23 USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared pursuant to the Caltrans/FHWA Memorandum of Understanding (MOU) authorizing State assumption of responsibilities under Section 326 of Chapter 3, title 23, United States Code (23U.S.C. 326), as amended by the Moving Ahead for Progress in the 21 st Century Act (MAP-21). MOU Section IV, State Performance Requirement F.1 requires Caltrans to provide a list of Categorical Exclusion (CE) determinations that it approves semi-annually. This report provides a list of all 23 USC 326 CE determinations reported between January 1 and June 30, 2014 (Quarter 27 and Quarter 28). Additionally, newly identified approvals from previous quarters are also included on this report. A total of 531 CE determinations were reported for the six month reporting period, including 203 State Highway System Projects and 328 Local Assistance Projects.

Upload: hoangdang

Post on 12-May-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions Six Month Report to FHWA

January 1, 2014 – June 30, 2014

Summary This report has been prepared pursuant to the Caltrans/FHWA Memorandum of Understanding (MOU) authorizing State assumption of responsibilities under Section 326 of Chapter 3, title 23, United States Code (23U.S.C. 326), as amended by the Moving Ahead for Progress in the 21st Century Act (MAP-21). MOU Section IV, State Performance Requirement F.1 requires Caltrans to provide a list of Categorical Exclusion (CE) determinations that it approves semi-annually. This report provides a list of all 23 USC 326 CE determinations reported between January 1 and June 30, 2014 (Quarter 27 and Quarter 28). Additionally, newly identified approvals from previous quarters are also included on this report. A total of 531 CE determinations were reported for the six month reporting period, including 203 State Highway System Projects and 328 Local Assistance Projects.

Page 2: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

District-EA County Route Post MileDate

Signed

01-0B030_ HUM 96 008.3/ 6/24/2014

01-0B270_ DN 101 015.1/ 6/2/2014

01-0B340_ HUM 36 022.8/027.7 6/26/2014

01-0B450_ HUM 299 R010.7/R02 4/1/2014

01-0E430_ MEN 1 92.85/92.85 5/14/2014

01-0E600_ HUM 101 10.9 6/13/2014

01-26201_ MEN 101 052.2/052.4 6/4/2014

01-49370_ HUM 96 011.0/ 6/25/2014

02-0E090_ SHA 5 045.5/ 5/28/2014

02-4E890_ SHA 299 047.5/ 4/22/2014

02-4F610_ TRI 3 Mar-82 5/7/2014

02-4F710_ TEH 5 24.8/26.7 5/1/2014

02-4F720_ TRI 299 3.7/4.2 6/2/2014

03-0G160_ YOL 16 31.7/40.6 5/13/2014

03-0G170_ PLA 28 0/11 6/26/2014

03-1E760_ YUB 20 000.6/ 4/17/2014

03-1F400_ PLA 80 035.1/ 4/10/2014

03-3F790_ SUT 20 16.52/16.52 4/24/2014

03-4M860_ NEV 80 14.8/16.4 6/19/2014

04-1SS59_ VAR VAR 2.7/2.7 6/20/2014

04-23552_ SM 92/8211/11.5,

10.3/10.75/5/2014

04-2A331_ ALA 84 13.6/18 5/23/2014

04-2G940_ NAP 128 017.9/017.9 6/9/2014

04-3E790_ SM 101 23.66/23.66 5/13/2014

04-3G080_ SON 1 003.4/030.5 6/26/2014

04-4C200_ SCL 152 9.9/21.9 4/1/2014

04-4H900_ SF 280 R0.143 and 5/28/2014

04-4S920_ SON 1 19.6/0 5/6/2014

05-0R830_ VAR 1 0/0 5/1/2014

05-0S030_ SB, SB, SB1, 101,

150, 2460.0, 0.0, 0.0 4/24/2014

05-1A870_ SCR 1 16.95/17.17 6/16/2014

05-1C080_ SLO 101 12.1/29.9 5/6/2014

05-1C110_ SLO 101 12.1/29.9 5/6/2014

05-1C130_ VAR 1 R0/0 4/25/2014

05-1C170_ SLO 1 5.3 / 5.8 4/23/2014

05-1F890_ MON 1 28/28.6 5/29/2014

06-0L340_ FRE 168 T30.2 5/27/2014

06-0M370_ KIN 43 1.4 4/11/2014

06-0N180_ KIN 198 R8.8 / R10.5 5/30/2014

06-0P290_ KER 155 1.5 6/9/2014

06-0P670_ TUL 245 7.0 / 7.2 4/8/2014

06-0R070_ MAD 99 R1.0/9.5 4/8/2014

06-0S350_ VAR 5 0/26.72 6/9/2014

07-1W140_ LA 1 21.9/23.9 6/6/2014

07-28920_ LA 710 18.7/21.0 6/11/2014

Hennessy Ridge Shoulder Widening

RAC Overlay

Microsurfacing

Marysville Operational Improvement

Sut-20 Signal Poles

I-5 Cable Barrier

Repair cracked and deteriorating AC pavement

Source Control, Install irrigation system, plants, &

pavement

Auberry Road Intersection

Whitley Avenue Roundabout

Latache Median Barrier

Delano Roundabout

Woodlake Intersection Improvement

Pavement rehab (CAPM)

Construct Soldier Pile Wall - 0.1 mile south of

Russian River Bridge

SB/SLO County Curb Ramps

SB Curb Ramps

Santa Cruz 1/17 Shoulder Widening

North SLO 101 Roadside Safety

South SLO Roadside Safety

Orcutt ADA (1 Location)

Add Left Turn Channelization

Cow Cliffs Viaduct

Niles 2 short term

Knoxville storm damage - construct roadway

Paint Bridge at Sierra Pt Parkway

Construct soil nail walls

CAPM Pavement preservation

Install Concrete Barrier

Repair slide

Partial Cloverleaf to be widened at 2 diagonal off-

ramps & 2 signalized I/S will be created

299 Slip / Slides

Rockport Slipout

Sinkhole/culverts repair / District Director's Order

Hoopa Safety

Dog Creek - Sidehill Viaduct - Seismic

McCandless Gulch Curve Improvement

TRI-3 Deck Rehab

Red Bluff Ramps

State Highway System Projects

Project Description

Hoopa Vista Point Curve Correction

Last Chance Slips

Larabe 3 Slip Repair

Replace Damaged Fence

Coho Mitigation @ Ryan Creek

I-80 3 Mile Truck Climbing Lane

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

1

Page 3: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

07-29080_ LA 1 2.75/12.17 6/19/2014

07-29340_ LA 5 25.2/25.9 6/30/2014

07-29770_ LA 110 23.7/25.5 5/12/2014

07-1W700_ LA 066 0.0/3.0 6/3/2014

07-2W640_ LA 10 20.2/23.6 5/6/2014

07-2W650_ LA 57 Various 5/6/2014

07-2W660_ LA 10 26.8/30.8 6/12/2014

07-2W670_ LA 010 23.9/26.4 6/24/2014

07-2W680_ LA 110 24.53/29.28 6/19/2014

07-2W690_ LA 5 13.89/28.7 6/16/2014

07-2W700_ LA 10 0.0/0.0 6/11/2014

07-2W710_ VEN 33 Various 4/29/2014

07-2W730_ LA 110 07.0/16.7 6/13/2014

07-2W740_ LA 110 16.98/23.69 6/12/2014

07-2W750_ LA 405 Various 6/13/2014

07-2W760_ LA 5 34.2/56.1 6/12/2014

07-2W770_ LA 118 Various 6/5/2014

07-2W840_ LA 101 27.63/32.08 6/23/2014

07-30060_ LA 405 20.5/28 6/5/2014

07-30070_ LA 5 13.8/19.2 6/17/2014

07-30170_ LA 210 33.7/39.8 4/9/2014

07-30260_ LA 57 4.45/12.12 6/2/2014

07-30290_ LA 5 43.9C/46.3C 6/4/2014

07-30570_ LA 110 25.48/25.8 4/1/2014

07-30620_ LA 91 R11.32/R20. 6/2/2014

07-30640_ LA 210 24.7/44.92 6/10/2014

07-30800_ LA 5 19.2/28.9 6/12/2014

07-30850_ VEN 23 11.4/11.4 6/12/2014

07-30860_ LA 10R2.15/R14.8

36/13/2014

07-3P890_ LA 91 17.6/20.5 5/2/2014

07-3P900_ LA 210 34.6/34.6 5/27/2014

07-3P930_ LA 110 27.063 5/28/2014

07-3X820_ LA 39 21.6/21.9 6/5/2014

07-4X230_ LA 39 41.0/44.0 4/24/2014

08-0N56U_ SBE 40 R94.7/R99.7 4/25/2014

08-0Q790_ SBD 40 93.60/93.65 4/25/2014

08-0R003_ SBD 138 / 5/5/2014

08-0R710_ SBD 15 87.26/91.81 6/24/2014

08-1C370_ RIV 95 0.0/36.2 5/12/2014

08-1E480_ RIV 79 12.6/12.9 5/5/2014

09-35880_ MNO 395 44.1-51.2 6/27/2014

10-0K140_ STA 120 0.0 / 4.3 5/23/2014

10-0W140_ MER, SCL 152, 152 R0.0 / R2.4, 4/10/2014

10-0Y900_ SJ 99 18.5/22.9 4/8/2014RHMA overlay

Non-Capacity Increasing Operational Improv, Install

Flashing Beacon & Signs

Repair Slope Failure

D.O. - Roadway Sideslope Damage

Bridge Replacement (Haller, Rojo, Clipper)

SR152 Median Barrier Near Pacheco Pass Summit

Install double thrie beam barrier - Coyote Lake

Mill and overlay pavement w/digouts

Install metal beam rail

Rush Creek Thin Blanket

Oakdale pavement repairs

Paint girders & beams, replace appr slabs, etc

0714000151 - LA-091 Roadway rehab

Hoff Bridge Replacement (BR #54 0889L&R)

Various Locations / Pefection of Title

0714000165 - LA-210 Install upgrade transportation

management system

0714000224 - LA-005-Ramp/ADA Ramp Repair

0714000245 - VEN-23, Upgrade Ramp Metering

0714000246 - LA-10, Upgrade Ramp Metering

Systems & convert Field Element

Const slope paving at bridge abutments

Foothill Maint. Station L5743, Install CNG fuel

0714000162 - LA-101, Line Ditch, Repair & Replace

Culverts

0713000485 - LA-405, Pavement rehab

0713000492 - LA-5 Pavement rehab

Repair Irrigation Systems & Planting

0713000483 - LA-057, Slab Replacement and Grind

Roadway Rehabilitation

Patch bridge deck spalls, pier walls, AC overlay, &

seal deck cracks

Meth Deck, Spall Repair, Joint Seal

0713000437 - Deck METH, Joint Seal, Approach

slab and spall repair

Meth Deck, Joint Spall Repair, Joint Seals

Bridge Preservation

Repair Joint Seal, Spalls, Methcrylate Deck

Replace bridge joints, meth deck, spalls

Bridge Rehabilitation

Various bridge maintenance work

Bridge Preservation

Bridge Preservation fr Eastern Ave to Allen Ave,

Repair deck & joint seals

0713000438 - Joint Seal, etc.

