2020 & 2024 final lcr study results stockton area · 2020 & 2024 final lcr study results...
TRANSCRIPT
ISO PublicISO Public
2020 & 2024 Final LCR Study Results
Stockton Area
Ebrahim Rahimi
Lead Regional Transmission Engineer
Stakeholder Call
April 10, 2019
ISO Public
Stockton Area Transmission System & LCR Subareas
Slide 2
Legend:Bellota230 kV
Weber 60 kV
WeberLCR Sub-Area60 kV
Weber 230 kV
Tesla230 kV
230 kV
Stockton A 60 kV Santa Fe
60 kV
Santa Fe 60 kV
Hazelton JCT 60 kV
Legend: Rio Oso230 kV
Lockeford 60 kV
LockefordLCR Sub-Area
Lodi60 kV
Industrial60 kV
60 kV
Colony60 kV
Victor60 kV
Lockeford 230 kV
Bellota230 kV
230 kV
Wodberg60 kV
Manteca 115 kV
Legend: 115 kV
Kasson 115 kV
Vierra 115 kV
Schulte
Tesla 115 kV
Tesla-Bellota LCR Sub-Area in 2020
Tracy
Salado 115 kV
Ingram Creek 115 kV
G
GWF Tracy Units
Lammers
Melones 115 kV
Bellota 115 kV
Riverbank115 kV
Tulloch115 kV
Stanislaus115 kV
Ripon 115 kV
Riverbank JCT
115 kV
Bellota 230 kV
ISO Public
New major transmission projects
Slide 3
Project Name Expected ISD
Year 2020
Ripon 115 kV Line Apr-19
Stockton A – Weber #1 & #2 60 kV lines Reconductor May-19
Year 2024
Vierra 115 kV Looping Project Feb-23
ISO Public
Power plant changes
Additions:
• No new resource addition
Retirements:
• No new retirements
Slide 4
ISO Public
Stockton Area Overall: Load and Resources
Slide 5
Load (MW) 2020 2024 Generation (MW) 2020 2024
Gross Load 1,270 1,360 Market/ Net Seller/ Battery 497 543
AAEE -16 -52 Solar 1 1
Behind the meter DG 0 0 Wind 0 0
Net Load 1,254 1,308 Muni 137 137
Transmission Losses 22 21 QF 18 18
Pumps 0 0Future preferred resource
and energy storage0 0
Load + Losses +
Pumps1,275 1,329 Total Qualifying Capacity 653 699
ISO Public
Lockeford Sub Area : Requirements
Slide 6
Year Category Limiting Facility ContingencyLCR (MW)
(Deficiency)
2020 BLockeford – Lodi #2 60
kV
Lockeford-Industrial 60 kV
line and Loci CT48 (24)
2020 CLockeford – Lodi #3 60
kV
Lockeford-Industrial and
Lockeford – Lodi #2 60 kV
lines
97 (73)
2024 BLockeford – Lodi #2 60
kV
Lockeford-Industrial 60 kV
line and Loci CT53 (29)
2024 CLockeford – Lodi #3 60
kV
Lockeford-Industrial and
Lockeford – Lodi #2 60 kV
lines
102 (78)
Lockeford
Lodi
Industrial
New HopeColony
Victor
Lodi Jct
Lockeford-Lodi #1
Lockeford-Industrial
Lockeford-Lodi #2
Lockeford-Lodi #3
Legend: 60 kV
X
X
XContingency
Overload
ISO Public
Lockeford Subarea: Load Profiles
Slide 7
ISO Public
Weber Sub Area : Requirements
Slide 8
Year Category Limiting Facility ContingencyLCR (MW)
(Deficiency)
2020 B None NoneNo
requirement
2020 C Stockton A-Weber #3Stockton A-Weber #1 and #2
60 kV lines26
2024 B None NoneNo
requirement
2024 C Stockton A-Weber #3Stockton A-Weber #1 and #2
60 kV lines26
Legend:
Bellota230 kV
Weber 60 kV
WeberLCR Sub-Area
60 kV
230 kV
Stockton A 60 kV
Santa Fe 60 kV
Hazelton JCT 60 kV
XContingency
Overload
X X
ISO Public
Weber Subarea: Load Profiles
Slide 9
ISO Public
Stanislaus Sub Area : Requirements
Slide 10
Year Category Limiting Facility ContingencyLCR (MW)
(Deficiency)
2020 BManteca - Ripon 115 kV
Line
Bellota-Riverbank-Melones 115
kV line and Stanislaus PH unit179
2020 C Same as Category B
