22 July 2009 LAND USE MANAGEMENT (LUM) MODULE MAINTENANCE AND EXPANSION OF THE RATES BASE

Upload: jasper-booker

Post on 31-Dec-2015

22 views

Category:

Documents


3 download

DESCRIPTION

LAND USE MANAGEMENT (LUM) MODULE MAINTENANCE AND EXPANSION OF THE RATES BASE. 22 July 2009. Introduction. The Rates Base Project. LUM as part of the project. High Level overview but with some detail. Land Use and Development application process - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 22 July 2009

22 July 2009

LAND USE MANAGEMENT (LUM) MODULE

MAINTENANCE AND EXPANSION OF THE RATES BASE

Page 2: 22 July 2009

Introduction• The Rates Base Project

• Land Use and Development application process (Acceptance / Control over Fees, Scrutinize, Evaluation and Approval) is accommodated in one electronic process with tracking and reporting

• LUM as part of the project

• Involvement of role players in the LUM process

• High Level overview but with some detail

Page 3: 22 July 2009

Purpose of Presentation

PREPARATION FOR IMPLEMENTATION OF THE LUM MODULE

ILLUSTRATE BENEFITS OF LUM AND OTHER MODULES

Page 4: 22 July 2009

HIGH LEVEL VIEW OF THE DEVELOPMENT PROCESS

PROPERTYVALUATION

DEMOLITIONMODULE

BUILDINGCONTROLMODULE

LANDUSE

MODULE

LAWENFORCEMENT

MODULE

WATER

REFUSEREMOVAL

BILLINGSYSTEM

ELECTRICITY

Page 5: 22 July 2009

Requirements and Sub Systems

One Source of data

Monitor & Control over processes

Interface / Integrate :

Step 1 Step 2 Step 3 Step 4Process :

Monitor : Events

Control : Assignments

GIS, Deeds, Zoning etc.

Page 6: 22 July 2009

Easy & Immediate access to Complaints

Instant notifications on progress

Self administration (Client)

As much data as possibleSecure system

Requirements and Sub Systems

Step 1 Step 2 Step 3 Step 4Process :

Notifications

StatusReports / Letters Drop down lists

Document / Scan & Upload

Client Employees

Page 7: 22 July 2009

How Does It Work

Processes For : LEM , BCM & LUM

Workflow Enterprise Service Bus (ESB)

GIS

Deeds

Events

Land Notifications Assignments

Escalations

Page 8: 22 July 2009
Page 9: 22 July 2009
Page 10: 22 July 2009
Page 11: 22 July 2009
Page 12: 22 July 2009
Page 13: 22 July 2009
Page 14: 22 July 2009
Page 15: 22 July 2009

Capture Consent Use Application

Page 16: 22 July 2009

Capture Building ApplicationCapture Consent Use Application

Page 17: 22 July 2009

Capture Building ApplicationCapture Consent Use Application

Page 18: 22 July 2009

Capture Building ApplicationCapture Consent Use Application

Page 19: 22 July 2009
Page 20: 22 July 2009
Page 21: 22 July 2009
Page 22: 22 July 2009
Page 23: 22 July 2009
Page 24: 22 July 2009

System takes control of the application by means of assignments to employees responsible for the next process and notifications to all interested parties.

Page 25: 22 July 2009
Page 26: 22 July 2009
Page 27: 22 July 2009
Page 28: 22 July 2009
Page 29: 22 July 2009

Once a document

/ photo has been

attached you can view or

print it any time

Page 30: 22 July 2009

System assigns the application to the Department head who must now assign role players to see this application through.

Page 31: 22 July 2009

System assigns each role player a ‘scrutinize’ assignment, as well as ‘Legal Dept.’

Page 32: 22 July 2009

Each Role player will have to perform his/her scrutinize.

NB; ALL DETAIL IS AVAILABLE FOR VIEWING

Page 33: 22 July 2009

Checklist per Role player / Dept.

Page 34: 22 July 2009

System monitors each ‘scrutinize’ before continuing with the application process, which is the Requesting of Comments

Page 35: 22 July 2009

System notifies each Department that comments have been requested.

Page 36: 22 July 2009

Multiple Comments may be captured.

Page 37: 22 July 2009

The Application may be held until all comments received, or may continue with evaluation (User’s Option)

Page 38: 22 July 2009

The Evaluation must be Authorised.

Page 39: 22 July 2009
Page 40: 22 July 2009

System validates various data captured. (Objections, Negative Comments )

Selection here determines the

route of the application.

Page 41: 22 July 2009

Opposed Route – The system guides through compiling the CPC report (Ex letters) and Authorising the CPC report.

Page 42: 22 July 2009

Opposed Route – The system guides Setting Committee Hearing dates, Capturing Outcomes, and Re-schedules hearings.

Page 43: 22 July 2009

The Un-Opposed route

The system guides the user through the compiling of the “Approval Letter” as opposed to the “CPC Report”

The Capturing of the Outcome Routine follows.

Page 44: 22 July 2009

The last step is to Capture the Outcome, which is done by selecting a Status.

Page 45: 22 July 2009

Depending on the application type the system guides the application through to;

Draft Scheme Process

Publish (promulgation)

Issuing of Regulation 38, 82, 101.

Page 46: 22 July 2009

The System Controls;

Objections - Withdrawn, Active and Late.

Appeals – Including hearings and outcomes.

Comments Management – Withdrawn, Negative, and Conditions.

Advertisements (Newspapers) and Placards

Applications withdrawn, Abandoned, and Re-evaluation.

Page 47: 22 July 2009

Benefits•Management Reports

•Positive Financial Implications (Rates Base)

•Management of Land Use Process. •Accountability / Responsibility•Integrated Processes LULAM and RSP Office Functions•Data Integrity

Page 48: 22 July 2009