LA 1 ADA - Upgrade Pedestrian Facilities

Meadian Barrier

Install Safety Lighting

0713000050 - Microsurfacing

Replace joint seals, repair spalls, AC rdwy, etc.

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

2

Page 4: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

10-0Y910_ MER 59 23.3/33.7 4/9/2014

10-1C030_ TUO 108 2-Feb 5/12/2014

10-1C090_ SJ 4 R16.6 6/25/2014

10-3A750_ SJ 4 0.0 / 8.2 6/11/2014

11-2M640_ SD 8 R5.8-R18.5 4/3/2014

11-2M740_ IMP 111 23.9/40.5 5/7/2014

11-2M780_ IMP 8 R28/R40.9 6/23/2014

11-2T190_ SD 15 5.6/6.0 5/12/2014

11-41470_ SD 67 9.3/11.2 4/23/2014

12-0H234_ ORA 5 23.8/23.8 6/19/2014

12-0M520_ ORA 39 20.17/20.17 6/5/2014

12-0N130_ ORA 57 21.59/22.09 6/17/2014

12-0N220_ ORA 5 23.8/23.8 4/10/2014

District-EA County Route Post Mile Project Description TypeDate

Signed

01-0B270_ DN 101 015.1/

015.3Last Chance Slips De minimis only 06/02/14

District-EA County Route Post MileDate

Signed

01-0C480_ HUM 101 69.9/75.1 08/03/2013

01-0C900_ MEN 101 50.7/51.2 12/06/2013

01-41540_ MEN 101 074.8/

081.412/15/2013

02-4E850_ SIS 005 45.7 02/14/2014

03-4M840_ NEV 80 21.2/28.1 07/13/2013

04-4H570_ SON 112 01/21/2014

05-1E060_ MON 101 47.6 / 53.8 11/05/2013

06-0Q630_ FRE 41 R29.3 / 33.4 09/03/2013

06-0R150_ KER 58 R88.5/R99.8 02/05/2014

06-0R230_ FRE VAR 24.5/31.37 12/19/2013Install High Friction Surface Treatment2

Yreka Storm Drain & Paving1

Resurfacing (grind existing bonded wearing course

overlay, profile grind PCC surface, apply concrete

hardener)2

Replace pavement and overlay1

Concrete median barrier, inside shoulder widening

and rumble strip2

Roadside safety improvements2

Pavement Preservation (CAPM)1

NB 57 Brea Safety Improvement

1213000182 - I-5 Upgrade existing A/V & Video Wall

in D12 TMC

1114000092 - Mill & Replace with RHMA Overlay -

HM1 - 124

Construct Class I bike path in San Diego County

(Route 15 from Adams Avenue overcrossing to

Camino Del Rio South undercrossing)

Drainage improvements and high friction surface

treatment

1214000037 - Advanced reports to support the TMS

and CHP

1212000096 - Modify signal add lighting refresh

pavement marking

Repair Hinges and Bearing Pads

Hwy. 4 Rehab & Old and Middle River Bridges

Replacement

Pavement Rehab

Imp-111 , AR Chip Seal

RHMA overlay

Tuolumne 108/49 intersection improvements

State Highway System Projects - Section 4(f)

Approvals from Quarters 24 - 27 State Highway System Projects

Project Description

Men 101 OGAC Overlay near Willits2

Laytonville North Rehab2

RHMA overlay2

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

3

Page 5: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

06-0S330_ KER 046 29.9/30.5 03/05/2014

07-4X110_ LA 2 15.1 08/30/2013

08-0R250_ RIV 010 154.6/156.1 05/13/2013

08-0R850_ SBD 5718 05/01/2013

08-1C410_ SBD VAR 0/0 05/23/2013

11-2E003_ SD 5 34.8/35.1 06/20/2013

11-2M650_ IMP 86 67.8/43.1 06/28/2013

12-0H007_ VAR VAR / 08/06/2013

12-0N070_ ORA 005 19.7/20 03/17/2014

District-EA County Route Post Mile Project Description TypeDate

Signed

None

Federal Aid Project

NumberDistrict

Date

Signed

BHLO-5914(070) 01 LAK 04/08/14

BPMP-5904(120) 01 HUM 06/10/14

BPMP-5904(121) 01 HUM 06/10/14

BRLO-5914(067) 01 LAK 04/08/14

BRLO-5914(068) 01 LAK 04/09/14

BRLO-5914(071) 01 LAK 04/08/14

HRRRL-5904(136) 01 HUM 06/24/14

HSIPL-5017(040) 01 HUM 06/12/14

RPSTPLE-5904(128) 01 HUM 04/22/14

BPMP-5903(056) 02 MOD 06/27/14

BRLO-5909(029) 02 PLU 05/13/14

Relocate East Hobson Way Westbound Ramps

Inspection Station2

Construct sandhouse at the Mountain Pass

Maintenance Station (SBD 15 PM 170.6)2

Methacrylate and/or Polyester Concrete Overlay and

Replace Joint Seals2

Dean Mitigation Site: Purchase and restore

environmental mitigatin parcels2

Apply Asphalt Rubber Chip Seal2

Provide CCTV in Orange County Freeways2

Rte 5, 55, 73 Grooving, OGAC, polyester concrete,

restriping1

Pedestrian and ADA improvements - CA Aqueduct

Lost Hills1

D.O. Bridge Repair from Truck Fire2

Bridge Rehabilitation - Harbin Springs Road over

Harbin Creek (Br. No. 14C-0111)

Local Assistance Projects

Project DescriptionCounty

Bridge Replacement - Foard Road Bridge over

Anderson Creek (Br. No. 14C-0076)

Bridge Replacement - Highland Springs Road Bridge

over Highland Creek (Br. No. 14C-0085)

Install Striping - Countywide, various locations

Install pedestrian countdown heads and ADA push

buttons - 25 Intersections throught the City of Eureka

Approvals from Quarters 24 - 27 State Highway System Projects - Section 4(f)

Bridge Rehabilitation - Various Bridges in Humboldt

County

Bridge Rehabilitation - Various Bridges in Humboldt

County

Bridge Replacement - Ackley Road Bridge over

Manning Creek (Br. No. 14C-0083)

Pedestrian and Bike Path - Red Cap Road Bike and

Pedestrian Improvements

Bridge Related - Other - Develop Bridge Preventive

Maintenance Plan

Bridge Replacement - In Plumas County - Blarsden

Gragle Rd. @ Middle Fork Feather River 0.5 mi N of

SH 89 - Br. #09C0134

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

4

Page 6: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

RPSTPL-5903(044) 02 MOD 04/30/14

RPSTPL-5909(106) 02 PLU 05/02/14

SRTSL-5068(048) 02 SHA 05/13/14

BRLO-5918(076) 03 SUT 06/26/14

BRLO-5924(184) 03 SAC 05/12/14

BRLS-5925(126) 03 ED 06/25/14

CML-5163(032) 03 SUT 05/28/14

CML-6158(066) 03 PLA 04/14/14

CMLFSP15-

6158(067)03 PLA 05/22/14

HSIPL-5142(034) 03 BUT 04/08/14

HSIPL-5425(026) 03 BUT 06/11/14

HSIPL-5479(042) 03 SAC 06/09/14

HSIPL-5917(086) 03 NEV 04/14/14

HSIPL-5917(087) 03 NEV 04/23/14

HSIPL-5919(112) 03 PLA 04/14/14

HSIPL-5919(118) 03 PLA 06/03/14

HSIPL-5922(094) 03 YOL 04/18/14

RPSTPL-5062(018) 03 GLE 05/14/14

RPSTPL-5062(019) 03 GLE 05/14/14

Road Rehabilitation - from Cedarville to Fort Bidwell

on County Road 1: Surprise Valley Road.

Road Rehabilitation - Bucks Lake Road Pavement

Rehabilitiation (Snake Lake Road to Slate Creek

Road) Near Meadow Valley west of Quincy, on

Bucks Lake Road between Snake Lake Road adn

Slate Creek Road.

Pedestrian and Bike Path - On west side Bidwell

Road from Bonnyview Elem School south to N

Bonnyview Rd; then east on north side North

Bonnyview Rd to East Bonnyview Road.

Bridge Replacement - Pennington Rd at Sutter Butte

Canal bridge ~0.5 mile East Sheldon Rd

Replace existing 2-lane functionally obsolete bridge

with a new 2-lane bridge - Apple Rd over Fruit

Channel 0.65 miles southeast of Dillard Rd

Bridge Related - Long Term Mitigation - Green

Valley Road at Tennessee Creek Bridge

Pedestrian and Bike Path - Garden Hwy, from

Lincoln Rd to Winship Rd

Planning,Programming and Monitoring - Congestion

Management Program

Freeway Service Patrol - SR65 and I80 within Placer

County

New Signals - Oro Dam Blvd./Orange Ave./Acacia

Ave.

Upgrade Signals - 15 intersections throughout

Paradise

Signal Synchronization - Franklin Blvd. between Elk

Grove Blvd. and Big Horn Blvd.; Bruceville Rd.

between Elk Grove Blvd. and Big Horn Blvd.