2024 BManteca - Ripon 115 kV
Line
Bellota-Riverbank-Melones 115
kV line and Stanislaus PH unit185
2024 C Same as Category B
Manteca 115 kV
Melones 115 kV
Bellota 115 kV
Riverbank115 kV
Tulloch115 kV
Stanislaus115 kV
Ripon 115 kV
Bellota – Riverbank – Melones SW STABellota – Riverbank
Riverbank JCT SW STA - Menteca
Stanislaus – Melones SW STA - Manteca
Stanislaus – Manteca #2
Riverbank JCT
115 kVX
Legend: 115 kV
XContingency
Overload
ISO Public
Stanislaus Subarea: Flow Profiles
Slide 11
ISO PublicSlide 12
Year Category Limiting Facility ContingencyLCR (MW)
(Deficiency)
2020 BTesla – Tracy
115 kV line
Schulte – Lammers 115 kV and GWF
Tracy #3 unit
639
(60 NQC/ 61 Peak)
2020 CSchulte-Kasson-
Manteca 115 kV lines
Schulte – Lammers and
Tesla – Tracy 115 kV lines
1,117
(538 NQC/ 539 Peak)
2024 BTesla – Vierra
115 kV line
Tesla – Tracy 115 kV and GWF Tracy
#3 unit364
2024 C (1)Tesla – Tracy 115 kV
line
Schulte – Lammers and
Tesla – Vierra 115 kV lines
756
(131 NQC/ 132 Peak)
2024 C (2)Tesla – Vierra 115 kV
line
Schulte – Lammers and
Schulte-Kasson-Manteca 115 kV lines
552
(256 NQC/ 257 Peak)
2024 C (total) N/A N/A881
(256 NQC/ 257 Peak)
Tesla - Bellota Sub Area : Requirements
Manteca 115 kV
Legend: 115 kV
Kasson 115 kV
Vierra 115 kV
Schulte
Tesla 115 kV
Tesla-Bellota LCR Sub-Area in 2020
Tracy
Salado 115 kV
Ingram Creek 115 kV
G
GWF Tracy Units
LammersX
X
Melones 115 kV
Bellota 115 kV
Riverbank115 kV
Tulloch115 kV
Stanislaus115 kV
Ripon 115 kV
Riverbank JCT
115 kV
Bellota 230 kV
Tesla-Bellota LCR Sub-Area in 2024
Manteca 115 kV
Kasson 115 kVSchulte
Tesla 115 kV
Tracy
Salado 115 kV
Ingram Creek 115 kV
G
GWF Tracy Units
Lammers
Vierra 115 kVThermal
Energy
Legend: 115 kV
X
X
Melones 115 kV
Bellota 115 kV
Riverbank115 kV
Tulloch115 kV
Stanislaus115 kV
Ripon 115 kV
Riverbank JCT
115 kV
Bellota 230 kV
ISO Public
Tesla-Bellota Subarea: Flow Profiles
Slide 13
ISO Public Slide 14
Subarea2019 2020
Load LCR Load LCR
Lockeford 184 83 (59) 190 97 (73)
Weber 229 21 238 26
Stanislaus N/A 152 N/A 179
Tesla - Bellota 761 673 (291) 848
1,117
(538 NQC/
539 Peak)
Total 1,174 777 (350) 1,275
1,241
(612 NQC/
613 Peak)
LCR increases is mostly due to load increase. The load has a much higher
effectiveness factor than the most effective resource.
N/A=Flow-through area. No defined load pocket.
Changes from 2019 to 2020
ISO Public
Changes from 2023 to 2024
Slide 15
LCR increases is mostly due to load increase. The load has a much higher
effectiveness factor than the most effective resource.
N/A=Flow-through area. No defined load pocket.
Subarea2023 2024
Load LCR Load LCR
Lockeford 198 103 (79) 193 102 (78)
Weber 219 21 238 26
Stanislaus N/A 147 N/A 185
Tesla - Bellota 809 319 (78) 899
881
(256 NQC/
257 Peak)
Total 1,226 439 (157) 1,330
1,009
(334 NQC/
335 Peak)
ISO Public
Stockton Area Total LCR Need
Slide 16
2020 LCR NeedExisting Generation
Capacity Needed (MW)Deficiency (MW) Total MW Need
Category B (Single) 603(84 NQC/
85 Peak)687
Category C (Multiple) 629(612 NQC/
613 Peak)1,241
2024 LCR NeedExisting Generation
Capacity Needed (MW)Deficiency (MW) Total MW Need
Category B (Single) 414 29 443
Category C (Multiple) 675(334 NQC/
335 Peak)1,009