29. hajduszovat s-5 biogas plant rebar layout
TRANSCRIPT
GSPublisherEngine 0.0.100.100
3,5
215
35,70
3515
56 25 45
3515
562545
3,5
215
33,18
M= 1:20Date :
june 2009
4010 11 H= 4x22 piece
LOWER LATTICE :M=1:25
S-5REBAR LAYOUT LOWER LATTICE
14 14141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414141414 14
6. splicing 7. splicing
8. splicing
9. splicing
Note: A cross-section of the reinforcement is therefore shaped connector 50% of the inserts are arranged alternately. ex: 2.1 , 2.2 , 2.3 , 2.4 ,
Drawing number:
Scale:Establishment location: Hajdúszovát,periphery HRSZ: 098/7
Proprietor: "STF" Pork producer and distributor Ltd. 4212 Hajdúszovát, Batthányi street. 12.
Engineer:Sallak Ltd.Kegyes S. Árpád OKI. engineerErdőtelek,József A. street. 17/AT-1-10-0106
Biogas plant.Rebar layout lower lattice.
Drawn by:Laszlo KapasZele-Bau Ltd.
3350 Kal Fo ut street 1www.zelebau.hu