New Signals - Brunswick Rd/Loma Rica Dr

Install striping and pavement markers - Various

locations throughout Nevada County

Install Pavement Raised/Reflective Markers -

Various locations throughout Placer County

Install High Friction Surface Treatment - 18 various

locations throughout Placer County (See Field

Review Form)

Install left-Turning Lanes - County Road 31/County

Road 95

Reconstruct roadway - Sacramento St from

Sycamore St to Wood St

Reconstruction of roadway, curb, gutter, and

sidewalk. - Butte St South from Willow St to Wood

St

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

5

Page 7: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

STPL-5046(040) 03 YOL 06/25/14

STPL-6085(059) 03 SAC 06/04/14

CML-5005(126) 04 SCL 04/22/14

CML-5934(173) 04 SF 05/07/14

CML-5937(200) 04 SCL 06/03/14

CML-6084(188) 04 MULT 06/05/14

CML-6429(008) 04 NAP 06/30/14

DEM06L-5933(122) 04 ALA 06/19/14

HPLUL-5273(024) 04 SM 05/29/14

HSIP-5005(135) 04 SCL 06/03/14

HSIPL-5177(031) 04 SM 06/06/14

HSIPL-5306(027) 04 SCL 06/03/14

IPSTPLE-6000(055) 04 MULT 06/02/14

NMTPL-5043(027) 04 MRN 05/21/14

RSTP-5034(023) 04 SCL 06/26/14

SR2SNI-5438(016) 04 SM 05/12/14

SRTSL-5005(124) 04 SCL 04/22/14

STPL-5114(017) 04 SON 06/05/14

STPL-5123(015) 04 SON 05/12/14

Pedestrian Walkway - Downtown Streetscape (Main

St)

Bicycle Related - Other - SACOG Region - Regional

Bicycle and Pedestrian Data Collection

Install low cost engineering enhancements to

improve safety along SRTS routes - 35 Schools in

San Jose.

Pedestrian Walkway - Vicinity of ER Taylor

Elementary School

Pedestrian Walkway - Non-Infrastructure Safe

Routes to School

Implement a pilot bikesharing program. - San Mateo

and Santa Clara Counties

Bike Path - NCTPA Napa Valley Vine Trail - Various

locations

Pedestrian and Bike Path - East Avenue from E. St.

to Camino Vosta

Upgrade Signals - Willow Rd between Middlefield

and Hamilton

Install Traffic signals; Construct sidewalk and raised

median. - On Ocala Ave: Daytona Dr to E Capitol

Expressway

Install Traffic Signals - Mission Rd./Evergreen Dr.

Install Traffic Signals.Signs, Pavement Markers -

Harriet Avenue (McCoy Ave to San Tomas Aquino

Rd)

Bicycle Related - Other - Capitol Corridor locations

between Roseville (Placer County) and San Jose

Bicycle Related - Other - Francisco Blvd. East from

Bellem to Grand.

Bike Path - Western Ronan Channels & Lions Creek

Safe Route to Schools - Fordham Bay Pulgas, Non

Infrastructure

Install sidewalk, curb/gutter, drainage modification

and new street lights - On Bucknall Rd Between

Mayfield Ave. to Woodglen Dr.

Road Rehabilitation - Napa Road from west of

Broadway Avenue to Jones Street

Reconstruct existing street: grind out existing

asphalt, recompact baserock, repave with HMA. -

Keating Avenue from North Main Street to Pitt

Avenue

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

6

Page 8: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

STPL-5127(028) 04 CC 05/12/14

STPL-5261(008) 04 SM 04/04/14

STPL-5314(010) 04 SCL 05/07/14

STPL-5322(055) 04 ALA 06/04/14

STPL-5350(020) 04 SM 05/12/14

STPL-6249(037) 04 SOL 05/19/14

BRLO-5943(054) 05 SBT 04/18/14

CASB12RP-

5391(013)05 SLO 04/07/14

ER-20E0(011) 05 SCR 06/03/14

HPLUL-6090(072) 05 SB 06/12/14

HRRRL-5951(150) 05 SB 04/28/14

HSIPL-5045(027) 05 MON 05/15/14

RPSTPLE-5359(018) 05 SLO 04/07/14

SRTSL-5080(029) 05 SB 05/15/14

BR-NBIL(523) 06 TUL 06/09/14

CML-5060(180) 06 FRE 05/29/14

CML-5060(216) 06 FRE 06/04/14

CML-5060(267) 06 FRE 06/16/14

CML-5109(209) 06 KER 04/01/14

Asphalt Concrete Overlay - Railroad Ave from north

of Linscheid Driver to south of State Rte 4

Road Reconstruction - Atherton Ave, Fair Oaks

Lane, Middlefield Rd.

Repair Failed AC pavement, Resurface Road,

reconstruct ADA curb Ramps, Repair sidewalk and

curbs, - Various Locations

Multi-Modal Improvements, Bicycle and Pedestrian

Improvements. - Capital Ave. - Fremont Blvd. to

State St., Fremont City Center

Pavement Rehabilitation - Linda Mar Blvd Blvd

between De Solo Dr and Adobe Dr

Priority Conservation Area (PCA) Program - Solano

County

Bridge Replacement - San Benito County Rocks

Road Bridge #43C0053 over Pinacate Rock Creek

Bike/Pedestrian Structure - Morro Bay from Hwy 1 to

Morro Rock

Emergency Opening and Restoration-Slipout - In the

Co of SCR on Felton-Empire Road (PM2.58) DAF#

DDM-SCRCO-005-0

Equipment Purchase - In Santa Barbara County

Pavement Markings: Install rumble strips and

flashing beacons - W. Betteravia Rd (Simas Rd.)

Between Black Rd and W. Main St

Upgrade Signals - Sanborn Road Signal

Improvements

PHASE 3: Grover Beach on West Grand Avenue

from the western city limits to 5th Street. Landscape

medians and parkways, install bike lanes, decorative

sidewalks, and crosswalks.

Replace Low Water Crossing / Br. No. 00L0057 -

Road 224 at Deer Creek

Interconnect Signals and Installation of signal

coordination - Willow Avenue from Ashlan to

International Avenue.

Safe Route to Schools - Infrastructure Project - In

the City of Lompoc various locations throughout the

City - Infrastructure Project

Install wireless networking cummunication

equipment, cotrollers, cameras and update signals -

West Avenue from Herndon to Olive Avenues

Install New Signals - Clinton and Valentine Avenues

Intersection

New Signals - Buena Vista Road At Harris Road &

Buena Vista Road from White to Panama Lanes

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

7

Page 9: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

CML-5143(027) 06 TUL 06/12/14

CML-5143(028) 06 TUL 06/12/14

CMLNI-5044(100) 06 TUL 05/06/14

CMLNI-5143(025) 06 TUL 04/24/14

CMLNI-5287(037) 06 KER 06/02/14

HSIPL-5060(274) 06 FRE 05/28/14

HSIPL-5060(275) 06 FRE 05/28/14

HSIPL-5060(276) 06 FRE 06/16/14

HSIPL-5060(277) 06 FRE 05/28/14

HSIPL-5060(282) 06 FRE 06/16/14

HSIPL-5109(211) 06 KER 05/03/14

HSIPL-5122(080) 06 TUL 04/28/14

HSIPL-5252(018) 06 FRE 05/22/14

HSIPL-5942(231) 06 FRE 04/28/14

RSTPL-5950(373) 06 KER 04/03/14

STPL-5044(102) 06 TUL 06/17/14

STPL-5060(244) 06 FRE 05/01/14

STPL-5060(254) 06 FRE 04/16/14

STPL-5060(262) 06 FRE 06/16/14

STPL-5224(020) 06 FRE 06/04/14

STPL-5291(021) 06 FRE 05/28/14

STPL-5301(015) 06 FRE 05/21/14

STPL-5370(024) 06 KER 04/24/14

STPL-5942(235) 06 FRE 05/27/14

Road Related - Shoulder Stabilization on Road 72

from Nebraska Avenue to Saginaw Avenue.

Road Related - Other / Shoulder Stabilization - West

Sierra Way from Rd 70 to Rd 72.

Equipment Purchase - Visalia

Equipment Purchase - Purchase One CNG Street

Sweeper.

Equipment Purchase - City of Wasco

Install Left Turn Phasing - McKinley and Palm

Avenues Intersection

Install left turn phasing - Cedar Avenue and Bulldog

Avenues Intersection

Install New Signals - Clinton and Vassar Avenues

Install Left turn phasing - Tulare and 'R' Streets

Intersection

New Signals - Shields and Weber Avenues

Intersection

Install pedestrian countdown signal heads - 60

Intersections throughout the City

Upgrade Signal to install protected left-turn phasing. -

Intersection of Putnam Street and D Street

Intersection Improvements and provideing LT turns

& RT Turns and Modifying Signal. - Intersection at

Manning Ave and Zediker Ave

Install New Signals,left turn pocket and road

widening - Grantland Ave and Shaw Ave

Asphalt Concrete Overlay - Elk hills road from

Skyline road to SR 58

Asphalt Concrete Overlay - North Avenue btwn.

Cedar and Maple Avenues

New Signals - SH99 NB Off-ramp at Ventura Street

Asphalt Concrete Overlay - Herndon Avenue

between Blackstone and West Avenues

Road Rehabilitation - Pavement resurfacing - 16th

St, O St, & Q St., City of Firebaugh

Roadway Widening, curb, gutter, sidewalk. - On

Vineland Ave from Kearny Blvd to Sunset Ave.

Road Reconstruction - Anchor Ave. from Adams

Ave. to Park Blvd.

Road Reconstruction - Campus Dr: Grapevine Dr to

approximately 800' North of Varsity Rd

Asphalt Concrete Overlay - Manning from 1.379

miles west of Lassen Alignment to Placer.

Road Rehabilitation - Visalia

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

8

Page 10: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

STPLE-5950(383) 06 KER 06/19/14

BHLS-5450(080) 07 LA 05/07/14

BPMPL-5953(679) 07 LA 04/09/14

CML-5006(647) 07 LA 06/04/14

CML-5026(054) 07 VEN 06/10/14

CML-5200(046) 07 LA 04/30/14

CML-5393(033) 07 VEN 06/05/14

CML-5952(171) 07 VEN 05/08/14

CML-5952(172) 07 VEN 06/04/14

CMLGNI-6155(086) 07 VEN 05/08/14

HPLUL-5455(016) 07 LA 05/08/14

HSIPL-5006(769) 07 LA 04/30/14

HSIPL-5006(773) 07 LA 04/16/14

HSIPL-5108(164) 07 LA 06/12/14

HSIPL-5403(022) 07 LA 06/06/14

Construct Class I Bike Path and pedestrian walkway.

