t Au, 208.0 g/t AgBELINAU DEEP
ASMAR DEEP4.15m @ 15.2 g/t Au, 24.0 g/t Ag
For
per
sona
l use
onl
y
![Page 17: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/17.jpg)
Tembang 2012 Milestones
16
PERMITTING
TECHNICAL
AMDAL ✔• Environmental
Management Plan
• Environmental Impact Assessment
AMDAL ✔• Environmental
Management Plan
• Environmental Impact Assessment
Forestry• In-principle
approval• Borrow and Use
- Pinjam PakaiManpower• Collaborative
Agreement
Forestry• In-principle
approval• Borrow and Use
- Pinjam PakaiManpower• Collaborative
Agreement
Operational• Technical head• Masterlists• Electricity
Generation• Explosives• Local permitting
Operational• Technical head• Masterlists• Electricity
Generation• Explosives• Local permitting
Pre- ✔Feasibility
Stage 1
Pre- ✔Feasibility
Stage 1
Resource to Reserve
Optimisation Report
Resource to Reserve
Optimisation Report
Definitive Feasibility
Stage 1
Definitive Feasibility
Stage 1
Q2/Q3 2012 Q4 2012Q3 2012Q1 2012
Q3 2012Q2 2012Q1 2012
Mining Licence
• Conversion of IUP from exploration to mining
Mining Licence
• Conversion of IUP from exploration to mining
Decision to MineDecision to Mine
Q1/Q2 2012
✔
✔
✔ “Sumatra has met all its 2012 milestones to
date”For
per
sona
l use
onl
y
![Page 18: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/18.jpg)
Summary
• Emerging Gold and Silver producer– Gold and silver production targeted for second half of 2013– Two-stage strategy allows early profitability with reduced financial exposure
• Tembang Project– Excellent early (within 6 months) cash producing asset– Low initial capital outlay– Production costs targeted for 1st quartile– Brownfields project means lower technical risk
• Major competitive advantage in Sumatra– Large tenement position and projects– Demonstrated capacity and ability to acquire projects, attract quality JV partners
• Experienced operators on the ground– Adi Sjoekri...director and geologist...permitted several projects prior joining Sumatra– Grant Harding...process engineer...20 years in Indonesia
17
For
per
sona
l use
onl
y
![Page 19: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/19.jpg)
18
Category Ktonnes Au g/t Ag g/t Au koz Ag kozMeasured 149 7.22 75.5 35 361Indicated 266 8.02 67.9 69 580Inferred 72 10.50 81.4 24 188Sub‐Total 487 8.14 72.2 127 1,130
Category Ktonnes Au g/t Ag g/t Au koz Ag kozMeasured 2,598 2.27 37.8 190 3,156Indicated 4,423 1.80 25.6 256 3,637Inferred 3,554 1.80 20.3 202 2,319Sub‐Total 10,575 1.91 26.8 648 9,112
Category Ktonnes Au g/t Ag g/t Au koz Ag kozMeasured ‐ ‐ ‐ ‐ ‐Indicated 11,323 0.54 6.9 198 2,523Inferred 194 0.50 4.6 3 29Sub‐Total 11,517 0.54 6.9 201 2,552
Category Ktonnes Au g/t Ag g/t Au koz Ag kozMeasured 2,747 2.54 39.9 224 3,517Indicated 16,012 1.02 13.1 522 6,741Inferred 3,820 1.90 20.7 229 2,536Total 22,579 1.35 17.6 976 12,794
PSV
Combined Total Resource Open Pit + Underground
ALL
Note: Rounding errors may occur, reporting cut‐offs as indicated, significant figures do not imply any added level of precision.
Tembang Mineral Resource August 2011 Reported to JORC Code StandardsBelinau Vein Above 2.78g/t Au Underground Cut‐Off
BELINAU VEIN
All Veins Excluding Belinau Above 0.5g/t Au Open Pit Cut‐Off
OTHER VEINS
PSV Material Above 0.3g/t Au Open Pit Cut‐Off
1A: Tembang Project Resources
For
per
sona
l use
onl
y
![Page 20: 29 May 2012 For personal use only · 2012. 5. 29. · 29 May 2012 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (20 pages by email) Dear Madam RE: PRESENTATION](https://reader031.vdocuments.us/reader031/viewer/2022011921/6031cb37e383d875cf62097e/html5/thumbnails/20.jpg)
19
1B: Tembang Project Reserves
DepositReserve Category
Tonnes(kt)
Grade Au (g/t)
Contained Gold (oz)
Grade Ag (g/t)
Contained Silver (oz)
AsmarProven 650 1.7 35,000 24.0 498,000
Probable 1,230 1.3 49,000 20.5 808,000
BerenaiProven 910 2.0 60,000 40.8 1,195,000
Probable 980 2.1 67,000 23.6 740,000
BuluhProven 560 2.5 45,000 40.9 735,000
Probable 400 2.0 26,000 29.0 374,000
AiditProven ‐ ‐ ‐ ‐ ‐
Probable 20 3.1 2,000 44.6 30,000
BujangProven 140 4.2 19,000 52.1 238,000
Probable 50 2.3 4,000 26.0 40,000
Belinau_OPProven 90 5.5 16,000 68.4 196,000
Probable 60 3.4 6,000 53.2 97,000
Belinau_UGProven 50 8.7 15,000 74.1 130,000
Probable 360 5.0 59,000 39.3 458,000
Total
Proven 2,400 2.5 190,000 38.7 2,991,000
Probable 3,090 2.1 213,000 25.6 2,547,000
Total 5,490 2.3 403,000 31.4 5,539,000
Gold Equivalent Reporting
Gold Equivalent = gold assay + (silver assay / 50) where the number 50 represents the ratio where 50 g/t Ag = 1 g/t Au. This ratio was calculated from the average of the 12 months of Financial Year 2011 from July 2010 to June 2011 taken from published World Bank Commodity Price Data and rounded up from 47 to 50. (http://econ.worldbank.org/WBSITE/EXTERNAL/EXTDEC/EXTDECPROSPECTS/0,,contentMDK:21574907~menuPK:7859231~pagePK:64165401~piPK:64165026~theSitePK:476883,00.html).The metal prices thus used in the calculation are the average gold price of US$1,500 per ounce and average silver price of US$30 per ounce. Metal recoveries assumptions are 90% for gold and 80% recovery for silver for Belinau.