26 th annual contest june 5 th 2014
DESCRIPTION
2014 INDIANA STATE MINE RESCUE CONTEST. 26 th annual contest june 5 th 2014 . 2014 Indiana Mine Rescue. - PowerPoint PPT PresentationTRANSCRIPT
26TH ANNUAL CONTESTJUNE 5TH 2014
2014 INDIANA STATE MINE RESCUE CONTEST
2014 Indiana Mine RescueThank your for assisting us with our emergency at the Vincennes No. 1 Mine. You are located at the fresh air base established by the previous exploring mine rescue team. At around 4 am this morning a 7 man crew entered the No. 3 Section to prep the unit and to load coal once the belts became available. From what we can tell they began loading coal around 6:00 am. At approximately 6:30 the dispatcher got a call from the unit stating that 2 miners where at the dinner hole and heard a rumbling sound and then they were knocked off the bench from the air rush. These two men did not wait around for the others on the crew and begin travels out the primary escapeway. They tried to call the No. 3 section once they got to the first belt drive location and could not get an answer on the phone from the No. 3 section. These two men have already made it to the surface and are getting interviewed now. The No. 3 section had mined into an air shaft yesterday. The shaft is not available to be used for ventilation at this time, but we have a crew working on it as we speak. This mine has experienced poor roof conditions and high concentrations of methane gas and troubles with water accumulation in the past. It is mining adjacent to the abandoned and sealed Vincennes No. 2 mine. The mine is being ventilated with blowing fan that can be shut off to reverse and be used as an exhausting fan, but not stalled out. We have power to the pump switch located at the fresh air base. The mine maps you will receive are not up to date. That is all the information we have available at this time and you have 90 minutes to complete the problem.
Written Instructions
• Bring all survivors to the fresh air base• Explore all areas of the mine that can
be done safely• You must ask the superintendent for
permission to change the fan from blowing to exhaust or exhaust to blowing
• You can not carry more than 2 sets of building materials at one time
• The fan must remain on at all times other than the brief time it takes to shut off to reverse if needed
• You have 90 minutes to complete the problem.
Judges Information
• Please be sure the placard in the unsafe is a person before you begin the problem. All placards and barricade in No. 1 need to be turned over at the start of the problem
• Once the team puts pump in the water and has the power turned on wait 5 second for the water to be pumped. Turn placard over to show ankle deep water. Once it pumped down it will stay down.
• Once water is pumped down tell the team the air shaft can now be used if needed• Once the team get to RA they will get a verbal response from inside the RA. They
will have to go in to get him and put a SCSR or breathing app prior to bringing him out. Once captain takes gas test after opening the outer door, he and 1 other can go into the RA. Once in the RA they will take another GT and find low O2 they wll purge the airlock (5 seconds), then retest. The air in the airlock will be respirable. He will open the inner door and have to take gas test in the RA as well it will be respirable.
• Once the team reaches the airshaft they have means to ventilate to get the person out from behind the barricade in No. 3 entry
• For the first vent the team must move the battery mine phone, install the temp controls and ask superintendent for permission to change the fan to exhausting
• The patient behind the barricade in No. 3 entry will give them a verbal response, but once the get in to him they will find the patient un-conscious
• 2nd vent the team will get the triangle 5% of Ch4 that they couldn’t get in the first vent. There are two options to do so. First vent and remove the diagonal or build as shown in booklet.
• For the third vent to get the barricade in No.1 cleared they will have to switch the fan back to blowing. They will get a verbal response, but they will find a body when they get in there
• Do not let the team move the pump any further than the water roofed.• Map judges please go and walk the fields with you “KEY” maps to make sure
placards match you maps.
RA Patient Statement
Help get me out of here, I am gonna be late for my fishing trip
Statement for Barricade 3
• Help get me out of here. I’m supposed to go fishing with my buddy.
DO NOT READ THIS PORTIONYou will become unconscious once the team begins to air lock into get you. Lay with head facing the right (looking inby)
Statement for barricade 1
• Help help help get me out of here, Me and my buddy are in here. Its getting hard to breathe.