- Tehachapi Cummings Valley Water District

Property : Highline Road to Valley Blvd.

PM000024 BRIDGE PREVENTIVE MAINTENANCE

PROGRAM - FIVE (5) VARIOUS BRIDGES IN THE

CITY OF SANTA CLARITA.

Bridge Preventative Maintenance Program - Various

Locations within Los Angeles County -Group 5 (18

Bridges)

Planning,Programming and Monitoring - Angels

Walk Crenshaw. To promote pedestrian activity

within the project limits with a guidebook and 15 on-

street information markers (historic stanchions) at

strategic locations.

Construction of bike path - Bike Path on property

along HWY 126

Burbank Channel Bikeway Regional Gap Closure -

Burbank Western Channel: Downtown Burbank

Metrolink-Alameda Ave, within the city limit

Signalize 4-way stop intersection of Dunnigan St.

and Arneill Rd. - Arneill Rd. from Las Posas Rd. to

Ponderosa Dr., Dunning St. from Mobil Ave. to

Bordeaux Ave.

Construction of ClassII Bike Lanes on both sides of

Las Posas Road. - Las Posas Road Bike lanes

Upgrade 3 berths with electrical shoreside power

units at wharf 1 - In the city of Port Hueneme on

ponoma St. 3 miles southeast of HWY 1

Rideshare activities within the County of ventura -

Within Ventura County

Grand Avenue Enchancement/Rehabilitation.

Beautification,Streetscape/Hardscape & Pedestrian

improvement - Grand Avenue

Enchancement/Rehabilitation.

Install 1 new & upgrade 7 existing traffic signal -

Corbin Ave./Roscoe Blvd.; Glenoaks Blvd./Hubbard

St.; Mason Ave./Roscoe Blvd.; Saticoy St./Winnetka

Ave.; Sepulveda Blvd./Vose St.;

Install new traffic signals - Pico Blvd./Wooster St.;

Pico Blvd./Bedford St.

Realign Intersection, Install Traffic Signal and Install

Bike Path - Intersection of Walnut Avenue and 20th

Street

Construct two right turns, modify traffic signal and

install pedestrian heads. - Avalon Blvd and Carson

Sreet Intersection

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

9

Page 11: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

HSIPL-5419(041) 07 LA 04/21/14

RPSTPLE-5064(080) 07 LA 05/02/14

RPSTPLE-5953(685) 07 LA 04/28/14

RPSTPLE-5953(686) 07 LA 04/24/14

SRTSL-5006(732) 07 LA 05/14/14

STPL-5006(774) 07 LA 06/12/14

STPL-5006(783) 07 LA 06/12/14

STPL-5064(077) 07 LA 05/19/14

STPL-5064(081) 07 LA 05/07/14

STPL-5315(013) 07 LA 06/09/14

STPL-5325(016) 07 LA 04/15/14

STPL-5334(047) 07 LA 04/22/14

STPL-5351(029) 07 LA 06/06/14

STPL-5405(081) 07 VEN 04/08/14

CML-6053(117) 08 SBD 06/19/14

CML-6053(118) 08 SBD 06/19/14

HSIPL-5188(020) 08 SBD 05/27/14

Modify Traffic signals; upgrade crosswalks; install

pedestrian countdown heads.pedestrian refuge -

Ave.I/10th St. West, Ave K/30th St. West

Install ped-scale street lights,trees,bus

benches,trash receptacles and bike racks - North

Fair Oaks Ave between North City Limit and Cedar

street in the City of Pasadena

Design & Construct class II bike lanes on Vermont

Ave - Vermont Ave-Manchester Bl to El Segundo Bl

Improve bicycle access to the Florence Avenue Blue

Line station. - Florence Metro Blue Line Station

Construct road diet with bike lanes, crosswalks, and

median refuge islands and bulb - The area

bordered/bounded by Martin Luther King Jr. Blvd.,

Hoover St., Vernon Ave., and Vermont Ave.

Asphalt Concrete Overlay - STP-L Force Account

Resurfacing Project XIII. Citywide resurfacing and

construction of ADA compliant access ramps

Road Rehabilitation, Force Account Resurfacing

Projec - Citywide, STP-L Force Account Resurfacing

Project XIV.

Install ped scale street lights, decorative

crosswalks, bus benches & trash receptacles on

street - East Colorado blvd between Hill ave and

Allen ave

Asphalt Concrete Overlay - Del Mar, Foothill, Lake,

Sierra Madre Villa.

Road Rehabilitation and other works - Del Amo Blvd:

Clark Aveenue to Downey Avenue

Road Rehabilitation - STUDEBAKER ROAD:

SOUTH ST TO ARTESIA BLVD

Road Rehabilitation - GARDENDALE ST:

GARFIELD AVE TO LAKEWOOD BLVD

Road Rehabilitation . - Whittier Blvd : Paramount

Blvd. to West City Limit

Widening the road to accommodate Northbound

Right Turn Lane. Construction and relocation of

curb/gutter - Madera Road From Simi Village Drive

To Los Angeles Avenue

Rideshare - Througout Mojave Desert within San

Bernardino County.

Rideshare - Within the South Coast Air Basin in San

Bernardino County

Upgrade Signals - Chino Ave at Ramona Ave.

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

10

Page 12: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

RPSTPLE-6054(074) 08 RIV 06/04/14

STPL-5430(032) 08 RIV 06/19/14

STPL-5486(002) 08 RIV 04/10/14

STPLER-5380(013) 08 SBD 05/01/14

BPMPL-5947(048) 09 MNO 06/06/14

CML-5385(053) 09 KER 06/06/14

CML-5399(022) 09 KER 04/22/14

RPSTPLE-5184(022) 09 KER 04/03/14

BPMP-5929(223) 10 SJ 05/19/14

BPMP-5929(224) 10 SJ 06/13/14

BPMP-5929(226) 10 SJ 04/15/14

BRLO-5926(031) 10 AMA 04/24/14

BRLS-5939(078) 10 MER 04/09/14

CML-5059(203) 10 STA 05/30/14

CML-5085(028) 10 MER 05/15/14

CML-5085(035) 10 MER 04/08/14

TEA - Other - Downtown Riverside and Pedley

Transit Station Improvements

Road rehabilitation - East Palm Canyon Drive from

Golf Club Drive to 550 feet west of Canyon Plaza

Drive and from Melrose Street to the east city limits

east of Date Palm Drive

Pedestrian and bike path - Riverwalk Trail in Mojave

Narrows Regional Park

Repair bridge railing and mitigate scour - Topaz

Lane over the Walker River, Br. No. 47C-0005

Signal Synchronization - On China Lake Blvd. from

Ridgecrest Blvd. to College Heights Blvd.

Park and ride facility - Northwest quadrant of the

intersection of California City Boulevard and Harvard

Avenue

Sidewalk, ADA-compliant curb ramps, pedestrian

lighting, and landscaping - East Tehachapi

Boulevard from Snyder Avenue to Dennison Road

Bridge Preventive Maintenance Program - Scour

Mitigation - Austin Road over North Fork of South

Little Johns Creek, Bridge 29C0259.

Bridge Preventive Maintenance Program - Scour

Mitigation - Stanley Road over Little Johns Creek,

Bridge 29C0112

Bridge Preventive Maintenance Program - Scour

Mitigation - Van Allen Road over South Little Johns

Creek, Bridge 29C0115

Replace existing 2-lane bridge with a standard t2-

lane bridge - Bunker Hill Rd @ Rancheria Creek, Br.

26C0043. In Amador County 0.6 miles north of

Amador City/School Street

Replace existing 2-lane timber bridge with a

standard 2-lane reinforced concrete bridge -

Dickenson Ferry Road over Bear Creek, Bridge

39C0095.

Rideshare - Stanislaus County

Bike Path - From Yosemite Ave to McKee Road

along Black Rascal Creek Corridor

Traffic Signal Synchronization and Traffic Operation

Center in the City of Merced. - Along G street From

16th St to Yosemite Ave and Along 16th St from R St

to G St. of the existing Traffic Signals and Develop a

Traffic Operation Center.

Road Rehabilitation - Schleisman Avenue pavement

Rehabilitation: Schleisman Ave from to Sumner Ave.

to W/O Harrison Ave.

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

11

Page 13: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

CML-5085(036) 10 MER 05/22/14

CML-5085(037) 10 MER 04/01/14

CML-5085(038) 10 MER 06/06/14

CML-5085(039) 10 MER 05/22/14

CML-5153(036) 10 STA 05/15/14

CML-5938(218) 10 STA 04/02/14

STPL-5059(170) 10 STA 04/02/14

STPL-5153(035) 10 STA 05/15/14

STPL-5929(268) 10 SJ 05/07/14

STPL-5929(269) 10 SJ 05/06/14

STPL-5938(216) 10 STA 05/16/14

STPL-5938(220) 10 STA 05/09/14

STPL-5938(221) 10 STA 05/09/14

HSIPL-5066(021) 11 SD 04/24/14

HSIPL-5211(030) 11 SD 04/16/14

HSIPL-5429(025) 11 SD 06/24/14

Asphalt Concrete Overlay - Phase G 1-Keyes

Rd(Hickman Rd to Hall Rd) 2- Keyes Rd& Sperry Rd

Intersection 3-Keyes Rd & Gratton Rd Intersection

50ft each direction 4- Fath Home Rd (Kaiser Rd to

West Main St)

Asphalt Concrete Overlay (Roadway Resurfacing

Phase I ) - 1-Emerald ave(Kansas ave to Woodland

ave)2-Rosemore ave(Kansas ave to SR132 3-Geer

rd( SR132 to Tuolumne river)4- Geer rd(Tuolumne

river to Hatch rd)5-Finch rd (Garner rd to Modest

Asphalt Concrete Overlay (roadway Resurfacing

Phase H ) - Rogers Rd. (SR 33 to Zacharias Rd).

Highland Avenue between Division Street and E 8th.

