Page 1: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019

285 Marlborough StreetSubmission to Back Bay Architectural Commission

Page 2: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Aerial View

285 Marlborough Street - Aerial view.

02

Page 3: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Plot Plan 03

Page 4: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Existing Conditions - Site Photos

South Elevation - View from Marlborough Street North Elevation - View from Public Alley

04

Page 5: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Existing Conditions - Site Photos

North Elevation - View from Public Alley View of Back Patio

View of Bay Window

05

Page 6: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019

Roof Deck Hatch - Existing Conditions Mechanical Equipment - Existing Conditions

Existing Conditions - Site Photos 06

Page 7: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Back Alley Elevation - Proposed Changes

Existing Conditions - North Elevation Proposed Changes- North Elevation

New Head house for Roof Deck AccessFinish material to be Standing Seam black finish metal cladding to match the historic character of the building.

New Exterrior Door within the aperture of the Window.

New Painted Steel Balcony to match the historical character of the building.

New Painted Wood Door With Glazed Aperture

New Roof Deck12” lower than previous.Existing Roof Deck

07

Page 8: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Roof Deck - Existing Conditions

Perspective view of existing Condition.

Roof Floor Plan - Existing condition.

Roof Hatch

Mechanical

Roof Deck

Roof

Roof

08

Page 9: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Proposed Roof Deck - Floor Plan

Roof Floor Plan - Proposed Roof Deck.

MechanicalRoof

Roof

New Head House for Roof Deck Access

New Counter wit Gas Grill and small sink.

09

Page 10: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Proposed Roof Deck - Perspective View

New Head house for Roof Deck AccessFinish material to be Standing Seam black finish metal cladding to match the historic character of the building.

Mechanical Equipment

New Deck.

10

Page 11: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Proposed Roof Deck - Perspective View 11

Page 12: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019

EXISTING Roof Deck and Guard Rail Perspective view of section detail

PROPOSED Roof Deck and Guard Rail Perspective view of section detail

Existing and Proposed Roof Deck and Guard Rail Detail

EXISTING DECK18” ABOVE ROOF SURFACE

NEW DECKLESS THAN 6” ABOVE ROOF SURFACE

EPDM ROOF MEMBRANE EPDM ROOF MEMBRANE

WOOD DECK SKIRTING

PROPOSED STEEL GUARD-RAIL WITH POSTS EVERY 4’PAINTED BLACK.

DECK RAILING SUPPORT BLOCKING EVERY 4’ TO ALLOW FOR WATTER DRAIN BETWEEN.

PROPOSEDBISON DECKING SYSTEMDIRECTLY SUPPORTED ON ROOF SURFACE.

12

Page 13: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Section View - Sightline

Public Alley 416

Property Line

13

Page 14: 285 Marlborough Street Submission to Back Bay ......DRAWING LEVEL DATE 285 Marlborough Street Renovation. DRAWING TITLE Landmarks Submission Proposed Roof Deck - Perspective View 1001

PROJECT # - PROJECT NAME DRAWING LEVELDATE

DRAWING TITLE285 Marlborough Street Renovation.Landmarks Submission

10/01/ 2019Roof Mockup - Existig Conditions Images

Images taken from across the public alley. The mock up of the head house currently on the roof is out of view.

14