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
X
14 Timbers
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
5% CH40 PPM CO20.8% O2
Battery Ram car
X
X
Person
Life Threating BleedingLeft Leg
Water Roofed
PumpX
BC
BC
XBattery MinePhone
Open
OpenOpen
D
0% CH40 PPM CO18.8% O2
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Conscious Live Person
Pump Cable
5% CH40 PPM CO18.0%O2
5% CH40 PPM CO18.0%O2
X
XBattery Ram car
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
xxxxxxxxxxxxx
5% CH40 PPM CO18.0%O2
Conscious Person
X
Unsafe rib
DD
Body
Becomes unconscious when team goes in
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
X
14 Timbers
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
5% CH40 PPM CO20.8% O2
Battery Ram car
X
X
Person
Life Threating BleedingLeft Leg
Water Roofed
XPumpX
BC
BC
XBattery MinePhone
Open
Open
DO
0% CH40 PPM CO18.8% O2
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Conscious Live Person
Pump Cable
Extent of gas
5% CH40 PPM CO18.0%O2
X
X
XBattery Ram car
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
xxxxxxxxxxxxx
5% CH40 PPM CO18.0%O2
Conscious Person
X
Unsafe rib
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
X
14 Timbers
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
5% CH40 PPM CO20.8% O2
Battery Ram car
X
X
Person
Life Threating BleedingLeft Leg
Water Roofed
XPumpX
BC
BC
XBattery MinePhone
Open
OpenOpen
D
0% CH40 PPM CO18.8% O2
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Conscious Live Person
Pump Cable
5% CH40 PPM CO18.0%O2
5% CH40 PPM CO18.0%O2
X
X
Team Stops
1/2/31/2/31/2/3
45 5/6
7
8910
11
12
13
XBattery Ram car
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
5% CH40 PPM CO18.0%O2
Conscious Person
Unsafe rib
D
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
X
14 Timbers
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
5% CH40 PPM CO20.8% O2
Battery Ram car
X
X
Person
Life Threating BleedingLeft Leg
Water Roofed
XPumpX
BC
BC
XBattery MinePhone
Open
OpenOpen
0% CH40 PPM CO18.8% O2
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Conscious Live Person
Pump Cable
5% CH40 PPM CO18.0%O2
5% CH40 PPM CO18.0%O2
X
X
Gas Test, Roof-Rib and DTI
XBattery Ram car
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
5% CH40 PPM CO18.0%O2
Conscious Person
DI
DI
DIDIDI
DI
R&RR&R GT
D
R&R DI GT
DI
R&
RD
I
GT
GT
GT
GT
GT
R&RGT
DI
DI DI
GT
DIGT
GT
GT
GT
GT
GT
R&
R
DI
GT
DI
DTGT
DI GT
GT
R&R
DI
R&R
DIDI
GT
GT
DIGT
R&
RD
I
GT
GT
R&
R
GT
GT
DI
GT
DI
DI R&R R&R DI R&R GT DI
DI DI
GT
GT
GT
GT
GT
GT
GTGT
DGT
DI
GT
DI X
Un-conscious
Unsafe rib
GTGT
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
X
14 Timbers
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
5% CH40 PPM CO20.8% O2
Battery Ram car
X
X
Person
Life Threating BleedingLeft Leg
XPortable PumpX
BC
BC
XBattery MinePhone
Open
OpenOpen
D
0% CH40 PPM CO18.8% O2
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Conscious Live Person
Pump Cable
5% CH40 PPM CO18.0%O2
5% CH40 PPM CO18.0%O2
X
X
1st VentChange fan to exhaust. Team may gamble and not build the diagonal and if so it will still vent the
gas and eliminate the 2nd vent
Remove
XBattery Ram car
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
xxxxxxxxxxxxx
5% CH40 PPM CO18.0%O2
X
Unsafe rib
One or both open
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
5% CH40 PPM CO20.8% O2
Battery Ram car
X
X
Person
PumpX
BC
BC
XBattery MinePhone
Open
OpenOpen
D
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Pump Cable
5% CH40 PPM CO18.0%O2
X
2nd VentLeave fan on exhaust Team may also use vent 1 but remove diagonal
XBattery Ram car
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
xxxxxxxxxxxxx
5% CH40 PPM CO18.0%O2
Unsafe rib
D
BO
LC
TEAM NO. ______FIELD NO. ______SCALE 1” = 10’
D
10’ Diameter Shaft
D
D
xxxxxxxxxxxxxxxxxxxxxxxxC
aved
Airt
ight
5% CH40 PPM CO20.8% O2
Battery Ram carX
BB
ContinuousMining Machine X
Face Face Face
2014Indiana State Mine Rescue Contest
Water OverKnee Deep
Battery Ram car
5% CH40 PPM CO20.8% O2
XXXXXXXXXX
XXXXXXXXXXCaved
XXXXXXXXXX
XXXXXXXXXXCaved
Battery Ram car
X
X
Person
Life Threating BleedingLeft Leg
Portable PumpX
BC
BC
XBattery MinePhone
Open
OpenOpen
D
0% CH40 PPM CO18.8% O2
D
Pump Switch
Off/On
BC
BC
BCBC
BC
RA
Pump Cable
5% CH40 PPM CO18.0%O2
X
XBattery Ram car
3rd VentChange fan to blowing
xxxxxxxxxxxxx
Cav
e ai
r tig
ht
xxxxxxxxxxxxx
5% CH40 PPM CO18.0%O2
Unsafe rib
D
THANK EACH AND EVERY ONE OF YOU FOR YOU
PARTICIPATION AND COMMENTMENT TO MINE
RESCUE