Street

Purchase and Install 3 Bike Shelters - 1) N Street

and 4th Street. 2) M Street across from Cornell

Court. 3) M Street and W 26th Street.

Purchase and Install 50 bike racks. - Main Street,

18th Street, and Canal Street

Sidewalk Infill on El Redondo Dr, Campass Pointe

Ave, Collins Dr, & R Street - Install sidewalk on El

Redondo Dr, Campass Pointe Ave, & R Street just

North of Yosemite Ave, and Collins Drive just North

of Olive Ave all within the city limits of Merced.

Sidewalk Infill on Carol Ave between HWY140 &

Motel Drive - Install sidewalk Infill on Carol Ave

between HWY140 & Motel Drive

Pedestrian Improvements - Yosemite Ave (H Street

to J Street), J Street (Yosemite to Sierra)

Upgrade signs - Various locations throughout the

City

Transit Related - Other(Stanislaus Co. Ridershare

Program) - Stanislaus County

Intersection Improvements on Oakdale Road from

Scenic Drive and extending approx. 1000 north -

Oakdale Road and Scenic Drive

Road Rehabilitation - South Yosemite Avenue - F

Street to Warnerville Road

Asphalt Concrete Overlay - Thornton Rd (Eight Mile

Rd. to De Vries Rd.)

Asphalt Concrete Overlay - Walnut Grove

Rd.(Sacramento Co. Line to Hope Bridge)

Upgrade Traffic Signals - 57 Intersections

throughout the City of El Cajon

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

12

Page 14: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

SRTS-5381(037) 11 SD 04/14/14

STPL-5169(042) 11 IMP 05/12/14

STPL-5174(024) 11 IMP 04/16/14

HSIPL-5073(073) 12 ORA 06/11/14

HSIPL-5073(075) 12 ORA 06/09/14

HSIPL-5073(076) 12 ORA 06/11/14

HSIPL-5181(177) 12 ORA 06/30/14

HSIPL-5181(178) 12 ORA 06/25/14

HSIPL-5312(094) 12 ORA 06/09/14

Federa Aid

Project NumberDistrict Project Description Type

Date

Signed

CASB12RP-

5391(013)05 SLO Bike/Pedestrian Structure De Minimis 04/07/14

STPLER-5380(013) 08 SBD

Pedestrian and bike paths -

Riverwalk Trail in Mojave

Narrows Regional Park

De Minimis 05/01/14

Federal Aid Project

NumberDistrict County Project Description

Date

Signed

ER-18D0(002) 05 SLO 03/27/2014

HSIPL-5007(064) 05 SB 01/07/2014

RPSTPLE-5423(028) 05 SLO 03/04/2014

BPMPL-5953(678) 07 LA 03/27/2014

HSIPL-5108(151) 07 LA 03/28/2014

ER-24M0(001) 09 INY 03/19/2014

County

Local Assistance Projects - Section 4(f)

Approvals from Quarters 24 - 27 Local Assistance Projects1

Safe Route to Schools - Borden/Richland Rd/Rose

Ranch

Install Curb & Gutter, Sidewalk, and - SR115/5th

Street at Grape Ave Intersection (North Side)

REF Project: STPL 5174(017) - SR115/5th Str.

(South Side)

Left turn channelization and signal phasing -

Intersection of Chapman Avenue and Hewes Street

Road Rehabilitation -Street Improvements

(reconditioning of pavement, curb, gutter, and

sidewalk.) - Adams Avenue from La Brucherie

Avenue to Lotus Drain

Emergency Opening and Restoration, PR-CON, PR-

CE

New Signals

Pedestrian and Bike Path between San Gabriel Rd

and Pismo Ave

Bridge Preventative Maintenance Program

Left turn channelization and signal phasing -

Intersection of Tustin Street and MayfairAvenue

Left turn channelization and signal phasing -

Intersection of Chapman Avenue and Esplanade

Street

Left-turn signal phasing and interconnect -

Intersections of Adams Avenue at Bushard Street

amd Magnolia Street at Yorktown Avenue

Left-turn signal phasing - Intersections of Gothard

Street at Talbert Avenue, Gothard Street at Heil

Avenue, and Springdale Street at McFadden Avenue

Roadway and Traffic Improvements

Emergency Opening

Raised landscaped median islands - Red Hill

Avenue from Bristol Street to McCormick Avenue

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

13

Page 15: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #28

April 1, 2014 - June 30, 2014Report Date: July 22, 2014

Federal Aid Project

NumberDistrict County Project Description Type

Date

Signed

None

2Erroneously omitted from previous reporting periods (January 1, 2013 - June 30, 2013 and July 1, 2013 - December 31, 2013)

Approvals Quarters 24 - 27 Local Assistance Projects - Section 4(f)

1Approval from Quarter 27 not included in Caltrans' quarterly report dated April 21, 2014; however, the approval falls within the current 6 month

reporting period as outlined under the NEPA Assignment MOU (Jan. 1, 2014 - June 30, 2014)

23 USC 326 Quarterly Report #28: April 1, 2014 - June 30, 2014

7/21/2014

14

Page 16: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

District-EA County Route Post MileDate

Signed

01-0A520_ HUM 299 R021.1/R0 03/14/14

01-0B370_ HUM 36 044.4/ 03/27/14

01-0B380_ HUM 96 004.1/ 03/26/14

01-0B460_ HUM 299 032.0/ 01/13/14

01-0B470_ MEN 1 035.7/ 03/26/14

01-0C350_ LAK 29 0.2/9.9 03/11/14

01-0C460_ HUM 299 / 01/06/14

01-36291_ MEN 101 9.2/ 01/31/14

01-45930_ MEN 101 064.7/ 01/13/14

02-3E730_ SIS 5 68.33 03/20/14

02-3E770_ TRI 299 036.9/053. 02/14/14

02-4E812_ VAR VAR / 01/15/14

03-0F370_ GLE 024.8/ 024.8/ 01/13/14

03-1F990_ BUT 32 006.0/ 02/04/14

03-2F290_ PLA 267 000.0/ 02/27/14

03-4F120_ SAC 5 12.9/13.1 01/24/14

03-4F130_ SAC VAR 0/0 02/21/14

03-4F340_ VAR 80 0/0 02/19/14

04-1A340_ SCL 9 3.6/11.4 03/21/14

04-1G830_ SM 280 0.3/27.1 03/24/14

04-1SS42_ ALA 680 20.2/20.2 01/10/14

04-1SS48_ SCL 87 4.8/4.8 01/17/14

04-2G830_ ALA 13009.1/009.

102/19/14

04-2L730_ MRN 580 2.5/3.0 01/15/14

04-3G110_ SON 116039.0/040.

002/10/14

04-3G650_ SOL 680 000.0/013. 03/10/14

04-3G750_ SM 92 2.5/2.5 01/27/14

04-3S900_ MRN 1 6.6 02/24/14

04-44500_ SCL 17 7.7/7.7 01/22/14

04-4S190_ SON 116 015.0/ 01/17/14

05-0S790_ SLO 101 R21.6 / 01/10/14

05-0T760_ MON 1 R77.6 03/25/14

05-1A390_ SB 101 84.1 / 90.9 01/24/14

05-1A730_ MON 101 49.8 / 55.3 01/08/14

05-1C120_ SB 101 0.0 / 12.7 02/28/14

05-1C130_ VAR 1 R0/0 02/19/14

06-0K810_ KER, KER 99, 178 26.7, R1.9 02/06/14

06-0Q860_ TUL 245 7.3/7.4 01/28/14

06-32551_ KIN 198 8.6/9.7 02/04/14

07-1W240_ LA 5 20.31/20.3 01/06/14

07-27540_ LA 1 Feb-00 01/09/14

07-2838U_ LA 2 Various 03/18/14

Pilarcitos Creek Wash Out - construct RSP and install

drainage

SON-116 Mays Canyon - Construct soldier pile wall

South San Luis Obispo Rehab

Pavement preservation (CAP M)

Roadside Safety Improvements

Oceano & Orcutt ADA (2 Locations)

