SALES REFERENCE LIST
for
Shipbuilding Equipment
-. Hull Shop Equipment-. Shiplift & Transfer system-. Shipyard Consulting
MTi Co., Ltd.
1/6
#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, KoreaTel : +82-70-7817-1775 Fax: +82-303-3130-1775E-mail : [email protected] http://www.mti21.com
No. BuyerSupplied equipment
Q’TYSupplied
yearRemark
Name of Project Name of equipment
1 Hanjin Shipyard Ship transfer system
Ship Transfer system: 20,000ton-. Hyd’ transfer car / 200ton-. 18 x500ton-idle car-. 22 x 500ton-self moving car
1 lot 2002/2
2Samsung Heavy
IndustriesPanel Fabrication Line Skid conveyor / 1500ton 6 set 2002/7
3Daewoo
Shipbuilding (3D shop)
Panel Fabrication LineHyd ‘ Transport car / 800tonLongi welding M/C / 24 pole
2 set1 set
2003/5
4Samsung Heavy
Industries (new factory)
Panel Fabrication Line
Hyd’ Transport car / 400tonChain conveyor / 1200tonIdle rollerSelf drive Winch / 10tonLongi fit-up M/CSwivel rollerUp-down roller
2 sets4 sets1 lot1 lot6 set1 set1 lot1 lot
2004/4
5
Hyundai Samho Heavy Industries(Mokpo, Hanla
Gr.)
Panel Fabrication Line
Hyd’ Transport car / 400ton/200tonPlate fit-up M/CChain conveyorLongi fit-up M/CLongi welding M/C/24poleIdle rollerSwivel rollerSelf driveWorking beamWinch / 10ton
3 sets1 set3 sets1 set1 set1 lot1 lot1 lot1 lot
6 sets
200411
2/6
#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, KoreaTel : +82-70-7817-1775 Fax: +82-303-3130-1775E-mail : [email protected] http://www.mti21.com
No.
BuyerSupplied equipment
Q’TYSupplied
yearRemark
Name of Project Name of equipment
6 STX Shipbuilding Panel Fabrication Line
Up down idle rollerWorking tableChain conveyorPlate fit-up M/CSelf driveIdle rollerLongi welding M/C /16poleBlock lifter / 400tonWinch / 5tonPin jig
2 lot2 lot
4 sets2 sets2 lot2 lot
2 sets2 sets4 sets1 lot
2005/3
7Hyundai
Shipbuilding(new factory)
Panel Fabrication Line
Chain conveyorIdle rollerSelf driveSwivel rollerUp-down roller
6 sets1 lot1 lot11 lot1 lot
2006/2
8Hyundai Mipo
DockyardPanel Fabrication Line
Chain conveyorIdle rollerSelf driveSwivel rollerT-bar Fabrication line
2 sets1 lot1 lot1 lot1 lot
2007/4
9Daewoo
ShipbuildingPanel Fabrication Line
Turn over M/CT-bar Fabrication line
1 set1 set
2007/5
3/6
#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, KoreaTel : +82-70-7817-1775 Fax: +82-303-3130-1775E-mail : [email protected] http://www.mti21.com
No. BuyerSupplied equipment
Q’TYSupplied
yearRemark
Name of Project Name of equipment
10Dung Quat ShipyardVietnam
New shipyard Consulting & Supply of Hull shop
equipment
Consulting of new shipyard engineering & planning
- Annual 2,500K DWT- Ship size: 170K~318K DWT- Dry dock
Supply of Hull shop equipment-. Panel & Block Fabrication Line- 4 bays-. Curved Block Fabrication Equipment- 2 bays-. T-bar Fabrication Line- 2 bays-. Sub assembly welding gantry, etc
1 Lot 2007/12
11 Mokpo ShipyardSupplying of Ship transfer
& Launching system
Ship transfer and launching system- Ship size: 45K dwt- Ship transfer system: 36 x 500ton- Floating dock: 22,000 ton
1 Lot 2008/1
12STX (Dalian)
Heavy Industry Co., Ltd.
Panel & Block Fabrication Lines
Panel & Block Fabrication Line: 30W x 482L m - 4 BayT-bar fabrication line – 2 baySub assembly line and welding gantry full set
4 Lines 2008/3
13Pella Shipyard
RussiaShipyard revamping
Shipyard reconstruction (7K DWG)- Shipyard layout- Ship Transfer system- Slipway Launching system
1 Lot 2008/5
4/6
#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, KoreaTel : +82-70-7817-1775 Fax: +82-303-3130-1775E-mail : [email protected] http://www.mti21.com
No. BuyerSupplied equipment
Q’TYSupplied
yearRemark
Name of Project Name of equipment
14Estaleiro Manu
ShipyardBrazil
Shipyard consulting
Consulting of new shipyard engineering & planning - Production capacity: 5 ships/year- Ship size: 45K B/C- Dry dock: 120W x 360L m- Annual steel throughput: 50,050 ton/year- Steel stock area: 30 x 160 – 3bay- Hull shop: 40 x 380 – 4bay- Piping/Machine shop/Ware house: 30 x 160
– 3bay- Shot blast/Paint shop: 50 x 190- Outfitting area: 100 x 250- PE area: 120 x 170 + 50 x 360- Offshore module area: 130 x 300- Quay: 400 + 870
Supply of Hull shop equipment – full line
1 Lot 2008/6
15HHIC, Subic
Shipyard,Philippines
Panel & Block Fabrication Lines
28W x 400L, m – 4bay 1 Lot 2008/12
16
STX (Dalian) Marine
Engineering Co., Ltd.
Panel & Block Fabrication Lines
Curved Block Fabrication line: 30W x 482L, m - 2 BayPanel Joining Line, 280 m – 1 Line
3 Lines 2009/3
5/6
#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, KoreaTel : +82-70-7817-1775 Fax: +82-303-3130-1775E-mail : [email protected] http://www.mti21.com
No. BuyerSupplied equipment
Q’TYSupplied
yearRemark
Name of Project Name of equipment
17C& Heavy
Industrial Co., Ltd. Panel & Block Fabrication
LinesFull line assembly x 1 Bay 1 Line 2009/9
18SPP Shipbuilding
Co.Floating dock & Ship
transfer system
Ship transfer system: 60 x 500tonFloating dock: 35,000 tonMooring devices, Trestles, etc
1 Set each 2009/10
19Oceana Shipyard,
BrazilShiplift and Transfer
system
Shiplift Ass’y:- Lifting capacity: 9800 ton (350 ton x 28)- Size: 30W x 100L x 11 Draft, m- 6 x ground birth
Transfer car: 9600 ton (400ton x 24)Traverse car: 55Kw x 2 with gear box
1 Lot 2012/07
20Turkmenbashi
ShipyardTurkmenistan
Shipyard consulting & supplying of shiplift and
transfer system
Consulting of new shipyard engineering & planning- Annual steel throughput: 24K ton- Ship size: 10K B/CShiplift: 120L x 25W x 8,000tonShip transfer system: 18 x 500ton
1 Lot 2012/03~Under progress
21Umm Qasr Shipyard,
Iraq
New shipyard consulting & supplying of shiplift and
transfer system
Consulting of new shipyard engineering & planning- Annual steel throughput: 20K ton- Ship size: 20K B/C- New ship and repair ship
Supplying of Shiplift and transfer system:- Shiplift: 120L x 25W x 8,000ton- Ship transfer system: 18 x 500ton
1 Lot 2012/10~Under progress