AAE 450 Spring 2008 1
Alan Schwing3/6/08
PMCost and Catastrophic Failure Analysis
![Page 2: 21 Schwing Alan PM - Purdue University](https://reader034.vdocuments.us/reader034/viewer/2022042421/626118d255bb396ad3600a54/html5/thumbnails/2.jpg)
AAE 450 Spring 2008 2
Cost Analysis for ‘Current Designs’
! 200g & 5kg cases may be over-designed
– DNC is still working on following trajectories
PM
Payload DeltaV Nom. Perigee Nom. Eccentricity Total Cost *200 g 10730 [m/s] 677.39 [km] 0.0055 $3,590,5801 kg 9500 [m/s] 406.39 [km] 0.0054 $3,160,3285 kg 11313 [m/s] 773.14 [km] 0.0025 $4,661,869
*Does not include gondola costs (~$3000)
Thanks to Avionics, Balta, Childers, Lattibeaudiere, Ling, Morris, Shoemaker, and Wilcox
![Page 3: 21 Schwing Alan PM - Purdue University](https://reader034.vdocuments.us/reader034/viewer/2022042421/626118d255bb396ad3600a54/html5/thumbnails/3.jpg)
AAE 450 Spring 2008 3
Catastrophic Risk Analysis
! Risk Analysis based on historical studies– Most conservative values were used
– Failure rates applied to each stage
– Hybrid uses both liquid and solid failure rates
PM
Thanks to Bluestone and Waite
Item Failures+
Successes+
Failure Rate Success Rate
Stage 1 Liquid Propellant 1 208 9,792 2.08% 97.92%
Solid Propellants 1 144 9,856 1.44% 98.56%
Stage 2 Solid Propellants 1 144 9,856 1.44% 98.56%
Stage 3 Solid Propellants 1 144 9,856 1.44% 98.56%
Overall Stage or Payload Separation 2 23 9,977 0.23% 99.77%
Fairing Separation 2 28 9,972 0.28% 99.72%
Electrical 2 43 9,957 0.43% 99.57%
Avionics 2 43 9,957 0.43% 99.57%
Total 775 9,225 7.51% 92.49%+ Based on 10,000 launches
![Page 4: 21 Schwing Alan PM - Purdue University](https://reader034.vdocuments.us/reader034/viewer/2022042421/626118d255bb396ad3600a54/html5/thumbnails/4.jpg)
AAE 450 Spring 2008 4
References1) Chang, I-Shih., Tomei, Edmardo Joe., “Solid Rocket
Failures in World Space Launches.” AIAA Paper 2005-3793, Joint Propulsion Conference and Exhibit, 41st,Tuscon, Az, July, 10-13, 2005.
2) Futron Corporation, Bethesda, MD. “Design ReliabilityComparison for SpaceX Falcon Vehicles.” November2004
PM
![Page 5: 21 Schwing Alan PM - Purdue University](https://reader034.vdocuments.us/reader034/viewer/2022042421/626118d255bb396ad3600a54/html5/thumbnails/5.jpg)
Payload: 200 g 115%
Stage 1 Stage 2 Stage 3 TotalPropulsion
PropellantFuel / Ox $1,834 $2,833 $186 $4,853Tubing $700 - - $700
Pressurant $24 - - $24Engine $679,720 $263,690 $79,930 $1,023,340LITVC $400 $400 - $800Balloon
Helium $74,905 - - $74,905Material $13,384 - - $13,384Gondola - - $0
Ground Costs $0Personel $42,000 - - $42,000Handling $2,000 $8,000 $8,000 $18,000
Structures$1,372,500 $780,100 $122,800 $2,275,400
$2,760 $930 $65 $3,755$19,603 $9,860 $8,956 $38,419
Welding $2,489 $1,344 $512Riveting $214 $116 $44Other $16,900 $8,400 $8,400
AvionicsWiring $8,000 - - $8,000
Material $500 - -Installation $7,500 - -
CPU - $10,000 - $10,000IMU - $15,000 - $15,000Sensors $8,000 - - $8,000Battery - $10,000 - $10,000Range Safety - $20,000 - $20,000Ground Tracking - $24,000 - $24,000
Total $3,590,580
Manufacturing
Cost Worksheet
TanksMaterial
![Page 6: 21 Schwing Alan PM - Purdue University](https://reader034.vdocuments.us/reader034/viewer/2022042421/626118d255bb396ad3600a54/html5/thumbnails/6.jpg)
Payload: 1 kg 125%
Stage 1 Stage 2 Stage 3 TotalPropulsion
PropellantFuel / Ox $1,188 $1,680 $225 $3,093Tubing $589 - - $589
Pressurant $38 - - $38Engine $634,090 $209,930 $86,860 $930,880LITVC $400 $400 - $800Balloon
Helium $53,213 - - $53,213Material $9,200 - - $9,200Gondola - - $0
Ground Costs $0Personel $42,000 - - $42,000Handling $2,000 $8,000 $8,000 $18,000
Structures$1,188,600 $633,100 $149,800 $1,971,500
$1,853 $560 $78 $2,490$14,952 $9,580 $8,992 $33,525
Welding $2,166 $1,087 $545Riveting $186 $94 $47Other $12,600 $8,400 $8,400
AvionicsWiring $8,000 - - $8,000
Material $500 - -Installation $7,500 - -
CPU - $10,000 - $10,000IMU - $15,000 - $15,000Sensors $8,000 - - $8,000Battery - $10,000 - $10,000Range Safety - $20,000 - $20,000Ground Tracking - $24,000 - $24,000
Total $3,160,328
TanksMaterialManufacturing
Cost Worksheet
![Page 7: 21 Schwing Alan PM - Purdue University](https://reader034.vdocuments.us/reader034/viewer/2022042421/626118d255bb396ad3600a54/html5/thumbnails/7.jpg)
Payload: 5 kg 125%
Stage 1 Stage 2 Stage 3 TotalPropulsion
PropellantFuel / Ox $5,171 $5,047 $192 $10,410Tubing $1,002 - - $1,002
Pressurant $166 - - $166Engine $1,138,700 $339,700 $80,900 $1,559,300LITVC $400 $400 - $800Balloon
Helium $152,320 - - $0Material $31,577 - - $0Gondola - - $0
Ground Costs $0Personel $42,000 - - $42,000Handling $2,000 $8,000 $8,000 $18,000
Structures$1,808,600 $943,500 $127,000 $2,879,100
$6,036 $1,692 $67 $7,795$29,123 $10,212 $8,961 $48,296
Welding $3,612 $1,668 $517Riveting $311 $144 $45Other $25,200 $8,400 $8,400
AvionicsWiring $8,000 - - $8,000
Material $500 - -Installation $7,500 - -
CPU - $10,000 - $10,000IMU - $15,000 - $15,000Sensors $8,000 - - $8,000Battery - $10,000 - $10,000Range Safety - $20,000 - $20,000Ground Tracking - $24,000 - $24,000
Total $4,661,869
Cost Worksheet
TanksMaterialManufacturing