Kern County Seismic Restoration

Woodlake Downtown Sidewalks Phase 4

19th Ave Landscape

Paint Elysian Viaduct Bridge

Project Description

Lupton Curve

Cobb Slide

Pipeline Slide

Willow Creek Wall

Satori Gulch Slip

LAK 29 CAPM

HUM 299 CAPM

Men 101 CAPM

Laytonville Pavement

Hilt Deck Replacement

West Weaverville CAPM

Phase 2 Workers Safety

3 Bridges Vertical Clearance Upgrades on Glenn 5.

BUT 32 ADA Compliance

PLA 267 Rehab. Pavement & Widen Shoulder

Beach Lake Bridge HFST

Sac Various Locations High Friction Surface

Treatment

Replace AC ditch with PCC, Kingvale & Soda Springs

Upgrade metal beam guardrails

Bridge Rail Replacement

DAF - Rock Slope Protection

Install midwest guardrail on MRN 580

Muir Beach 0 Construct Tie Back Wall

SCL-17 WIM

Aquajito Ramp Overlay

Asphalt Overlay

Pavement repair -- install permeable blanket, etc

Repair slope slide with soldier beam, tie back retaining

wall

Lakeville Hwy RSP

CAPM 680 - Rehabilitate pavement

Test Boring for GeoTech Study

Transp. Enhancement for Rtes 2, 134, 101 & 210

State Highway System Projects

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

1

Page 17: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

07-28730_ LA 210 39.8/41 03/18/14

07-28820_ LA 60 0.2/3.2 02/19/14

07-29450_ LA 5 R45.1/R55. 03/21/14

07-2W600_ LA 5 Various 02/27/14

07-30130_ LA 5 28.9/29.4 02/06/14

07-30450_ LA 57 R0.0/R4.45 03/17/14

07-3P790_ LA 1 41.7 01/17/14

07-3P830_ LA 213 3.2 01/17/14

07-3P840_ LA 405 23.3/24.66 02/03/14

07-3P850_ LA 105 7.7/8.9 01/13/14

07-3P870_ LA 105 R6.0/R6.5 01/31/14

07-3X710_ LA 60 007.7/008. 01/06/14

07-4X150_ LA 27 1.5 03/25/14

08-33630_ SBD 38 26.3/26.8 01/24/14

09-34090_ MNO 395 72.5 / 78.9 03/13/14

09-35990_ INY 127 35.8/41.8 02/04/14

10-0U520_ MER 59 12.8 / 13.5 01/02/14

10-0V620_ CAL 26 8.4 01/06/14

10-0V660_ STA 5 0.0 / 28.1 02/10/14

10-0W110_ SJ 4 R16.2 01/07/14

10-0X300_ MER 140 40.7 01/10/14

10-0Y690_ SJ 5 39/39.4 01/06/14

11-26041_ SD 8 R037.8/000 03/05/14

11-41540_ SD 816.0/R

030.501/29/14

11-41710_ IMP 86 27.571 02/05/14

11-41720_ IMP 86 25.571 02/05/14

12-0H890_ ORA 55 9.6/12 01/23/14

12-0N000_ ORA 405 15.4 01/23/14

12-0N140_ ORA 57 20.73/20.7 01/21/14

12-0N330_ ORA 5 12.8-21.3 03/19/14

12-0N420_ ORA 55 11.7 03/06/14

12-0N540_ ORA 405 8.44/ 02/20/14

12-0N600_ ORA 142 0.8/2.6 03/06/14

12-0N690_ ORA 22 4.6/7.36 03/13/14

District-EA County Route Post Mile Project Description TypeDate

Signed

NONE

District-EA County Route Post MileDate

Signed

05-0Q590_ SCR 9 1.7/23.9 12/04/13

05-1A640_ SB, SB 101, 135 82.1 / 90.9, 10/31/13

Enhance Striping and Upgrade Bridge End

Treatments

Hwy 9 Source Control

Approvals from Quarters 23 - 26 State Highway System Projects1

Santa Maria planting and rehab

Project Description

Drainage Improvements

Landscape Rehabilitation

I-5, Native Planting and Corridor Enhancements

Repair and Line Culverts

Pavement Rehabilitation

LA-60 Storm Water Source Control

Pavement Rehabilitation

Repair drainage benches on hillside

At Westmont/Delasonde Dr, redo signals & striping

Upgrade Irrigation & Hwy Planting

Replace diseased and dying shrubs

Highway Planting Restoration

Realign & Upgrade Ramps @ Paramont Blvd

Repair wire-mesh covered hillside & install anchored

cable net

SBd 38 Hathaway Bridge Deck Replacement

Overlay and shoulder backing

Vista del Lago Drive signalization

Stanislaus County CAPM

Bridgeport culverts

Mission Ave Left Turn Lane

SR4 - I5 Connector

Tri-Cities Flashing Beacons Safety Project

SR 57 On/Off Ramps at Lambert

Capital Preventive Maintenance

Overlay and restriping

Intersection Signalization

Upgrade curb ramps to ADA

Repair Existing Rock Blanket Upgrade Existing

Irrigation

Minor B project

San Joaquin HFST

Remove & repair damaged rdwy, slope embankment

Rte 142 CAPM PR

Install Irrigation Controllers

State Highway System Projects - Section 4(f)

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

2

Page 18: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

05-1C800_ SLO 101 37.7 10/14/13

05-1F480_ SB 101 47.38/47.8 10/17/13

05-1F610_ SB 101 14.19 12/20/13

11-28230_ SD 5 31.5/32.0 10/16/13

District-EA County Route Post Mile Project Description TypeDate

Signed

NONE

Federal Aid Project

NumberDistrict

Date

Signed

RPSTPLE-5021(019) 01 HUM 03/18/14

BRLO-5914(072) 01 LAK 03/05/14

BHLO-5914(069) 01 LAK 03/06/14

BRLO-5904(113) 01 HUM 03/07/14

ER-20A0(021) 01 HUM 01/15/14

ER-20A0(001) 01 HUM 01/16/14

ER-20A0(005) 01 HUM 01/16/14

ER-20A0(002) 01 HUM 01/16/14

RPSTPLE-5161(013) 02 TEH 03/25/14

BRLS-5908(070) 02 TEH 03/12/14

RSTPL-5902(073) 02 SIS 01/21/14

BRLS-5020(016) 02 SIS 02/11/14

HSIPL-5919(110) 03 PLA 02/21/14

HSIPL-5924(196) 03 SAC 02/27/14

Approvals from Quarters 23 - 26 State Highway System Projects - Section 4(f)

County

Bridge Replacement-Mathews Road Bridge over

Manning Creek (Br. No. 14C-0082)

Pedestrian and Bike Path-Rails with Trails from

Samoa Blvd to Foster Ave

Project Description

Reconfigure Route 101 Southbound Off-Ramp to

Route 58

Gaviota HFST

Castillo Street Pavers

Bridge Rehabilitation-Mockingbird Lane Bridge over

Robinson Creek (Br. No. 14C-0086)

Bridge Replacement-Big Rock Gulch Bridge on Red

Cap Road 04C0117

Restoration-Bell Springs Rd PM 4.85, in Humboldt

County. DAF # JLB-HUM-019-0

Restoration-Alderpoint Rd PM 4.9, in Humboldt

County. DAF# JLB-HUM-001-0

Restoration-Alderpoint Rd PM 6.6-6.7, in Humboldt

County. DAF # JLB-HUM-005-0

Restoration-Alderpoint Rd PM 5.5, in Humboldt

County. DAF # JLB-HUM-002-0

TEA - Other-In the City of Corning in the downtown

area. Downtown area preservation and

enhancements.

Bridge Replacement-Near Corning, HWY 99W @

Thomes Creek Br. No. (#8C-0110).

Road Rehabilitation-In Siskiyou County on Gazelle

Callahan Road from MP 16.7 to MP 25.0.

Bridge resurfacing-Fairlane Road Bridge #02C0149

0.3 miles south of Sharps Road

Pavement Markings-Various locations throughout the

county

Install sidewalks, curb ramps, curb and gutter-Fair

Oaks Blvd. between Day Dr. and Arden Way

Los Penasquitos Slope Stabilization Project

Local Assistance Projects

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

3

Page 19: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

CML-6236(012) 03 SAC 01/06/14

STPL-6085(055) 03 SAC 02/21/14

HSIP-5924(198) 03 SAC 02/21/14

CML-6085(056) 03 SAC 03/21/14

CML-5916(091) 03 YUB 03/17/14

RSTP-5919(120) 03 PLA 02/16/14

HSIPL-5002(165) 03 SAC 02/12/14

BPMP-5925(105) 03 ED 01/14/14

BRLO-5925(093) 03 ED 02/19/14

STPL-5042(056) 04 NAP 02/07/14

CML-5019(033) 04 SCL 02/07/14

CML-5005(125) 04 SCL 03/07/14

CML-6429(013) 04 NAP 01/10/14

STPL-6160(025) 04 MULT 01/14/14

SRTS-5038(024) 04 CC 01/02/14

CML-5124(030) 04 SCL 02/04/14

STP-6249(034) 04 SOL 02/24/14

Spare the Air Program/Phase II-Sacramento Federal

non-attainment area that includes all of Sacto and

Yolo Counties

Planning,Programming and Monitoring-Programming

and Monitoring (RSTP) Phase 2, 13/14 fy

Upgrade Signals-Ten (10) signalized intersections

throughout the city

Planning,Programming and Monitoring-Transportation

Demand Management (TDM) Phase 2 (13/14 fy)

Pedestrian and Bike Path-Olivehurst, on Powerline

Rd, from 15th Ave to 9th Ave

Asphalt Concrete Overlay-Placer County HMA

Overlay 2014

Upgrade Signals & Right turn lane-Mack Rd./Valley Hi

Dr. (La Mancha Way)

Replace elastomeric bearing pads; remove and

replace abutment backfill-Ice House Rd @ Jones Fork

Silver Creek 12.8 miles north of US-50

Replace existing functionally obsolete 2-lane bridge

with a new 2-lane bridge-Alder Dr over EID Canal at

Pony Express Trail

Priority Development Area (PDA) Infrastructure

Financing Strategy including Bike/Ped Facilities-City of

Napa

Pedestrian Walkway-Hughes Elementary, Don

Callejon School, Montaque Elementary, Bracher

Elementary, Bowers Elementary, Briarwood

Elementary, Cabrillo Middle, Scott Lane Elementary,

Sutter Elementary

Construct Pedestrian Safety and Transit Access

Including Installing 3 New Signalized Crosswalks-On

Jackson Ave between McKee Rd and Alum Rock Ave

Non-infrastructure project to continue the service

provided by SRTS project 6446(001)-Napa County

Freeway Service Patrol, Call Box and Safe Capital

Projects-Bay Area Freeways, Bridges

Bike Path-various location Cavallo Garrow road from

Wilbur Ave to Davidson Dr.

Non-infrastructure educational program-Education

Program in Mountain View public schools

NON-INFRASTRUCTURE: Priority Development

Areas (PDAs) and Priority Conservation Areas (PCAs)-

Various local agencies in Solano County

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

4

Page 20: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

CML-6249(035) 04 SOL 02/24/14

CML-6447(006) 04 SF 02/21/14

CML-5005(128) 04 SCL 01/10/14

CMLNI-5928(121) 04 CC 03/13/14

RSTPLNI-6072(017) 04 CC 02/10/14

HSIPL-5239(023) 04 CC 01/21/14

SRTSL-5043(034) 04 MRN 01/31/14

HSIPL-5005(121) 04 SCL 03/06/14

HSIPL-5005(123) 04 SCL 03/07/14

HSIP5-5213(048) 04 SCL 03/26/14

ER-22X0(001) 04 SM 02/19/14

CML-5350(019) 04 SM 03/13/14

STPL-5339(003) 04 SCL 02/06/14

RSTP-5239(024) 04 CC 01/21/14

STPL-5404(025) 04 CC 01/02/14

STPL-5050(041) 04 ALA 03/03/14

STPL-5032(028) 04 SOL 02/24/14

CML-5437(028) 04 CC 03/03/14

Solano Transit Ambassador Program - NON-

INFRASTRUCTURE-various locations throughout

Solano County

In City and County of San Francisco

SRTS, Encourage and promote mode shift to walking

and Biking.-San Jose Schools

Safe Route to Schools Non-Infrastructure-Conduct

Educational and outreach programs for 17 elementary

and middle schools in West CCCo

Planning,Programming and Monitoring-Contra Costa

County

AC overlay, ADA ramp replacement to complie with

FHWA-Arlington blvd and Brewster Dr. in city of El

Cerrito

Road Reconstruction-on Lindardo Street in San

Rafael

Install tubular markets, pavement treatment, and

payment markings for bicycle lanes-Park Ave between

Hedding St and South Market St, San Jose

Install tubular marker, Pavement treatment, and

pavement markings for bicycle lances-North First

Street between SR 237 and Brokaw Rd

Upgrade Traffic Signals-Saratoga Road/Fremont Ave

Restoration : Stich Pier/ lag retaining wall, rip rap

stabalize bank-Alpine Rd. 5500 Block to 3940' S. from

Willowbrook Dr. DAF#MEM-PTLV-001-0

Pavement Rehab and pedestrian sidewalk

improvements-Palmetto Ave fr. Bella Vista Ave to

Clarendon Rd.

