24 steps to start an ssi
TRANSCRIPT
8/3/2019 24 Steps to Start an SSI
http://slidepdf.com/reader/full/24-steps-to-start-an-ssi 1/4
Steps in launching an entrepreneual venture-
1. Decision to be self employed:
- Think positively
- Self confidence
- Goal setting.
- Initiative- Courage
- Determination
What to manufacture?
Analyzing strengths and weakness-
Training-
Skills and technical
• Environmental scanning-The method of granting consent under water and airpollution to SSI units has been simplified. Except for 17 critically polluting
sectors, in all other cases SSI units will merely have to file an application and
obtain an acknowledgement which will serve the purpose of consent.
• Product selection
Selection of the product based on market survey. Making a Product Choice
In a project conceptualization stage while making a product choices following
factors are related to product need to be considered:
- Product Line - Depth, Width
- Packaging
- Branding
- Warranties
- After Sales Service
Some other factors that one should consider while finalizing the product choiceare:
- Ease of availability of raw-material
- Process Technology
- Accessibility to the market
- Incentive and support from Government
8/3/2019 24 Steps to Start an SSI
http://slidepdf.com/reader/full/24-steps-to-start-an-ssi 2/4
Market survey-
Market information is also important for product selection. Products, which are
likely to have a number of players in the market, are best avoided. Some such
products in the recent past have been plastic footwear, audio cassettes, disposablegloves and bulk drugs.
Forms of ownership- Form of ownership
- Proprietary concern
- Partnership
- Limited company
- Cooperative society
Location-- Nearness to market and nearness to raw materials.
- Early availability of transport facility at cheaper rates.- Availability of skilled workers at cheaper rates.
- Incentives/concessions for industrially backward areas
• Technology-
• Machinery and equipment- Availability industrial sheds and with minimum
investment
• Project report-
- Technical feasibility.
- Economic viability.
- Total cost of the project-fixed as well as working capital
Finance- (for fixed assets & working capital)
Whom to approach - Bank, private financial Institutions, Govt. agencies, UPFC,
etc.Types of scheme.
Provisional Registration- Whom to approach-depending upon the location of the
factory.
Power connection / water supply-
Among the utilities of prime importance are power and water. In many cases getting
power connection causes delay in setting up of plant. Therefore it is imperative to
commence work on these aspects with diligent follow up. Power connections are
generally of either LT (Low Tension) or HT (High-tension) type. If connected load is
8/3/2019 24 Steps to Start an SSI
http://slidepdf.com/reader/full/24-steps-to-start-an-ssi 3/4
up to 75 HP, LT connection is provided. For connected loads of 130 HP or higher
only HT connection is provided.
A formal application needs to be made in a specified form to the state electricity
board. An electrical inspector is deputed for evaluation of application to factory
site, after which the load is sanctioned. In areas of power shortage, it is advisableto augment the power supply with a captive generating set.
Water connection is also obtained likewise by applying in advance in formal forms.
The water supply can be augmented by installation of tube well.
Installation of machinery.
NSIC provides indigenous and imported machinery to MSMEs on hire purchase
basis. The rate of earnest to be paid varies from 15 to 30%. Full hire purchase
value is pay able in 13 installments.
Recruitment of personnel: -
- Well qualified - skilled & unskilled
- Well experienced skilled & unskilled
- Minimum wage rate prevalent
Procurement of raw materials: -
- Minimum stock
- Easily available
- Find substitutes- Lower rates
Production:- Know the installed capacity.
- Less rejections
- Quality control & testing
Marketing :-
- Advertisement and publicity
- Channel of distribution
- After sales service, if required- Feed back from customer.
Quality assurance
Permanent registration
Market research-
8/3/2019 24 Steps to Start an SSI
http://slidepdf.com/reader/full/24-steps-to-start-an-ssi 4/4
Periodical monitoring and evaluation in terms not only for market survey but also
production, quality management and profitability helps in knowing where the firm
stands in comparison to performance envisaged in the project report.