highlighted · 2021. 1. 20. · sh cergas saujana sh nti jalan kapar sh nti sle east. hsse bulletin...

4
FATALITIES LOST TIME RESTRICTED WORK MEDICAL TREATMENT ZOOM IN HIGHLIGHTED 55,821 LTI FREE MANHOUR HEALTH * SAFETY * SECURITY * ENVIRONMENT SH NTI JALAN KAPAR : MANUAL LIFT AWARENESS ENOTEK ENGINEERING SDN BHD CUMULATIVE LFI SHARING NOV 2020 INTERNAL ISO 9001 & 45001 AUDIT BOOTS ON GROUND @ NORTHERN REGION SITE ENOTEK HSSE AUDIT FINDINGS DATA NOVEMBER 2020 DOCUMENTATION 12 GAPS POOR ISOLATION 7 GAPS HOUSEKEEPING 6 GAPS INTERNAL ISO 9001 & 45001 AUDIT SH NTI SLE EAST : PPE AWARENESS BRIEFING WAH NATIONWIDE STAND DOWN : NOV 2020 MONTHLY HSSE INDEX PERFORMANCE – NOVEMBER 2020 MANHOUR NMPI NO OF AUDIT 11,759 60 6 SAFETY CORNER : LION IN THE CAGE NOV 2020 ISSUANCE BOOTS ON GROUND : NORTHERN REGION SITE

Upload: others

Post on 31-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • FATALITIES

    LOST TIME

    RESTRICTED WORK

    MEDICAL TREATMENT

    ZOOM IN HIGHLIGHTED

    55,821 LTI – FREE MANHOUR

    H E A L T H * S A F E T Y * S E C U R I T Y * E N V I R O N M E N T

    SH NTI JALAN KAPAR : MANUAL LIFT AWARENESS

    ENOTEK ENGINEERING SDN BHD

    CUMULATIVE LFI SHARING NOV 2020

    INTERNAL ISO 9001 & 45001 AUDIT

    BOOTS ON GROUND @ NORTHERN REGION SITE

    ENOTEK HSSE AUDIT FINDINGS DATA

    NOVEMBER 2020

    DOCUMENTATION 12 GAPS

    POOR ISOLATION 7 GAPS

    HOUSEKEEPING 6 GAPS

    INTERNAL ISO 9001 & 45001 AUDIT

    SH NTI SLE EAST : PPE AWARENESS BRIEFING

    WAH NATIONWIDE STAND DOWN : NOV 2020

    MONTHLY HSSE INDEX PERFORMANCE – NOVEMBER 2020

    MANHOUR NMPI NO OF AUDIT

    11,759 60 6

    SAFETY CORNER : LION IN THE CAGE

    NOV 2020 ISSUANCE

    BOOTS ON GROUND : NORTHERN REGION SITE

  • HSSE BULLETIN NOVEMBER 2020

    WAH NATIONWIDE STAND DOWN : NOVEMBER 2020

    INTERNAL ISO 9001 & 45001 AUDIT

    Being an ISO registered company offers numerous

    benefits, but implementing and maintaining the ISO

    management system is no small task. Reflecting to

    this Enotek ISO team had conducted internal ISO

    9001 & 45001audit at Enotek HQ Office which is a

    periodically self-check mechanism to verifies that all

    clause and standard meets all requirements. At the

    end of session, issue and gap capture had been raise

    by auditor to all for improvement.

    Internal ISO 9001 & 45001 Audit Session

    On November 2020, Enotek has

    conducted WAH Nationwide Stand

    Down. Reflect to this, Enotek

    management committed to deliver

    the challenges, action, outcome

    and learning from the non-

    compliance to all frontliner to

    ensure the issue are not present at

    Enotek site. This stand down

    sharing had been conducted at

    Enotek Engineering HQ Office,

    Shell Cergas Saujana, Shell NTI

    Jalan Kapar and Shell NTI SLE

    East. At the end of the stand down,

    all frontliner are aware and

    understand on all the delivered

    messages.

    ENOTEK ENGINEERING HQ

    SH CERGAS SAUJANA

    SH NTI JALAN KAPAR

    SH NTI SLE EAST

  • HSSE BULLETIN NOVEMBER 2020

    ENOTEK ENGINEERING SDN BHD

    BOOTS ON GROUND @ ENOTEK NORTHERN REGION SITE

    SHELL SLE EAST : PPE AWARENESS BRIEFING

    On 5 November 2020, SH NTI SLE EAST was conduct training

    for PPE Awareness on Morning TBT session. Focusing to

    encourages frontliner on how to wear a proper PPE and show

    the correct way and method of PPE usage. The importance

    message to deliver is to aware frontliner the usage of PPE is to

    protect employees when engineering and administrative

    controls are not feasible to reduce the risks to acceptable

    levels. At the end of the briefing, all frontliner understand on

    PPE usage and on how to use PPE correctly.

    On November 2020, there

    was Boots On Ground -

    Management audit which been

    conducted at Shell Cergas Saujana

    and Shell Jalan Besar Jitra by

    Enotek HSSE manager, Mr Bahtiar

    and Enotek Program Manager, Mr

    Syahir. The audit were start with PH

    briefing session to all about the site

    information, emergency response

    plan, work activities and related

    hazard of the day. The audit

    session are to capture any gaps

    from execution work related to

    HSSE, QAQC and Project term. At

    the end of the audit, all the finding,

    was discussed to ensure project run

    smoothly without any delay or

    incident.

    SH CERGAS SAUJANASH JALAN BESAR JITRA

    DON’T DO

    DON’T DO

    Improper wearing face shield

    Unrecognized safety glasses

  • HSSE BULLETIN NOVEMBER 2020

    ENOTEK ENGINEERING SDN BHD

    SH NTI JALAN KAPAR : MANUAL LIFTING AWARENESS

    SAFETY CORNER : LION IN THE CAGE

    On 21 November 2020,

    Manual Lifting Awareness briefing

    were been conducted at site Shell

    NTI Jalan Kapar. The main point

    to deliver the awareness sharing

    are to educate worker on how to

    manually lift an object/material in

    safe way without interrupting

    health risk. The session were

    been shown sequently to all

    frontliner with clear demonstration

    and practical session. At the end

    of the session, all frontliner

    understand and aware on risk of

    manual lifting which been

    endanger to back and waist.

    Eliminate the hazard (lion)

    Substitute the hazard (lion) with cat

    Isolate the hazard (lion) into cage

    Place warning sign at the hazard

    Hazard: Lion

    Use PPE only when

    expose to hazard

    SCENARIO : FEEDING TO LION AT ZOO BY WORKER

    LE

    SS

    EF

    FE

    CT

    IVE