Road Rehabilitation-Andrews St (Rose Ave to city

limit), Rose St (SR9 to Andrews St) and Daves Ave

(Poppy Ln to Carril Ct)

AC Overlay, striping, loop detectors, curb ramps, tree

planting - Arlington, Central, Colusa, Fairmont and

Manila

Road Rehabilitation-Mt. Diablo Blvd from Mtn View Dr.

to El Nido Ranch Rd.

Pavement Rehabilitation-Industrial Blvd. from Clawiter

Road to South of Depot Road

Road Rehabilitation-Walters Rd. between Petersen

Rd. and Bella Vista, Pintail Dr. between Walters Rd.

and Blackspur Dr.

Pedestrian and Bike Path-Windemere Parkway at

Holborn Way and Kearny Way; Harcourt Way at

Craiglee Dr; Talavera Dr at Cardona Circle; Alcosta

Blvd at Firestation #34 south driveway

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

5

Page 21: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

STPL-5019(032) 04 SCL 02/10/14

STPL-5318(028) 04 SCL 02/04/14

STPL-5437(027) 04 CC 01/21/14

STPL-5014(041) 04 ALA 01/21/14

STPL-5034(025) 04 SCL 03/10/14

HSIPL-5928(110) 04 CC 01/31/14

CML-5003(028) 04 SOL 03/10/14

STPL-5390(005) 04 SM 02/19/14

STPL-5029(033) 04 SM 02/19/14

STPL-5273(023) 04 SM 02/19/14

STPL-5003(027) 04 SOL 03/10/14

STPL-5303(015) 04 CC 02/26/14

HRRRL-5944(113) 05 MON 01/15/14

HRRRL-5944(114) 05 MON 01/15/14

HSIPL-5936(098) 05 SCR 03/24/14

BRLO-5936(089) 05 SCR 03/25/14

ER-20E0(012) 05 SCR 03/21/14

CML-5208(127) 06 FRE 02/12/14

Rehabilitate Roadways-Benton St (Kiely Blvd to

Blackfield Dr), Los Padres Blvd (El Camino Real to

Benton St), Lincoln St (El Camino Real to Homestead

Rd)

Rubberized Asphalt Overlay-Stevens Creek Blvd

(SR85 to De Anza Blvd)

Rehabilitate Roadway-San Ramon Valley Blvd.

between Bollinger Canyon Rd and Montevideo Dr

Rehab pavement and make minor imprvmnts to

strmwtr, bike/ped, and transit facilities-Pacific Avenue

from Main Street to Fourth Street and Otis Drive for

Park St to BroadwayStreet Resurfacing-Eigleberry st. between 1st to 10th

st.

Roadway Widening-Camino Tassajara Road- approx

1 mile S of Highland Rd. to .2 miles N of Windemere

Pkwy.

Pedestrian Walkway, Signal Modifications and Striping-

Robert Semple and Matthew Turner Elementary and

Benicia Middle School

Asphalt Concrete Overlay-Alpine Rd . , Corte Madera

Rd., Portola Rd., Westridge Dr.

Road Rehabilitation-Whipple Ave:E. Bayshore to

Veterans, El Camino Real to Upland, Veterans: 101

Off Ramp to Whipple

Road Rehabilitation-Hamilton, Olive, Woodland,

University Dr

Asphalt Concrete Overlay-East Second Street from

Military Rd to Old Lake Herman Rd

Road Rehabilitation-Emeric, San Pablo, & Market

Avenues

Road Related - Other-River Road Pavement

Delineation

Road Related - Other-Castroville Boulevard Pavement

Delineation

Guardrail & slope stabilization

-In the Co of SCR on Felton Empire Rd 0.8 mi E of

Empire Grade

Bridge Replacement 36C-0095-Old Country Rd Br at

Earl Crk-0.25 mile NW of SR9

Emergency Opening & Restoration- On Glenwood Dr

(PM 0.21), in the Co of Santa Cruz. DAF# DDM-

SCRCO-006-0

Upgrade Signals-Clovis Ave and Gettysburg Ave, City

of Clovis

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

6

Page 22: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

CML-5157(093) 06 MAD 02/19/14

CML-5258(031) 06 MAD 01/24/14

CML-5157(097) 06 MAD 03/14/14

STPLNI-6087(044) 06 KER 01/08/14

RPSTPLE-5109(205) 06 KER 02/03/14

RPSTPLE-5950(377) 06 KER 01/13/14

CML-5950(381) 06 KER 02/07/14

CMLNI-6087(045) 06 KER 02/13/14

CML-5109(206) 06 KER 03/26/14

CML-5170(052) 06 FRE 01/15/14

CML-5245(015) 06 FRE 03/14/14

CML-5109(208) 06 KER 02/11/14

CML-5060(223) 06 FRE 03/27/14

CML-5208(126) 06 FRE 02/20/14

CML-5950(380) 06 KER 01/08/14

STPL-5060(259) 06 FRE 03/05/14

CML-5950(371) 06 KER 01/23/14

CML-5060(239) 06 FRE 01/24/14

CML-5109(207) 06 KER 03/06/14

CML-5060(200) 06 FRE 02/07/14

CML-5060(201) 06 FRE 01/24/14

ER-18D2(007) 07 LA 03/05/14

Purchase of a PM-10 Certified Streetsweeper

Pedestrian Facilities-Sidewalks, Curb Ramps, Etc.-

Monterey Ave - 3rd to 13th Street

10 foot wide AC Bike Path-Laurel Street from Sunset

Avenue to Fresno River Trail

13/14 Regional Traffic Count Program-Kern County

Landscape-Mount Vernon Median Improvements from

Columbus Street to University Avenue

Pedestrian and Bike Path-Bernard street from Mt.

Vernon to Haley

New Signals-Merle Haggard Dr. and Airport Drive

13/14 Rideshare Program-Various locations

throughout Kern County

Interconnect Signals-Calloway from Olive to Norris,

and Jewetta from Hageman to Olive

Pedestrian Walkway(Construct sidewalk)-West Side

of 18th Ave from Lewis Street to Washingtion Street

and East Side of 18th Ave from Mariposa Street to

Kern Street

Pedestrian and Bike Path-Sports Park and 8th Street

New Signals-Jewetta Avenue at Reina Road

Install New Traffic Signals-Shields and Sunnyside

Avenues Intersection

New Signals-Ashlan Ave and Armstrong Ave, City of

CLovis

Road Rehabilitation-in Tehachapi: Roost Ave from

Bear Valley Rd to End limit

Pedestrian Trail resurfacing & Bicycle Bridge repairs-

Eaton Trail from 1/4 mile north of Audubon Drive to

Copper Avenue

Surfacing Unpaved Shoulders-Redrock-Randsburg

Road for SR 14 to Garlock Road

Install ITS Electronic Communications-Tulare St.

btwn. 'C' Street and Clovis Avenue

Signal Synchronization-H from California to White,

White from H to Monitor, White from H to Stine, and

Stine from White to Ming

Install fiber in existing conduit, cameras, upgrade

signal controllers, and impacted ramps-Friant Rd.

from Fresno St. to Nees Ave., along Nees Ave. to

Palm Ave., along Palm Ave. to Palmdon Ave.

Install wireless ITS, Cameras, cabinets, vaults, &

upgrade signal controllers-Shields Ave. from West

Ave. to Chestnut Ave.

Emergency Opening-East Fork Rd @ MM 0.29

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

7

Page 23: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

HSIPL-5378(037) 07 LA 03/20/14

STPL-5348(028) 07 LA 02/13/14

RPSTPLE-5006(762) 07 LA 03/07/14

ER-20W0(009) 07 LA 01/16/14

HSIPL-5413(015) 07 LA 01/14/14

CML-5006(608) 07 LA 02/04/14

CML-5006(609) 07 LA 03/17/14

HPLU-5064(058) 07 LA 01/10/14

CML-5953(622) 07 LA 02/14/14

STPL-5118(018) 07 LA 01/23/14

SRTSL-5131(019) 07 LA 03/03/14

STPL-5070(031) 07 LA 03/13/14

STPL-5108(163) 07 LA 01/23/14

HSIPL-5212(010) 07 LA 01/22/14

HSIPL-5392(052) 07 VEN 02/06/14

Install Protected left-turn phasing and non-motorized

detection-Ave S / 30th St. East

Pavement rehabilitation of segment of Flower Street

from East City Limit to Woodruff Avenue.

Watts streescape enhancements-Along 103rd St

corridor from Central Avenue to Grape St

Tree and debris removal by agency forces and

contractor to make the road accessible to the public-

Streets throughout San Marino, DAF # MKN-SMRO-

001-0

Install Median Barriers, Delineators, Replace Signs-

Palos Verdes Dr. East from Bronco Drive to Headland

Drive

Pedestrian Walkway-North Broadway between

Bernard Street and Solano Ave

Pedestrian Walkway-Exposition Blvd between

Crenshaw Blvd to Jefferson Blvd

Sound Wall-07/LA/210/22.5 - 24.6/Pasadena

Route 210 Fwy Between Arroyo Bl & Orange Groove

Bl.

Bike Trail-Emerald Lake bicycle trail from Duarte

Road to the San Gabriel River bicycle trail

Resurfacing of Streets: Hollenbeck, Cypress, et. al.-

Hollenbeck Avenue- Arrow Highway to San Dimas

Wash and Cypress - San Bernardino Rd to Northerly

Construct sidewalks, bulb-outs, curb ramps;install

crosswalks, ped countdown heads &signs-Various

locations throughout the city

Street Rehabilitation - Slurry Seal and Overlay Various

Locations Citywide-Street Rehabilitation - Slurry Seal

and Overlay Various Locations Citywide

Foothill Blvd.

Road Rehabilitation-Bixby Rd: Atlantic Ave / Orange

Ave

Install: Cross-walks, Ped. Count-down Heads,

Flashing Beacons and Signs; Construct Bulb-Outs-22

intersections

Modify median to extend northbound left turn pocket,

modify signage & pavement markings.-Westlake Blvd.

between Avenida de los Arboles and Lang Ranch

parkway.

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

8

Page 24: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

BHLO-5450(066) 07 LA 01/08/14

BHLS-5405(064) 07 VEN 01/15/14

BPMPL-5953(674) 07 LA 01/22/14

BPMPL-5953(673) 07 LA 01/21/14

SRTS-5449(027) 08 SBD 01/15/14

SRTS-5449(026) 08 SBD 01/15/14

STPL-5956(232) 08 RIV 02/05/14

STPL-5384(018) 08 RIV 02/10/14

SRTSL-5439(028) 09 MNO 03/28/14

HSIPL-5385(051) 09 KER 02/04/14

HSIPL-5385(049) 09 KER 02/07/14

HSIPL-5385(052) 09 KER 02/04/14

CML-5385(046) 09 KER 01/22/14

CML-5184(021) 09 KER 02/18/14

STPL-5385(047) 09 KER 02/07/14

CML-5938(217) 10 STA 03/17/14

CML-6308(014) 10 MER 02/11/14

CML-6089(062) 10 STA 03/25/14

STPL-6089(063) 10 STA 03/25/14

CML-5279(006) 10 MER 03/17/14

Bridge Rehabilitation- On Lost Canyon Rd from 130 Ft

to 240 Ft west of the Intersection of Lost Canyon Rd

and Sand Canyon Dr. State Bridge No. 53c1024

Bridge Widening-Cochran Street over Las Llajas

Creek, .4 Mile E/O Tapo Street. Brd #52c-0115

NULL-Various Locations within Los Angeles County -

Group 3

Bridge Related - Other-Various Locations within Los

Angeles County- Group 2

Construct sidewalk,curb,gutter, ramps, in pavement

crosswalk lights, flashing beacons-9th St. between

Cunningham St. and Palm Ave.; Church

Ave./Norwood St.

Construct sidewalk,curb,gutter, ramps, in pavement

crosswalk lights, flashing beacons-McKinley St.

between 9th St. and Base Line; Base Line/Valaria Dr.

Regional Rideshare Program-StanCOG area

Road Rehabilitation-62nd Street Pavement Rehab

from Jackson Street to Harrison Street

NULL

Pedestrian and bike path-Along the north side of

Meridian Boulevard from the end of the multi-use path

near Joaquin Road to Sierra Park Road

Upgrade signals-Seven intersections throughout the

City of Ridgecrest

New signals and signal interconnect, ADA-compliant

ramps, curb, and gutter-Intersection of China Lake

Boulevard and Bowman Road

Upgrade traffic signs and pavement markings-Twelve

intersections throughout the City of Ridgecrest

Pave dirt road-South Sunland Drive from East

Bowman Road to East Upjohn Avenue

Cross gutter removal and subsurface drainage

improvements-Intersection of Curry Street and Valley

Boulevard

Road rehabilitation-South China Lake Boulevard from

Bowman Road to Upjohn Avenue

Equipment Purchase-Stanislaus County

Public Outreach and Marketing

Planning,Programming and Monitoring-StanCOG area

Purchase One Tier 4 loader-City of Dos Palos

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

9

Page 25: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

CASB12-6190(026) 10 STA 02/19/14

CML-5165(073) 10 STA 02/24/14

HSIPL-5008(128) 10 SJ 02/10/14

CML-5059(190) 10 STA 03/17/14

CML-5059(185) 10 STA 02/11/14

CML-5254(017) 10 MER 01/23/14

HSIPL-5938(197) 10 STA 01/23/14

STPL-5255(049) 10 STA 03/12/14

STPL-5192(038) 10 SJ 02/07/14

STPL-5165(076) 10 STA 02/05/14

STPL-5255(050) 10 STA 03/18/14

STPL-5165(074) 10 STA 01/23/14

CML-5059(197) 10 STA 03/26/14

BRLOZ-5938(156) 10 STA 01/23/14

FSP14-6066(118) 11 SD 02/18/14

Road Rehabilitation-Geer Rd. - Monte Vista Ave. to

Taylor Rd.

Road Rehabilitation ( Widening existing pavement and

overlay )-Morrill Rd. (Jackson to Roselle Avenue)

Freeway Service Patrol-San Diego Association of

Governments

Install New Traffic Signals-At the intersections of: 1)

Prescott Rd & Mt. Vernon Dr, 2) Floyd Ave & Milbrook

Ave, 3)Roselle Ave & Belharbour

Construct/ Install pedestrian Improvements around

Elem. School in City of Atwater-1. "Olive Ave" east of

city limit to Herman St 2. "Marguerite St" From South

of Olive Ave to North of Mitchell Ave.3 "Willow St"

North of Olive Ave to north of Mitchell Ave

Realign roadway, widen shoulders, re-surface and re-

stripe area to conform to new pavement.-About 1250

feet north and south of the northern intersection of

Central Ave. & E. Taylor Rd.

Asphalt Concrete Overlay-Central Ave ( California to

Kentucky Ave)

Rubberized Asphalt Concrete overlay. Pavement

repair, signing & striping, traffic signal loop rep-Tracy

Blvd. from Clove Road to Larch Road and

MacArthur Drive from Grant Line Road to North of I-

205.

Miscellaneous - Other-Silvertip Campground,

Adjacent Highway 4 in Bear Valley, Stanislaus

National Forest

Install Traffic signal, striping, accessibility ramps-

Intersection of Christoffersen Pkwy and Fosberg Rd.

Miscellaneous - Other (Modify Traffic Signal).-On

Harding Way at El Dorado and Center Street Dorado

St

Upgrade Signals - install detector loops, pedestrian

push buttons, and indications for ADA stndards.-

Intersection of: 9th & B St., 7th & G St., 7th & H St.

and 7th & I St.

Road Rehabilitation-Hawkeye Ave. from Del's Lane to

Olive Ave.

Install Bus Turnout-Dale Road (south of Veneman

Ave. and North of Standiford Ave.)

Deck restrainers; Enlarge/modify footings; Retrofit

columns.-Pete Miller Road over Delta-Mendota Canal,

Bridge 38C0202

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

10

Page 26: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

CML-5243(013) 11 IMP 03/04/14

HSIPL-5381(035) 11 SD 02/13/14

HSIPL-5957(116) 11 SD 02/24/14

CML-5181(179) 12 ORA 03/12/14

HSIPL-5955(086) 12 ORA 03/04/14

CML-5229(015) 12 ORA 02/27/14

Federa Aid

Project NumberDistrict Project Description Type

Date

Signed

RPSTPLE-5021(019) 01 HUM Pedestrian and Bike Path De minimis 03/18/14

ER-22X0(001) 04 SM

Restoration : Stich Pier/ lag

retaining wall, rip rap

stabalize bank

De minimis 02/19/14

BRLOZ-5938(156) 10 STA

Deck restrainers;

Enlarge/modify footings;

Retrofit columns.

De minimis 01/23/14

Federal Aid Project

NumberDistrict County Project Description

Date

Signed

BRLO-5922(074) 03 YOL 09/26/13

VPPLNI-6072(016) 04 CC 12/10/13

BPMPL-5080(027) 05 SB 11/15/13

BPMP-5942(219) 06 FRE 10/14/13

BRLO-5946(110) 06 TUL 11/13/13

CML-5109(187) 06 KER 01/30/13

RSTPL-5950(372) 06 KER 12/23/13

STPCML-5227(045) 06 KER 05/07/13

STPCML-5227(046) 06 KER 05/22/13

STPL-5146(012) 06 FRE 05/16/13

CML-5160(024) 10 MER 01/25/13

STPL-6089(060) 10 STA 04/11/13

Federal Aid Project

NumberDistrict County Project Description Type

Date

Signed

Traffic signal & lighting system

Road Reconstruction

purchase 2- new tier 4-powered title 23 Backhoes to

replace older -Diesel Backhoes

Planning and Monitoring Activities

Roadway resurfacing and shoulder paving

Shoulder paving, road rehabilitation

Approvals Quarters 23 - 26 Local Assistance Projects - Section 4(f)1

Approvals from Quarters 23 - 26 Local Assistance Projects1

County

Westminster Ave. Bicycle Lane from Seal Beach Blvd.

to Bolsa Chica Rd.

Replace existing functionally obsolete 2 lane bridge

with a new 2 lane bridge

I-80 Real Time Rideshare

Bridge Related - Other

Local Assistance Projects - Section 4(f)

Road Rehabilitation & Reconstruction with pedestrian

improvements.-North International Avenue from Delta

St. to Main St.

Signs-Various locations in the City of San Marcos

Install center-line rumble strips-Mission Rd, Olive Hill

Rd, El Nopal, Reche Rd, and Old Hwy 395

2 - bicycle signs, 4 - sharrows, & 28 - bike racks-Lake

St. from Pecan Ave. to Orange Ave. & Downtown

Main St. Area

Gilbert St. from Katella Ave. to Ball Rd.

Bridge Preventative Maintenance for various locations

Replace Bridge

Asphalt Concrete Overlay

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

11

Page 27: 23 USC 326 Categorical Exclusions Six Month Report … USC 326 Categorical Exclusions Six Month Report to FHWA January 1, 2014 – June 30, 2014 Summary This report has been prepared

23 USC 326 Categorical Exclusions

Quarterly Report #27

January 1, 2014 - March 31, 2014Report date: April 21, 2014

RPSTPLE-5924(191) 03 SAC

New signal, signal

modifications, CGSW,

drainage, bike lanes

De minimis 04/24/2013

1Erroneously omitted from previous reporting periods (January 1 - June 30, 2013 and July 1, 2013 - December 31, 2013)

23 USC 326 Quarterly Report #27: January 1, 2014 - March 31, 2014

4/21/2014

12